Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Leak Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Hermetic Seal Leak Detection Apparatus

The present invention is a hermetic seal leak detection apparatus, which can be used to test for hermetic seal leaks in instruments and containers. A vacuum tight chamber is created around the unit being tested to minimize gas space outside of the hermetic seal. A vacuum inducing device is then used to increase the gas chamber volume inside the device, so that a slight vacuum is pulled on the unit being tested. The pressure in the unit being tested will stabilize. If the stabilized pressure reads close to a known good seal calibration, there is not a leak in the seal. If the stabilized pressure reads closer to a known bad seal calibration value, there is a leak in the seal. The speed of the plunger can be varied and by evaluating the resulting pressure change rates and final values, the leak rate/size can be accurately calculated.

Kelley, Anthony R.↗

Characteristics of refrigerant leaks from small HVAC&R systems

Reduced use of high global warming potential (GWP) hydrofluorocarbon (HFC) refrigerants is desired. However, many lower-GWP alternatives are flammable, some of higher flammability levels, or A3, and others of lower flammability (A2 or A2L).Safety standards for A2 and A3 flammable refrigerants, including the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 calculate maximum flammable refrigerant charge limits using a fixed 4-minute leak time based on the time to leak 150 g of CO2 through a capillary tube.Actual refrigerant leak times depend on the equipment type, leak location, leak orifice diameter and equipment operation condition (on or off).Five systems were installed in test chambers with leak quantities and rates measured by tracking total system weight during the leak event. Among the major results were that almost all of the system charge was shown to escape the units, >80% within the first 10 minutes.

Patel, Viral↗

Demonstration of rapid and sensitive module leak certification for Space Station Freedom

A leak detection and quantification demonstration using perflurocarbon tracer (PFT) technology was successfully performed at the NASA Marshall Space Flight Center on January 25, 1991. The real-time Dual Trap Analyzer (DTA) at one-half hour after the start of the first run gave an estimated leak rate of 0.7 mL/min. This has since been refined to be 1.15 (+ or -) 0.09 mL/min. The leak rates in the next three runs were determined to be 9.8 (+ or -) 0.7, -0.4 (+ or -) 0.3, and 76 (+ or -) 6 mL/min, respectively. The theory on leak quantification in the steady-state and time-dependent modes for a single zone test facility was developed and applied to the above determinations. The laboratory PFT analysis system gave a limit-of-detection (LOD) of 0.05 fL for ocPDCH. This is the tracer of choice and is about 100-fold better than that for the DTA. Applied to leak certification, the LOD is about 0.00002 mL/s (0.000075 L/h), a 5 order-of-magnitude improvement over the original leak certification specification. Furthermore, this limit can be attained in a measurement period of 3 to 4 hours instead of days, weeks, or months. A new Leak Certification Facility is also proposed to provide for zonal (three zones) determination of leak rates. The appropriate multizone equations, their solutions, and error analysis have already been derived. A new concept of seal-integrity certification has been demonstrated for a variety of controlled leaks in the range of module leak testing. High structural integrity leaks were shown to have a linear dependence of flow on (Delta)p. The rapid determination of leak rates at different pressures is proposed and is to be determined while subjecting the module to other external force-generating parameters such as vibration, torque, solar intensity, etc.

Dietz, R. N.↗

Risk Evaluation for the Diesel Fuel Leak Near Generator Building TRA-674 at the Advanced Test Reactor Complex

This report describes the risk-based evaluation conducted for the underground diesel fuel leak near Generator Building TRA-674 at the Advanced Test Reactor Complex, located at the Idaho National Laboratory. The risk evaluation process followed the Idaho Risk Evaluation Manual for Petroleum Releases (August 2012) guidance document and used the Idaho Risk Evaluation Computational Software (August 2015) to estimate the human health risks posed by residual contamination. Site-specific data were collected to estimate the representative concentrations of the soil for estimating the cumulative risk. Based on historical and current data, the site does not exceed unacceptable risk to human health receptors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pressure Loading with In-Situ Permeability Measurement of SiC Ceramic Matrix Composite Tube

Silicon carbide fiber in a silicon carbide matrix composite (SiC-SiC) has been actively researched as a potential structural material to be used in advanced high temperature gas reactors (HTGR) and as an accident tolerant cladding material for light water reactors (LWR). This ceramic composite material demonstrates desirable properties for use in nuclear reactor core that include retention of strength from ambient to LWR and HTGR operating and accident temperatures and stability under neutron radiation. However, the ceramic composite material must be designed to meet all the necessary, application driven requirements before it could be implemented in a reactor design. As one of the requirements for a fuel cladding material, the composite has to maintain high level of impermeability as to retain fission gases throughout the fuel cycle. General Atomics (GA) had previously reported results on permeability levels obtained by CVI produced SiC-SiC composites. It has been determined that for LWR size cladding tube that is 51 mm long the permeability allocation equivalent to currently used claddings is 7.3 E-10 atm*cc/sec. With high level of attention to possible sources of leaks in a test setup, it has been demonstrated that a CVI SiC-SiC composites produced by GA can achieve a leak rate of 1 E-12 atm*cc/sec, and therefore it meets the permeability allocation for a fuel cladding. Further study showed that a particular SiC-SiC composite tube can remain impermeable after being pressure loaded well above LWR normal operating conditions. In the study done by Deck et al., hoop stress was applied to a composite tube using pressure load on the inside surface in a load-unload stepwise sequence with increasing maximum applied stress at each step and measuring permeability between steps. The tested composite comprised of 70% thickness of SiC-SiC composite which provides fracture toughness and bears a majority of the applied stress and a 30% thickness of monolithic SiC layer on the outside surface to provide an impermeable barrier. The composite remained impermeable up to internal pressure of 56 MPa which is more than 2.5 times greater than a typical pressure at the end of life in a fuel rod.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazardous Gas Leak Analysis in the Space Shuttle

Helium tests of the main propulsion system in the Space Shuttle and on hydrogen leaks are examined. The hazardous gas detection system (HGDS) in the mobile launch pad uses mass spectrometers (MS) to monitor the shuttle environment for leaks. The mass spectrometers are fed by long tubes to sample gas from the payload bay, mid-body, aft engine compartment, and external tank. The purpose is to improve the HGDS, especially in its potential for locating cryogen leaks. Pre-existing leak data was analyzed for transient information to determine if the leak location could be pinpointed from test data. A rapid response leak detection experiment was designed, built, and tested. Large eddies and vortices were visually seen with Schlieren imaging, and they were detected in the time plots of the various instruments. The response time of the MS was found in the range of 0.05 to 0.1 sec. Pulsed concentration waves were clearly detected at 25 cycles per sec by spectral analysis of MS data. One conclusion is that the backup HGDS sampling frequency should be increased above the present rate of 1 sample per second.

Barile, Ronald G.↗

Fiber Optic Cable Feedthrough and Sealing

A novel fiberoptic hermetic bulkhead feedthrough has been developed which will offer cryogenic sealing at leak rates of 10(exp -11) cc/sec helium. This feedthrough was developed for NASA in response to needs for a hermetically sealed feedthrough which could withstand a range of temperatures from low cryogenic (-196 C), due to liquid fuels and oxidizers, to high temperatures (+200 C) encountered in the proximity of combustion gasses. The development effort will be reported from conceptual design of single and multi-channel feedthrough units with single interconnection interfaces to units with double-ended interconnection interfaces. Various combinations of fiber/buffers are reported with recommendations based on test results. A comprehensive series of environmental and mechanical tests were performed to evaluate the feedthroughs in adverse conditions. Test results are reported including insertion loss, salt spray, sinusoidal vibration, random vibration, mechanical shock, thermal shock and humidity. A second set of feedthrough units was exposed to 3 different types of radiation. Optical transmittance changes during the tests were monitored and leak rate testing was done after each test. State-of-the-art technology in optical fiber feedthroughs constructed with polycrystalline ceramic is presented.

Fan, Robert J.↗

Eleventh interim status report: Model 9975 O-Ring fixture long-term leak performance

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperature. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF.

42 ENGINEERING↗

Bypass control valve seal and bearing life cycle test report

The operating characteristics of a bypass control valve seal and bearing life cycle tests are reported. Data from the initial assembly, leak, torque, and deflection tests are included along with the cycle life test results and conclusions. The equipment involved was to be used in the nuclear engine for the rocket vehicles program.

Lundback, A. V.↗

Calculating Static-Seal Leakage Correlation

Operational leakage rates of various working fluids predicted from test data. Method converts leakage through fixed area flow passage from one set of fluid conditions to another. Correction factor improves correlation of measured engine static seal leak rate under test conditions with rate under operating conditions. Potential applications include extrapolating from test conditions to operating condition.

Daniels, C. M.↗

Test program to provide confidence in liquid oxygen cooling of hydrocarbon fueled rocket thrust chambers

An experimental program has been planned at the NASA Lewis Research Center to build confidence in the feasibility of liquid oxygen cooling for hydrocarbon fueled rocket engines. Although liquid oxygen cooling has previously been incorporated in test hardware, more runtime is necessary to gain confidence in this concept. In the previous tests, small oxygen leaks developed at the throat of the thrust chamber and film cooled the hot-gas side of the chamber wall without resulting in catastrophic failure. However, more testing is necessary to demonstrate that a catastrophic failure would not occur if cracks developed further upstream between the injector and the throat, where the boundary layer has not been established. Since under normal conditions cracks are expected to form in the throat region of the thrust chamber, cracks must be initiated artificially in order to control their location. Several methods of crack initiation are discussed in this report. Four thrust chambers, three with cracks and one without, should be tested. The axial location of the cracks should be varied parametrically. Each chamber should be instrumented to determine the effects of the cracks, as well as the overall performance and durability of the chambers.

Armstrong, E. S.↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Leak rate measurements for satellite subsystems and residual gas analysis during space environment tests

The measuring and evaluation procedure for the determination of leak rates of satellite subsystems with a quadrupole mass spectrometer, and the results of the residual gas analysis are described. The method selected for leak rate determination was placing the system into a vacuum chamber and furnishing the chamber with a mass spectrometer and calibrated leaks. The residual gas of a thermal vacuum test facility, in which the thermal balance test radiation input was simulated by a heated canister, was analyzed with the mass spectrometer in the atomic mass unit range up to 300 amu. In addition to the measurements during the space environment tests, mass spectrometric studies were performed with samples of spacecraft materials. The studies were carried out during tests for the projects HELIOS, AEROS B and SYMPHONIE.

Nuss, H. E.↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Balance/Thermal Vacuum Test Configuration and Test Planning at NASA's Goddard Space Flight Center

The James Webb Space Telescope (JWST) is the next of the great observatories , scheduled to be launched in 2014. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center s (GSFC) Space Environment Simulator (SES). The test enclosure surrounding the instruments during the integrated ISIM-level thermal balance testing is complex, and is designed to simulate as closely as possible the in-flight conductive and radiative thermal environment around the ISIM. Thermal control and measurement of parasitic sources of heat leak into the test volume is critical, as the dissipation plus known parasitics in the flight ISIM is approximately 454 mW, and additional parasitics attributed to the flight enclosure itself are nearly equal to this, resulting in the energy balance of the inflight ISIM being less than 1.0 W. Sources of test-induced parasitics must be carefully controlled and measured, and the ability to thermally control the test environment is critical to enable accurate thermal balance testing and thermal model correlation. This paper describes the test configuration and plans for the ISIM-level thermal vacuum/thermal balance testing at GSFC.

Glazer, Stuart↗

Tenth Interim Status Report: Model 9975 O-Ring Fixture Long-Term Leak Performance

A series of experiments to monitor the aging performance of Viton ® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 °F. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 °F.

42 ENGINEERING↗

Cryogenic Flange and Seal Evaluation

The assembly of flanges, seals, and pipes are used to carry cryogenic fluid from a storage tank to the vehicle at launch sites. However, after a certain amount of cycles these raised face flanges with glass-filled Teflon gaskets have been found to have torque relaxation and are as a result susceptible to cryogenic fluid leakage if not re-torqued. The intent of this project is to identify alternate combinations of flanges and seals which may improve thermal cycle performance and decrease re-torque requirements. The general approach is to design a test fixture to evaluate leak characteristics between spiral and concentric serrations and to test alternate flange and seal combinations. Due to insufficient time, it was not possible to evaluate these different types of combinations for the combination that improved thermal cycle performance the most. However, the necessary drawings for the test fixture were designed and assembled along with the collection of the necessary parts.

fluid↗

Natural Gas Fugitive Leak Detection Using an Unmanned Aerial Vehicle: Localization and Quantification of Emission Rate

We describe a set of methods for locating and quantifying natural gas leaks using a small unmanned aerial system equipped with a path-integrated methane sensor. The algorithms are developed as part of a system to enable the continuous monitoring of methane, supported by a series of over 200 methane release trials covering 51 release location and flow rate combinations. The system was found throughout the trials to reliably distinguish between cases with and without a methane release down to 2 standard cubic feet per hour (0.011 g/s). Among several methods evaluated for horizontal localization, the location corresponding to the maximum path-integrated methane reading performed best with a mean absolute error of 1.2 m if the results from several flights are spatially averaged. Additionally, a method of rotating the data around the estimated leak location according to the wind is developed, with the leak magnitude calculated from the average crosswind integrated flux in the region near the source location. The system is initially applied at the well pad scale (100–1000 m2 area). Validation of these methods is presented including tests with unknown leak locations. Sources of error, including GPS uncertainty, meteorological variables, data averaging, and flight pattern coverage, are discussed. The techniques described here are important for surveys of small facilities where the scales for dispersion-based approaches are not readily applicable.

47 OTHER INSTRUMENTATION↗

FY2018 Status Report: Model 9975 O-Ring Fixture Long-Term Leak Performance

A series of experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the Model 9975 shipping package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperature. Other methods such as compression stress-relaxation (CSR) tests and field surveillance are also on going to evaluate O-ring behavior. Seventy tests using PCV mock-ups with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, a smaller test matrix with fourteen additional tests was initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗