Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LICENSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Risk Informed, Performance-Based, Technology-Inclusive Regulatory Infrastructure: Technology-Inclusive Determination of Mechanistic Source Terms for Offsite Dose-Related Assessments for Advanced Nuclear Reactor Facilities

This report summarizes a risk informed, performance-based and technology-inclusive approach to determine source terms for dose related assessments at advanced nuclear facilities. This approach uses a graded process which allows both the non-mechanistic source terms calculation methods, which adopt conservative approaches and assumptions based on known physical and chemical principles, and more importantly the mechanistic source term calculation methods, which consider design-specific scenarios and use best estimate models with uncertainty quantification for a range of licensing basis events (LBEs), to be used for the design and licensing of advanced nuclear technologies. The source terms developed with this graded approach, and radionuclide inventories elsewhere in the facility that are determined during source term analysis, can be used to address licensing issues to support the application processes of 10 CFR Part 50 for a construction permit and operating license or 10 CFR Part 52 for a Combined Operating License (COL), Standard Design Certification, Early Site Permit, Standard Design Approval or Manufacturing License. They can also be used for other purposes including equipment environmental qualification, control room habitability analyses, and assessments of severe accident risks in environmental impact statements. There are many advanced reactor concepts being developed including high temperature gas-cooled reactor (HGTR), sodium-cooled fast reactor (SFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), micro-reactor, etc. The graded approach presented in this report for source terms determination is, to the extent possible, generic to any of these reactor designs and to future reactor designs. This report provides information on the review of the regulatory foundation for use of conservative bounding source terms as well as event-specific mechanistic source terms for advanced nuclear reactor designs.

07 ISOTOPE AND RADIATION SOURCES↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advances in Integral and Separate Effects Experiments for Water Cooled Small Modular Reactors

This paper focuses on the progress being made in water-cooled small modular reactor (SMR) advanced integral effects and separate effects experiments for reactor licensing. SMRs, considered modular in design, are mostly factory-built and then shipped to the reactor site. Of the several types of SMR designs available, water-cooled SMRs are likely to receive regulatory approval faster than others, as most of the technologies involved (e.g., the fuel and coolant technologies) are matured. However, the unique safety systems of SMRs, which depend on specific SMR design features, require integral and separate effects experiments to achieve reactor licensing. Thus, of the many SMR designs being proposed, only a few have successfully undergone licensing and reached the final development and demonstration stage. Many nuclear vendors and newcomer companies are investing millions of dollars to develop integral and separate effects testing facilities for preparing final safety analysis reports to include in licensing applications. Development and analysis of these experimental facilities is costly and takes about four to five years. The unique challenges involved can be reduced when stakeholders synergistically apply lessons learned, knowing the critical role played by advancements in experiments that support the licensing of SMR safety systems. Identification of knowledge/research gaps with the phenomena identification and ranking table (PIRT) and designing experimental facilities focusing on the phenomena of interest (POI) and figures of merit (FOMs) are pivotal to select the critical path to successful design demonstration and licensing application.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Regulatory Treatment of Low Frequency External Events as Part of a Risk-Informed, Performance-Based Approach

To assist the developing advanced reactor industry in future licensing efforts, the U.S. Department of Energy Advanced Reactor Demonstration Program Regulatory Development area initiated a project at Argonne National Laboratory to examine the regulatory treatment of external hazards as part of a risk-informed performance-based (RIPB) licensing framework. A RIPB licensing framework for advanced reactors built on establishing an affirmative safety case offers the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. Historically, reactor licensing addressed events of very low frequency primarily through the application of design margin and defense-in-depth philosophy. In contrast, RIPB approaches attempt to evaluate these scenarios at a level of detail commensurate with their risk, which often necessitates an explicit treatment of their frequency and associated consequence. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. This project aims to identify the benefits and challenges of such approaches for advanced reactor vendors and aid in the development of consistent and appropriate analysis methodologies. The paper summarizes project findings and explores the application of various approaches for different external hazards. In addition, the current work also evaluates the application of the quantitative health objectives as a limit on external event risk, as they are a potential regulatory requirement under the current draft 10 CFR Part 53, which is a new technology-neutral reactor licensing pathway in the U.S.

Grabaskas, David↗

Development of a Consensus Standard for Verification and Validation of Nuclear System Thermal-Fluids Software

With the resurgence of nuclear power and increased interest in advanced nuclear reactors as an option to supply abundant energy without the associated greenhouse gas emissions of the more conventional fossil fuel energy sources, there is a need to establish internationally recognized standards for the verification and validation (V&V) of software used to calculate the thermal-hydraulic behavior of advanced reactor designs for both normal operation and hypothetical accident conditions. To address this need, ASME (American Society of Mechanical Engineers) Standards and Certification has established the V&V 30 Committee, under the jurisdiction of the V&V Standards Committee, to develop a consensus standard for verification and validation of software used for design and analysis of advanced reactor systems. The initial focus of this committee will be on the V&V of system analysis and computational fluid dynamics (CFD) software for nuclear applications. To limit the scope of the effort, the committee will further limit its focus to software to be used in the licensing of High-Temperature Gas-Cooled Reactors. In this framework, the Standard should conform to Nuclear Regulatory Commission (NRC) and other regulatory practices, procedures and methods for licensing of nuclear power plants as embodied in the United States (U.S.) Code of Federal Regulations and other pertinent documents such as Regulatory Guide 1.203, 'Transient and Accident Analysis Methods' and NUREG-0800, 'NRC Standard Review Plan'. In addition, the Standard should be consistent with applicable sections of ASME NQA-1-2008 'Quality Assurance Requirements for Nuclear Facility Applications (QA)'. This paper describes the general requirements for the proposed V&V 30 Standard, which includes; (a) applicable NRC and other regulatory requirements for defining the operational and accident domain of a nuclear system that must be considered if the system is to be licensed, (b) the corresponding calculation domain of the software that should encompass the nuclear operational and accident domain to be used to study the system behavior for licensing purposes, (c) the definition of the scaled experimental data set required to provide the basis for validating the software, (d) the ensemble of experimental data sets required to populate the validation matrix for the software in question, and (e) the practices and procedures to be used when applying a validation standard. Although this initial effort will focus on software for licensing of High-Temperature Gas-Cooled Reactors, it is anticipated that the practices and procedures developed for this Standard can eventually be extended to other nuclear and non-nuclear applications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cdc6 is a rate-limiting factor for proliferative capacity during HL60 cell differentiation

The DNA replication (or origin) licensing pathway represents a critical step in cell proliferation control downstream of growth signalling pathways. Repression of origin licensing through down-regulation of the MCM licensing factors (Mcm2-7) is emerging as a ubiquitous route for lowering proliferative capacity as metazoan cells exit the cell division cycle into quiescent, terminally differentiated and senescent 'out-of-cycle' states. Using the HL60 monocyte/macrophage differentiation model system and a cell-free DNA replication assay, we have undertaken direct biochemical investigations of the coupling of origin licensing to the differentiation process. Our data show that down-regulation of the MCM loading factor Cdc6 acts as a molecular switch that triggers loss of proliferative capacity during early engagement of the somatic differentiation programme. Consequently, addition of recombinant Cdc6 protein to in vitro replication reactions restores DNA replication competence in nuclei prepared from differentiating cells. Differentiating HL60 cells over-expressing either wild-type Cdc6 or a CDK phosphorylation-resistant Cdc6 mutant protein (Cdc6A4) exhibit an extended period of cell proliferation compared to mock-infected cells. Notably, differentiating HL60 cells over-expressing the Cdc6A4 mutant fail to down-regulate Cdc6 protein levels, suggesting that CDK phosphorylation of Cdc6 is linked to its down-regulation during differentiation and the concomitant decrease in cell proliferation. In this experimental model, Cdc6 therefore plays a key role in the sequential molecular events leading to repression of origin licensing and loss of proliferative capacity during execution of the differentiation programme.

60 APPLIED LIFE SCIENCES↗

NGNP (Next Generation Nuclear Plant Project): High Temperature Gas-Cooled Reactor Key Definitions, Plant Capabilities, and Assumptions

This document is intended to provide a Next Generation Nuclear Plant (NGNP) Project tool in which to collect and identify key definitions, plant capabilities, and inputs and assumptions to be used in ongoing efforts related to the licensing and deployment of a high temperature gas-cooled reactor (HTGR). These definitions, capabilities, and assumptions are extracted from a number of sources, including NGNP Project documents such as licensing related white papers and previously issued requirement documents. Also included is information agreed upon by the NGNP Regulatory Affairs group's Licensing Working Group and Configuration Council. The NGNP Project approach to licensing an HTGR plant via a combined license (COL) is defined within the referenced white papers and reference, and is not duplicated here.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Risk Reduction for Advanced Reactor Technologies: FY 2017 Framework Modernization Proposals and Status

The regulatory framework governing the licensing of commercial nuclear power plants in the U.S. developed over recent decades with a strong emphasis towards assessing large light water reactor (LWR) safety. However, recent shifts in energy market needs and priorities has brought new and different types of nuclear technologies into consideration for applications that include but are not limited to electric power generation. In order to realize the benefits in efficiency, reliability and safety that advanced (non-LWR) can potentially offer, efforts are needed to modernize the existing regulatory framework to make technical licensing requirements more compatible with radically new nuclear technologies. To serve the needs of the energy market, this update should be performed on a schedule conducive to deployments projected to begin as early as 2025. Beginning in 2016, an initiative was launched to amend the U.S. nuclear power reactor licensing framework by making the technical requirements contained therein more generically compatible with non LWR technology. The Licensing Modernization Project (LMP) was established as an industry-led team of subject matter experts managed by Southern Company Services and supported through a cost sharing arrangement with the U.S. Department of Energy (DOE). Technical and programmatic coordination for the effort was also provided by the Nuclear Energy Institute (NEI), the Licensing Department of the Advanced Reactor Technologies (ART) Program located at the Idaho National Laboratory (INL), and others.

42 ENGINEERING↗

Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Container Approval for the Disposal of Radioactive Waste with Negligible Heat Generation in the German Konrad Repository - 12148

Since the license for the Konrad repository was finally confirmed by legal decision in 2007, the Federal Institute for Radiation Protection (BfS) has been performing further planning and preparation work to prepare the repository for operation. Waste conditioning and packaging has been continued by different waste producers as the nuclear industry and federal research institutes on the basis of the official disposal requirements. The necessary prerequisites for this are approved containers as well as certified waste conditioning and packaging procedures. The Federal Institute for Materials Research and Testing (BAM) is responsible for container design testing and evaluation of quality assurance measures on behalf of BfS under consideration of the Konrad disposal requirements. Besides assessing the container handling stability (stacking tests, handling loads), design testing procedures are performed that include fire tests (800 deg. C, 1 hour) and drop tests from different heights and drop orientations. This paper presents the current state of BAM design testing experiences about relevant container types (box shaped, cylindrical) made of steel sheets, ductile cast iron or concrete. It explains usual testing and evaluation methods which range from experimental testing to analytical and numerical calculations. Another focus has been laid on already existing containers and packages. The question arises as to how they can be evaluated properly especially with respect to lack of completeness of safety assessment and fabrication documentation. At present BAM works on numerous applications for container design testing for the Konrad repository. Some licensing procedures were successfully finished in the past and BfS certified several container types like steel sheet, concrete until cast iron containers which are now available for waste packaging for final disposal. However, large quantities of radioactive wastes had been placed into interim storage using containers which are not already licensed for the Konrad repository. Safety assessment of these so-called 'old' containers is a big challenge for all parties because documentation sheets about container design testing and fabrication often contain gaps or have not yet been completed. Appropriate solution strategies are currently under development and discussion. Furthermore, BAM has successfully initiated and established an information forum, called 'ERFA QM Konrad Containers', which facilitates discussions on various issues of common interest with respect to Konrad container licensing procedures as well as the interpretation of disposal requirements under consideration of operational needs. Thus, it provides additional, valuable supports for container licensing procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Pre-existing Containers According to the Acceptance Criteria of the Repository Konrad - 17204

As well as working in the field of waste management, Kerntechnische Entsorgung Karlsruhe GmbH (KBE) is, for historical reasons, one of Germany's three constructors of repository containers for the repository Konrad. The focus of this container production is merely on the side of requalification of the existing legacy containers, which are partly already loaded and grouted. To a smaller extend, KTE also produces new containers for its own use because the containers exactly match the waste properties present on the Karlsruhe site. There are three major container types in the process of requalification: - The Type-IV-Drum-Steel-Container FSC-IV-D was successfully licensed in 2014 and regularly produced thereafter. At the same time, the pre-existing containers of this type are re-qualified on the basis of this license by proof of the compliance with this license. - The Type-IV-Product-Container PSC-I-D is identical to the FSC-VI-D in terms of steel construction but also contains a liner of concrete for shielding and protection of the steel construction. This container is designed for large components and demolition waste. After a successful drop test, it is currently in the advanced process of licensing. - Type I cylindrical concrete containers are simple single drum shieldings which were produced in large numbers in the 1970's and 1980's. KTE owns 7,000 of those containers, thus making requalification and licensing cheaper than retreatment of the waste after demolition of the containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparison of Social and Economic Engagement Approaches: Lessons from Recent International Radioactive Waste Projects - 17478

The central challenge of any proposed radioactive waste management project is securing not only regulatory permissions, but also a social license to operate. 'Social license' generally refers to a community's acceptance or approval of a specific project. Oftentimes development of social license occurs outside of, or in parallel to, formal regulatory or permitting processes, and requires sustained commitment and proposed economic benefits to communities by proponents to acquire, build, and sustain social capital in the context of trust-based relationships. Historically, radioactive waste management projects have defaulted to demagoguery and 'siege warfare' modes of thinking and action by both proponents and opponents. While radioactive waste management projects are always inherently controversial, it is only recently that project owners and developers have experimented with alternative forms of social engagement outside of, or in addition to, formal regulatory processes. This paper compares and contrasts recent projects in Canada, Australia, the United Kingdom, and the United States, by examining distinct approaches to social engagement, with a focus on new methods that have been used to promote mutual understanding, foster rational debate, build confidence, promote economic development, and secure social license. The projects examined span the life-cycle of radioactive waste management development, from ones that are purely aspirational, to ones in early planning stages, to ones seeking a host community, to one that is focused on sustainment of existing social license. Several notable lessons and innovative practices are identified that will be of interest to radioactive waste management project owners and developers, non-governmental organizations, potential host communities, and political decision-makers for such projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Status of DoE's Standardized Canister - 19657

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) currently in its possession, as well as SNF that will come into its possession in the future. DOE will rely upon the standardized canister to confine radionuclides and precluding the moderator in order to ensure safe, long-term management and disposition of SNF in its possession. This strategy helps minimize characterization costs (i.e., funds and exposure) and other technical challenges associated with the traditional approach of relying on fuel-specific properties to demonstrate compliance with the regulator. The use of the standardized canister offers the following benefits: - The standardized canister design is complete. It has been tested under a variety of drop and accident scenarios and was subsequently licensed under 10 CFR 72 as a storage system as part of the Foster Wheeler Environmental Corporation (FWENC) Facility. It is also part of the license submittal for Yucca Mountain. - There is high confidence that the standardized canister design can be stored within commercially-available storage casks and licensed as part of a transportation-system package. - A robust standardized canister simplifies accident analyses and does not rely on characterization of the contained waste. This simplifies safety analysis, provides a greater level of confidence with stakeholders and reduces cost and risk. - A common design for the associated packaging, closure, and loadout facilities results in significant savings. - The DOE standardized canister would simplify design efforts, procurement, and fabrication. - Standardizing handling activities and associated training, procedures, equipment, and tooling leads to enhanced safety and surety of operations. The standardized canister is the preferred package for these materials. It withstood scrutiny by the Yucca Mountain Repository License Application, the Nuclear Regulatory Commission's (NRC) Advisory Committee on Nuclear Waste, the Nuclear Waste Technical Review Board, an American Society of Mechanical Engineers peer review, and the FWENC storage license application. This evaluation summarizes and documents the status of the design and rationale for the DOE standardized canister, and outlines remaining needs before deployment. In addition, it discusses the factors that have the potential to influence storage, transportation, and disposal of DOE SNF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Standard for Verification and Validation of Software Used to Calculate Nuclear System Thermal Fluids Behavior

With the resurgence of nuclear power and increased interest in advanced nuclear reactors as an option to supply abundant energy without the associated greenhouse gas emissions of the more conventional fossil fuel energy sources, there is a need to establish internationally recognized standards for the verification and validation (V&V) of software used to calculate the thermal-hydraulic behavior of advanced reactor designs for both normal operation and hypothetical accident conditions. To address this need, ASME (American Society of Mechanical Engineers) Standards and Certification has established the V&V 30 Committee, under the responsibility of the V&V Standards Committee, to develop a consensus Standard for verification and validation of software used for design and analysis of advanced reactor systems. The initial focus of this committee will be on the V&V of system analysis and computational fluid dynamics (CFD) software for nuclear applications. To limit the scope of the effort, the committee will further limit its focus to software to be used in the licensing of High-Temperature Gas-Cooled Reactors. In this framework, the standard should conform to Nuclear Regulatory Commission (NRC) practices, procedures and methods for licensing of nuclear power plants as embodied in the United States (U.S.) Code of Federal Regulations and other pertinent documents such as Regulatory Guide 1.203, “Transient and Accident Analysis Methods” and NUREG-0800, “NRC Standard Review Plan”. In addition, the standard should be consistent with applicable sections of ASME Standard NQA-1 (“Quality Assurance Requirements for Nuclear Facility Applications (QA)”). This paper describes the general requirements for the V&V Standard, which includes; (a) the definition of the operational and accident domain of a nuclear system that must be considered if the system is to licensed, (b) the corresponding calculational domain of the software that should encompass the nuclear operational and accident domain to be used to study the system behavior for licensing purposes, (c) the definition of the scaled experimental data set required to provide the basis for validating the software, (d) the ensemble of experimental data sets required to populate the validation matrix for the software in question, and (e) the practices and procedures to be used when applying a validation standard. Although this initial effort will focus on software for licensing of High-Temperature Gas Reactors, it is anticipated that the practices and procedures developed for this standard can eventually be extended to other nuclear and non-nuclear applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation of 10 CFR 20.1406 Through Life Cycle Planning for Decommissioning

The focus of this paper is on a regulatory guide (draft guide DG-4012) being developed by the Office of Nuclear Regulatory Research for the implementation of 10 CFR 20.1406. The draft guide was published in the Federal Register on July 31, 2007 for a 90 day public comment period. Besides being available in the Federal Register, it is also available electronically in NRC's agency data management system (ADAMS). The accession number is ML0712100110. 10 CFR 20.1406 requires license applicants, other than renewals, after August 20, 1997, '..to describe in the application how facility design and procedures for operation will minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize to the extent practicable, the generation of radioactive waste'. The intent of the regulation is to diminish the occurrence and severity of 'legacy sites' by taking measures that will reduce and control contamination and facilitate eventual decommissioning. 10 CFR 20.1406 is significant because it applies to all new facilities and in the very near future (perhaps as soon as the fall of 2007), the U.S. Nuclear Regulatory Commission (NRC) anticipates receiving one or more license applications for new nuclear power plants. The regulatory guide is intended to facilitate that licensing by providing suggestions of things an applicant can do to minimize contamination of the facility and the environment, minimize generation of waste, and to facilitate decommissioning. Over 100 different kinds of activities are covered by license applications submitted to the NRC. They do not all reflect the same potential for contamination of a facility and the environment, or for the generation of radioactive waste. Therefore, an applicant should use sound judgment to evaluate the potential for contamination and the consequences of such contamination in deciding on the extent to which this guide applies to any given facility or activity. Factors which may enter into this decision include form (e.g., dry solids, liquids, gases), inventory, and environmental mobility of unintended releases. The bulk of the guidance presented in the guide will consist of specific design considerations drawn from nuclear industry experience and lessons learned from decommissioning. These design suggestions provide examples of measures which can be combined to support a contaminant management philosophy for a new facility. The principles embodied in this philosophy are threefold: (1) prevention of unintended release, (2) early detection if there is unintended release of radioactive contamination, and (3) prompt and aggressive clean-up should there be an unintended release of radioactive contamination. If the guiding principles are followed through the use of 'good' engineering and science, as well as careful attention to operational practices, it should result in meeting the requirements of 10 CFR 20.1406. All this should be considered in the context of the life cycle of the facility from the early planning stages through the final plans for decommissioning and waste disposal. Some of the mechanisms which can be employed for life cycle planning are described further in the Discussion section. In summary: The principles of the guide are threefold: prevention, early detection, and prompt response. If these guiding principles are followed through the use of 'good' engineering and science, as well as careful attention to operational practices, it should result in meeting the requirements of 10 CFR 20 In summary, the thrust of this guide is for an applicant to use technically sound engineering judgment and a practical risk-informed approach to achieve the objectives of 10 CFR 20.1406. This approach should consider the materials and processes involved (e.g., solids, liquids, gases) and focus on: (1) the relative significance of potential contamination; (2) areas most susceptible to leaks; and (3) the appropriate level of consideration to prevention and control of contamination that should be incorporated in facility design. Since the applicability of the guidance is a facility-by-facility decision, early consultation with the NRC is strongly suggested.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multipurpose Transportation, Aging, and Disposal Canisters for Used Nuclear Fuel - Getting From Here to There and Beyond

The idea of a universal canister system, in which used fuel can be placed at reactor sites, transported and - without ever needing to be re-opened -, disposed of in a geologic repository, is certainly not new. Originally proposed by DOE in the early 1990's as the Multi-Purpose Canister (MPC) system, this common sense idea has always had considerable appeal as a means to reduce used fuel handling and simplify repository surface facility operations. However, difficulties in launching the development of such a system, in the face of large uncertainties in repository design and limited program funding, caused the original MPC project to be abandoned in 1997. Then, after eight years of inactivity in this area, DOE, while experiencing difficulty completing the repository surface facility design and having missed a December 2004 deadline for submittal of a repository license application to the Nuclear Regulatory Commission (NRC), re-proposed the concept. Under this renewed initiative, the MPC systems were renamed as Transportation, Aging, and Disposal or TAD canister systems. DOE's repository design had advanced significantly at this point and industry, having gained considerable experience through the design, licensing, manufacture, and loading of over 800 used fuel dry storage systems, was well positioned to provide DOE with the meaningful technical input that would be necessary to bring the TAD concept to reality. With a firm foundation on which to build, industry actively engaged DOE in an extensive series of interactions to facilitate TAD development. This paper describes the evolution of the TAD concept through the industry/DOE dialogue that occurred over an 18 month period beginning in January 2006. It discusses the technical issues that were addressed and resolved through this collaboration. Successful completion of this dialogue led to the issuance, by DOE, of a final TAD design specification in July, 2007. This specification is being used by DOE as a fundamental input to the Yucca Mountain license application that DOE expects to submit to the NRC no later than June 2008. DOE is now in the process completing a procurement of TAD demonstrations. As part of these demonstrations, DOE expects industry vendors to seek and obtain storage and transportation licenses for the TADs by 2010 and for utilities to deploy them at reactor sites by 2012. (authors)

42 ENGINEERING↗

Activation Calculation for the Dismantling and Decommissioning of a Light Water Reactor Using MCNP{sup TM} with ADVANTG and ORIGEN-S

The boiling water reactor (BWR) Philippsburg 1 (KKP1) and the pressurized water reactor (PWR) Neckarwestheim 1 (GKN I), with a thermal power of 2575 MW{sub th} resp. 2497 MW{sub th}, were shut down and entered directly the post-operational phase which is covered by the operating license held by the nuclear power plant owner. The decommissioning of a nuclear power plant (NPP) which is licensed under chap. 7 of the German Atomic Energy Act, following the post-operational phase requires a comprehensive licensing procedure including in particular radiation protection aspects and possible impacts to the environment. Decommissioning requires a decommissioning license. This will include essential changes in requirements for the systems and components and will mainly lead to the immediate dismantling of the nuclear power plant which is now the only permitted decommissioning strategy in Germany. In this context, neutron activation calculations for the structural components of KKP1 and GKN I have to be carried out to predict occurring activities and to estimate future costs for conditioning and packaging. To avoid an overestimation of the radioactive inventory and to calculate the expenses for decommissioning as accurate as possible, modern state-of-the-art Monte-Carlo-Techniques (MCNP6) combined with automated variance reduction tools (ADAVANTG) are used and are coupled with the activation and decay module ORIGEN-S. This paper presents the calculation procedure and the obtained results with a validation by measured activations and gamma dose rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proactive Management of Materials Degradation for Nuclear Power Plant Systems

There are approximately 440 operating reactors in the global nuclear power plant (NPP) fleet, and these have an average age greater than 20 years. These NPPs had design lives of 30 or 40 years. The United States is currently implementing license extensions of 20 years on many plants and consideration is now being given to the concept of “life-beyond-60,” a further period of license extension from 60 to 80 years, and potentially longer. In almost all countries with NPPs, authorities are looking at some form of license renewal program. There is a growing urgency as a number of plants face either approvals for license extension or shut down, which will require deployment of new power plants. In support of NPP license extension over the past decade, various national and international programs have been initiated. This paper reports part of the work performed in support of the U.S. Nuclear Regulatory Commission’s (NRC’s) Proactive Management of Materials Degradation (PMMD) program. The paper concisely explains the basic principles of PMMD, its relationship to advanced diagnostics and prognostics and provides an assessment of some the technical gaps in PMMD and prognostics that need to be addressed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗