Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “March 2007”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Using Third-Party Inspectors in Building Energy Codes Enforcement in India

India is experiencing fast income growth and urbanization, and this leads to unprecedented increases in demand for building energy services and resulting energy consumption. In response to rapid growth in building energy use, the Government of India issued the Energy Conservation Building Code (ECBC) in 2007, which is consistent with and based on the 2001 Energy Conservation Act. ECBC implementation has been voluntary since its enactment and a few states have started to make progress towards mandatory implementation. Rajasthan is the first state in India to adopt ECBC as a mandatory code. The State adopted ECBC with minor additions on March 28, 2011 through a stakeholder process; it became mandatory in Rajasthan on September 28, 2011. Tamil Nadu, Gujarat, and Andhra Pradesh have started to draft an implementation roadmap and build capacity for its implementation. The Bureau of Energy Efficiency (BEE) plans to encourage more states to adopt ECBC in the near future, including Haryana, Uttar Pradesh, Karnataka, Maharashtra, West Bengal, and Delhi. Since its inception, India has applied the code on a voluntary basis, but the Government of India is developing a strategy to mandate compliance. Implementing ECBC requires coordination between the Ministry of Power and the Ministry of Urban Development at the national level as well as interdepartmental coordination at the state level. One challenge is that the Urban Local Bodies (ULBs), the enforcement entities of building by-laws, lack capacity to implement ECBC effectively. For example, ULBs in some states might find the building permitting procedures to be too complex; in other cases, lack of awareness and technical knowledge on ECBC slows down the amendment of local building by-laws as well as ECBC implementation. The intent of this white paper is to share with Indian decision-makers code enforcement approaches: through code officials, third-party inspectors, or a hybrid approach. Given the limited capacity and human resources available in the state and local governments, involving third-party inspectors could rapidly expand the capacity for plan reviews and broad implementation. However, the procedures of involving third-parties need to be carefully designed in order to guarantee a fair process. For example, there should be multiple checks and certification requirements for third-party inspectors, and the government should have the final approval when third-party inspectors are used in a project. This paper discusses different approaches of involving third-parties in ECBC enforcement; the Indian states may choose the approaches that work best in their given circumstances.

Yu, Sha↗

Laboratory Directed Research and Development Program Assessment for FY 2007

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal Year 2007 spending was $515 million. There are approximately 2,600 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development', April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new 'fundable' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research 'which could lead to new programs, projects, and directions' for the Laboratory. As one of the premier scientific laboratories of the DOE, BNL must continuously foster groundbreaking scientific research. At Brookhaven National Laboratory one such method is through its LDRD Program. This discretionary research and development tool is critical in maintaining the scientific excellence and long-term vitality of the Laboratory. Additionally, it is a means to stimulate the scientific community and foster new science and technology ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Program Assessment Report contains a review of the program. The report includes a summary of the management processes, project peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included are a metric of success indicators and Self Assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Habitat use and population characteristics of potentially spawning shovelnose sturgeon Scaphirhynchus platorynchus (Rafinesque, 1820), blue sucker ( Cycleptus elongatus (Lesueur, 1817), and associated species in the lower Wisconsin River, USA

The goal of this study was to compare the possible locations, timing, and characteristics of potentially spawning shovelnose sturgeon ( Scaphirhynchus platorynchus ), blue sucker ( Cycleptus elongatus ), and associated species during the spring of 2007-2015 in the 149-km-long lower Wisconsin River, Wisconsin, USA, a large, shallow, sand-dominated Mississippi River tributary. A 5-km index station of two pairs of rocky shoals surrounded by sandy areas was electrofished for shovelnose sturgeon and blue sucker in a standardized fashion a total of 40 times from late March through mid- June, the presumed spawning period. On one date in 2008 and two dates in 2012, all rocky shoals and adjacent sandy areas in the lowermost 149 km of the river were also electrofished for both species. Shovelnose sturgeon and blue sucker appeared to spawn in the limited rocky areas of the river along with at least four other species: mooneye ( Hiodon tergisus ), quillback ( Carpiodes cyprinus ), smallmouth buffalo ( Ictiobus bubalus ), and shorthead redhorse ( Moxostoma macrolepidotum ), usually at depths of 0.8-2.0 m and surface velocities of 0.4–1.0 m/s. However, apparently spawning shovelnose sturgeon were found only on mid-channel cobble and coarse gravel shoals within a single 7-km segment that included the 5-km index station, whereas apparently spawning blue suckers were encountered on these same shoals but also more widely throughout the river on eroding bluff shorelines of bedrock and boulder and on artificial boulder wing dams and shoreline rip-rap. Both species showed evidence of homing to the same mid-channel shoal complexes across years.

54 ENVIRONMENTAL SCIENCES↗

A Carbon Flux Super Site: New Insights and Innovative Atmosphere-Terrestrial Carbon Exchange Measurements and Modeling (Final Report)

Approximately around January 2010, instrumentation was setup and became operational on a permanent AmeriFlux flux tower at the Savannah River Site (SRS, see Figure 1), Aiken, SC, which has been named AmeriFlux Aiken site. Monitoring of key ecosystems in that region has been in process since March, 2010. We have made long-term measurements in the SRS region since December 2008, with a set of instrumentation including eddy-covariance systems, two SODARs, two microbarograph arrays, a soil heat flux system, and automated soil CO 2 efflux systems. The launching of the AmeriFlux Aiken site follows previous intensive field campaigns in 2007, 2008, and 2009 involving lidar, tethered balloon, scintillometer measurements, and tracer releases. Given the zero-tolerance for risk and the rigor of the contracting a company to operate at the national laboratory, the AmeriFlux core data collection portion of our project’s initial timeline was delayed to ensure maximum safety for all working at the site, but all aspects of the planned research are now fully functional and the project has been successfully taking flight. A rich database, unseen at most flux sites is now available for modeling while the present project uses this data to identify sources of uncertainties in flux measurements and create methodologies to reduce flux-related errors. Long-term measurements are well underway at the new AmeriFlux Aiken site.

54 ENVIRONMENTAL SCIENCES↗

Operational Experience with Autonomous Star Trackers on ESA Interplanetary Spacecraft

Mars Express (MEX), Rosetta and Venus Express (VEX) are ESA interplanetary spacecrafts (S/C) launched in June 2003, March 2004 and November 2005, respectively. Mars Express was injected into Mars orbit end of 2003 with routine operations starting in spring 2004. Rosetta is since launch on its way to rendezvous comet Churyumov-Gerasimenko in 2014. It has completed several test and commissioning activities and is performing several planetary swingbys (Earth in spring 2005, Mars in spring 2007, Earth in autumn 2007 and again two years later). Venus Express has also started routine operations since the completion of the Venus orbit insertion maneuver sequence beginning of May 2006. All three S/C are three axes stabilized with a similar attitude and orbit control system (AOCS). The attitude is estimated on board using star and rate sensors and controlled using four reaction wheels. A bipropellant reaction control system with 10N thrusters serves for wheel off loadings and attitude control in safe mode. Mars Express and Venus Express have an additional 400N engine for the planetary orbit insertion. Nominal Earth communication is accomplished through a high gain antenna. All three S/C are equipped with a redundant set of autonomous star trackers (STR) which are based on almost the same hardware. The STR software is especially adapted for the respective mission. This paper addresses several topics related to the experience gained with the STR operations on board the three S/C so far.

Lauer, Mathias↗

The American Board of Radiology perspective on maintenance of certification: Part IV: Practice quality improvement in radiologic physics

Recent initiatives of the American Board of Medical Specialties (ABMS) in the area of maintenance of certification (MOC) have been reflective of the response of the medical community to address public concerns regarding quality of care, medical error reduction, and patient safety. In March 2000, the 24 member boards of the ABMS representing all medical subspecialties in the USA agreed to initiate specialty-specific maintenance of certification (MOC) programs. The American Board of Radiology (ABR) MOC program for diagnostic radiology, radiation oncology, and radiologic physics has been developed, approved by the ABMS, and initiated with full implementation for all three disciplines beginning in 2007. The overriding objective of MOC is to improve the quality of health care through diplomate-initiated learning and quality improvement. The four component parts to the MOC process are: Part I: Professional standing, Part II: Evidence of life long learning and periodic self-assessment, Part III: Cognitive expertise, and Part IV: Evaluation of performance in practice (with the latter being the focus of this paper). The key components of Part IV require a physicist-based response to demonstrate commitment to practice quality improvement (PQI) and progress in continuing individual competence in practice. Diplomates of radiologic physics must select a project to be completed over the ten-year cycle that potentially can improve the quality of the diplomate's individual or systems practice and enhance the quality of care. Five categories have been created from which an individual radiologic physics diplomate can select one required PQI project: (1) Safety for patients, employees, and the public, (2) accuracy of analyses and calculations, (3) report turnaround time and communication issues, (4) practice guidelines and technical standards, and (5) surveys (including peer review of self-assessment reports). Each diplomate may select a project appropriate for an individual, participate in a project within a clinical department, participate in a peer review of a self-assessment report, or choose a qualified national project sponsored by a society. Once a project has been selected, the steps are: (1) Collect baseline data relevant to the chosen project, (2) review and analyze the data, (3) create and implement an improvement plan, (4) remeasure and track, and (5) report participation to the ABR, using the template provided by the ABR. These steps begin in Year 2, following training in Year 1. Specific examples of individual PQI projects for each of the three disciplines of radiologic physics are provided. Now, through the MOC programs, the relationship between the radiologic physicist and the ABR will be continuous through the diplomate's professional career. The ABR is committed to providing an effective infrastructure that will promote and assist the process of continuing professional development including the enhancement of practice quality improvement for radiologic physicists.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning of the LCLS LINAC

The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

43 PARTICLE ACCELERATORS↗

September 2008 monitoring results for Centralia, Kansas.

In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under a KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly (for a recommended period of two years) for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling in September 2007 represented the fifth and final monitoring event performed under the two-year twice yearly monitoring program (Argonne 2006a,b, 2007a, 2008a). The results from the two-year monitoring program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 Risk-Based Screening Level of 5 {micro}g/L for this compound in a broad groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC in situ chemical reduction technology, that was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the proposed interim measure occurred in December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009). The KDHE has requested that sitewide monitoring continue at Centralia until a final remedy has been implemented and a comprehensive program of performance and compliance monitoring has been established for this site (KDHE 2008a). The groundwater sampling events at Centralia in March 2008 (Argonne 2008b) and September 2008 were performed in response to this request. The present report documents the results of groundwater sampling conducted in September 2008, in the network of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for extended monitoring of the groundwater contamination at Centralia (KDHE 2005a,b). Sampling of additional piezometers specifically installed to monitor the progress of the interim measure pilot test (PMP1-PMP9; Figure 1.2) was also performed in September 2008; the results of these analyses are reported and discussed separately (Argonne 2009).

54 ENVIRONMENTAL SCIENCES↗

Precipitation Climatology over Mediterranean Basin from Ten Years of TRMM Measurements

Climatological features of mesoscale rain activities over the Mediterranean region between 5 W-40 E and 28 N-48 N are examined using the Tropical Rainfall Measuring Mission (TRMM) 3B42 and 2A25 rain products. The 3B42 rainrates at 3-hourly, 0.25 deg x 0.25 deg spatial resolution for the last 10 years (January 1998 to July 2007) are used to form and analyze the 5-day mean and monthly mean climatology of rainfall. Results show considerable regional and seasonal differences of rainfall over the Mediterranean Region. The maximum rainfall (3-5 mm/day) occurs over the mountain regions of Europe, while the minimum rainfall is observed over North Africa (approximately 0.5 mm/day). The main rainy season over the Mediterranean Sea extends from October to March, with maximum rainfall occurring during November-December. Over the Mediterranean Sea, an average rainrate of approximately 1-2 mm/day is observed, but during the rainy season there is 20% larger rainfall over the western Mediterranean Sea than that over the eastern Mediterranean Sea. During the rainy season, mesoscale rain systems generally propagate from west to east and from north to south over the Mediterranean region, likely to be associated with Mediterranean cyclonic disturbances resulting from interactions among large-scale circulation, orography, and land-sea temperature contrast.

Mehta, Amita V.↗

China Refrigerator Information Label: Specification Development and Potential Impact

In the last five years, China's refrigerator market has grown rapidly, and now urban markets are showing signs of saturation, with ownership rates in urban households reaching 92%. Rural markets continue to grow from a much lower base. As a result of this growth, the Chinese government in 2006 decided to revise the refrigerator standards and its associated efficiency grades for the mandatory energy information label. In the Chinese standards process, the efficiency grades for the information label are tied to the minimum standards. Work on the minimum standards revision began in 2006 and continued through the first half of 2007, when the draft standard was completed under the direction of the China National Institute of Standardization (CNIS). Development of the information label grades required consideration of stakeholder input, continuity with the previous grade classification, ease of implementation, and potential impacts on the market. In this process, CLASP, with the support of METI/IEEJ, collaborated with CNIS to develop the efficiency grades, providing technical input to the process, comment and advice on particular technical issues, and evaluation of the results. After three months of effort and three drafts of the final grade specifications, this work was completed. In addition, in order to effectively evaluate the impact of the label on China's market, CLASP further provided assistance to CNIS to collect data on both the efficiency distribution and product volume distribution of refrigerators on the market. The new information label thresholds to be implemented in 2008 maintain the approach first adopted in 2005 of establishing efficiency levels relative to the minimum standard, but increased the related required efficiency levels by 20% over those established in 2003 and implemented in 2005. The focus of improvement was on the standard refrigerator/freezer (class 5), which constitutes the bulk of the Chinese market. Indeed, the new requirements to achieve grade 1 on the label are now virtually as stringent as those for US Energy Star-qualified or EU A-grade refrigerators. When the energy information label went into effect in March 2005, refrigerator manufacturers were required to display their declared level of efficiency on the label and report it to the China Energy Label Center (CELC), a newly established unit of CNIS responsible for label program management. Because of the visible nature of the label, it was found, through a METI/IEEJ-supported study, that MEPS non-compliance dropped from 4% to zero after the label became mandatory, and that the percentage of higher-grade refrigerators increased. This suggests that the label itself does have potential for shifting the market to higher-efficiency models (Lin 2007). One challenge, however, of assessing this potential impact is the lack of a comprehensive baseline of market efficiency and a program to evaluate the market impact on a yearly basis. As a result, the impact evaluation in this study draws upon the market transformation experience of the related EU energy information label, for which quantitative assessments of its market impact exist. By assuming a parallel process unfolding in China, it is possible to look at the potential impact of the label to 2020. The results of the analysis demonstrates that a robust market transformation program in China focused on the energy information label could save substantial amounts of electricity by 2020, totaling 16.4 TWh annually by that year, compared to a case in which the efficiency distribution of refrigerators was frozen at the 2007 level. Remarkably, the impact of a successful market transformation program with the label would essentially flatten the consumption of electricity for refrigerator use throughout most of the next decade, despite the expectations of continued growth in total stock by nearly 190 million units. At the end of this period, total consumption begins to rise again, as the least efficient of the units have been mostly removed from the market. Such a level of savings would reduce CO{sub 2}, SO{sub 2}, NO{sub x} and particulate matter as well. Cumulatively to 2020, CO{sub 2} emissions would decline by 67.5 million tonnes; SO{sub 2} by 368,000 tonnes, NO{sub x} by 263,000 tonnes, and particulate matter by 1.6 million tonnes. To ensure that the information label can provide the basis for such a market transformation, additional focus should be paid to regular monitoring and supervision of the label, expansion of market survey and information collection efforts, building recognition and awareness of the benefits of buying higher-ranked models, and development of programs of consumer education and promotion in conjunction with retailers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NTS MC&A History

Within the past three years, the Nevada Test Site (NTS) has progressed from a Category IV to a Category I facility. In accordance with direction from the U. S. Department of Energy (DOE) Secretary and National Nuclear Security Administration (NNSA) Administrator, NTS received shipments of large quantities of special nuclear material from Los Alamos National Laboratory (LANL) and other sites in the DOE complex. September 2004 was the first occurrence of Category I material at the NTS, with the exception of two weeks of underground testing in 2001, since 1992. The Material Control and Accountability (MC&A) program was originally a joint-lab effort by LANL, Lawrence Livermore National Laboratory (LLNL), and Bechtel Nevada (BN), but in March 2006 the NNSA Nevada Site Office appointed the NTS Management and Operations contractor with sole responsibility. This paper will discuss the process and steps taken to transition the NTS MC&A program from multiple disciplines to a single entity and from a Category IV to a Category I program. This transition flourished as MC&A progressed from the 2004 Office of Assessment (OA) rating of “Significant Weakness” to the 2007 OA assessment rating of “Effective Performance.” The paper will provide timelines, funding and staffing issues, OA assessment findings and corrective actions, and future expectations. The process has been challenging, and MC&A’s innovative responses to the challenges have been very successful.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NTS MC&A History

Within the past three and a half years, the Nevada Test Site (NTS) has progressed from a Category IV to a Category I nuclear material facility. In accordance with direction from the U.S. Department of Energy (DOE) Secretary and National Nuclear Security Administration (NNSA) Administrator, NTS received shipments of large quantities of special nuclear material from Los Alamos National Laboratory (LANL) and other sites in the DOE complex. December 2004 was the first occurrence of Category I material at the NTS, with the exception of two weeks of sub-critical underground testing in 2001, since 1992. The Material Control and Accountability (MC&A) program was originally a jointlab effort by LANL, Lawrence Livermore National Laboratory, and Bechtel Nevada, but in March 2006 the NNSA Nevada Site Office appointed the NTS Management and Operations contractor with sole responsibility. This paper will discuss the process and steps taken to transition the NTS MC&A program from multiple organizations to a single entity and from a Category IV to a Category I program. This transition flourished as MC&A progressed from the 2004 Office of Assessment (OA) rating of “Significant Weakness” to the 2007 OA assessment rating of “Effective Performance.” The paper will provide timelines, funding and staffing issues, OA assessment findings and corrective actions, and future expectations. The process has been challenging, but MC&A’s innovative responses to the challenges have been very successful.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SEARCH FOR GAMMA RAYS ABOVE 100 TeV FROM THE CRAB NEBULA WITH THE TIBET AIR SHOWER ARRAY AND THE 100 m{sup 2} MUON DETECTOR

A 100 m{sup 2} muon detector (MD) was successfully constructed under the existing Tibet air shower (AS) array in the late fall of 2007. The sensitivity of the Tibet AS array to cosmic gamma rays can be improved by selecting muon-poor events with the MD. Our MC simulation of the MD response reasonably agrees with the experimental data in terms of the charge distribution for one-muon events and the background rejection power. Using the data collected by the Tibet AS array and the 100 m{sup 2} MD taken from 2008 March to 2010 February, we search for continuous gamma-ray emission from the Crab Nebula above ∼100 TeV. No significant excess is found, and the most stringent upper limit is obtained above 140 TeV.

79 ASTRONOMY AND ASTROPHYSICS↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗

Cassini/CIRS Observations of Saturn's "Storm Alley"

In the Voyager era storms on Saturn were observed predominantly in the northern hemisphere, however, in recent years storm activity has been confined to a narrow range of latitudes referred to as "storm alley" (approx.40degS planetographic latitude). Throughout Cassini's prime mission storms have been detected by two independent instruments: ISS through dayside images and RPWS using radio emissions from Saturn Electrostatic Discharges (SED's) (Dyudina et al. 2007). Analysis of these storms indicates that the cloud tops are in the 200 - 500rnbar altitude range. During Saturn's Equinox, in August 2009, lSS imaged lightning on the night side in storm alley when ring-shine was at a minimum (Dyudina et al. 2010). This study indicates that lightning may have originated as deep as the water cloud. Decently, Cassini/CIRS was targeted at storm alley while a storm, originally detected by amateurs, was ongoing (March 2010). Phosphine can be used as a tracer of vertical transport because it is a disequilibrium species that falls off with altitude in the upper troposphere. CIRS can measure temperature and phosphine abundance independently in the altitude range where these cloud tops occur. Early analysis of these data shows stronger phosphine absorption at storm longitudes. This is an indication that powerful updrafts were dredging material upward into the upper troposphere. The results of the analysis of the March 2010 CIRS observations of storm alley will be presented.

Hesman, Brigette E.↗

Field and Satellite Observations of the Formation and Distribution of Arctic Atmospheric Bromine Above a Rejuvenated Sea Ice Cover

Recent drastic reduction of the older perennial sea ice in the Arctic Ocean has resulted in a vast expansion of younger and saltier seasonal sea ice. This increase in the salinity of the overall ice cover could impact tropospheric chemical processes. Springtime perennial ice extent in 2008 and 2009 broke the half-century record minimum in 2007 by about one million km2. In both years seasonal ice was dominant across the Beaufort Sea extending to the Amundsen Gulf, where significant field and satellite observations of sea ice, temperature, and atmospheric chemicals have been made. Measurements at the site of the Canadian Coast Guard Ship Amundsen ice breaker in the Amundsen Gulf showed events of increased bromine monoxide (BrO), coupled with decreases of ozone (O3) and gaseous elemental mercury (GEM), during cold periods in March 2008. The timing of the main event of BrO, O3, and GEM changes was found to be consistent with BrO observed by satellites over an extensive area around the site. Furthermore, satellite sensors detected a doubling of atmospheric BrO in a vortex associated with a spiral rising air pattern. In spring 2009, excessive and widespread bromine explosions occurred in the same region while the regional air temperature was low and the extent of perennial ice was significantly reduced compared to the case in 2008. Using satellite observations together with a Rising-Air-Parcel model, we discover a topographic control on BrO distribution such that the Alaskan North Slope and the Canadian Shield region were exposed to elevated BrO, whereas the surrounding mountains isolated the Alaskan interior from bromine intrusion.

Nghiem, Son V.↗