Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Frequency Relay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

296 records · Page 17

Modeling Framework for Data Center

This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.

25 ENERGY STORAGE↗

Wireless Integrated Microelectronic Vacuum Sensor System

NASA Stennis Space Center's (SSC's) large rocket engine test facility requires the use of liquid propellants, including the use of cryogenic fluids like liquid hydrogen as fuel, and liquid oxygen as an oxidizer (gases which have been liquefied at very low temperatures). These fluids require special handling, storage, and transfer technology. The biggest problem associated with transferring cryogenic liquids is product loss due to heat transfer. Vacuum jacketed piping is specifically designed to maintain high thermal efficiency so that cryogenic liquids can be transferred with minimal heat transfer. A vacuum jacketed pipe is essentially two pipes in one. There is an inner carrier pipe, in which the cryogenic liquid is actually transferred, and an outer jacket pipe that supports and seals the vacuum insulation, forming the "vacuum jacket." The integrity of the vacuum jacketed transmission lines that transfer the cryogenic fluid from delivery barges to the test stand must be maintained prior to and during engine testing. To monitor the vacuum in these vacuum jacketed transmission lines, vacuum gauge readings are used. At SSC, vacuum gauge measurements are done on a manual rotation basis with two technicians, each using a handheld instrument. Manual collection of vacuum data is labor intensive and uses valuable personnel time. Additionally, there are times when personnel cannot collect the data in a timely fashion (i.e., when a leak is detected, measurements must be taken more often). Additionally, distribution of this data to all interested parties can be cumbersome. To simplify the vacuum-gauge data collection process, automate the data collection, and decrease the labor costs associated with acquiring these measurements, an automated system that monitors the existing gauges was developed by Invocon, Inc. For this project, Invocon developed a Wireless Integrated Microelectronic Vacuum Sensor System (WIMVSS) that provides the ability to gather vacuum-gauge measurements automatically and wirelessly, in near-real time - using a low-maintenance, lowpower sensor mesh network. The WIMVSS operates by using a self-configuring mesh network of wireless sensor units. Mesh networking is a type of networking where each sensor or node can capture and disseminate its own data, but also serve as a relay to receive and transmit data from other sensors. Each sensor node can synchronize with adjacent sensors, and propagate data from one sensor to the next, until the destination is reached. In this case, the destination is a Network Interface Unit (NIU). The WIMVSS sensors are mounted on the existing vacuum gauges. Information gathered by the sensors is sent to the NIU. Because of the mesh networking, if a sensor cannot directly send the data to the NIU, it can be propagated through the network of sensors. The NIU requires antenna access to the sensor units, AC power, and an Ethernet connection. The NIU bridges the sensor network to a WIMVSS server via an Ethernet connection. The server is configured with a database, a Web server, and proprietary interface software that makes it possible for the vacuum measurements from vacuum jacketed fluid lines to be saved, retrieved, and then displayed from any Web-enabled PC that has access to the Internet. Authorized users can then simply access the data from any PC with Internet connection. Commands can also be sent directly from the Web interface for control and maintenance of the sensor network. The technology enabled by the WIMVSS decreases labor required for gathering vacuum measurements, increases access to vacuum data by making it available on any computer with access to the Internet, increases the frequency with which data points can be acquired for evaluating the system, and decreases the recurring cost of the sensors by using off-the-shelf components and integrating these with heritage vacuum gauges.

Krug, Eric↗

Laser Communications Relay Demonstration Optimetrics Experiment

Within this paper, we report on an Optimetrics experiment conducted on the National Aeronautics and Space Administration (NASA) Laser Communication Relay Demonstration (LCRD). The high precision two-way ranging is conducted on the optical communications link between the LCRD space terminal in a geosynchronous orbit and the Optical Ground Station 1 (OGS1) at Table Mountain, California, and is referred to as optimetrics ranging. The receiver to transmitter clock loopback is implemented in the LCRD space modem. A digital dual mixer time difference phase meter (DDMTD) is implemented in the OGS1 ground modem. The round-trip time is measured with the DDMTD by counting the frame and data clock ticks between transmitter and receiver frame synchronization markers for coarse range, and the relative phase of the transmit and receive clock for high precision range. This approach provides coverage for all potential ranges with no ranging ambiguity. The flight modem FPGA code was modified for frame and data clock loopback and the OGS1 FPGA code was modified for the DDMTD phase meter implementation. The experiment team conducted a 36-hour continuous ranging measurement. Preliminary two-way optimetrics ranging data show a noise floor of 3cm (rms). Based on our theoretical noise analysis and ground tests with spare flight modems, we expected one order of magnitude improvement on ranging precision. We are conducting detailed post data processing to identify the differences to further reduce the noise level and formulating an improved implementation approach for future missions. For reference and comparison, traditional Radio Frequency (RF) ranging between LCRD and OGS1 was conducted at the same time and indicates a ranging noise floor of 30cm(rms). Other telemetry and relevant environmental parameters such as weather and atmosphere temperature were also collected for offline data processing. The high precision ranging and range rate measurements from the laser communications data link clock and clock phase are performed simultaneously with continuous optical communication. No extra hardware added to existing system. This high precision optimetrics measurement implementation provides alternative ranging and range rate measurements for orbit determination (OD) and flight dynamics calculations with higher precision. We see significant improvement on OD for navigation upon implementation in future optical communication systems.

Rafael Garcia↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Spread Spectrum Time Domain Reflectivity for String Monitoring in PV Power Plants (Final Technical Report)

This final report describes the methods and results of applying Spread Spectrum Time Domain Reflectivity (SSTDR) for String Monitoring in PV Power Plants for DE-EE0008169. The project created a new system for both detecting and locating electrical faults in photovoltaic systems. In this work, we address photovoltaic electric faults that are both common and costly. Based on interviews with photovoltaic power plant owners, operators, and maintainers, three types of faults are common and of significant interest: disconnects, ground faults, and arc faults. Disconnects can originate from many sources. They are often due to everyday events, such as lawnmowing (accidentally running over a cable), animals eating through the cables, or degradation that occurs over time due to corrosion or general degradation. Ground faults occur when the cables (for example, due to frayed insolation) connect to the ground, relaying current into the ground. These faults are particularly problematic since the ground faults are often intermittent. That is, ground faults commonly appear during rain storms due to a change in soil conductivity and then disappear when the rain ends. This makes the ground fault difficult to find because while current systems can detect the overall change in voltage and current associated with a ground fault, technicians are necessary to locate the fault. As a result, ground faults may disappear before the technician arrives at the power plant. Hence, locating and fixing ground faults often require multiple trips. We also study arc faults, which can result when nearby conductors create an arc of electrical current through the air. While less common, arc faults can be extremely dangerous. The energetic electrical arc can cause fires and destroy equipment, costing significant damage. Overall all three types of faults cost owners and operators money, either from the destruction of equipment or from technician time. Furthermore, while devices exist for detecting ground faults (ground fault circuit interrupters) and arc faults (arc fault circuit interrupter), these systems only search patterns of electrical current that correspond to each fault. This information cannot be used to locate the fault. In addition, these protection systems experience nuisance trips due to nearby electromagnetic interference, such as from a lawn mower or other motors that produce significant amounts of electromagnetic radiation. Hence, the overall goal of this project is to create an SSTDR tool that provides photovoltaic power plants with more reliable fault detection in addition to the localization of faults. SSTDR works by transmitting electrical signals into the photovoltaic string. Those signals reflect from impedance discontinuities (i.e., disconnects, ground faults, and arc faults). These faults are then detected by measuring the presence of a reflection at the SSTDR and can be located by identifying the location of that reflection in time. In addition, unlike current protection systems, these systems do not experience nuisance trips since their low amplitude, high frequency, and coded signal can by analyzed without interference from the regular operational voltage on the photovoltaic string.

14 SOLAR ENERGY↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗