Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230

Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA comes from the diversity of facilities to be dismantled, which are predominantly research facilities and therefore have no series advantage. There is tremendous operating feedback, however. For more than twenty years in all its centres, the CEA has acquired experience and know-how through dismantling research reactors or critical models and laboratories or plants. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing from two dedicated funds, close to euro 15,000 Millions for the next thirty years, for current or projected dismantling operations, the Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2020, the dismantling of the UP1 plant at Marcoule, one of the largest dismantling works in the world, will be well advanced, with all the process equipment dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems, Using a Bottom-Up Approach and Installer Survey – Second Edition

This report presents results from the second U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs -- often referred to as 'business process' or 'soft' costs -- for U.S. residential and commercial photovoltaic (PV) systems. In service to DOE's SunShot Initiative, annual expenditure and labor-hour-productivity data are analyzed to benchmark 2012 soft costs related to (1) customer acquisition and system design (2) permitting, inspection, and interconnection (PII). We also include an in-depth analysis of costs related to financing, overhead, and profit. Soft costs are both a major challenge and a major opportunity for reducing PV system prices and stimulating SunShot-level PV deployment in the United States. The data and analysis in this series of benchmarking reports are a step toward the more detailed understanding of PV soft costs required to track and accelerate these price reductions.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Stringfellow Superfund Site in Riverside, California

This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on the Stringfellow Superfund Site in Riverside, California. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electricrate of $0.13/kWh and incentives offered by Southern California Edison under the California Solar Initiative. According to the assessment, a government-owned, ground-mounted PV system represents a technically and economically feasible option. The report recommends financing options that could assist in the implementation of such a system.

14 SOLAR ENERGY↗

Solar Technical Assistance Team (STAT) (Fact Sheet)

The Solar Technical Assistance Team (STAT) is a team of solar technology and deployment experts who ensure that the best information on policies, regulations, financing and other issues is getting into the hands of state government decision makers at the time they need it. The goal of the team is to provide timely, unbiased expertise to assist key policy makers and regulators in making informeddecisions.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics in the Commonwealth of Puerto Rico

This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on brownfield sites in the Commonwealth of Puerto Rico. All of the assessed sites are landfills. The sites were assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potentialsystems were analyzed using an electric rate of $0.119/kWh and incentives offered by Puerto Rico and by the serving utility, PREPA. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Refuse Hideaway Landfill in Middleton, Wisconsin

This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on a brownfield site at the Refuse Hideaway Landfill in Middleton, Wisconsin. The site currently has a PV system in place and was assessed for further PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics ofthe potential systems were analyzed using an electric rate of $0.1333/kWh and incentives offered by the State of Wisconsin and by the serving utility, Madison Gas and Electric. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in theimplementation of such a system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Banking on Solar: An Analysis of Banking Opportunities in the U.S. Distributed Photovoltaic Market

This report provides a high-level overview of the developing U.S. solar loan product landscape, from both a market and economic perspective. It covers current and potential U.S. solar lending institutions; currently available loan products; loan program structures and post-loan origination options; risks and uncertainties of the solar asset class as it pertains to lenders; and an economic analysis comparing loan products to third party-financed systems in California.

14 SOLAR ENERGY↗

Meeting Summary of Kitchen Cabinet on Financial Due Diligence to Reduce Proliferation Risks

The U.S. Department of Energy’s Pacific Northwest National Laboratory convened the Kitchen Cabinet (KC) to facilitate a candid discussion about the role of financial institutions (FIs) in antiproliferation efforts to reduce nuclear proliferation risks by identifying suspicious business transactions and exports when making lending or insurance decisions. The meeting brought together a group of export control specialists, largely representatives from the Nuclear Suppliers Group (NSG) Participating Governments (PGs) and finance experts representing banks and insurance companies. By assembling a KC of experts, the group could understand what suspicious transactions look like from each other’s perspectives and better inform each of their operations. The goal was to develop red flags FIs could use to identify suspicious proliferation-related transactions and to help governments gain a clearer picture of proliferation using financial information.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Seams issues in European transmission investments

European policy goals are challenging for transmission networks, requiring investments in cross-border capacity. Despite those goals, an increased awareness of the need for investments and the voluntary cooperation among countries sharing the challenges, a regulatory gap between national and European interests persists. Further development of a European cross-border planning and financing framework is required. U.S. experiences may serve as food for thought. (author)

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financial sustainability in municipal solid waste management – Costs and revenues in Bahir Dar, Ethiopia

Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Global Onshore Wind Energy Potential and Generation Costs

In this study, we develop an updated global estimate of onshore wind energy potential using reanalysis wind speed data, along with updated wind turbine technology performance and cost assumptions as well as explicit consideration of transmission distance in the calculation of transmission costs. We find that wind has the potential to supply a significant portion of world energy needs, although this potential varies substantially by region as well as with assumptions such as on what types of land can be used to site wind farms. Total global wind potential under central assumptions is estimated to be approximately 89 petawatt hours per year at less than 9 cents/kWh with substantial regional variations. One limitation of global wind analyses is that the resolution of current global wind speed reanalysis data can result in an underestimate of high wind areas. A sensitivity analysis of eight key parameters is presented. Wind potential is sensitive to a number of input parameters, particularly those related to land suitability and turbine density as well as cost and financing assumptions which have important policy implications. Transmission cost has a relatively small impact on total wind costs, changing the potential at a given cost by 20-30%. As a result of sensitivities studied here we suggest that further research intended to inform wind supply curve development focus not purely on physical science, such as better resolved wind maps, but also on these less well-defined factors, such as land-suitability, that will also have an impact on the long-term role of wind power.

17 WIND ENERGY↗

Overview of nuclear energy: Present and projected use

Several factors will influence the contribution of nuclear energy to the future energy mix. Among them, the most important are the degree of global commitment to greenhouse gas reduction, continued vigilance in safety and safeguards, technological advances, economic competitiveness and innovative financing arrangements for new nuclear power plant constructions, the implementation of nuclear waste disposal, and, last but not least, public perception, information and education. The paper presents an overview of the current nuclear energy situation, possible development scenarios, of reactor technology, and of non-electric applications of nuclear energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Joint Evaluation of System Host and Developer Financial Perspectives within the System Advisor Model

The System Advisor Model (SAM)11https://sam.nrel.gov already contains several RE project financing including residential mortgage, commercial loan partnership flips, and third-party ownership. However, a variety of SAM users wanted to evaluate a system in which a third party owned the system, both from the developer's perspective and the system host perspective concurrently. Therefore, a new host and developer co-model has been added and is described. This model effectively combines the previously-released 'third party ownership' and 'Single owner' models into the same analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

First Known Use of QECBs will Save Yolo County at Least $8.7 Million Over the Next 25 Years, Energy Analysis (Revised) (Brochure)

Yolo County, California, made history in July when officials installed a 1 MW solar PV project to supply power to both a jail and juvenile center. The project is noteworthy for at least two reasons: It is the first known use of qualified energy conservation bonds (QECBs) and, subsequently, the first known combined use of QECBs and clean renewable energy bonds (CREBs) in the country. This articleoutlines the process the county underwent to finance the installation as well as the ways in which it helped make the process easier for itself.

14 SOLAR ENERGY↗