Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

305 records · Page 17

Mars Sample Return mission utilizing in-situ propellant production

This report presents the results of a study examining the potential of in-situ propellant production (ISPP) on Mars to aid in achieving a low cost Mars Sample Return (MSR) mission. Two versions of such a mission were examined: a baseline version employing a dual string spacecraft, and a light weight version employing single string architecture with selective redundancy. Both systems employed light weight avionics currently being developed by Lockheed Martin, Jet Propulsion Lab and elsewhere in the aerospace community, both used a new concept for a simple, light weight parachuteless sample return capsule, both used a slightly modified version of the Mars Surveyor lander currently under development at Lockheed Martin for flight in 1998, and both used a combination of the Sabatier-electrolysis and reverse water gas shift ISPP systems to produce methane/oxygen propellant on Mars by combining a small quantity of imported hydrogen with the Martian CO2 atmosphere. It was found that the baseline mission could be launched on a Delta 7925 and return a 0.5 kg sample with 82 percent mission launch margin;over and beyond subsystem allocated contingency masses . The lightweight version could be launched on a Mid-Lite vehicle and return a 0.25 kg sample with 11 percent launch margin, over and above subsystem contingency mass allocations.

Zubrin, Robert↗

Examining the Trends in Financial Support Given to Science Teams for Data Analysis in Mission Proposals

Introduction: The goal of this summer internship research project was to analyze trends in financial support proposed for the science teams of planetary missions. The analysis focuses on the funding for Co-Investigators (Co-Is) to conduct research and/or data analysis needed to achieve the science objectives of the mission. The operational portion of the missions after launch (i.e., Phase E, including cruise and prime operations at the final destination) were examined since that is when the bulk of research is funded and conducted. The objectives of the project were to determine the average level of support for Co-Investigators, identify variation between mission competitions and over time, and determine the relationship between mission type and the amount of support requested. Methodology: This project was conducted using data from 90 proposals submitted to six mission competitions in the Discovery and New Frontiers programs. The level of support for Co-Is was determined by examining Work Breakdown Structure (WBS) 4 (Science Analysis) for Phase E, which was further subdivided into cruise and prime operations. This data represents a proxy rather than the actual funding Co-Is receive to perform research and data analysis because not every dollar in WBS 4 is spent on this activity. Therefore, the proxy obtained in this research represents an overestimate of the funds allocated to Co-Is for research and data analysis. Findings: Analysis shows that on average a Co-I receives approximately four full years of support spread across the entirety of Phase E for science analysis. The variation among proposed missions is less than expected given the variety of factors that are expected to drive this metric (length of mission, mission type, etc.). Additionally, the level of requested support for Co-Is has been remarkably consistent across every variable considered (by competition, over time, by mission type) over the six competitions and nearly 20 years spanned by this project. This remains true for cruise, primary operations, and all of Phase E. Conclusions: A remarkable amount of science is accomplished by the science teams of planetary missions. However, a surprisingly small amount of funding is requested to support the science analysis driving this productivity, both in terms of absolute magnitude of funding and as a portion of total mission cost. This suggests improvements are needed to refine the estimates of Co-I support and/or that Co-Is rely on other funding sources to conduct their research. Better estimates can be determined by engaging directly with Co-Is and NASA centers to obtain data as well as finding other data sources. Additionally, NASA could consider mandating improved reporting of requested funding levels in mission competitions.

E Murray↗

Uncertainty Reduction With Multi-Model Monte Carlo for Crystal Plasticity Simulations of Additively Manufactured Metals

In this work, multi-model Monte Carlo estimators are developed to reduce uncertainty in quantities of interest (QoIs) extracted from crystal plasticity simulations of additively manufactured (AM) metals. A significant concern in AM parts is uncertainty in mechanical properties caused in part by complex microstructures that arise from the AM process. Quantifying uncertainty in microstructure-sensitive behavior using experiments alone is costly, especially when mechanical allowables must be established. Quantitative relationships among microstructure, micromechanical metrics like slip accumulation, crack initiation, and failure are also difficult to capture with limited experiments. Crystal plasticity material models instead enable computational prediction of micromechanical stress and strain fields given a discretized microstructure. However, high-fidelity finely discretized crystal plasticity simulations are computationally expensive, while lower-fidelity models are less accurate and generally biased, making uncertainty quantification and reduction computationally difficult as well. Multi-model Monte Carlo methods leverage correlations between high- and low-fidelity models to produce unbiased estimators for QoIs with reduced uncertainty relative to standard Monte Carlo. Crystal plasticity QoIs considered in this work include yield strength and the mean and extreme values of micromechanical fields that are relevant to crack initiation. Multi-model Monte Carlo estimators are developed for each individual QoI and several groups of QoIs. The results of this work establish relationships among model correlations, sample allocation, and uncertainty reduction for different combinations of QoIs and demonstrate a trend of less uncertainty reduction as QoIs become more sensitive to local microstructure. Limitations from using pilot samples to estimate model covariances and train low-fidelity models are also addressed. The uncertainty reduction achieved by multi-model Monte Carlo is an important step toward using computational mechanics models to predict microstructure-sensitive crack initiation and failure in AM parts.

uncertainty quantification↗

Systems Integration Processes for NASA's Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable low earth orbit. This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and non-propulsion elements within NASA's Crew Launch Vehicle (CLV). The objective of the CLV is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to Low Earth Orbit (LEO) in support of the lunar and Mars missions. The CLV must successfully provide the capability within cost and schedule with an acceptable risk approach. This paper will describe in detail the systems engineering management processes that will be applied to assure CLV Project success through complete and efficient technical integration. Discussion of specific processes for requirements development and verification, integrated design and analysis, integrated simulation and testing and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The CLV Project is broken logically into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these CLV elements and among the other Constellation projects. Launch vehicle stack integration (CLV to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage will also be discussed. The processes for decomposing requirements to the Elements and ensuring that requirements have been correctly validated, decomposed, allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements will be discussed.

Reuter, James L.↗

On the application of under-decimated filter banks

Maximally decimated filter banks have been extensively studied in the past. A filter bank is said to be under-decimated if the number of channels is more than the decimation ratio in the subbands. A maximally decimated filter bank is well known for its application in subband coding. Another application of maximally decimated filter banks is in block filtering. Convolution through block filtering has the advantages that parallelism is increased and data are processed at a lower rate. However, the computational complexity is comparable to that of direct convolution. More recently, another type of filter bank convolver has been developed. In this scheme, the convolution is performed in the subbands. Quantization and bit allocation of subband signals are based on signal variance, as in subband coding. Consequently, for a fixed rate, the result of convolution is more accurate than is direct convolution. This type of filter bank convolver also enjoys the advantages of block filtering, parallelism, and a lower working rate. Nevertheless, like block filtering, there is no computational saving. In this article, under-decimated systems are introduced to solve the problem. The new system is decimated only by half the number of channels. Two types of filter banks can be used in the under-decimated system: the discrete Fourier transform (DFT) filter banks and the cosine modulated filter banks. They are well known for their low complexity. In both cases, the system is approximately alias free, and the overall response is equivalent to a tunable multilevel filter. Properties of the DFT filter banks and the cosine modulated filter banks can be exploited to simultaneously achieve parallelism, computational saving, and a lower working rate. Furthermore, for both systems, the implementation cost of the analysis or synthesis bank is comparable to that of one prototype filter plus some low-complexity modulation matrices. The individual analysis and synthesis filters have complex coefficients in the DFT filter banks but have real coefficients in the cosine modulated filter banks.

Lin, Y.-P.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Optimal Communication Topology Determination and Sensor Selection for Independent Airspace Surveillance

The paper presents an approach to sensors selection and network topology determination for independent airspace surveillance with maximum outcome and minimum cost using ground based distributed sensing, computing and communication network infrastructure. The selection criteria includes minimum estimation error, maximum airspace coverage, minimum communication time and power consumption while guaranteeing the system observability and providing in-time quality information to a monitoring observer. The developed algorithm uses multi-objective optimization strategy taking into account trade-offs between conflicting objectives and relaxations for in time implementation. It is implemented utilizing graph theoretic tools. The approach is validated in a desktop simulation environment using synthetic sensors data generated for a simulated multi-vehicle flight scenario in the selected regional airspace.

Distributed sensing↗

Influence Diagram Use With Respect to Technology Planning and Investment

Influence diagrams are relatively simple, but powerful, tools for assessing the impact of choices or resource allocations on goals or requirements. They are very general and can be used on a wide range of problems. They can be used for any problem that has defined goals, a set of factors that influence the goals or the other factors, and a set of inputs. Influence diagrams show the relationship among a set of results and the attributes that influence them and the inputs that influence the attributes. If the results are goals or requirements of a program, then the influence diagram can be used to examine how the requirements are affected by changes to technology investment. This paper uses an example to show how to construct and interpret influence diagrams, how to assign weights to the inputs and attributes, how to assign weights to the transfer functions (influences), and how to calculate the resulting influences of the inputs on the results. A study is also presented as an example of how using influence diagrams can help in technology planning and investment. The Space Propulsion Synergy Team (SPST) used this technique to examine the impact of R&D spending on the Life Cycle Cost (LCC) of a space transportation system. The question addressed was the effect on the recurring and the non-recurring portions of LCC of the proportion of R&D resources spent to impact technology objectives versus the proportion spent to impact operational dependability objectives. The goals, attributes, and the inputs were established. All of the linkages (influences) were determined. The weighting of each of the attributes and each of the linkages was determined. Finally the inputs were varied and the impacts on the LCC determined and are presented. The paper discusses how each of these was accomplished both for credibility and as an example for future studies using influence diagrams for technology planning and investment planning.

Levack, Daniel J. H.↗

Optimal Communication Topology Construction and Sensor Selection for Independent Airspace Surveillance

The paper presents an approach with no estimation feedback to sensors selection and communication network topology computation for independent airspace surveillance with maximum outcome and minimum cost using ground based distributed sensing, computing and communication network infrastructure. The selection criteria includes maximum airspace coverage with minimal resources, minimum communication time and power consumption while guaranteeing the system observability and providing in-time high quality information to both stationary and mobile users. The developed algorithms use multi-objective optimization strategy taking into account trade-offs between conflicting objectives and are implemented using off-the-shelf computational tools. The algorithms are validated in a desktop simulation environment using synthetic sensors data generated for a simulated multi-vehicle flight scenario in the selected regional airspace and parameters of a notional wireless communication network.

Distributed sensing↗

Power Management in Regenerative Life Support Systems

Effective management of power can reduce the cost of launch and operation of regenerative life support systems. Variations in power may be quite severe and may manifest as surges or spikes, While the power plant may have some ability to deal with these variations, with batteries for example, over-capacity is expensive and does nothing to address the fundamental issue of excessive demand. Because the power unit must be sized to accommodate the largest demand, avoiding power spikes has the potential to reduce the required size of the power plant while at the same time increasing the dependability of the system. Scheduling of processors can help to reduce potential power spikes. However, not all power-consuming equipment is easily scheduled. Therefore, active power management is needed to further decrease the risk of surges or spikes. We investigate the use of a hierarchical scheme to actively manage power for a model of a regenerative life support system. Local level controllers individually determine subsystem power usage. A higher level controller monitors overall system power and detects surges or spikes. When a surge condition is detected, the higher level controller conducts an 'auction' and describes subsystem power usage to re-allocate power. The result is an overall reduction in total power during a power surge. The auction involves each subsystem making a 'bid' to buy or sell power based on local needs. However, this re-allocation cannot come at the expense of life support function. To this end, participation in the auction is restricted to those processes meeting certain tolerance constraints. These tolerances represent acceptable limits within which system processes can be operated. We present a simulation model and discuss some of our results.

Crawford, Sekou↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Large Space Optics: From Hubble to JWST and Beyond

If necessity truly is the mother of invention, then advances in lightweight space mirror technology have been driven by launch vehicle mass and volume constraints. In the late 1970 s, at the start of Hubble development, the state of the art in ground based telescopes was 3 to 4 meter monolithic primary mirrors with masses of 6000 to 10,000 kg - clearly too massive for the planned space shuttle 25,000 kg capability to LEO. Necessity led Hubble to a different solution. Launch vehicle mass constraints (and cost) resulted in the development of a 2.4 meter lightweight eggcrate mirror. At 810 kg (180 kg/m2), this mirror was approximately 7.4% of HST s total 11,110 kg mass. And, the total observatory structure at 4.3 m x 13.2 m fit snuggly inside the space shuttle 4.6 m x 18.3 m payload bay. In the early 1990 s, at the start of JWST development, the state of the art in ground based telescopes was 8 meter class monolithic primary mirrors (16,000 to 23,000 kg) and 10 meter segmented mirrors (14,400 kg). Unfortunately, launch vehicles were still constrained to 4.5 meter payloads and 25,000 kg to LEO or 6,600 kg to L2. Furthermore, science now demanded a space telescope with 6 to 8 meter aperture operating at L2. Mirror technology was identified as a critical capability necessary to enable the next generation of large aperture space telescopes. Specific telescope architectures were explored via three independent design concept studies conducted during the summer of 1996 (1). These studies identified two significant architectural constraints: segmentation and areal density. Because the launch vehicle fairing payload dynamic envelop diameter is approximately 4.5 meters, the only way to launch an 8 meter class mirror is to segment it, fold it and deploy it on orbit - resulting in actuation and control requirements. And, because of launch vehicle mass limits, the primary mirror allocation was only 1000 kg - resulting in a maximum areal density of 20 kg/m2. At the inception of JWST in 1996, such a capability did not exist. A highly successful technology development program was initiated resulting in matured and demonstrated mirror technology for JWST (2, 3). Today, the JWST 6.5 meter primary mirror has an areal density of 25 kg/m2 for a total mass of 625 kg or 9.6% of the total JWST observatory mass of 6,500 kg. Looking into the future, science requires increasing larger collecting apertures. Ground based telescopes are already moving towards 30+ meter mirrors. The only way to meet this challenge for space telescopes is via even lower areal density mirrors or on-orbit assembly or larger launch vehicles (4). The planned NASA Ares V with its 10 meter fairing and 55,000 kg payload to L2 eliminates this constraint (5).

Stahl, H. Philip↗

TTEthernet for Integrated Spacecraft Networks

Aerospace projects have traditionally employed federated avionics architectures, in which each computer system is designed to perform one specific function (e.g. navigation). There are obvious downsides to this approach, including excessive weight (from so much computing hardware), and inefficient processor utilization (since modern processors are capable of performing multiple tasks). There has therefore been a push for integrated modular avionics (IMA), in which common computing platforms can be leveraged for different purposes. This consolidation of multiple vehicle functions to shared computing platforms can significantly reduce spacecraft cost, weight, and design complexity. However, the application of IMA principles introduces significant challenges, as the data network must accommodate traffic of mixed criticality and performance levels - potentially all related to the same shared computer hardware. Because individual network technologies are rarely so competent, the development of truly integrated network architectures often proves unreasonable. Several different types of networks are utilized - each suited to support a specific vehicle function. Critical functions are typically driven by precise timing loops, requiring networks with strict guarantees regarding message latency (i.e. determinism) and fault-tolerance. Alternatively, non-critical systems generally employ data networks prioritizing flexibility and high performance over reliable operation. Switched Ethernet has seen widespread success filling this role in terrestrial applications. Its high speed, flexibility, and the availability of inexpensive commercial off-the-shelf (COTS) components make it desirable for inclusion in spacecraft platforms. Basic Ethernet configurations have been incorporated into several preexisting aerospace projects, including both the Space Shuttle and International Space Station (ISS). However, classical switched Ethernet cannot provide the high level of network determinism required by real-time spacecraft applications. Even with modern advancements, the uncoordinated (i.e. event-driven) nature of Ethernet communication unavoidably leads to message contention within network switches. The arbitration process used to resolve such conflicts introduces variation in the time it takes for messages to be forwarded. TTEthernet1 introduces decentralized clock synchronization to switched Ethernet, enabling message transmission according to a time-triggered (TT) paradigm. A network planning tool is used to allocate each device a finite amount of time in which it may transmit a frame. Each time slot is repeated sequentially to form a periodic communication schedule that is then loaded onto each TTEthernet device (e.g. switches and end systems). Each network participant references the synchronized time in order to dispatch messages at predetermined instances. This schedule guarantees that no contention exists between time-triggered Ethernet frames in the network switches, therefore eliminating the need for arbitration (and the timing variation it causes). Besides time-triggered messaging, TTEthernet networks may provide two additional traffic classes to support communication of different criticality levels. In the rate-constrained (RC) traffic class, the frame payload size and rate of transmission along each communication channel are limited to predetermined maximums. The network switches can therefore be configured to accommodate the known worst-case traffic pattern, and buffer overflows can be eliminated. The best-effort (BE) traffic class behaves akin to classical Ethernet. No guarantees are provided regarding transmission latency or successful message delivery. TTEthernet coordinates transmission of all three traffic classes over the same physical connections, therefore accommodating the full spectrum of traffic criticality levels required in IMA architectures. Common computing platforms (e.g. LRUs) can share networking resources in such a way that failures in non-critical systems (using BE or RC communication modes) cannot impact flight-critical functions (using TT communication). Furthermore, TTEthernet hardware (e.g. switches, cabling) can be shared by both TTEthernet and classical Ethernet traffic.

Loveless, Andrew↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address safety and operational challenges of national airspace access by unmanned aircraft systems, or UAS. In the process, the project will work with other key stakeholders to define necessary deliverables and products to help enable such access. Within the project, NASA is focusing on five sub-projects. These five focus areas include assurance of safe separation of unmanned aircraft from manned aircraft when flying in the national airspace; safety-critical command and control systems and radio frequencies to enable safe operation of UAS; human factors issues for ground control stations; airworthiness certification standards for UAS avionics and integrated tests and evaluation designed to determine the viability of emerging UAS technology. Five Focus Areas of the UAS Integration in the NAS Project Separation Assurance Provide an assessment of how planned Next Generation Air Transportation System (NextGen) separation assurance systems, with different functional allocations, perform for UAS in mixed operations with manned aircraft Assess the applicability to UAS and the performance of NASA NextGen separation assurance systems in flight tests with realistic latencies and uncertain trajectories Assess functional allocations ranging from today's ground-based, controller-provided aircraft separation to fully autonomous airborne self-separation Communications Develop data and rationale to obtain appropriate frequency spectrum allocations to enable safe and efficient operation of UAS in the NAS Develop and validate candidate secure safety-critical command and control system/subsystem test equipment for UAS that complies with UAS international/national frequency regulations, standards and recommended practices and minimum operational and aviation system performance standards for UAS Perform analysis to support recommendations for integration of safety-critical command and control systems and air traffic control communications to ensure safe and efficient operation of UAS in the NAS Human Systems Integration Develop a research test bed and database to provide data and proof of concept for GCS - ground control station - operations in the NAS Coordinate with standards organizations to develop human-factors guidelines for GCS operation in the NAS Certification Define a UAS classification scheme and approach to determining Federal Aviation Regulation airworthiness requirements applicable to all UAS digital avionics Provide hazard and risk-related data to support development of type design criteria and best development practices Integrated Tests and Evaluation Integrate and test mature concepts from technical elements to demonstrate and test viability Evaluate the performance of technology development in a relevant environment (full-mission, human-in-the-loop simulations and flight tests)

outreach↗

NASA Graduate Student Researchers Program Ronald E. McNair PhD Program

The NASA Ronald E. McNair PHD Program was funded in September 1995. Implementation began during the spring of 1996. The deferment of the actual program initial semester enabled the program to continue support through the fall semester of 1998. This was accomplished by a no-cost extension from August 15, 1998 through December 31, 1998. There were 12 fellows supported by the program in 1996, 15 fellows in 1997, and 15 fellows 1998. Current program capacity is 15 fellows per funding support. Support for the academic outreach component began in spring 1998. The program was named the "Good Enough" Crew Activity (GECA) in honor of Dr. McNair's philosophy of everyone being good enough to achieve anything they want bad enough. The program currently enrolls 65 students from the third through the eight grades. The program is held 12 Saturdays per semester. The time is 9:00 AM to 12:30 PM each Saturday Morning. Program direction and facilitation is jointly administered with the PHD fellows and the Saturday Academy staff. Dr. John Kelly, REM-PHD Principal Investigator serves in a program oversight and leadership capacity. Ms. Sunnie Howard, The NASA REM-PHD Administrative Coordinator serves in an administrative and logistical capacity. Mr. Aaron Hatch, the NASA-AMES Liaison Officer, serve@'in a consultative and curriculum review capacity. The first recognition activity will be held on December 12, 1998, with the students, parents, faculty, PHD fellows, and other local student support services persons. Program outreach efforts are jointly supported by the NASA REM-PHD Program and the National Space Grant College and Fellowship Program. The Ph.D. program reached its first milestone in May 1998. North Carolina A&T State University graduated the first Ph.D. fellows. The first three Ph.D. Alumni were Ronald E. McNair PHD Program Fellows. It is hoped that this is just the beginning of a highly acclaimed doctoral program. The ultimate program success will be recognized when the program begins to graduate 15 fellows per year. The Ph.D. Program is only three and a half years old and the expectations of graduating PH.D's in that timeframe, is a phenomenal accomplishment for any program in the country. Since inception of the NASA REM-PHD program, tuitions and fees have increased. Stipend support was increased to offer the Ph.D. program on a competitive basis. These increases will place allocation restraints on r_ the current level of funding. These issues are being addressed in the proposal and will bear their own merit.

Howard, Sunnie↗

Aerocapture Trajectory Design for Uranus Orbiter

Introduction: The recently released National Academies Planetary Science and Astrobiology Decadal Survey 2023-2032 [1] identified the Ice Giants as the top priority science destination. While the survey acknowledged the potential for either a Uranus Orbiter and Probe (UOP) mission or a Neptune-Triton Odyssey mission, it ultimately identified the former as the highest priority new flagship mission. UOP missions calls for a launch window of opportunity between 2031-2038 with 12-15 year interplanetary cruise time along with a fully-propulsive Uranus Orbit Insertion burn on the order of a few km/s. However, a mission to Uranus with the same science payload could utilize aerocapture for orbit insertion to achieve both a significant reduction in the interplanetary cruise time and reduction in propulsive burn costs. Why Aerocapture: Aerocapture is a promising propellant and time-saving orbital insertion technique for planetary destinations with an atmosphere. Although not flight-proven, previous aerocapture systems studies in the literature have demonstrated both the validity and robustness of the technique at various planetary destinations. With respect to the Ice Giant planets, Neptune has seen more of the analysis in the literature. For science missions at Neptune, aerocapture can enable 1.4 times more delivered mass to orbit than an all-propulsive mission for the same launch vehicle while reducing interplanetary cruise times by more than 3 years [2] Additionally with modern guidance and control, Neptune aerocapture with blunt-body aeroshells is realizable [3][4]. There are limited papers in the literature investigating Uranus aerocapture with those available providing a preliminary feasibility assessment [5]. Consequently, the two-year funded NASA Space Technology Mission Directorate (STMD)-funded project, titled Aerocapture System as an Enabling Technology for Ice Giants Missions, aims to mature the analysis and technology state of Uranus aerocapture. Trajectory Design: This paper presents the current state of the trajectory design in support of the new aerocapture project. The project design philosophy is inspired from recent Neptune aerocapture studies, which employed modern guidance and control, in the sense that blunt-body aeroshells are analyzed. An assessment of the theoretical flight path angle corridor width is conducted for a range of ballistic coefficients and lift-to-drag ratios for both Space Launch System and Falcon Heavy Launch Vehicle interplanetary trajectory solutions. The results from the corridor width assessment provide an assessment of the aerocapture design-space and qualitative metrics on trajectory design considerations. The Program to Optimize Simulated Trajectories II (POST2) is utilized to run Monte Carlo simulations of Uranus aerocapture three-degree-of-freedom bank angle modulated trajectories using a closed-loop numerical-predictor corrector guidance algorithm. UranusGRAM 2021 is utilized as the atmospheric model [6]. A Uranus-developed aerodatabase, originally derived from Mars Science Laboratory (MSL), is utilized to provide vehicle aerodynamics over a wide range of hypersonic flow regimes. A MSL-derived 70 deg 4.5m diameter sphere-cone aeroshell that houses the UOP payload mass is assumed. Robustness testing and performance analysis is conducted, including the assessment of entry state errors, atmosphere density variations, and aerodynamic dispersions. Post-aerocapture Delta-V and aerothermal statistics are formulated into propellant mass and TPS requirements. The results presented in the paper will demonstrate the trajectory viability of Uranus aerocapture. Preliminary Results: Preliminary trajectory design results indicates successful Uranus aerocapture with a blunt-body aeroshell housing the same payload mass as the UOP mission from an Earth-to-Uranus interplanetary trajectory arriving in less than 7 years. From this interplanetary trajectory, aerocapture provides an orbit insertion Delta-V capability of 6.9 km/s requiring less than 300 m/s for post-aerocapture correction burns (15% of wet mass allocated to propellant). To put this into perspective, the UOP study utilized an Earth-to-Uranus trajectory that arrives in 13 years and requires more than 1000 m/s for fully-propulsive orbit insertion (40% of wet mass allocated to propellant). Achieving the same 6.9 km/s Delta-V capability fully-propulsively is mass prohibitive (97% of wet mass allocated to propellant). Nevertheless, aerocapture has the potential to reduce interplanetary transit times to Uranus by half while delivering the same payload mass to orbit in a reduced propellant mass footprint.

Rohan Deshmukh↗