Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Causality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The Causal Connection Between Disc and Power-Law Variability in Hard State Black Hole X-Ray Binaries

We use the XMM-Newton EPIC-pn instrument in timing mode to extend spectral time-lag studies of hard state black hole X-ray binaries into the soft X-ray band. \Ve show that variations of the disc blackbody emission substantially lead variations in the power-law emission, by tenths of a second on variability time-scales of seconds or longer. The large lags cannot be explained by Compton scattering but are consistent with time-delays due to viscous propagation of mass accretion fluctuations in the disc. However, on time-scales less than a second the disc lags the power-law variations by a few ms, consistent with the disc variations being dominated by X-ray heating by the power-law, with the short lag corresponding to the light-travel time between the power-law emitting region and the disc. Our results indicate that instabilities in the accretion disc are responsible for continuum variability on time-scales of seconds or longer and probably also on shorter time-scales.

Uttley, P.↗

Saharan Dust as a Causal Factor of Significant Cloud Cover Along the Saharan Air Layer in the Atlantic Ocean

The tropical Atlantic is frequently affected by Saharan dust intrusions. Based on MODIS cloud fraction (CF) data during the ten-year study period, we found that these dust intrusions contribute to significant cloud cover along the Saharan Air Layer (SAL). Below the temperature inversion at the SAL's base, the presence of large amounts of settling dust particles, together with marine aerosols, produces meteorological conditions suitable for the formation of shallow stratocumulus clouds. The significant cloud fraction along the SAL together with clouds over the Atlantic Inter-tropical Convergence Zone contributes to the 20% hemispheric CF asymmetry between the tropical North and South Atlantic. This leads to the imbalance in strong solar radiation, which reaches the sea surface between the tropical North and South Atlantic, and, consequently, affects climate formation in the tropical Atlantic. Therefore, despite the fact that, over the global ocean, there is no noticeable hemispheric asymmetry in cloud fraction, over the significant area such as the tropical Atlantic the hemispheric asymmetry in CF takes place. Saharan dust is also the major contributor to hemispheric aerosol asymmetry over the tropical Atlantic. The NASA GEOS-5 model with aerosol data assimilation was used to extend the MERRA reanalysis with five atmospheric aerosol species (desert dust, sulfates, organic carbon, black carbon, and sea-salt). The obtained ten-year (2002 - 2012) MERRA-driven aerosol reanalysis dataset (aka MERRAero) showed that, over the tropical Atlantic, dust and carbonaceous aerosols were distributed asymmetrically relative to the equator, while other aerosol species were distributed more symmetrically.

CF↗

A Prognostic Launch Vehicle Probability of Failure Assessment Methodology for Conceptual Systems Predicated on Human Causal Factors

Lessons learned from past failures of launch vehicle developments and operations were used to create a new method to predict the probability of failure of conceptual systems. Existing methods such as Probabilistic Risk Assessments and Human Risk Assessments were considered but found to be too cumbersome for this type of system-wide application for yet-to-be-flown vehicles. The basis for this methodology were historic databases of past failures, where it was determined that various faulty human-interactions were the predominant root causes of failure rather than deficient component reliabilities evaluated through statistical analysis. This methodology contains an expert scoring part which can be used in either a qualitative or a quantitative mode. The method produces two products: a numerical score of the probability of failure and guidance to program management on critical areas in need of increased focus to improve the probability of success. In order to evaluate the effectiveness of this new method, data from a concluded vehicle program (USAF's Titan IV with the Centaur G-Prime upper stage) was used as a test case. The theoretical vs. actual probability of failure was found to be 4.46% vs. 6.67% respectively. Recommendations are made for future applications of this method to ongoing launch vehicle development programs.

Launch Vehicle↗

Prognostic Launch Vehicle Probability of Failure Assessment Methodology for Conceptual Systems Predicated on Human Causal Factors

Lessons learned from past failures of launch vehicle developments and operations were used to create a new method to predict the probability of failure of conceptual systems. Existing methods such as Probabilistic Risk Assessments and Human Risk Assessments were considered but found to be too cumbersome for this type of system-wide application for yet-to-be-flown vehicles. The basis for this methodology were historic databases of past failures, where it was determined that various faulty human-interactions were the predominant root causes of failure rather than deficient component reliabilities evaluated through statistical analysis. This methodology contains an expert scoring part which can be used in either a qualitative or a quantitative mode. The method produces two products: a numerical score of the probability of failure or guidance to program management on critical areas in need of increased focus to improve the probability of success. In order to evaluate the effectiveness of this new method, data from a concluded vehicle program (USAF's Titan IV with the Centaur G-Prime upper stage) was used as a test case. Although the theoretical vs. actual probability of failure was found to be in reasonable agreement (4.46% vs. 6.67% respectively) the underlying sub-root cause scoring had significant disparities attributable to significant organizational changes and acquisitions. Recommendations are made for future applications of this method to ongoing launch vehicle development programs.

Craig H Williams↗