Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “First Quarter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Psychosocial issues in space: results from Shuttle/Mir

Important psychosocial issues involving tension, cohesion, leader support, and displacement of negative emotions were evaluated in a 4 1/2-year study involving five U.S. and four Russian Shuttle/Mir space missions. Weekly mood and group climate questionnaires were completed by five U.S. astronauts, eight Russian cosmonauts, and 42 U.S. and 16 Russian mission control subjects. There were few findings that supported our hypothesized changes in tension, cohesion, and leader support in crew and ground subjects using various time models, although crewmembers reported decreasing leader support in the 2nd half of the missions, and astronauts showed some evidence of a novelty effect in the first few weeks. There was no evidence suggesting a 3rd quarter effect among crewmembers on any of the 21 subscales evaluated. In contrast, there was strong evidence to support the hypothesized displacement of tension and negative emotions from crewmembers to mission control personnel and from mission control personnel to management. There were several significant differences in response between Americans vs. Russians, crewmembers vs. mission control personnel, and subjects in this study vs. people in comparable groups on Earth. Subject responses before, during, and after the missions were similar, and we did not find evidence for asthenia in space. Critical incidents that were reported generally dealt with events on-board the Mir and interpersonal conflicts, although most of the responses were from a relatively small number of subjects. Our findings have implications for future training and lead to a number of countermeasures.

short duration↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

The tubulin structure, a quarter of a century later

This retrospective on the 25th anniversary of the publication of the first structure of tubulin is shaped by my own personal experiences rather than being a strict and complete historical account of the event. It is a reflection on how working in science felt many years ago, on the struggles and the joys of reaching for the high-hanging fruit, and, ultimately, on how relevant or not our personal scientific contributions are to the broader scientific community. Writing it brought back memories of my unique and sadly lost postdoctoral advisor Ken Downing, who dreamt of this structure and brought it to fruition against all odds.

59 BASIC BIOLOGICAL SCIENCES↗

Cryogenic Cam Butterfly Valve

A cryogenic cam butterfly valve has a body that includes an axially extending fluid conduit formed there through. A disc lug is connected to a back side of a valve disc and has a circular bore that receives and is larger than a cam of a cam shaft. The valve disc is rotatable for a quarter turn within the body about a lug axis that is offset from the shaft axis. Actuating the cam shaft in the closing rotational direction first causes the camming side of the cam of the cam shaft to rotate the disc lug and the valve disc a quarter turn from the open position to the closed position. Further actuating causes the camming side of the cam shaft to translate the valve disc into sealed contact with the valve seat. Opening rotational direction of the cam shaft reverses these motions.

McCormack, Kenneth J.↗

Managing Fire Risk During Drought: The Influence of Certification and El Nino on Fire-Driven Forest Conversion for Oil Palm in Southeast Asia

Indonesia and Malaysia have emerged as leading producers of palm oil in the past several decades, expanding production through the conversion of tropical forests to industrial plantations. Efforts to produce "sustainable" palm oil, including certification by the Roundtable on Sustainable Palm Oil (RSPO), include guidelines designed to reduce the environmental impact of palm oil production. Fire-driven deforestation is prohibited by law in both countries and a stipulation of RSPO certification, yet the degree of environmental compliance isunclear, especially during El Niño events when drought conditions increase fire risk. Here, we used time series of satellite data to estimate the spatial and temporal patterns of fire-driven deforestation on and around oil palm plantations. In Indonesia, fire-driven deforestation accounted for one-quarter of total forest losses on both certified and noncertified plantations. After the first plantations in Indonesia received RSPO certification in 2009,forest loss and fire-driven deforestation declined on certified plantations but did not stop altogether. Oil palm expansion in Malaysia rarely involved fire; only 5 % of forest loss on certified plantations had coincident activefire detections. Interannual variability in fire detections was strongly influenced by El Nino and the timing of certification. Fire activity during the 2002, 2004, and 2006 El Nino events was similar among oil palm plantations in Indonesia that would later become certified, noncertified plantations, and surrounding areas. However, total fire activity was 75% and 66% lower on certified plantations than noncertified plantations during the 2009 and 2015 El Nino events, respectively. The decline in fire activity on certified plantations, including during drought periods, highlights the potential for RSPO certification to safeguard carbon stocks in peatlands and remaining forests in accordance with legislation banning fires. However, aligning certification standards with satellite monitoring capabilities will be critical to realize sustainable palm oil production and meet industry commitments to zero forestation.

Noojipady, Praveen↗

Remote Sensing of Earth Resources (1970-1973 Supplement): A Literature Survey with Indexes

This literature survey cites 4930 reports, articles and other documents that were announced between March 1970 and December 1973 in Scientific and Technical Aerospace Reports (STAR) or in International Aerospace Abstracts (IAA). This publication supplements Remote Sensing of Earth Resources (NASA-SP-7036) that cited documents announced between January 1962 and February 1970. Beginning in 1974, a quarterly publication, Earth Resources, A Continuing Bibliography (NASA-SP-7041) was initiated. The first issue, NASA-SP-7041(01), was published in June covering the document announced between January 1974 and March 1974. The coverage includes documents related to the identification and evaluation by means of sensors in spacecraft and aircraft of vegetation, minerals, and other natural resources, and the techniques and potentialities of surveying and keeping up-to-date inventories of such riches. It encompasses studies of such natural phenomena as earthquakes, volcanoes, ocean currents and magnetic fields; and such cultural phenomena as cities, transportation networks, and irrigation systems. Descriptions of the components and use of remote sensing and geophysical instrumentation, their subsystems, observational procedures, signature and analyses and interpretive techniques for gathering data are also included. Reports generated under NASA's Earth Resources Survey Program and announced during the period covered by this bibliography are included.

Source record↗

An estimate of equatorial wave energy flux at 9- to 90-day periods in the Central Pacific

Deep fluctuations in current along the equator in the Central Pacific are dominated by coherent structures which correspond closely to narrow-band propagating equatorial waves. Currents were measured roughly at 1500 and 3000 m depths at five moorings between 144 and 148 deg W from January 1981 to March 1983, as part of the Pacific Equatorial Ocean Dynamics program. In each frequency band resolved, a single complex empirical orthogonal function accounts for half to three quarters of the observed variance in either zonal or meridional current. Dispersion for equatorial first meridional Rossby and Rossby gravity waves is consistent with the observed vertical-zonal coherence structure. The observations indicate that energy flux is westward and downward in long first meridional mode Rossby waves at periods 45 days and longer, and eastward and downward in short first meridional mode Rossby waves and Rossby-gravity waves at periods 30 days and shorter. A local minimum in energy flux occurs at periods corresponding to a maximum in upper-ocean meridional current energy contributed by tropical instability waves. Total vertical flux across the 9- to 90-day period range is 2.5 kW/m.

Eriksen, Charles C.↗

RTF+SpeX Near-IR Images and Spectra of the Moon Pre-impact and at Impact of SMART-1

We present SpeX 0.8-2.5 micron spectra and Br-gamma or J H or K-band images of the Moon on 2006 July 10 UT, 2006 Sep 1 UT, and 2006 Sep 3 UT. The first two dates are data taken in preparation (near Full Moon and 1 st quarter Moon) for observing the impact of ESA's SMART-1 Lunar satellite on 2006 Sep 3 UT. We hope to be presenting images (about 1 arc minute by 1 arc minute), and low resolution (Prism mode) spectra of the SMART-1 impact to be taken with the 60 arc second long slit.

Wooden, Diane H.↗

Information expectations from Landsat-D

The first satellite of the Landsat-D Project is to be launched in the third quarter of 1982 with a second satellite to be prepared for launch 12 to 15 months later. Both spacecraft are to include the familiar Multispectral Scanner (MSS) and the advanced multispectral scanner called the Thematic Mapper (TM). The ground data processing system for the MSS data is to be ready to produce 200 scenes a day in 1982. The data processing systems for the TM are to be fully operational at the 50 to 100 scenes a day level in early 1985. The fabrication of the system components has proceeded well in recent months, and integration of the total system is under way. The procedures for processing the data and meeting specifications are nearly completed for the MSS and are outlined in detail for the TM. An outline of an investigation program stressing systems performance has been developed for the period 1982 to 1985.

Salomonson, V. V.↗

RF tuning element

A device for tuning a circuit includes a substrate, a transmission line on the substrate that includes first and second conductors coupled to a circuit to be tuned, and a movable short-circuit for varying the impedance the transmission line presents to the circuit to be tuned. The movable short-circuit includes a dielectric layer disposed atop the transmission line and a distributed shorting element in the form of a conductive member that is configured to be slid along at least a portion of the transmission line atop the dielectric layer. The conductive member is configured to span the first and second conductors of the transmission line and to define at least a first opening that spans the two conductors so that the conductive member includes first and second sections separated by the first opening. The first and second sections of the conductive member combine with the first and second conductors of the transmission line to form first and second low impedance sections of transmission line, and the opening combines with the first and second conductors of the transmission line and the dielectric layer to form a first high impedance section of transmission line intermediate the first and second low impedance sections. Each of the first low impedance section and the first high impedance section have a length along the transmission line of approximately one-quarter wavelength, thus providing a periodic variation of transmission line impedance. That enhances reflection of rf power.

McGrath, William R.↗

First lunar outpost

Design and research efforts at the University of Puerto Rico have focused on the evaluation and refinement of the Habitability Criteria for a prolonged human presence in space during the last four years. Living quarters for a Mars mission and a third generation lunar base concept were proposed. This academic year, 1991-92, work on further refinement of the habitability criteria and design of partial gravity furniture was carried on. During the first semester, design alternatives for furniture necessary in a habitat design optimized for lunar and Martian environments were developed. Designs are based on recent research data from lunar and Mars gravity simulations, and current NASA standards. Artifacts will be submitted to NASA architects to be tested in KC-135 flights. Test findings will be submitted for incorporation in future updates to NASA habitat design standards. Second semester work was aimed at integrating these findings into the First Lunar Outpost (FLO), a mission scenario currently being considered by NASA. The mission consists of a manned return to the moon by crews of four astronauts for periods of 45 days. The major hardware components of the mission are as follows: (1) a Crew Module for the delivery of the crew and their supplies, and (2) the Habitat Module, which will arrive on the Moon unmanned. Our design efforts concentrated on this Habitat Module and on application of habitability criteria. Different geometries for the pressure vessel and their impact on the interior architecture were studied. Upon the selection of a geometry, a more detailed analysis of the interior design was performed, taking into consideration the reduced gravity, and the protection against radiation, micrometeorites, and the extreme temperature variation. A proposal for a FLO was submitted by the students, consisting essentially of a 24-feet (7.3 m.) by 35-feet (10.67 m) high vertical cylinder with work areas, crew quarters, galley, wardroom, leisure facilities, health maintenance, waste management, EVA operations facilities, and safe havens.

Andino, Aureo F.↗

Single-Event Effect Report for EPC Series eGaN FETs: EPC1001, EPC1010, EPC1014, EPC1012

Heavy ion testing of newly available GaN FETs from EPC were tested in March of 2012 at TAM. The EPC1010, EPC1001, EPC1012, and EPC1014 were tested for general radiation response from gold and xenon ions. Overall the devices showed radiation degradation commensurate with breakdown in isolation oxides, and similar testing by EPC and Microsemi agrees with these data. These devices were the first generation production of the device called Gen1. Gen2 parts are scheduled for later in the third quarter of FY2012

Scheick, Leif↗

Single-Event Effect Report for EPC Series eGaN FETs: EPC1001, EPC1010, EPC1014, EPC1012

Heavy ion testing of newly available GaN FETs from EPC were tested in March of 2012 at TAM. The EPC1010, EPC1001, EPC1012, and EPC1014 were tested for general radiation response from gold and xenon ions. Overall the devices showed radiation degradation commensurate with breakdown in isolation oxides, and similar testing by EPC and Microsemi agrees with these data. These devices were the first generation production of the device called Gen1. Gen2 parts are scheduled for later in the third quarter of FY2012

Scheick, Leif↗

The low-noise 115-GHz receiver on the Columbia-GISS 4-ft radio telescope

The superheterodyne millimeter-wave radiometer on the Columbia-GISS 4-ft telescope is described. This receiver uses a room-temperature Schottky diode mixer, with a resonant-ring filter as LO diplexer. The diplexer has low signal loss, efficient LO power coupling, and suppresses most of the LO noise at both sidebands. The receiver IF section has a parametric amplifier as its first stage with sufficient gain to overcome the second-stage amplifier noise. A broad-banded quarter-wave impedance transformer minimizes the mismatch between mixer and paramp. At 115 GHz, the SSB receiver noise temperature is 860 K, which is believed to be the lowest figure so far reported for a room-temperature receiver at this frequency.

Cong, H.-I.↗

Preliminary Evaluation of the Low-Speed Stability and Control Characteristics of the McDonnell XP-85 Airplane from Tests of an Unballasted 1/5-Scale Model in the Langley Free-Flight Tunnel

At the request of the Air Material Command, Army Air Forces an investigation of the low-speed, power-off stability and control characteristics of the McDonnell XP-85 airplane is being conducted in the Langley free-flight tunnel. The XP-85 airplane is a jet propelled, parasite fighter with a 34 deg sweepback at the wing quarter chord. It was designed to be carried in a bomb bay of the B-36 air plane. The first portion of the investigation consists of a preliminary evaluation of the stability and control characteristics of the airplane from force and fight tests of an unballasted 1/5-scale model. The second portion of the investigation consists of test of a properly balasted 1/10-scale model which will include a study of the stability of the Xp-85 when attached to the trapeze for retraction into the B-36 bomb bay. The results of the preliminary test with the 1/5-scale model are presented herein. This portion fo the investigation included tests of the model with various center fin arrangements. Both the design nose flap and a stall control vane were investigated.

Paulson, John W.↗

Publications of Goddard Space Flight Center, 1964. Volume I - Space sciences

This publication is a collection of articles, papers, talks, and reports generated by the scientific and engineering staff of Goddard Space Flight Center in the year 1964. Many of these articles were originally published in scientific or engineering Journals or as official NASA technical publications, while other are documents of a more informal nature. All are reprinted here as nearly verbatim as typography and format will permit. These articles are grouped into broad subject categories, but no detailed subdivision has been made. Within each category, the articles are arranged alphabetically by author. An overall author index is given in the back of the volume. The years 1963, 1964, and 1965 are being published as whole-year issues, and the resulting size dictates the use of two volumes; the first volume is titled Space Sciences, and the second Space Technology. It is anticipated, however, that future issues will be quarterly single volumes.

IONOSPHERE↗

Timing analysis of low-energy gamma ray emission from galactic compact objects using the Gamma Ray Observatory

The principal goal of our phase 1 investigation was the development of techniques and data analysis tools for pulsar searches and timing. After the launch of the Compton Observatory, we received from the Burst and Transient Source Experiment (BATSE) team one day of discriminator large area (DISCLA) data for use in the development and testing of data analysis techniques. Using this first day of data for testing and optimizing our timing tools we detected four x-ray binary pulsars, Vela X-1, Cen X-3, 4U 0115+63, and GX 301-2. Subsequently, we received four more days of data, allowing us to test our timing tools with data from a variety of days. In summary, using the tools we developed based on the first day of data that we received, we have detected 8 pulsars in 5 days of data, or roughly one quarter of the approximately 30 known x-ray binary pulsars. In addition to the pulsars listed above, we detected GX 1+4, 4U 1626-67, OAO 1657-415, and Her X-1. Many of the data analysis tools that we developed have been ported to MSFC and are being used for the analysis of BATSE data. This appendix describes some of the timing tools and presents preliminary pulse period and phase profile results.

Prince, Thomas A.↗

Low-Noise Large-Area Photoreceivers with Low Capacitance Photodiodes

A quad photoreceiver includes a low capacitance quad InGaAs p-i-n photodiode structure formed on an InP (100) substrate. The photodiode includes a substrate providing a buffer layer having a metal contact on its bottom portion serving as a common cathode for receiving a bias voltage, and successive layers deposited on its top portion, the first layer being drift layer, the second being an absorption layer, the third being a cap layer divided into four quarter pie shaped sections spaced apart, with metal contacts being deposited on outermost top portions of each section to provide output terminals, the top portions being active regions for detecting light. Four transimpedance amplifiers have input terminals electrically connected to individual output terminals of each p-i-n photodiode.

Joshi, Abhay M.↗