Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The Need for Technology Maturity of Any Advanced Capability to Achieve Better Life Cycle Cost (LCC)

Programs such as space transportation systems are developed and deployed only rarely, and they have long development schedules and large development and life cycle costs (LCC). They have not historically had their LCC predicted well and have only had an effort to control the DDT&E phase of the programs. One of the factors driving the predictability, and thus control, of the LCC of a program is the maturity of the technologies incorporated in the program. If the technologies incorporated are less mature (as measured by their Technology Readiness Level - TRL), then the LCC not only increases but the degree of increase is difficult to predict. Consequently, new programs avoid incorporating technologies unless they are quite mature, generally TRL greater than or equal to 7 (system prototype demonstrated in a space environment) to allow better predictability of the DDT&E phase costs unless there is no alternative. On the other hand, technology development programs rarely develop technologies beyond TRL 6 (system/subsystem model or prototype demonstrated in a relevant environment). Currently the lack of development funds beyond TRL 6 and the major funding required for full scale development leave little or no funding available to prototype TRL 6 concepts so that hardware would be in the ready mode for safe, reliable and cost effective incorporation. The net effect is that each new program either incorporates little new technology or has longer development schedules and costs, and higher LCC, than planned. This paper presents methods to ensure that advanced technologies are incorporated into future programs while providing a greater accuracy of predicting their LCC. One method is having a dedicated organization to develop X-series vehicles or separate prototypes carried on other vehicles. The question of whether such an organization should be independent of NASA and/or have an independent funding source is discussed. Other methods are also discussed. How to make the choice of which technologies to pursue to the prototype level is also discussed since, to achieve better LCC, first the selection of the appropriate technologies.

Robinson, John W.↗

Advanced technologies applied to reduce the operating costs of small commuter transport aircraft

The application of new aerodynamic, structural, and propulsion technologies to a specified baseline commuter aircraft is studied. The assessment models can be used on a desktop calculator and include a sizing program, operating cost program, and passenger ride qualities model. Evaluation is done with a step-by-step approach and is applied to range, number and type of engines, structure, wing selection, and configuration. A 40 percent direct operating cost saving is anticipated compared to current well established commuter aircraft.

Masefield, O.↗

Cost comparisons for the use of nonterrestrial materials in space manufacturing of large structures

This paper presents results of a study sponsored by NASA to evaluate the relative merits of constructing solar power satellites (SPS) using resources obtained from the earth and from the moon. Three representative lunar resources utilization (LRU) concepts are developed and compared with a previously defined earth baseline concept. Economic assessment of the alternatives includes cost determination, economic threshold sensitivity to manufacturing cost variations, cost uncertainties, program funding schedule, and present value of costs. Results indicate that LRU for space construction is competitive with the earth baseline approach for a program requiring 100,000 metric tons per year of completed satellites. LRU can reduce earth-launched cargo requirements to less than 10% of that needed to build satellites exclusively from earth materials. LRU is potentially more cost-effective than earth-derived material utilization, due to significant reductions in both transportation and manufacturing costs. Because of uncertainties, cost-effectiveness cannot be ascertained with great confidence. The probability of LRU attaining a lower total program cost within the 30-year program appears to range from 57 to 93%.

Bock, E. H.↗

Safeguards First Principle Initiative (SFPI) Cost Model

The Nevada Test Site (NTS) began operating Material Control and Accountability (MC&A) under the Safeguards First Principle Initiative (SFPI), a risk-based and cost-effective program, in December 2006. The NTS SFPI Comprehensive Assessment of Safeguards Systems (COMPASS) Model is made up of specific elements (MC&A plan, graded safeguards, accounting systems, measurements, containment, surveillance, physical inventories, shipper/receiver differences, assessments/performance tests) and various sub-elements, which are each assigned effectiveness and contribution factors that when weighted and rated reflect the health of the MC&A program. The MC&A Cost Model, using an Excel workbook, calculates budget and/or actual costs using these same elements/sub-elements resulting in total costs and effectiveness costs per element/sub-element. These calculations allow management to identify how costs are distributed for each element/sub-element. The Cost Model, as part of the SFPI program review process, enables management to determine if spending is appropriate for each element/sub-element.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DORCA 2 computer program. Volume 1: User's guide

The Dynamic Operational Requirements and Cost Analysis Program (DORCA 2) is described. The computer program provides a top level analysis tool for NASA and relies on a man machine interaction to optimize results based on external criteria. The computer program relies heavily on outside sources to provide cost information and vehicle parameters. Given data describing mission, vehicles, payloads, containers, space facilities, schedules, cost values, and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules, and cost summaries. The program is designed to consider earth orbit, lunar, interplanetary, and automated satellite missions.

Wray, S. T., Jr.↗

Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks (aka AURORA: Areal Use and Reactant Optimization at Rated Amperage)

Hydrogen fuel cells are recognized as one of the most viable solutions for mobility in the 21st century; however, there are technical challenges that must be addressed before the technology can become available for mass production. One of the most demanding aspects is the costs of present-day fuel cells which are prohibitively high for the majority of envisioned markets. The fuel cell community recognizes two major drivers to an effective cost reduction: (1) decreasing the noble metals content, and (2) increasing the power density in order to reduce the number of cells needed to achieve a specified power level. To date, the majority of development work aimed at increasing the value metric (i.e. W/mg-Pt) has focused on the reduction of precious metal loadings, and this important work continues. Efforts to increase power density have been limited by two main factors: (1) performance limitations associated with mass transport barriers, and (2) the historical prioritization of efficiency over cost. This program is driven by commercialization imperatives, and challenges both of these factors. The premise of this Program, supported by proprietary cost modeling by Nuvera, is that DOE 2015 cost targets can be met by simultaneously exceeding DOE 2015 targets for Platinum loadings (using materials with less than 0.2 mg-Pt/cm 2 ) and MEA power density (operating at higher than 1.0 Watt/cm 2 ). The approach of this program is to combine Nuvera’s stack technology, which has demonstrated the ability to operate stably at high current densities (> 1.5 A/cm 2 ), with low Platinum loading MEAs developed by Johnson Matthey in order to maximize Pt specific power density and reduce stack cost. A predictive performance model developed by PSU/UTK is central to the program allowing the team to study the physics and optimize materials/conditions specific to low Pt loading electrodes and ultra-high current density and operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space station data system analysis/architecture study. Task 5: Program plan

Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

Source record↗

Launch operations efficiency

The paper discusses launch operations from a program perspective. Launch operations cost is a significant part of program cost. New approaches to launch operations, integrated with lessons learned, have the potential to increase safety and reliability as well as reduce cost. Operational efficiency must be an initial program goal. Design technology and management philosophy must be implemented early to ensure operational cost goals. Manufacturing cost and launch cost are related to operational efficiency. True program savings can be realized through implementation of launch operations cost saving approaches which do not correspondingly increase cost in other program areas such as manufacturing and software development and maintenance. Launch rate is a key factor in the cost/flight analysis and the determination of launch operations efficiency goals.

Diloreto, Clem↗

Shared visions: Partnership of Rockwell International and NASA Cost Effectiveness Enhancements (CEE) for the space shuttle system integration program

As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations. The future success of NASA space programs and Rockwell hinges upon the ability to adopt new, more efficient and effective work processes. Efficiency, proficiency, cost effectiveness, and teamwork are a necessity for economic survival. Continuous improvement initiatives like the CEE are, and will continue to be, vehicles by which the road can be traveled with a vision to the future.

Bejmuk, Bohdan I.↗

DORCA computer program. Volume 1: User's guide

The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.

Wray, S. T., Jr.↗

Three Phases of Low-Cost Rocket Engine Demonstration Program Completed

The NASA Lewis Research Center and the TRW Space & Technology Group have successfully completed three phases of testing on the Low-Cost Roc ket Engine Demonstration Program. TRW and the McDonnell Douglas Corpo ration are working, in a joint effort, to quickly develop and produce a highly stable, inexpensive, simple, yet reliable, expendable launc h vehicle.

Source record↗

Cost of saving natural gas through efficiency programs funded by utility customers: 2012–2017

This study estimates the cost of saving a therm of natural gas from energy efficiency programs funded by utility customers during the period 2012 to 2017. Berkeley Lab researchers compiled and analyzed efficiency program data reported by investor-owned utilities and other program administrators in a dozen states representative of the four U.S. Census regions — Arkansas, California, Connecticut, Iowa, Massachusetts, Michigan, Minnesota, New Jersey, New York, Oklahoma, Rhode Island and Utah. Depending on the year, the dataset accounts for about 50 percent to 70 percent of annual national spending on natural gas efficiency programs. The estimated cost of saving natural gas during the study period is $0.40 per therm. The analysis also includes estimates of the program administrator cost of saved energy for three core sectors for natural gas: commercial and industrial, residential, and low-income households. It aggregates these sectors to provide regional and national values. Our metrics include savings-weighted averages, unweighted medians, and interquartile ranges (25th and 75th percentiles) of the levelized program administrator cost of saving gas, in constant 2017 dollars. In addition, the study analyzes cost trends during the study period, finding that average program costs trended downward. The U.S. Department of Energy’s Building Technologies Office supported this work.

03 NATURAL GAS↗