Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GROUT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Implementation of Increased Salt and Decreased Sludge Volumes in the Defense Waste Processing Facility - 19597

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). The disposition of high-level waste (HLW) into a glass waste form poured into canisters at the DWPF began in 1996. DWPF processed a sludge only flowsheet until 2008 when the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began treating the salt waste from the underground liquid storage tanks by striking with monosodium titanate (MST) to remove actinides, when necessary to meet downstream acceptance criteria, and removing the MST and entrained sludge solids (SS) by filtration before using an organic solvent to strip the cesium from the salt, creating two new concentrated HLW streams. This change caused the DWPF to begin processing under both a sludge-only and a coupled operations flowsheet where salt streams would only be added when available. This strategy allows for continuous glass canister production at DWPF. Recently, DWPF completed a 10-month melter replacement in December 2017 and the Concentrate, Storage, and Transfer Facility (CSTF) has completed repairs to the 3H Evaporator system. These facility outages have caused delays in preparing the next batch of sludge feed for DWPF. Concurrent with these facility outages, the Salt Waste Processing Facility (SWPF) has been undergoing system testing and commissioning, working toward startup. SWPF is designed to process salt waste in the same manner as ARP/MCU, but with much higher throughput volumes produced per unit time. In order to process the SWPF salt streams efficiently, DWPF will implement a coupled operation only flowsheet. Based on the facility outages mentioned above, efforts have been made to identify strategies to minimize sludge volumes and maximize salt volumes in the DWPF until the next sludge batch is ready for processing in DWPF. Savannah River Remediation (SRR) recently performed an evaluation that examines the effects of reducing the volume of sludge and maximizing the addition of the cesium-rich concentrated salt solution in each Sludge Receipt and Adjustment Tank (SRAT) batch in order to extend the existing sludge batch as long as possible until the next sludge batch is ready. These effects include a reduction of weight percent solids in the DWPF processing vessels, an increase in cycle time, a new canister heat generation value that remains within regulatory limits, and higher gamma source that remains within bulk facility gamma shielding. Balancing the above parameters resulted in a small reduction of sludge volume per SRAT batch under SWPF operation and maximizing the salt volumes for both ARP/MCU and SWPF operation. This slight reduction in sludge volume and increase in salt volumes allows SRR to mitigate some of the schedule impact incurred by the facility outages. This strategy was evaluated for both ARP/MCU and SWPF operation. This strategy has been successfully implemented under ARP/MCU operation using small step changes in the current process. This paper provides an overview of the evaluation performed for DWPF with ARP/MCU and DWPF with SWPF operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding and Controlling Cesium Loading on Crystalline Silicotitanate - 19601

Savannah River Remediation (SRR) contracted with Westinghouse Electric Corporation (WEC), Columbia Energy and Environmental Services (CEES), to build and deliver a modular ion exchange process that will be used to remove radioactive cesium from dissolved salt solution contained in Tank 10 at the Savannah River Site (SRS). The resulting decontaminated salt solution will be sent to Tank 11 and then to Tank 50 for final disposition in grout at the Saltstone facility. At the end of processing, the loaded ion exchange (IX) columns are drained, rinsed, and dried. The IX columns are removed from the modular unit and stored at Interim Safe Storage (ISS). This ion exchange process is called the Tank Closure Cesium Removal (TCCR) system. The TCCR system consists of several unit operations and process monitoring capability housed within three modular units. The first modular unit contains the process control computer, the second modular unit contains the main process equipment (two prefilters, four IX columns, and resin trap (post filtration)), and the third modular unit is the ventilation system. The main unit operations of the TCCR system are filtration, ion exchange, and ventilation. The ion exchange media utilized is a form of inorganic Crystalline Silicotitanate (CST), IONSIV{sup TM} R9120-B supplied by UOP Honeywell. CST has a high selectivity for cesium (Cs) and has some affinity for other Group IA alkali metals on the periodic chart (hydrogen, lithium, sodium, potassium, rubidium, and francium). CST has also been shown to have affinity for strontium and actinides. Cesium loading on the CST is dependent on many factors including chemical composition (cations and anions), temperature, and pH of the salt solution. The actual amount of Cs loaded onto an IX column is dependent on the factors above along with the salt solution volume fed to the IX column. Because of CST's high selectivity for Cs, the Cs-137 equilibrium loading can contribute enough decay heat to result in an ion exchange column boiling event under no flow conditions in the IX column. The boiling event under no flow is a safety concern that must be prevented from occurring. To prevent boiling of the column under no flow conditions, the Cs-137 equilibrium loading must be determined and understood. Several methodologies were evaluated for performing the Cs-137 equilibrium loading determination for CST. After review of available research and development (R and D), batch equilibrium contact test data, and Zheng Anthony Miller (ZAM) model predictions for the salt solution chemistry in Tank 10, a methodology for determining the Cs-137 equilibrium loading on CST was selected. The methodology selected involves an in-tank batch equilibrium contact test performed in duplicate that considers additional corrections to account for anticipated operational evolutions. The in-tank batch equilibrium contact test utilizes ∼0.1 grams of CST secured in a slotted sample vial. The slotted sample vial design allows for salt solution to be in contact with the CST. The slotted sample vials containing the CST are submerged in Tank 10 and exposed to the salt solution for ten days. After ten days, the samples are retrieved and sent to the Savannah River National Laboratory (SRNL) for analysis of the Cs-137 equilibrium loading. Additional corrections are then made to the Cs-137 results to account for anticipated operational evolutions. Anticipated operational evolutions include external additions (water/caustic) to Tank 10 that result in a change to its chemical composition, tank temperature effects, departures from the laboratory testing (mixed vs. stagnant tank conditions), and IX column flushes. A description of the methodologies considered, feasibility of methodology deployment, and the down select process (benefits vs. risks) is discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Unmanned Aerial Systems for Post-closure Waste Site Maintenance and Surveillance - 20143

The P- and R-Area Reactor buildings, located at SRS near Aiken, SC, were in-situ decommissioned by grouting below-grade portions of the buildings and demolishing some above-grade structures to grade level. Other reactor building structures were left above-grade and sealed to prevent human or animal access. Because the above grade-structures are expected to continue in their present state for hundreds of years, the condition of the building roofs is critical to mitigate rainwater intrusion. For this reason, building roof areas were strengthened with high strength concrete to ensure the long-term integrity of the roof structure. Periodic inspections of the roof structures are required to ensure that the roofs are functioning properly and to identify damage areas. The traditional method of inspecting closed reactor buildings requires the use of a helicopter and photographer to generate photographs and videos for review. This method proved sufficient but lacked the resolution and clarity that is required for a thorough inspection of the building structure. Fortunately, the Savannah River National Laboratory (SRNL) has established a Small Unmanned Aircraft System (sUAS) program using commercially available and custom-built remote-controlled aircraft. EC and ACP contacted the SRNL program to evaluate whether the sUAS technology could be employed for periodic reactor building inspections. The sUAS can fly within a few meters of the reactor buildings and hover, allowing for a more thorough aerial inspection. The initial sUAS inspection of the P-Area Reactor building was completed in February 2018 and at the R-Area Reactor building in August 2018 and were successful in providing higher resolution photos and videos. The sUAS inspections also revealed that vegetation had begun to grow on the roofs that could potentially damage the structure integrity. SRNL partnered with Virginia Polytechnic Institute and State University to build a custom heavy lift sUAS that could be equipped with herbicides to remotely treat the vegetative growth. Herbicides were successfully applied to the R-Area Reactor building roof using the custom sUAS in September 2018. The use of unmanned aircraft systems at SRS to perform aerial inspections and herbicide treatment in otherwise inaccessible areas has proven to be an efficient and cost-effective technology that provides high value, increases knowledge of facility conditions, and provides for early detection of damage. Periodic inspections of the reactor building roofs using sUAS technology are performed safely, efficiently, and at a significant cost and schedule savings while reducing emissions, noise, and fossil fuel use. The use of sUAS equipment for building inspections and herbicide application at SRS is unique within the DOE complex. The goal of SRS is to apply this remote technology to other waste unit operations and maintenance activities in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Processing Batches for Tank Closure Cesium Removal Through In-Tank Batch Contact Testing - 20470

The Tank Closure Cesium Removal (TCCR) process at the Savannah River Site (SRS) is currently processing waste from Tank 10H, generating decontaminated salt solution that is sent to Tank 11H. Transfers out of Tank 11H are then disposed of on site as a grout wasteform in the SRS Saltstone Processing Facility. This is a full-scale demonstration of the use of Crystalline Silicotitanate (CST) for the decontamination of aqueous nuclear waste supernate. CST primarily removes cesium from the high sodium alkaline feed, but also adsorbs strontium, actinides, and some other trace metals. The TCCR unit is an at-tank set of four ion exchange columns, with two typically being operated in series during waste processing. Tank 10H is serving a dual function as both the salt dissolution tank as well as the feed tank for the TCCR system. Prior to operation of TCCR, Tank 10H must undergo dissolution campaigns, dissolving the salt cake to form an aqueous salt solution (supernate). After each dissolution campaign, the supernate created must be qualified prior to processing through the TCCR system. Qualification includes detailed characterization of the supernate as well as in-tank batch contact tests to determine the equilibrium loading of Cs-137 on the CST ion exchange media (IONSIV{sup TM} R9120-Ba). In support of the in-tank batch contact testing, Savannah River National Laboratory (SRNL) developed a CST sample holder, also referred to as a 'tea-bag', to hold a measured amount (∼0.1 grams) of pretreated CST between stainless steel screens. The tea-bag fits within a standard stainless steel sample vial that has been modified to allow the flow of supernate to the CST. This sample holder is then immersed in the waste tank allowing free contact between the CST beads and the surrounding liquid, at an effectively infinite liquid-to-solid phase ratio. A pair of tea-bags are deployed in the tank for a period of 10 days for each batch, after which the CST is recovered, digested, and analyzed to determine the loading of cesium isotopes on the CST. This result then supports the TCCR column thermal loading limits for processing as part of the TCCR safety basis. This paper will discuss the design and testing of the CST sample holder, as well as results from the first few batches of waste qualified and subsequently processed through the TCCR system. In addition, results from analyses of Tank 11H samples, showing decontamination of the product will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CEMENTITIOUS BARRIERS PARTNERSHIP ACCOMPLISHMENTS AND RELEVANCE TO THE DOE COMPLEX

The Cementitious Barriers Partnership (CBP) was initiated to reduce risk and uncertainties in the performance assessments that directly impact U.S. Department of Energy (DOE) environmental cleanup and closure programs. The CBP is supported by the DOE Office of Environmental Management (DOE-EM) and has been specifically addressing the following critical EM program needs: (i) the long-term performance of cementitious barriers and materials in nuclear waste disposal facilities and (ii) increased understanding of contaminant transport behavior within cementitious barrier systems to support the development and deployment of adequate closure technologies. To accomplish this, the CBP has two initiatives: (1) an experimental initiative to increase understanding of changes in cementitious materials over long times (> 1000 years) over changing conditions and (2) a modeling initiative to enhance and integrate a set of computational tools validated by laboratory and field experimental data to improve understanding and prediction of the long-term performance of cementitious barriers and waste forms used in nuclear applications. In FY10, the CBP developed the initial phase of an integrated modeling tool that would serve as a screening tool which could help in making decisions concerning disposal and tank closure. The CBP experimental programs are underway to validate this tool and provide increased understanding of how CM changes over time and under changing conditions. These initial CBP products that will eventually be enhanced are anticipated to reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the DOE assessment process. These tools have application to low activity waste forms, high level waste tank closure, D&D and entombment of major nuclear facilities, landfill waste acceptance criteria, and in-situ grouting and immobilization of vadose zone contamination. This paper summarizes the recent work provided by the CBP to support DOE operations and regulatory compliance and the accomplishments over the past 2 years. Impacts of this work include: (1) a forum for DOE-NRC technical exchange, (2) material characterization to support PA predictions, (3) reducing uncertainty in PA predictions, (4) establishing base case performance to improve PA predictions, and (5) improving understanding and quantification of moisture and contaminant transport used in PAs. Additional CBP accomplishments include: sponsorship of a national test bed workshop to obtain collaboration in establishing the path forward in obtaining actual data to support future predictions on cementitious barrier performance evaluations, and participation in an International Atomic Energy Agency (IAEA) Cooperative Research Project on the use of cementitious barriers for low-level radioactive waste treatment and disposal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Performance of Underground Radioactive Waste Storage Tanks at the Savannah River Site: A 60-Year Historical Perspective

The Savannah River Site produced weapons-grade materials for nearly 35 years between 1953 and 1988. The legacy of this production is nearly 37 million gallons of radioactive waste. Since the 1950s, the liquid waste has been stored in large, underground carbon steel waste tanks. During the past 20 years, the site has begun to process the waste so that it may be stored in vitrified and grout forms, which are more suitable for long-term storage. Over the history of the site, some tanks have experienced leakage of the waste to the secondary containment. This article is a review of the instances of leakage and corrosion degradation that the tanks and associated equipment have experienced since the first tanks were built. Furthermore, the activities that the site has taken to mitigate the degradation and manage the service life of the tank for its anticipated lifetime are reviewed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Three-Dimensional Numerical Investigation of a Novel Shallow Bore Ground Heat Exchanger Integrated with Phase Change Material

The heat transfer performance of an innovative design of ground heat exchanger, called underground thermal battery (UTB), was investigated in this paper. The UTB is designed to be installed in a shallow subsurface of the ground (less than 20 ft or 6 m below the grade), which is much shallower than the vertical bores (deeper than 200 ft or 60 m) required for installing conventional vertical bore ground heat exchangers (VBGHE). The UTB consists of a water-filled tank that also contains a phase change material (PCM), which impart the UTB a large thermal storage capacity. A three-dimensional (3D) numerical model has been developed to evaluate the performance of the UTB and to compare it with a conventional VBGHE. The simulation results indicated that a UTB can better regulate the entering water temperature of a ground source heat pump (GSHP) for more efficient operation than a conventional VBGHE under short-term high thermal load conditions. In addition, the UTB can make more effective use of PCMs compared with using PCMs to replace the conventional grouting material in a VBGHE.

42 ENGINEERING↗

Assessment of model assumptions and budget terms of the unsteady flamelet equations for a turbulent reacting jet-in-cross-flow

An a priori analysis of the flamelet model for diffusion flames is conducted to systematically assess model assumptions that are associated with the asymptotic expansion, the omission of higher-order expansion terms, the consideration of preferential diffusion effects, and the one-dimensional flamelet representation. For this, a recent direct numerical simulation database of a reacting hydrogen/air jet-in-cross-flow (JICF) by Grout et al. [15,16] is used. The full flamelet equation for temperature, exact to the order of the Eulerian transport equation and general to different definitions of the mixture fraction, is derived. Analysis of mixture fraction conditioned profiles of temperature and scalar dissipation rate along the jet trajectory identified different ignition and flame stabilization scenarios on the windward and leeward sides of the reacting JICF. A balance analysis of the temperature flamelet equation is conducted to quantify contributions in flame-aligned and flame-orthogonal directions. Consistent with the flamelet assumption, it is shown that terms arising from scalar diffusion, heat-release, and species-diffusion-induced enthalpy flux are the dominant contributions, while the flame-aligned preferential diffusion promotes entrainment of heat into the flamelet structure. Finally, for the current JICF-configuration, it is found that contributions along the flame-orthogonal direction are on average negligible.

42 ENGINEERING↗

The EGS Collab project: Outcomes and lessons learned from hydraulic fracture stimulations in crystalline rock at 1.25 and 1.5 km depth

With the goal of better understanding stimulation in crystalline rock for improving enhanced geothermal systems (EGS), the EGS Collab Project performed a series of stimulations and flow tests at 1.25 and 1.5 km depths. The tests were performed in two well-instrumented testbeds in the Sanford Underground Research Facility in Lead, South Dakota, United States. The testbed for Experiment 1 at 1.5 km depth contained two open wells for injection and production and six instrumented monitoring wells surrounding the targeted stimulation zone. Four multi-step stimulation tests targeting hydraulic fracturing and nearly year-long ambient temperature and chilled water flow tests were performed in Experiment 1. The testbed for Experiments 2 and 3 was at 1.25 km depth and contained five open wells in an outwardly fanning five-spot pattern and two fans of well-instrumented monitoring wells surrounding the targeted stimulation zone. Experiment 2 targeted shear stimulation, and Experiment 3 targeted low-flow, high-flow, and oscillating pressure stimulation strategies. Hydraulic fracturing was successful in Experiments 1 and 3 in generating a connected system wherein injected water could be collected. However, the resulting flow was distributed dynamically, and not entirely collected at the anticipated production well. Thermal breakthrough was not observed in the production well, but that could have been masked by the Joule-Thomson effect. Shear stimulation in Experiment 2 did not occur - despite attempting to pressurize the fractures most likely to shear - because of the inability to inject water into a mostly-healed fracture, and the low shear-to-normal stress ratio. The EGS Collab experiments are described to provide a background for lessons learned on topics including induced seismicity, the correlation between seismicity and permeability, distributed and dynamic flow systems, thermoelastic and pressure effects, shear stimulation, local geology, thermal breakthrough, monitoring stimulation, grouting boreholes, modeling, and system management.

15 - GEOTHERMAL ENERGY↗

Formulation and Performance Evaluation of Epoxy Sealant Systems for Double-Shell Tank Bottom Refurbishment

The performance of epoxy sealants used in the refurbishment of double-shell tank (DST) systems requires balancing processability, thermomechanical stability, and adhesion to cementitious substrates. This study incorporates Heloxy 8 as a reactive diluent into Westlake 862 epoxy to tailor workability and cured-state properties. Rheological time-sweep analysis demonstrates that increasing the diluent content significantly reduces complex viscosity and extends workability, thereby improving pumpability and flow for large-area applications. However, the targeted 2-hour processing window is not fully achieved. Differential scanning calorimetry (DSC) confirms that all formulations cure at room temperature to glass transition temperatures ( T g ) at least 20 °C above the maximum DST operating temperature (27 °C), thereby ensuring service in the glassy regime. Dynamic mechanical analysis (DMA) reveals formulation-dependent reductions in tan delta and increases in storage modulus, indicating increasingly elastic and mechanically stable networks with diluent incorporation. Pull-off adhesion testing shows that modified formulations (70–90% Westlake epoxy) exhibit significantly higher adhesion strengths than the unmodified system. Grout cohesive failure indicates that interfacial bonding exceeds substrate strength. Collectively, these results demonstrate that controlled reactive diluent incorporation enables optimization of processing behavior, interfacial adhesion, and thermomechanical performance, supporting the suitability of the modified epoxy systems as durable sealant layers for cementitious barrier applications in hazardous waste containment infrastructure.

Differential scanning calorimetry↗

Spectroscopic identification of Ca-bearing uranyl silicates formed in C–S–H systems

Portland cement-based grouts used for radioactive waste immobilisation contain a Ca- and Si-rich binder phase, known as calcium–silicate–hydrate (C–S–H). Depending on the blend of cement used, the Ca/Si ratio can vary considerably. A range of C–S–H minerals with Ca/Si ratios from 0.6 to 1.6 were synthesised and contacted with aqueous U(VI) at 0.5 mM and 10 mM concentrations. Solid-state 29 Si MAS-NMR spectroscopy was applied to probe the Si coordination environment in U(VI)-contacted C–S–H minerals and, in conjunction with U L III -edge X-ray absorption spectroscopy analysis, inferences of the fate of U(VI) in these systems were made. At moderate or high Ca/Si ratios, uranophane-type uranyl silicates or Ca-uranates dominated, while at the lowest Ca/Si ratios, the formation of a Ca-bearing uranyl silicate mineral, similar to haiweeite (Ca[(UO 2 ) 2 Si 5 O 12 (OH) 2 ]·3H 2 O) or Ca-bearing weeksite (Ca 2 (UO 2 ) 2 Si 6 O 15 ·10H 2 O) was identified. This study highlights the influence of Ca/Si ratio on uranyl sequestration, of interest in the development of post-closure safety models for U-bearing radioactive waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The ongoing destabilization of the mosul dam as observed by synthetic aperture radar interferometry

We present a detailed survey here on the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is unstable due to the underlying geology that is formed by alternate and variable strata of highly soluble materials such as gypsum, anhydrite, marl and limestone. We present the first comprehensive multi-sensor cumulative deformation map for the dam generated from space-based synthetic aperture radar (SAR) measurements from the Italian constellation COSMO-SkyMed and the European Sentinel-1a satellite. We compared 2014-2016 data to an historic dataset spanning 2004-2010 acquired with the Envisat ASAR sensor. We found that deformation was rapid during 2004-2010, slowed down in 2012-2014, and restarted in August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State in Iraq and Syria (ISIS). We took advantage of the availability of data from multiple SAR satellites to infer the deformation at the dam in great spatial and temporal detail and shed new light on the processes of the ongoing destabilization. This study highlights how new constellations of SAR sensors together with the availability of historical datasets are leading to important advances in deformation monitoring of small scale geologic and manmade features.

58 GEOSCIENCES↗

BHResist [SWR-25-57]

BHResist is a pure python library for computing thermal resistance within single-u, double-u, and coaxial grouted borehole heat exchangers. For single and double u-tube configurations, the methods use the 1st-order closed-form multipole approximations, which typically produces results with less than 1% error when compared to the 10th-order multipole method. Coaxial borehole methods apply a simple 1D resistance network method. This is intended to be a lightweight library that can be easily imported into any other Python tool, with no bulky dependencies.

Mitchell, Matt [National Renewable Energy Laborato↗