Evaluating Utility Costs Savings and Resilience: A Case Study in Port Arthur, Texas

This study evaluates the techno-economic feasibility of integrating solar photovoltaics (PV), battery energy storage systems (BESS), and generators to enhance both cost savings and resilience in critical community facilities in Port Arthur, Texas. Using NREL's REopt model, we analyze four facilities: the Golden Triangle Empowerment Center (GTEC), Lamar State College (LSC), Port Arthur Independent School District (PAISD), and Port Arthur Transit (PAT). A key aspect of the analysis is the incorporation of the Value of Lost Load (VoLL) and microgrid upgrade costs to assess the hidden value of resilience during grid outages. While standalone PV scenarios show moderate cost reductions and a 10-15% decrease in CO2 emissions, the inclusion of resilience measures with BESS and generators significantly increases system costs. However, the hidden value of resilience - quantified through avoided outage costs - leads to a substantial improvement in financial outcomes, resulting in positive Net Present Value (NPV) at many sites. The study demonstrates that resilient solar and storage systems offer both economic and resilience benefits, particularly for underserved communities, by balancing energy savings and enhanced operational continuity during outages.

14 SOLAR ENERGY↗

Value of Nuclear Energy to the Reliability of the North American Power System: Results for Western and Eastern Interconnections

This report documents the fulfillment of a milestone for the United States (U.S.) Department of Energy Office of Nuclear Energy Light Water Reactor Sustainability Program: completing a baseline study of regional impact of nuclear power plants and hydrogen production in maintaining grid services and power quality. Models have been comprehensively demonstrated for the Western Interconnection, or Western Electric Coordinating Council area, and in the Eastern Interconnection for scenarios representative of past extreme events (e.g., drought and heat waves). Understanding the impact on the reliability of the bulk electric system of any reduction in generation capacity from nuclear power, for any reason, is the motivation of this work. Factors that might lead to the premature or unplanned closure of nuclear plants, extended outages, or repurposing of nuclear power include: • Aging infrastructure: Many nuclear power plants in the U.S. are nearing the end of their designed operating lives. Upgrading aging infrastructure can be expensive, and some utilities may choose to retire plants rather than invest in costly upgrades. • Low wholesale electricity prices: The deregulation of the electricity market in many states has led to increased competition and driven down wholesale electricity prices, causing nuclear power operators to seek other revenue sources for their heat and power such as clean hydrogen production. • Renewables growth: The rapid growth of renewable energy sources like solar and wind power is posing a challenge to traditional generation sources like nuclear. While many see renewables as a key part of the clean energy transition, their intermittent nature requires additional grid solutions for reliable power supply. • The potential for regulatory decisions to be in conflict: In its 2021 rulemaking, EPA rule (86 FR 880), the Environmental Protection Agency (EPA) set a compliance date for the ban on processing and distribution in commerce of Decabromodiphenyl Ether (DecaBDE). Since DecaBDE is in many components, particularly wiring, of nuclear power plants which are deemed safety-related or important to safety, three plants would not have been able to restart after their 2023 spring outages, and numerous others would have faced issues in the near future. Fortunately, in this case, the EPA provided relief to the nuclear energy industry. The report provides a summary of the significant role nuclear energy plays in the United States’ power generation mix, supplying around 20% of the nation’s electricity generation, spread across 28 U.S. states. Nuclear power is reliable, mostly unaffected by weather and seasonal changes, and provides a consistent source of baseload power. In terms of capacity, nuclear power plants account for as much as 26% of balancing area power generation capacity. Nuclear power also provides a substantial contribution (e.g., 10% of the inertia in the Eastern Interconnection) of the synchronous spinning mass/inertia that buffers the rate at which frequency changes when a load and generation imbalance occurs (e.g., a large plant trips or a load is suddenly shed due to a transmission outage). This contribution is critical for maintaining grid stability during sudden changes in load or generation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Application of Mobile Energy Storage for Enhancing Power Grid Resilience: A Review

Natural disasters can lead to large-scale power outages, affecting critical infrastructure and causing social and economic damages. These events are exacerbated by climate change, which increases their frequency and magnitude. Improving power grid resilience can help mitigate the damages caused by these events. Mobile energy storage systems, classified as truck-mounted or towable battery storage systems, have recently been considered to enhance distribution grid resilience by providing localized support to critical loads during an outage. Compared to stationary batteries and other energy storage systems, their mobility provides operational flexibility to support geographically dispersed loads across an outage area. This paper provides a comprehensive and critical review of academic literature on mobile energy storage for power system resilience enhancement. As mobile energy storage is often coupled with mobile emergency generators or electric buses, those technologies are also considered in the review. Allocation of these resources for power grid resilience enhancement requires modeling of both the transportation system constraints and the power grid operational constraints. These aspects are discussed, along with a discussion on the cost–benefit analysis of mobile energy resources. The paper concludes by presenting research gaps, associated challenges, and potential future directions to address these challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Series FACTS Devices for Increasing Resiliency in Severe Weather Conditions

Severe weather conditions are low-probability, high-impact events that affect grid operations. The majority of power outages are caused by severe weather conditions. Grid resiliency to weather events can be enhanced by decreasing the reliance on its affected sections. One way to do this is to reduce the power flow through lines vulnerable to severe weather. If a line is disconnected, its initial power flow is distributed through the neighbor lines, which may cause congestion in the grid. FACTS devices can be used to control the power flow of lines that have a higher chance of power outages. Most previous works do not consider weather events in power flow control. In this work, a linearized optimal power flow (OPF)–based algorithm is developed to minimize the real power flow of vulnerable lines considering the thermal limits of lines to prevent infeasible solutions; the simulation is fast, making it suitable for large-scale systems. The proposed optimization problem is presented as a mixed-integer linear program (MILP), making it capable of using short-term load forecasting due to its high solution speed. The proposed optimization problem considers multiple lines with different outage probabilities and the uncertainties of the weather forecast. Moreover, it estimates the power reduction in vulnerable lines due to changes in the series FACTS devices. The performance of the proposed optimization problem is tested on IEEE 14-, 30-, and 118-bus systems for several scenarios. The results are validated with the AC power flow results from MATPOWER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Resilient Integrated Resource Planning Framework for Transmission Systems: Analysis and Optimization

This article presents a resilient Integrated Resource Planning (IRP) framework designed for transmission systems, with a specific focus on analyzing and optimizing responses to High-Impact Low-Probability (HILP) events. The framework aims to improve the resilience of transmission networks in the face of extreme events by prioritizing the assessment of events with significant consequences. Unlike traditional reliability-based planning methods that average the impact of various outage durations, this work adopts a metric based on the proximity of outage lines to generators to select HILP events. The system’s baseline resilience is evaluated by calculating load curtailment in different parts of the network resulting from HILP outage events. The transmission network is represented as an undirected graph. Graph-theoretic techniques are used to identify islands with or without generators, potentially forming segmented grids or microgrids. This article introduces Expected Load Curtailment (ELC) as a metric to quantify the system’s resilience. The framework allows for the re-evaluation of system resilience by integrating additional generating resources to achieve desired resilience levels. Optimization is performed in the re-evaluation stage to determine the optimal placement of distributed energy resources (DERs) for enhancing resilience, i.e., minimizing ELC. Case studies on the IEEE 24-bus system illustrate the effectiveness of the proposed framework. In the broader context, this resilient IRP framework aligns with energy sustainability goals by promoting robust and resilient transmission networks, as the optimal placement of DERs for resilience enhancement not only strengthens the system’s ability to withstand and recover from disruptions but also contributes to efficient resource utilization, advancing the overarching goal of energy sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

97 MATHEMATICS AND COMPUTING↗

Characterization of high level nuclear waste glass samples following extended melter idling

The Savannah River Site Defense Waste Processing Facility (DWPF) melter was recently idled with glass remaining in the melt pool and riser for approximately three months. This situation presented a unique opportunity to collect and analyze glass samples since outages of this duration are uncommon. The objective of this study was to obtain insight into the potential for crystal formation in the glass resulting from an extended idling period. The results will be used to support development of a crystal-tolerant approach for operation of the high-level waste melter at the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Two glass pour stream samples were collected from DWPF when the melter was restarted after idling for three months. The samples did not contain crystallization that was detectible by X-ray diffraction. Electron microscopy identified occasional spinel and noble metal crystals of no practical significance. Occasional platinum particles were observed by microscopy as an artifact of the sample collection method. Reduction/oxidation measurements showed that the pour stream glasses were fully oxidized, which was expected after the extended idling period. Chemical analysis of the pour stream glasses revealed slight differences in the concentrations of some oxides relative to analyses of the melter feed composition prior to the idling period. While these differences may be within the analytical error of the laboratories, the trends indicate that there may have been some amount of volatility associated with some of the glass components, and that there may have been interaction of the glass with the refractory components of the melter. These changes in composition, although small, can be attributed to the idling of the melter for an extended period. The changes in glass composition resulted in a 70-100 °C increase in the predicted spinel liquidus temperature (TL) for the pour stream glass samples relative to the analysis of the melter feed prior to the outage. This indicates that the potential for spinel crystallization increased as a result of idling for an extended period. However, the predicted TL of the pour stream glasses remained 150-200 °C below the mean melt pool temperature of about 1125 °C during the idling period. Given the change in predicted TL over the three month outage, the results indicate that it is important to have a thorough understanding of spinel crystallization within the melter for WTP to operate with a volume percent crystallization constraint. This knowledge will enable process control routines to be developed that avoid bulk crystallization in the melter and allow for recovery from off-normal events. The current WTP crystal-tolerant glass program will develop an improved understanding of spinel crystallization in the WTP melter to allow for operation at maximum waste loading in glass composition systems limited by predictions of spinel crystallization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Real-time digital simulation to improve advanced microgrid design

In this study, there are several ways to address energy reliability concerns during an extended power outage. This can include hardening the energy infrastructure to reduce potential loss of power, adding redundant backup systems with larger fuel tanks, and improving generator reliability through better maintenance. While each is valid, they are often expensive to adequately implement. The traditional emergency power approach for decades has been the use of building-tied emergency generators to start up and supply emergency power until the utility can come back on line. Unfortunately, operational experience from many recent extended power outages has shown that emergency backup generators are often mismatched in size with the building energy load, under-maintained such that their operational reliability is well below expected values, and have insufficient fuel to operate for the entire power outage. Here we describe how energy reliability and security can be enhanced with the use of Advanced Microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing Resiliency Through Renewable Energy Microgrids

This paper describes a methodology to quantify the economic and resiliency benefit provided by renewable energy (RE) in a hybrid RE-storage-diesel microgrid. We present a case study to show how this methodology is applied to a multi-use/ multi-function telecommunications facility in southern California. In the case study, we first identify photovoltaic (PV) and battery energy storage system (BESS) technologies that minimize the lifecycle cost of energy at the site under normal, grid-connected operation. We then evaluate how those technologies could be incorporated alongside existing diesel generators in a microgrid to increase resiliency at the site, where resiliency is quantified in terms of the amount of time that the microgrid can sustain the critical load during a grid outage. We find that adding PV and BESS to the existing backup diesel generators with a fixed fuel supply extends the amount of time the site could survive an outage by 1.8 days, from 1.7 days for the existing diesel-only backup system to 3.5 days for the PV/diesel/BESS hybrid system. Furthermore, even after diesel fuel supplies are exhausted, the site can continue to operate critical loads during daytime hours using just the PV/BESS when there is sufficient solar resource. We find that the site can save approximately 100,000 dollars in energy costs over the 25-year lifecycle while doubling the amount of time they can survive an outage. Here, the methodology presented here provides a template for increasing resiliency at telecomm sites by implementing renewable energy solutions, which provide additional benefits of carbon emission reduction and energy cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid optimized resource dispatch for public-purpose resiliency and sustainability. The Olney Town Center Microgrid Project

Communities in Atlantic coastal regions have in recent years sought to improve the resiliency of their critical infrastructure and public services, especially to protect against hurricanes and other events capable of causing widespread damage and disruption. As the backbone of any community’s critical functions, the electricity distribution system requires high resiliency in order to maintain local energy delivery services. Against this backdrop, the Project sought to develop a resilient energy microgrid control system capable of integrating distributed renewable energy resources, natural gas CHP units, energy storage, and demand-side management technologies in near-real-time optimization schemes for the community of Olney, Md. The Montgomery County Planning Board in 2005 established the Olney Town Center area as a “civic center/town commons,” in part because it serves as a key point of interaction in the community – but also because it contains numerous vital community assets. With a total peak electrical load of about 8 MW (including Montgomery General Hospital with a 2.4 MW peak), the Project area is a business and essential services area, directly serving a suburban population of more than 33,000 residents. It contains a hospital, police station, two fire stations, two schools, grocery stores, and gas stations, and the community’s water tower, among other things. Moreover, the location stands at the crossroads of two state highways that represent major regional arteries for commerce and public safety in Montgomery County. These characteristics made the Project area an appropriate setting for considering microgrid deployment. It presented a model of a typical Maryland suburban community, with geographic dispersion of vital assets over a sizeable area, and a combination of overhead distribution lines and underground cables serving those critical loads. Such a representative model helped to ensure the solutions developed and the scenarios tested would be readily applicable to other communities in the state and the region. Further, the Project’s outcomes and lessons provide insights to guide community microgrid design and development in many locations. To achieve Project objectives – including those established by the U.S. Department of Energy (DOE) National Energy Technology Laboratory – the Project team researched, developed, and tested in simulation a set of microgrid controls capable of maintaining electricity supplies for critical community loads in the event of a regional utility outage lasting many days or even weeks. Testing and analysis showed that the microgrid would be capable of maintaining electricity supply to critical loads essentially indefinitely in most outage scenarios, while also substantially improving overall reliability for microgrid customers. With targeted improvements in local utility distribution infrastructure, test analysis showed that the microgrid would be capable of reducing annual electricity outages for critical loads by 98%. Further, to help achieve environmental and efficiency policy goals established by both the State of Maryland and the federal government, the team designed the system to reduce the annual carbon footprint of served loads by 20%, and to improve system energy efficiency for those loads by at least 20%. Testing showed that, as designed, the system is capable of meeting these performance requirements, with potential for further improvements through more effective thermal energy utilization. This Final Report, comprised of four volumes and 11 annexes, presents the results of these project efforts, including feasibility assessment (section F) and guidance for decision-makers considering prospective deployment of public-purpose microgrid systems in Maryland communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy: Preprint

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Sizing of Resilience Solutions for the U.S. Army Reserve

Power or water outages in buildings threaten the ability of the military to support surrounding communities during natural disasters. Outages can last for days, weeks or months. Typical solutions include very expensive batteries and onsite generation that are sized based on historical power needs. The U.S. Army Reserve (USAR) has teamed up with the Pacific Northwest National Laboratory (PNNL) to develop a simulation framework that optimizes future power needs to reduce the cost of resilience solutions. The approach starts with the building. Power needs during an emergency event are simulated at the building end-use level, then loads are reduced through the selection of life cycle cost-effective building-level technology improvements. These new optimized loads are then fed into a microgrid sizing tool that dynamically constructs many different combinations of solar photovoltaic, battery storage, and generator resources to meet the load for hundreds of statistically generated outage scenarios. Six site assessments completed by USAR and PNNL in 2019 have resulted in a 1-14% reduction in overall investment when optimizing the buildings first before determining the generation requirements. This approach helps the Army secure critical missions and provide a 14 day-minimum supply of necessary energy and water in the most efficient manner.

buidlings, efficiency, resilience, FEDS, MCOR↗

Resilience Metrics for Building-Level Electrical Distribution Systems with Energy Storage: Preprint

The energy system infrastructure that delivers power to a building's loads needs to be resilient, such that it can withstand and recover from extreme outages (e.g., grid faults that leave millions of people without power during severe weather events). Building-level electrical distribution systems (BEDSs) distribute power from a building's energy sources - including the grid, solar photovoltaic (PV) panels, and batteries - to its loads, including lighting, HVAC, and plug loads. BEDS with storage can provide resilience by distributing local electricity supply to critical loads during an outage. Quantitative metrics are needed to assess the resilience improvements associated with new BEDS and storage system technologies. In this paper, we apply an existing metric, the probability of outage survival curve (POSC), to BEDS with storage and propose a set of novel metrics that improve upon POSC. Through a simulation-based case study, we demonstrate how these metrics are impacted by the BEDS design and how they can be used to design a resilient system.

buildings↗