Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Data for Aboveground rather than belowground productivity drives variability in Miscanthus x giganteus net primary productivity

This dataset contains the data used for the publication “Aboveground rather than belowground productivity drives variability in Miscanthus x giganteus net primary productivity”. This dataset contains Miscanthus x giganteus biomass, carbon, and nitrogen tissue data for aboveground and belowground plant parts collected in 2021 for three different sites in Iowa with three different nitrogen application rates. Data at the Iowa sites were collected via biometric hand harvesting, belowground excavations, and soil coring both in-clump and beside-clump. Data were collected at two collection timepoints to calculate the contributions of belowground parts to Miscanthus x giganteus net primary productivity. This dataset also includes Miscanthus x giganteus and Switchgrass soil coring and excavation data collected in 2012 at the University of Illinois Urbana Champaign Energy Farm.

Belowground Biomass↗

Influence of Clastic Dikes on Vertical Migration of Contaminants at the Hanford Site

Clastic dikes are subvertical sedimentary features that cut through horizontally layered sediments, and they are common at the Hanford Site. Because of their cross-cutting relationship with the surrounding matrix, they have been proposed as potential fast paths from former contaminant discharge sites at the surface to the water table. However, little was known of the detailed hydrogeologic properties of the dikes and detailed modeling of flow and transport through the dikes had not been performed. We excavated a 2 m wide clastic dike at the Hanford Site and characterized it using an air minipermeameter, infrared imagery, and grain size analyses. Field injection experiments were also used to characterize the system. The resulting data were used to prepare a detailed numerical model of the clastic dike and surrounding matrix for a portion of the excavation. Unsaturated flow and transport through the system were modeled for several recharge rates. The highly heterogeneous nature of the system led to complex behavior, with the relative flux rates in the matrix and clastic dike being highly dependent on the recharge rates that were imposed on the system. The study suggests that the potential role of clastic dikes in vertical transport at the Hanford Site would depend on the leakage rate, and that areas of contaminant deposition formed at high flow rates might become isolated at low flow rates, and vice-versa. The results may also help explain the occurrence of complex breakthrough patterns of contaminants at the water table.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary studies of tunnel interface response modeling using test data from underground storage facilities.

In attempting to detect and map out underground facilities, whether they be large-scale hardened deeply-buried targets (HDBT's) or small-scale tunnels for clandestine border or perimeter crossing, seismic imaging using reflections from the tunnel interface has been seen as one of the better ways to both detect and delineate tunnels from the surface. The large seismic impedance contrast at the tunnel/rock boundary should provide a strong, distinguishable seismic response, but in practice, such strong indicators are often lacking. One explanation for the lack of a good seismic reflection at such a strong contrast boundary is that the damage caused by the tunneling itself creates a zone of altered seismic properties that significantly changes the nature of this boundary. This report examines existing geomechanical data that define the extent of an excavation damage zone around underground tunnels, and the potential impact on rock properties such as P-wave and S-wave velocities. The data presented from this report are associated with sites used for the development of underground repositories for the disposal of radioactive waste; these sites have been excavated in volcanic tuff (Yucca Mountain) and granite (HRL in Sweden, URL in Canada). Using the data from Yucca Mountain, a numerical simulation effort was undertaken to evaluate the effects of the damage zone on seismic responses. Calculations were performed using the parallelized version of the time-domain finitedifference seismic wave propagation code developed in the Geophysics Department at Sandia National Laboratories. From these numerical simulations, the damage zone does not have a significant effect upon the tunnel response, either for a purely elastic case or an anelastic case. However, what was discovered is that the largest responses are not true reflections, but rather reradiated Stoneley waves generated as the air/earth interface of the tunnel. Because of this, data processed in the usual way may not correctly image the tunnel. This report represents a preliminary step in the development of a methodology to convert numerical predictions of rock properties to an estimation of the extent of rock damage around an underground facility and its corresponding seismic velocity, and the corresponding application to design a testing methodology for tunnel detection.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

54 ENVIRONMENTAL SCIENCES↗

Assessing Potential Acidification of Marine Archaeological Wood Based on Concentration of Sulfur Species

The presence of sulfur in marine archaeological wood presents a challenge to conservation. Upon exposure to oxygen, sulfur compounds in waterlogged wooden artifacts are being oxidized, producing sulfuric acid. This speeds the degradation of the wood, potentially damaging specimens beyond repair. Sulfur K-edge x-ray absorption spectroscopy was used to identify the species of sulfur present in samples from the timbers of the Mary Rose, a preserved 16th century warship known to undergo degradation through acidification. The results presented here show that sulfur content varied significantly on a local scale. Only certain species of sulfur have the potential to produce sulfuric acid by contact with oxygen and seawater in situ, such as iron sulfides and elemental sulfur. Organic sulfurs, such as the amino acids cysteine and methionine, may produce acid but are integral parts of the wood's structure and may not be released from the organic matrix. The sulfur species contained in the sample reflect the exposure to oxygen while submerged, and this exposure can differ greatly over time and position. A better understanding of the species pathway to acidifications required, along with its location, in order to suggest a more customized and effective preservation strategy. Waterlogged archaeological wood, frequently in the form of shipwrecks, is being excavated for historical purposes in many countries around the world. Even after extensive efforts towards preservation, scientists are discovering that accumulation of sulfate salts results in acidic conditions on the surfaces of the artifacts. Sulfuric acid degrades structural fibers in the wood by acid hydrolysis of cellulose, accelerating the decomposition of the ship timbers. Determining the sulfur content of waterlogged wood is now of great importance in maritime archaeology. Artifact preservation is often more time consuming and expensive than the original excavation; but it is key to the availability of objects for future study as well as maintaining the integrity of historical data and preserving the value of museum pieces. Sulfur occurs in a wide number of oxidation states from -2 to +6, and appears in numerous organic and inorganic compounds in nature. However, it is a very minor component of wood. Sulfur K-edge x-ray absorption spectroscopy (XAS) is a valuable technique because it has the ability to detect very low concentrations of sulfur in the specimen. XAS is also sensitive to differences in oxidation states, as well as long and short range order in molecules.

09 BIOMASS FUELS↗

Experimental and Numerical Investigations of Soil Desiccation for Vadose Zone Remediation: Report for Fiscal Year 2007

Apart from source excavation, the options available for the remediation of vadose zone metal and radionuclide contaminants beyond the practical excavation depth (0 to 15 m) are quite limited. Of the available technologies, very few are applicable to the deep vadose zone with the top-ranked candidate being soil desiccation. An expert panel review of the work on infiltration control and supplemental technologies identified a number of knowledge gaps that would need to be overcome before soil desiccation could be deployed. The report documents some of the research conducted in the last year to fill these knowledge gaps. This work included 1) performing intermediate-scale laboratory flow cell experiments to demonstrate the desiccation process, 2) implementing a scalable version of Subsurface Transport Over Multiple Phases–Water-Air-Energy (STOMP-WAE), and 3) performing numerical experiments to identify the factors controlling the performance of a desiccation system.

54 ENVIRONMENTAL SCIENCES↗

Modeling Coupled Processes in Clay Formations for Radioactive Waste Disposal

As a result of the termination of the Yucca Mountain Project, the United States Department of Energy (DOE) has started to explore various alternative avenues for the disposition of used nuclear fuel and nuclear waste. The overall scope of the investigation includes temporary storage, transportation issues, permanent disposal, various nuclear fuel types, processing alternatives, and resulting waste streams. Although geologic disposal is not the only alternative, it is still the leading candidate for permanent disposal. The realm of geologic disposal also offers a range of geologic environments that may be considered, among those clay shale formations. Figure 1-1 presents the distribution of clay/shale formations within the USA. Clay rock/shale has been considered as potential host rock for geological disposal of high-level nuclear waste throughout the world, because of its low permeability, low diffusion coefficient, high retention capacity for radionuclides, and capability to self-seal fractures induced by tunnel excavation. For example, Callovo-Oxfordian argillites at the Bure site, France (Fouche et al., 2004), Toarcian argillites at the Tournemire site, France (Patriarche et al., 2004), Opalinus clay at the Mont Terri site, Switzerland (Meier et al., 2000), and Boom clay at Mol site, Belgium (Barnichon et al., 2005) have all been under intensive scientific investigations (at both field and laboratory scales) for understanding a variety of rock properties and their relations with flow and transport processes associated with geological disposal of nuclear waste. Clay/shale formations may be generally classified as indurated and plastic clays (Tsang et al., 2005). The latter (including Boom clay) is a softer material without high cohesion; its deformation is dominantly plastic. For both clay rocks, coupled thermal, hydrological, mechanical and chemical (THMC) processes are expected to have a significant impact on the long-term safety of a clay repository. For example, the excavation-damaged zone (EDZ) near repository tunnels can modify local permeability (resulting from induced fractures), potentially leading to less confinement capability (Tsang et al., 2005). Because of clay's swelling and shrinkage behavior (depending on whether the clay is in imbibition or drainage processes), fracture properties in the EDZ are quite dynamic and evolve over time as hydromechanical conditions change. To understand and model the coupled processes and their impact on repository performance is critical for the defensible performance assessment of a clay repository. Within the Natural Barrier System (NBS) group of the Used Fuel Disposition (UFD) Campaign at DOE's Office of Nuclear Energy, LBNL's research activities have focused on understanding and modeling such coupled processes. LBNL provided a report in this April on literature survey of studies on coupled processes in clay repositories and identification of technical issues and knowledge gaps (Tsang et al., 2010). This report will document other LBNL research activities within the natural system work package, including the development of constitutive relationships for elastic deformation of clay rock (Section 2), a THM modeling study (Section 3) and a THC modeling study (Section 4). The purpose of the THM and THC modeling studies is to demonstrate the current modeling capabilities in dealing with coupled processes in a potential clay repository. In Section 5, we discuss potential future R&D work based on the identified knowledge gaps. The linkage between these activities and related FEPs is presented in Section 6.

54 ENVIRONMENTAL SCIENCES↗

Overview of NASA's Break the Ice Lunar Challenge

This paper provides the background, status and ongoing plans by NASA’s CentennialChallenges Program (CCP) in developing “Break the Ice Lunar Challenge”. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon. As a direct result of NASA’s Space Policy Directive 1 (To the Moon, then Mars”), CCP organized a kickoff meeting in October 2019 where Subject Matter Experts (SME) from various NASA centers got together and identified the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. Following the kickoff meeting, CCP in partnership with external challenge consultants conducted in-depth interviews with experts from academia, industry, and NASA over a period of two months to further identify any technology gaps and the status of the current state of the art technologies in these areas. Through these activities, we determined that there is sufficient need and opportunity to move forward and develop this into a robust challenge. As a nextstep, CCP organized a workshop in February 2020 where experts from academia, industry, NASA, and other government agencies met to validate the specific technology need and prioritize those needs in such a way that the potential challenge can address the high priority needs. Since the completion of this workshop, a core challenge development team has been working on the challenge scenarios, rules, and requirements with the goal to open the challenge in Nov 2020.

Centennnial Challenges↗

INTERIM BARRIER AT HANFORDS TY FARM TO PROTECT GROUNDWATER AT THE HANFORD SITE WASHINGTON USA

An innovative interim surface barrier was constructed as a demonstration project at the Hanford Site's TY Tank Farm. The purpose of the demonstration barrier is to stop rainwater and snowmelt from entering the soils within the tank farm and driving contamination from past leaks and spills toward the ground water. The interim barrier was constructed using a modified asphalt material with very low permeability developed by MatCon{reg_sign}. Approximately 2,400 cubic yards of fill material were added to the tank farm to create a sloped surface that will gravity drain precipitation to collection points where it will be routed through buried drain lines to an evapotranspiration basin adjacent to the farm. The evapotranspiration basin is a lined basin with a network of perforated drain lines covered with soil and planted with native grasses. The evapotranspiration concept was selected because it prevents the runoff from percolating into the soil column and also avoids potential monitoring and maintenance issues associated with standing water in a traditional evaporation pond. Because of issues associated with using standard excavation and earth moving equipment in the farm a number of alternate construction approaches were utilized to perform excavations and prepare the site for the modified asphalt.

54 ENVIRONMENTAL SCIENCES↗

Plowshare Program - American Atomic Bomb Tests For Industrial Applications

The United States Atomic Energy Commission (AEC) established the Plowshare Program as a research and development activity to explore the technical and economic feasibility of using nuclear explosives for industrial applications. The reasoning was that the relatively inexpensive energy available from nuclear explosions could prove useful for a wide variety of peaceful purposes. The Plowshare Program began in 1958 and continued through 1975. Between December 1961 and May 1973, the United States conducted 27 Plowshare nuclear explosive tests comprising 35 individual detonations. Conceptually, industrial applications resulting from the use of nuclear explosives could be divided into two broad categories: 1) large-scale excavation and quarrying, where the energy from the explosion was used to break up and/or move rock; and 2) underground engineering, where the energy released from deeply buried nuclear explosives increased the permeability and porosity of the rock by massive breaking and fracturing. Possible excavation applications included: canals, harbors, highway and railroad cuts through mountains, open pit mining, construction of dams, and other quarry and construction-related projects. Underground nuclear explosion applications included: stimulation of natural gas production, preparation of leachable ore bodies for in situ leaching, creation of underground zones of fractured oil shale for in situ retorting, and formation of underground natural gas and petroleum storage reservoirs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technology Solutions Case Study: Excavationless: Exterior-Side Foundation Insulation for Existing Homes

Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. This project describes an innovative, minimally invasive foundation insulation upgrade technique on an existing home that uses hydrovac excavation technology combined with a liquid insulating foam. Cost savings over the traditional excavation process ranged from 23% to 50%. The excavationless process could result in even greater savings since replacement of building structures, exterior features, utility meters, and landscaping would be minimal or non-existent in an excavationless process.

Building America↗

Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Water Treatment at a United States Environmental Protection Agency Superfund Site - 12322

A water treatment system at a United States Environmental Protection Agency (USEPA) Superfund site impacted by radiological contaminants is used to treat water entering the site. The United States Army Corps of Engineers (USACE) is actively managing the remedial action for the USEPA using contracts to support the multiple activities on site. The site is where former gas mantle production facilities operated around the turn of the century. The manufacturing facilities used thorium ores to develop the mantles and disposed of off-specification mantles and ore residuals in the surrounding areas. During Site remedial actions, both groundwater and surface water comes into contact with contaminated soils and must be collected and treated at an on-site treatment facility. The radionuclides thorium and radium with associated progeny are the main concern for treatment. Suspended solids, volatile organic compounds, and select metals are also monitored during water treatment. The water treatment process begins were water is pumped to a collection tank where debris and grit settle out. Stored water is pumped to a coagulant tank containing poly-aluminum chloride to collect dissolved solids. The water passes into a reaction tube where aspirated air is added or reagent added to remove Volatile Organic Compounds (VOC'S) by mass transfer and convert dissolved iron to a solid. The water enters the flocculent polymer tank to drop solids out. The flocculated water overflows to a fluidized bed contact chamber to increase precipitation. Flocculation is where colloids of material drop out of suspension and settle. The settled solids are periodically removed and disposed of as radioactive waste. The water is passed through filters and an ion exchange process to extract the radionuclides. Several million liters of water are processed each year from two water treatment plants servicing different areas of the remediation site. Ion exchange resin and filter material are periodically replaced and disposed of as radioactive waste. A total of 0.85 m{sup 3} of waste sludge per year requires disposal on average, in addition to another 6.6 m{sup 3} of waste cartridge filters. All water discharges are regulated by a state of New Jersey Pollutant Discharge Elimination System Permit implemented by the Federal Water Pollution Control Act (Clean Water Act). Laboratory analyses are required to satisfy requirements of the state NPDES permit. Specific monitoring parameters and discharge rates will be provided. Use of the water treatment systems drastically reduces the amount of contaminated water requiring solidification and water disposal to near zero. Millions of liters of potentially contaminated water from excavation activities is treated and released within permit limits. A small volume of solid radioactive waste (21 cubic meters) is generated annually from water treatment process operations. Management of ground and surface water is effectively controlled in remediation areas by the use of sumps, erosion control measures and pumping of water to storage vessels. Continued excavations can be made as water impacting the site is effectively controlled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Steel-pipe Vertical Pipe Units - 18238

The 618-10 Burial Ground is approximately 485 feet by 470 feet and consisted of 12 trenches and 94 VPUs. It is located approximately 5 miles north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). The 618-10 Burial Ground contained approximately 94 VPUs (uncertain mix of first and second generation). There are different variants of VPUs. The first generation of VPUs was simply corrugated culverts or standard pipes, 14-in diameter and 10- to 15-ft long, buried vertically. The second generation of VPUs was 22-in diameter, 15-ft long waste receptacles constructed by welding five 55-gallon bottomless drums together end-to-end and burying them vertically, separated by approximately 10 feet on center in rows approximately 25 feet apart. A subset of the first generation VPUs consisted of the steel pipe VPUs represented by carbon-steel pipes, 10 to 24 in. in diameter with various wall thicknesses. This paper will present the remediation of the steel-pipe VPUs, which were the last of the VPUs remediated in this project. The remediation process developed for steel pipe VPUs included exposing a section of the VPU within an excavated trench, placing a mix box around the VPU, filling the mix box with grout, shearing the VPU and contents, and then removing the grout waste mixture into a waste box for disposal at the Hanford Environmental Restoration Disposal Facility (ERDF). Prior the start of remedial activities extensive mock-ups were performed on surrogate steel-pipe VPUs to ensure the effectiveness of the process before introducing the hazards of radioactive VPU waste. The critical steps in the process of size reducing steel-pipe VPUs and mixing the contents with grout was successfully demonstrated. This process was completed for each steel-pipe VPU in successive lifts until the entire set of steel-pipe VPUs were mixed in grout and removed from the excavation. The remediation of the steel-pipe VPUs proved be successful in that all the VPUs were removed and transported to ERDF without a release to the local environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Key Technical Issues for Greater-Than-Class-C (GTCC) Waste Disposal - 20164

Greater-than-Class C (GTCC) waste is low-level waste (LLW) that exceeds the Class C concentrations tabulated in Title 10, Code of Federal Regulations (CFR), Part 61. Disposal of GTCC waste in the near surface (i.e. upper 30 m of the earth's surface) is prohibited in the United States. Though GTCC waste disposal is generally prohibited, the Commission can approve disposal according to 10 CFR 61.55(a)(2)(iv) on a case-by-case basis. The waste classification tables, developed in the early 1980's, were based on model projections of dose to an inadvertent intruder in agricultural, construction, and discovery exposure scenarios. The assumptions and parameters used were documented in a series of public reports. Though different disposal facility designs and site conditions were considered, the waste classification tables were based on a disposal facility design located in a specific environment. The tables were based on shallow (i.e., top few meters) trench facility designs and did not consider deeper facilities. To determine the suitability of GTCC waste disposal in the near-surface, site-specific analyses must account for differences between GTCC waste and Class A, B, and C LLW (hereafter, traditional LLW). GTCC waste can have concentrations of radionuclides that are much higher than traditional LLW. Because of these higher concentrations, processes that are typically not significant for traditional LLW may be significant with respect to disposal of GTCC waste. These processes include, but are not limited to, heat generation, criticality, and radiolysis. The form of the waste as well as the barriers to release of the waste (e.g. waste package) could be substantially different than they are for traditional LLW. These barriers need to be considered when assessing the impacts of accidents during receipt and placement and in evaluating long-term performance. Some GTCC radioactivity is either embedded in stainless steel or contained in stainless steel barriers. Stainless steel can have very low corrosion rates under a variety of environmental conditions. Finally, and possibly most importantly, GTCC waste would likely need to be disposed deeper than traditional LLW to reduce the probability of disturbance. The waste classification table values of traditional LLW are based on an inadvertent intruder excavating into the waste and bringing some of the material to the land surface. If waste is deeper than approximately 5 m, the excavation scenario becomes very unlikely. Therefore, other intruder scenarios, such as drilling exposure scenarios, need to be evaluated. This paper summarizes key technical issues for the disposal of GTCC waste. Our previous study shows that certain GTCC waste may be suitable for near surface disposal whereas others may not. This study may support ongoing technical analyses assessing potential disposal of GTCC in a near surface disposal facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Approach to Sampling and Survey for Radiological Contaminants to Release Overburden Soil for Reuse - 20120

Various methods may be utilized to determine if overburden soil meets approved release criteria to allow for reuse of overburden soil as backfill material: soil scanning and sorting equipment, survey and sampling of excavated soil, in-situ sampling, and utilization of box or truck counters are common approaches. This paper focuses on a modified approach using elements of in-situ sampling and after excavation survey for a large volume of overburden soil that was expected to meet soil release criteria. This approach was utilized for the U.S. Army Corps of Engineers (USACE) St. Louis District at a North St. Louis County property. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stability investigation and stabilization of a heavily fractured and loosened rock slope during construction of a strategic hydropower station in China

This paper presents a case history of the 205 m high intake slope at the Huangjinping (HJP) hydropower station on the Dadu River. Deformation and cracks developed on the cut slope during excavation, and the deformation extended onto the natural slope above the cut, giving rise to serious safety concerns. Research was conducted to study the engineering geological conditions and the deformation characteristics of the slope during excavation. In situ monitoring data and possible causes of cracking were analyzed. The results show that the zone of loosened rock mass extended much deeper into the rock mass than it did at other sites in the region because of the tectonic history of the site and cutting. The empirically designed cable anchors with lengths of 40 m or 45 m were insufficient to stabilize the slope, while the remedial cable anchors as long as 100 m successfully stabilized the slope. The analytic method and procedure used in this paper could be useful to similar projects.

42 ENGINEERING↗