Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design Reference Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Small Fast Spectrum Reactor Designs Suitable for Direct Nuclear Thermal Propulsion

Advancement of U.S. scientific, security, and economic interests through a robust space exploration program requires high performance propulsion systems to support a variety of robotic and crewed missions beyond low Earth orbit. Past studies, in particular those in support of the Space Exploration Initiative (SEI), have shown nuclear thermal propulsion systems provide superior performance for high mass high propulsive delta-V missions. The recent NASA Design Reference Architecture (DRA) 5.0 Study re-examined mission, payload, and transportation system requirements for a human Mars landing mission in the post-2030 timeframe. Nuclear thermal propulsion was again identified as the preferred in-space transportation system. A common nuclear thermal propulsion stage with three 25,000-lbf thrust engines was used for all primary mission maneuvers. Moderately lower thrust engines may also have important roles. In particular, lower thrust engine designs demonstrating the critical technologies that are directly extensible to other thrust levels are attractive from a ground testing perspective. An extensive nuclear thermal rocket technology development effort was conducted from 1955-1973 under the Rover/NERVA Program. Both graphite and refractory metal alloy fuel types were pursued. Reactors and engines employing graphite based fuels were designed, built and ground tested. A number of fast spectrum reactor and engine designs employing refractory metal alloy fuel types were proposed and designed, but none were built. The Small Nuclear Rocket Engine (SNRE) was the last engine design studied by the Los Alamos National Laboratory during the program. At the time, this engine was a state-of-the-art graphite based fuel design incorporating lessons learned from the very successful technology development program. The SNRE was a nominal 16,000-lbf thrust engine originally intended for unmanned applications with relatively short engine operations and the engine and stage design were constrained to fit within the payload volume of the then planned space shuttle. The SNRE core design utilized hexagonal fuel elements and hexagonal structural support elements. The total number of elements can be varied to achieve engine designs of higher or lower thrust levels. Some variation in the ratio of fuel elements to structural elements is also possible. Options for SNRE-based engine designs in the 25,000-lbf thrust range were described in a recent (2010) Joint Propulsion Conference paper. The reported designs met or exceeded the performance characteristics baselined in the DRA 5.0 Study. Lower thrust SNRE-based designs were also described in a recent (2011) Joint Propulsion Conference paper. Recent activities have included parallel evaluation and design efforts on fast spectrum engines employing refractory metal alloy fuels. These efforts include evaluation of both heritage designs from the Argonne National Laboratory (ANL) and General Electric Company GE-710 Programs as well as more recent designs. Results are presented for a number of not-yet optimized fast spectrum engine options.

Schnitzler, Bruce G.↗

Planetary Rover Simulation for Lunar Exploration Missions

When planning planetary rover missions it is useful to develop intuition and skills driving in, quite literally, alien environments before incurring the cost of reaching said locales. Simulators make it possible to operate in environments that have the physical characteristics of target locations without the expense and overhead of extensive physical tests. To that end, NASA Ames and Open Robotics collaborated on a Lunar rover driving simulator based on the open source Gazebo simulation platform and leveraging ROS (Robotic Operating System) components. The simulator was integrated with research and mission software for rover driving, system monitoring, and science instrument simulation to constitute an end-to-end Lunar mission simulation capability. Although we expect our simulator to be applicable to arbitrary Lunar regions, we designed to a reference mission of prospecting in polar regions. The harsh lighting and low illumination angles at the Lunar poles combine with the unique reflectance properties of Lunar regolith to present a challenging visual environment for both human and computer perception. Our simulator placed an emphasis on high fidelity visual simulation in order to produce synthetic imagery suitable for evaluating human rover drivers with navigation tasks, as well as providing test data for computer vision software development.In this paper, we describe the software used to construct the simulated Lunar environment and the components of the driving simulation. Our synthetic terrain generation software artificially increases the resolution of Lunar digital elevation maps by fractal synthesis and inserts craters and rocks based on Lunar size-frequency distribution models. We describe the necessary enhancements to import large scale, high resolution terrains into Gazebo, as well as our approach to modeling the visual environment of the Lunar surface. An overview of the mission software system is provided, along with how ROS was used to emulate flight software components that had not been developed yet. Finally, we discuss the effect of using the high-fidelity synthetic Lunar images for visual odometry. We also characterize the wheel slip model, and find some inconsistencies in the produced wheel slip behaviour.

Allan, Mark↗

PlanetarY Telemetric Helicopter for Investigation and Analysis (PYTHIA): A Rotorcraft for Martian Lava Tube Exploration

The PlanetarY Telemetric Helicopter for Investigation and Analysis (PYTHIA) project presents an early feasibility study into future Mars rotorcraft. With the success of Ingenuity and the current development of the Mars Sample Retrieval Helicopters, there is motivation to explore additional vehicle concepts for Mars exploration. This work presents an early conceptual design of a lava tube exploring quadrotor. The nominal mission for the PYTHIA quadrotor includes a two-phase in-depth exploration of one or mutliple lava tubes in the area of interest, Arsia Mons. A sizing analysis was completed using the NASA Design and Analysis of Rotorcraft (NDARC) tool. An eight-bladed quadrotor was selected based on the NDARC sizing sweeps. With preliminary vehicle and blade sizing completed, a flow visualization study was conducted. Two simulations were completed in Rotorcraft Computational Fluid Dynamics (RotCFD): one of the quadrotor alone and another in a lava tube. This paper introduces a baseline reference mission, preliminary vehicle design, and initial sizing analysis of a rotorcraft to explore Martian lava tubes.

PlanetarY↗

Nuclear Thermal Propulsion Mars Mission Systems Analysis and Requirements Definition

This paper describes the Mars transportation vehicle design concepts developed by the Marshall Space Flight Center (MSFC) Advanced Concepts Office. These vehicle design concepts provide an indication of the most demanding and least demanding potential requirements for nuclear thermal propulsion systems for human Mars exploration missions from years 2025 to 2035. Vehicle concept options vary from large "all-up" vehicle configurations that would transport all of the elements for a Mars mission on one vehicle. to "split" mission vehicle configurations that would consist of separate smaller vehicles that would transport cargo elements and human crew elements to Mars separately. Parametric trades and sensitivity studies show NTP stage and engine design options that provide the best balanced set of metrics based on safety, reliability, performance, cost and mission objectives. Trade studies include the sensitivity of vehicle performance to nuclear engine characteristics such as thrust, specific impulse and nuclear reactor type. Tbe associated system requirements are aligned with the NASA Exploration Systems Mission Directorate (ESMD) Reference Mars mission as described in the Explorations Systems Architecture Study (ESAS) report. The focused trade studies include a detailed analysis of nuclear engine radiation shield requirements for human missions and analysis of nuclear thermal engine design options for the ESAS reference mission.

Mulqueen, Jack↗

Austere Human Missions to Mars

The Design Reference Architecture 5 (DRA 5) is the most recent concept developed by NASA to send humans to Mars in the 2030 time frame using Constellation Program elements. DRA 5 is optimized to meet a specific set of requirements that would provide for a robust exploration program to deliver a new six-person crew at each biennial Mars opportunity and provide for power and infrastructure to maintain a highly capable continuing human presence on Mars. This paper examines an alternate architecture that is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. It is recognized that a mission set using this approach would not meet all the current Constellation Mars mission requirements; however, this 'austere' architecture may represent a minimum mission set that would be acceptable from a science and exploration standpoint. The austere approach is driven by a philosophy of minimizing high risk or high cost technology development and maximizing development and production commonality in order to achieve a program that could be sustained in a flat-funded budget environment. Key features that would enable a lower technology implementation are as follows: using a blunt-body entry vehicle having no deployable decelerators, utilizing aerobraking rather than aerocapture for placing the crewed element into low Mars orbit, avoiding the use of liquid hydrogen with its low temperature and large volume issues, using standard bipropellant propulsion for the landers and ascent vehicle, and using radioisotope surface power systems rather than a nuclear reactor or large area deployable solar arrays. Flat funding within the expected NASA budget for a sustained program could be facilitated by alternating cargo and crew launches for the biennial Mars opportunities. This would result in two assembled vehicles leaving Earth orbit for Mars per Mars opportunity. The first opportunity would send two cargo landers to the Mars surface to preposition a habitat, supplies, and exploration equipment. The next opportunity, two years later, would send to Mars orbit 1) a lander with a Mars Ascent Vehicle (MAV) and 2) a crewed Mars Transit Habitat with an Orion CEV for Earth return. The following opportunity, two years after the first crew, would go back to cargo-only launches. This alternation of cargo and crew opportunities results in a sustainable launch rate of six Ares V launches every two years. It is notable that four of the six launches per Mars opportunity are identical, build-to-print, Tran-Mars Injection stages. This type of production rate could lend itself well to a COTStype service provider, and would make it feasible to have a live spare in place in the event of a single launch failure.

landers↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

A lunar base reference mission for the phased implementation of bioregenerative life support system components

Previous design efforts of a cost effective and reliable regenerative life support system (RLSS) provided the foundation for the characterization of organisms or 'biological processors' in engineering terms and a methodology was developed for their integration into an engineered ecological LSS in order to minimize the mass flow imbalances between consumers and producers. These techniques for the design and the evaluation of bioregenerative LSS have now been integrated into a lunar base reference mission, emphasizing the phased implementation of components of such a BLSS. In parallel, a designers handbook was compiled from knowledge and experience gained during past design projects to aid in the design and planning of future space missions requiring advanced RLSS technologies. The lunar base reference mission addresses in particular the phased implementation and integration of BLS parts and includes the resulting infrastructure burdens and needs such as mass, power, volume, and structural requirements of the LSS. Also, operational aspects such as manpower requirements and the possible need and application of 'robotics' were addressed.

Dittmer, Laura N.↗

Assessment of variable camber for application to transport aircraft

The potential benefits were determined for the variable camber of commercial transport airplanes designed for intercontinental and domestic missions. A variable camber concept was developed and incorporated into airplanes designed for the two missions. Benefits were evaluated by comparing the mission performance and direct operating costs for the variable camber airplanes with those for reference airplanes designed for the same missions but having fixed geometry high speed wings. Several technical uncertainties associated with implementing variable camber were also examined.

Source record↗

HEDS-UP Mars Exploration Forum

In the early 1990s, Duke and Budden convened a series of workshops addressing mission rationale, exploration objectives, and key constraints and issues facing human crews on Mars. The focal point was "why" the U.S. should fly humans to Mars. In the mid-1990s, strategies for a Mars mission matured and evolved, driven formally by NASA Johnson Space Center's Office of Exploration. In 1997, NASA published a report capturing the current thinking: the NASA Mars Reference Mission. In the 1997-1998 school year, HEDS-UP sponsored six universities to conduct design studies on Mars exploration, using the Reference Mission as a basis for their work. The 1998 Mars Exploration Forum presents the results of these university studies, suggesting "how" we might explore Mars, in terms of specific technical components that would enable human missions to Mars. A primary objective of the HEDS-UP Mars Exploration Forum was to provide a forum for active interaction among NASA, industry, and the university community on the subject of human missions to Mars. NASA scientists and engineers were asked to present the state of exploration for Mars mission options currently under study. This status "snapshot" of current Mars strategies set the stage for the six HEDS-UP universities to present their final design study results. Finally, a panel of industry experts discussed readiness for human missions to Mars as it pertains to the aerospace industries and technologies. A robust poster session provided the backdrop for government-industry-university discussions and allowed for feedback to NASA on the Mars Reference Mission. The common thread woven through the two days was discussion of technologies, proven and emerging, that will be required to launch, land, and sustain human crews on the Red Planet. As this decade (and indeed this millenium) draws to a close, Mars will continue to loom in our sights as the next target for human space exploration. It is our hope that the efforts of the Mars Exploration Forum will serve as one small contribution toward the ultimate goal of humans exploring Mars.

Budden, Nancy Ann↗

Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

Mattfeld, Bryan↗

Aircraft Design Implications for Urban Air Mobility Vehicles Performing Public Good Missions

NASA has previously designed and described set of concept aircraft to serve as reference vehicles for Urban Air Mobility (UAM), to encourage public discussion and research. These vehicles are used in this paper to quantify how suitable UAM aircraft might be for missions other than their primary commercial design missions. A set of representative public good missions are described, along with design requirements and equipage. For two of these missions, the additional weight, power, and cost to facilitate a basic vehicle which may be built or configured with the ability to perform these missions is quantified. Special layout and other considerations which may impact vehicle design are described. For aircraft designed to the NASA UAM reference mission, the addition of some meaningful public good missions causes less than 10% growth in weight and power for fossil-fueled aircraft; advanced batteryelectric powered aircraft grow by a significantly larger amount and may only be possible with relaxed requirements. Meaningful public good missions with UAM vehicles are feasible, provided that public good mission requirements are considered and incorporated in the conceptual design stage of development.

Aircraft↗

CisLunar Habitat Internal Architecture Design Criteria

BACKGROUND: In preparation for human exploration to Mars, there is a need to define the development and test program that will validate deep space operations and systems. In that context, a Proving Grounds CisLunar habitat spacecraft is being defined as the next step towards this goal. This spacecraft will operate differently from the ISS or other spacecraft in human history. The performance envelope of this spacecraft (mass, volume, power, specifications, etc.) is being defined by the Future Capabilities Study Team. This team has recognized the need for a human-centered approach for the internal architecture of this spacecraft and has commissioned a CisLunar Phase-1 Habitat Internal Architecture Study Team to develop a NASA reference configuration, providing the Agency with a "smart buyer" approach for future acquisition. THE CISLUNAR HABITAT INTERNAL ARCHITECTURE STUDY: Overall, the CisLunar Habitat Internal Architecture study will address the most significant questions and risks in the current CisLunar architecture, habitation, and operations concept development. This effort is achieved through definition of design criteria, evaluation criteria and process, design of the CisLunar Habitat Phase-1 internal architecture, and the development and fabrication of internal architecture concepts combined with rigorous and methodical Human-in-the-Loop (HITL) evaluations and testing of the conceptual innovations in a controlled test environment. The vision of the CisLunar Habitat Internal Architecture Study is to design, build, and test a CisLunar Phase-1 Habitat Internal Architecture that will be used for habitation (e.g. habitability and human factors) evaluations. The evaluations will mature CisLunar habitat evaluation tools, guidelines, and standards, and will interface with other projects such as the Advanced Exploration Systems (AES) Program integrated Power, Avionics, Software (iPAS), and Logistics for integrated human-in-the-loop testing. The mission of the CisLunar Habitat Internal Architecture Study is to become a forcing function to establish a common understanding of CisLunar Phase-1 Habitation Internal Architecture design criteria, processes, and tools. The scope of the CisLunar Habitat Internal Architecture study is to design, develop, demonstrate, and evaluate a Phase-1 CisLunar Habitat common module internal architecture based on design criteria agreed to by NASA, the International Partners, and Commercial Exploration teams. This task is to define the CisLunar Phase-1 Internal Architecture Government Reference Design, assist NASA in becoming a "smart buyer" for Phase-1 Habitat Concepts, and ultimately to derive standards and requirements from the Internal Architecture Design Process. The first step was to define a Habitat Internal Architecture Design Criteria and create a structured philosophy to be used by design teams as a filter by which critical aspects of consideration would be identified for the purpose of organizing and utilizing interior spaces. With design criteria in place, the team will develop a series of iterative internal architecture concept designs which will be assessed by means of an evaluation criteria and process. These assessments will successively drive and refine the design, leading to the combination and down-selection of design concepts. A single refined reference design configuration will be developed into in a medium-to-high fidelity mockup. A multi-day human-in-the-loop mission test will fully evaluate the reference design and validate its configuration. Lessons learned from the design and evaluation will enable the team to identify appropriate standards for Phase-1 CisLunar Habitat Internal Architecture and will enable NASA to develop derived requirements in support of maturing CisLunar Habitation capabilities. This paper will describe the criteria definition process, workshop event, and resulting CisLunar Phase-1 Habitat Internal Architecture Design Criteria.

Jones, R.↗

Team X Spacecraft Instrument Database Consolidation

In the past decade, many changes have been made to Team X's process of designing each spacecraft, with the purpose of making the overall procedure more efficient over time. One such improvement is the use of information databases from previous missions, designs, and research. By referring to these databases, members of the design team can locate relevant instrument data and significantly reduce the total time they spend on each design. The files in these databases were stored in several different formats with various levels of accuracy. During the past 2 months, efforts have been made in an attempt to combine and organize these files. The main focus was in the Instruments department, where spacecraft subsystems are designed based on mission measurement requirements. A common database was developed for all instrument parameters using Microsoft Excel to minimize the time and confusion experienced when searching through files stored in several different formats and locations. By making this collection of information more organized, the files within them have become more easily searchable. Additionally, the new Excel database offers the option of importing its contents into a more efficient database management system in the future. This potential for expansion enables the database to grow and acquire more search features as needed.

Wallenstein, Kelly A.↗

Preliminary Design of a Manned Nuclear Electric Propulsion Vehicle Using Genetic Algorithms

Nuclear electric propulsion (NEP) vehicles will be needed for future manned missions to Mars and beyond. Candidate designs must be identified for further detailed design from a large array of possibilities. Genetic algorithms have proven their utility in conceptual design studies by effectively searching a large design space to pinpoint unique optimal designs. This research combined analysis codes for NEP subsystems with a genetic algorithm. The use of penalty functions with scaling ratios was investigated to increase computational efficiency. Also, the selection of design variables for optimization was considered to reduce computation time without losing beneficial design search space. Finally, trend analysis of a reference mission to the asteroids yielded a group of candidate designs for further analysis.

Irwin, Ryan W.↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

The NASA Artemis program has brought significant change to the agency’s human exploration strategy over the last several years. The human exploration of Mars remains an ultimate objective of the overall human exploration strategy. However, how the agency intends to execute initial human exploration of Mars has shifted to better align with current policy. These changes find their way into the design of key architecture elements, such as the Mars Ascent Vehicle (MAV). Of the numerous changes in the conceptual human Mars architecture, two in particular have had significant impact on the design of the human MAV: the desire for minimal surface infrastructure for initial human Mars missions, and technology investment timelines in support of initial human missions to Mars. The first leads to a surface mission architecture targeting a 30-day surface duration with two crewmembers. The second drives out in-situ resource utilization (ISRU) from the initial sortie. As a result, the reference MAV design for initial human Mars missions in the Human Exploration and Operations Mission Directorate’s Strategic Analysis Cycle 2021 (SAC21) is based around supporting the return of 2 crew from the surface of Mars, without surface ISRU. This has led to several design changes since 2019, when details of a reference human MAV were last published. The MAV concept for SAC21 consists of a two-stage vehicle capable of supporting two crew for 84 hours. This duration is derived from a baseline ascent trajectory targeting an apoapsis rendezvous with the habitation element in a nominal 5-sol Mars aggregation orbit. With the goal of minimizing technology investments for the initial surface sortie removing ISRU from the trade space, the MAV must now be landed either fully loaded with propellant, or with some portion of the propellant off-loaded. Landing a partially-fueled MAV will require additional surface assets to perform robotic propellant transfer on the surface of Mars from a pre-emplaced propellant depot. Furthermore, cryogenic fluid management and storage for extended duration with no losses represents additional technology investment that would have to be made to support cryogenic-based propellant concepts that have been the baseline in past architectures. As a result, the SAC21 architecture utilizes a storable propellant-based MAV propulsion system to minimize these potential technology investments incurred by cryogenic-based propulsion systems. Recent efforts also focused on evaluating the sensitivity of key design parameters, such as landing site latitude, elevation, and local atmospheric conditions. All play a large role in determining the predicted propellant requirements of the MAV. Understanding their potential impacts is important because of the rippling effects of changes to the MAV design on other architecture elements, such as entry, descent, landing, and transportation systems. Results indicate up to +2% to -4% wet mass variation due to landing site latitude, with higher latitudes greater than 70 degrees North resulting in greater than 6% wet mass increases. The MAV saw reduced impact due to atmospheric design parameters, which only accounting for -0.6% to +0.4% wet mass variation.

Douglas J. Trent↗

Design and structural analysis of Mars Rover RTG

The Mars Rover and Sample Return mission's radioisotope thermoelectric generator (RTG) is presently subjected to a structural and mass analysis in view of a reference mission scenario, an illustrative Rover design and Martian activities agenda, and RTG power system requirements and environmental constraints. The modular heat-source stack in the Rover RTG can be held together by axial load springs. The RTGs should be mounted on the Rover with a vertical orientation, in order to avoid the buildup of windborne Martian sand on its heat-rejection surfaces.

Schock, Alfred↗

Modeling Mission-Specific Worst-Case Solar Energetic Particle Environments

To plan and design safe and reliable space missions, it is necessary to take into account the effects of the space radiation environment. The environment during large solar energetic particle events poses the greatest challenge to missions. As a starting point for planning and design, a reference environment must be specified representing the most challenging environment to be encountered during the mission at some confidence level. The engineering challenge is then to find plans and mission design solutions that insure safe and reliable operations in this reference environment. This paper describes progress toward developing a model that provides such reference space radiation environments at user-specified confidence levels.

Adam, James H., Jr.↗

The Design of the Reference Orbit for NISAR, the NASA-ISRO Synthetic Aperture Radar Mission

The NISAR mission plans to use a 12-day-repeating sun-synchronous orbit for repeat-pass interferometry at multiple time scales using SAR data. For the interferometry to work the radar measurements must be made from within a critical baseline, which happens if all of the orbits are maintained to be within a fixed tube around a reference orbit. This paper describes the choice of dynamical models used in defining such a reference orbit, the perturbative effects of dynamics not considered in the repeat orbit, and the process of designing the orbit to repeat. We also describe our method for sharing the repeat orbit among multiple mission participants who use different models and software.

Hatch, Sara J.↗