Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

CEBAF Injector Model for KL Beam Conditions

The Jefferson Lab KL experiment will run at the Continuous Electron Beam Accelerator Facility with a much lower bunch repetition rate (7.80 or 15.59 MHz) than nominally used (249.5 or 499 MHz). While the proposed average current of 2.5 - 5.0 muA is relatively low compared to the maximum CEBAF current of approximately 180 muA, the corresponding bunch charge is atypically high for CEBAF injector operation. In this work, we investigated the evolution and transmission of low-rep-rate, high-bunch-charge (0.32 to 0.64 pC) beams through the CEBAF injector. Using the commercial software General Particle Tracer, we have simulated and analyzed the beam characteristics for both values of bunch charge. We performed these simulations with the existing injector using a 130 kV gun voltage. We have calculated and measured the transmission as a function of the photocathode laser spot size and pulse length. We report on the findings of these simulations and optimum parameters for operating the experiment.

Pokharel, Sunil↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

Beam study on low dispersion CEBAF arcs

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab employs recirculating linac SRF technology to generate a high polarization 12 GeV electron beam for nuclear physics users. New opportunities to study multipass energy recovery have also emerged with the proposal of a 5-pass energy recovery demonstration, ER@CEBAF. New beam optics with minimized beta functions have been developed and tested to avoid collective beam instabilities for multi-pass beams and meet the beam requirements of the nuclear physics community. To enable energy recovery for a common arc beam transport of five passes, achromatic and isochronous arc optics conditions were satisfied by re-designing the transverse optics of CEBAF. This paper focuses on beam studies conducted to study the newly-designed, low-dispersion, lowest energy arcs for CEBAF operations and ER@CEBAF.

Neththikumara, I.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

Evaluation of a High-Power Target Design for Positron Production at CEBAF

A source for polarized positron beams at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is being designed. The Polarized Electrons for Polarized Positrons (PEPPo) concept is used to produce polarized e$^+$e$^-$-pairs from the bremsstrahlung radiation of a longitudinally polarized electron beam interacting within a high-Z conversion target. The scheme under consideration includes a 4 mm thick tungsten target that absorbs 17 kW deposited by a 1 mA continuous-wave electron beam with an energy of 120 MeV. The concept of a rotating tungsten rim mounted on a water-cooled copper disk was explored. The results of ANSYS thermal and mechanical analyses are discussed together with FLUKA evaluations of the radiation damages.

Ushakov, A.↗

Capture Cavities for the CW Polarized Positron Source Ce+BAF

The initial design of the capture cavities for a continuous wave (CW) polarized positron beam for the Continuous Electron Beam Accelerator Facility (CEBAF) up-grade at Jefferson Lab is presented. A chain of standing wave multi-cell copper cavities inside a solenoid channel are selected to capture positrons in CW mode. The cavity shunt impedance is surveyed by tuning the cavity geometry while considering accommodating large phase space distribution positron beams with large beam pipe radius while ensuring a large enough passband mode separation. The RF field wall loss power and maximum wall loss power density are considered in cavity and waveguide design. A range of design parameters are given for larger system optimization when the capture cavities are considered together with thermal calculation and beam dynamics in next phase of work.

Wang, S.↗

Toward a long-lifetime polarized photoelectron gun for the Ce+BAF positron source

The addition of spin-polarized, continuous-wave (c.w.) positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) would provide a significant capability to the experimental nuclear physics program at Jefferson Lab. Based on bremsstrahlung and pair-production in a high-Z target, the positron source requires a 120 MeV spin-polarized c.w. electron beam of several milliamperes. While the beam dynamics of the high-current electron beam are tenable, sustaining this current for weeks of user operations requires an unprecedented charge lifetime from a high-polarization GaAs-based photocathode. A promising approach to exceed the kilocoulomb charge lifetime barrier is reducing the ion back-bombardment fluence at the photocathode. By increasing the laser size and managing the emittance growth with an adequate cathode/anode design, significantly enhanced charge lifetime may be achieved. Based upon a new simulation model that qualitatively explains the lifetime data previously measured at different spot sizes, we describe the practical implications on the parameter space available for a kilocoulomb-lifetime polarized photogun design.

Bruker, M.↗

Towards large phase space beams at the CEBAF injector

We report on the status of a degrader device to generate large phase space beams for machine acceptance studies in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The degrader device consists of thin, low-Z targets to degrade the electron beam phase space through multiple scattering, two apertures to define the maximum transverse emittance, and a solenoid to aid in matching to the rest of the injector beamline. The engineering design of the degrader device and projected degraded beam phase space parameters are presented.

Sy, A.↗

Simulations of Positron Capture at Ce+BAF

We present a capture concept for the continuous wave (CW) polarized positron injector for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab (Ce+BAF). This two-step concept is based on (1) the generation of bremsstrahlung radiation by a longitudinally polarized electron beam 1 mA, 120 MeV, 90% polarization), passing through a tungsten target, and (2) the production of e+e--pairs by these bremsstrahlung photons in the same target. To provide highly-polarized positron beams (>60% polarization) or high-current positron beams (>1 µA) with low polarization for nuclear physics experiments, the positron source requires a flexible capture system with an adjustable energy selection band. The results of beam dynamics simulations and calculations of the power deposited in the positron capture section are presented.

Ushakov, Andriy↗

Computational simulations and beamline optimizations for an electron beam degrader at CEBAF

An electron beam degrader is under development with the objective of measuring the transverse and longitudinal acceptance of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. This project is in support of the CE+BAF positron capability. Computational simulations of beam-target interactions and particle tracking were performed integrating the GEANT4 and Elegant toolkits. A solenoid was added to the setup to control the beam's divergence. Parameter optimization of the solenoid field and magnetic quadrupoles gradient was also performed to further reduce particle loss through the rest of the injector beamline.

Lizárraga-Rubio, V.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

Thomas Jefferson National Accelerator Facility (Jeffer- son Lab) currently studies the feasibility of upgrading its energy to 22 GeV. It considers addition of six more linac passes. The highest energy passes will share two new arcs designed using the Fixed-Field Alternating Gradient (FFA) technology. The FFA arcs are built using permanent combined-function magnets. They will be connected to the linacs through transition sections that will match the optics of all six passes to the linacs. With the high number of con- straints and the limited space available, we are investigating a parametric resonance technique to match the optics quasi- independently at each energy. A resonance is excited at each individual energy to selectively control its optics. The reso- nant dipole and quadrupole kick harmonics are imposed for all energies simultaneously using Panofsky corrector mag- nets placed throughout the FFA arcs. This paper presents the current progress on that transition section design

Deitrick, K.↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

CHARACTERIZATION OF RADIATION DAMAGES TO POSITRON SOURCE MATERIALS

The secondary beam production target at future positron sources at the Continuous Electron Beam Accelerator Facility (CEBAF), the International Linear Collider (ILC) or the Future Circular Collider (FCC), features unprecedented mechanical and thermal stresses which may compromise sustainable and reliable operation. Candidate materials are required to possess high melting temperature together with excellent thermal conductivity, elasticity and radiation hardness properties. In order to substantiate the material choice for the CEBAF and ILC positron sources, the response of candidate materials such as titanium alloys, tungsten, and tantalum to electron beam irradiation was experimentally investigated. CEBAF and ILC expected operating conditions were mimicked using the 3.5 MeV electron beam of the MAMI facility injector. The material degradations were precisely analyzed via high energy X-ray diffraction at the HEMS beamline operated by the Helmholtz-Zentrum Hereon at the PETRA III synchrotron facility. This work reports the results of these measurements and their interpretation.

Lengler, T.↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. A Principal Component Analysis (PCA) approach is being developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and PCA model, along with initial performance metrics. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Carpenter, A.↗

High-Gradient Wien Spin Rotators at Jefferson Lab

Nuclear physics experiments performed in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) require spin manipulation of electron beams. Two Wien spin rotators in the injector keV region are essential at CEBAF to establish longitudinal polarization at the end station target, and to flip the polarization direction by ? rad to rule out false asymmetries. In a Wien filter, the homogeneous and independent electric and magnetic fields, along with the velocity vectors of the electrons that traverse it, form a mutually orthogonal system. The magnitude of the electrostatic field, established by biasing two highly-polished electrodes, defines the desired spin angle at the target yet deviates the beam trajectory due to the Lorentz force. The beam trajectory in the Wien is then re-established by adjusting the magnetic field, induced by an electromagnet encasing the device vacuum chamber. This contribution describes the evolution design and high voltage testing of Wien filters for spin manipulation at increased beam energies in the keV injector region, required by high precision parity violation experiments like MOLLER.

Palacios Serrano, G. G.↗

Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study

In early 2020, COVID-19 swept across the world. The accelerator industry, like many others, was impacted by disease, delays, shortages, and new working conditions. All Thomas Jefferson National Accelerator Facility (JLab) employees were sent home in mid-March 2020, with many still working remotely now. At the time, JLab was working on the Proton Power Upgrade (PPU) to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). Procurements had been placed and were being managed, parts were being received and inspected. This paper details the JLab procurement plan for the SNS PPU project, and the mitigations that were developed to continue to support this project smoothly under the limitations imposed by COVID-19.

Wilson, K. M.↗

DEVELOPMENT OF A PROTOTYPE 197 MHz CRAB CAVITY FOR THE ELECTRON-ION COLLIDER AT JLAB

Thomas Jefferson National Accelerator Facility (JLab) is currently developing a prototype 197MHz Radio-Frequency Dipole (RFD) crab cavity as part of the Electron-Ion Collider (EIC) to be built at Brookhaven National Laboratory (BNL). Cryomodules containing these cavities will be part of the Hadron Storage Ring (HSR) of the EIC. The prototype cavity is constructed primarily of formed niobium sheets of thickness 4.17mm, with machined niobium parts used as interfaces where tight tolerancing is required. The cavity?s large size and complex features present sever-al challenges in fabrication, tuning, and RF testing. Structural and forming analyses have been carried out to optimize the design and fabrication processes. An overview of the design phase and the current state of fabrication are presented in this paper.

Huque, Naeem↗

Photon Irradiation Effects on the Enduray Vision System for Nuclear Inspections

Video cameras with greater radiation hardening are needed for the operation and remote handling of equipment in nuclear reactor inspection and refueling applications. Vega Wave Systems has developed a radiation-hardened vision system for nuclear energy applications. The program described in this report provided radiation-hardness testing of this vision system using the Argonne Low-Energy Accelerator Facility (LEAF). This report presents the results of irradiation tests performed on several of Vega Wave System’s cameras at dose rates ranging from 1 kGy/hr up to 10 kGy/hr and up to total doses of >500 kGy. The results were excellent, providing proof of the camera system’s immunity to radiation effects at all levels tested.

36 MATERIALS SCIENCE↗