Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Solutions for Disposal of Intermediate Level Waste in the UK - 16693

GNS mbH is a competence centre owned by of the German utilities and tasked with the management of spent fuel and nuclear waste of all activity levels arising from operation and decommissioning of the commercial German nuclear power plants. Waste management products and methods developed by GNS over the past decades are at present the standard solutions for their respective tasks in Germany. While regulatory environments in the nuclear industry vary strongly from country to country thus limiting the one-to-one portability of such established solutions, GNS has managed to offer its services abroad, with continuously growing success. Challenges and first results of GNS' activities in the UK are the subject of this paper. Content: GNS in Germany and UK; Ion Exchange Resin at Sizewell-B; Drying of wet Intermediate Level Waste at Bradwell NPP; Lessons Learnt in the UK; New Technology Optimised for UK waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative management and funding options for aeronautics programs, Task 1

Research and technology will be at lower program levels with basic military research for aviation decreasing as fewer aircraft programs are initiated and the present new aircraft programs move into the prototype and production status. The key question is can industry take on the management and financing role and meet the criteria and characteristics considered essential for a viable research and technology program. The criteria for evaluating alternative approaches include an examination of the nature of the product to be provided, responsiveness to changing needs, efficiency in terms of costs, ability to provide leadership, and to provide impartial and independent evaluation of approaches, and to provide technological inputs for regulating functions.

Source record↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

VULCON: A System for Vulnerability Prioritization, Mitigation, and Management

Vulnerability remediation is a critical task in operational software and network security management. In this paper, an effective vulnerability management strategy, called VULCON (VULnerability CONtrol), is developed and evaluated. The strategy is based on two fundamental performance metrics: i). Time-to-Vulnerability Remediation (TVR) and; ii). Total Vulnerability Exposure (TVE). VULCON takes as input real vulnerability scan reports, metadata about the discovered vulnerabilities, asset criticality, and personnel resources. VULCON uses a mixed integer multi-objective optimization algorithm to prioritize vulnerabilities for patching, such that the above performance metrics are optimized subject to the given resource constraints. VULCON has been tested on multiple months of real scan data from a Cyber-Security Operations Center (CSOC). Results indicate an overall Total Vulnerability Exposure reduction of 8.97\% when VULCON optimizes a realistic security analyst workforce's effort. Additionally, it is demonstrated that VULCON can determine monthly resources required to maintain a target TVE score. As such, VULCON provides valuable operational guidance for improving vulnerability response processes in CSOCs.

Farris, Katheryn A.↗

Single-Pilot Workload Management

Integrated glass cockpit systems place a heavy cognitive load on pilots (Burian Dismukes, 2007). Researchers from the NASA Ames Flight Cognition Lab and the FAA Flight Deck Human Factors Lab examined task and workload management by single pilots. This poster describes pilot performance regarding programming a reroute while at cruise and meeting a waypoint crossing restriction on the initial descent.

Rogers, Jason↗

Advanced information processing system: Local system services

The Advanced Information Processing System (AIPS) is a multi-computer architecture composed of hardware and software building blocks that can be configured to meet a broad range of application requirements. The hardware building blocks are fault-tolerant, general-purpose computers, fault-and damage-tolerant networks (both computer and input/output), and interfaces between the networks and the computers. The software building blocks are the major software functions: local system services, input/output, system services, inter-computer system services, and the system manager. The foundation of the local system services is an operating system with the functions required for a traditional real-time multi-tasking computer, such as task scheduling, inter-task communication, memory management, interrupt handling, and time maintenance. Resting on this foundation are the redundancy management functions necessary in a redundant computer and the status reporting functions required for an operator interface. The functional requirements, functional design and detailed specifications for all the local system services are documented.

Burkhardt, Laura↗

SWIM: A Switch Manager for Datacenter Networks

As modern datacenter networks (DCNs) grow to support hundreds of thousands of servers and beyond, managing network equipment - such as routers, firewalls, and load balancers - becomes increasingly complex. Network attributes such as IP address allocations and BGP neighbor relations are scattered among various network engineering groups, which makes troubleshooting the network a cumbersome task. In addition, network vendor diversity leads to an explosion of vendor-specific management systems or single-use automation scripts, limiting network scalability while increasing the time required to perform management tasks. In this article, the authors propose a unified network management system, Switch Manager (SWIM), to cope with the growth by standardizing the language for describing network attributes and unifying the interface for executing management actions on the network equipment.

97 MATHEMATICS AND COMPUTING↗

Identifying management opportunities to combat climate, land, and marine threats across less climate exposed coral reefs

Conserving coral reefs is critical for maintaining marine biodiversity, protecting coastlines, and supporting livelihoods in many coastal communities. Climate change threatens coral reefs globally, but researchers have identified a portfolio of coral reefs (bioclimatic units [BCUs]) that are relatively less exposed to climate impacts and strongly connected to other coral reef systems. These reefs provide a proactive opportunity to secure a long-term future for coral reefs under climate change. To help guide local management efforts, we quantified marine cumulative human impact (CHI) from climate, marine, and land pressures (2013 and from 2008 to 2013) in BCUs and across countries tasked with BCU management. Additionally, we created a management index based on common management measures and policies for each pressure source (climate, marine, and land) to identify a country's intent and commitment to effectively manage these pressures. Twenty-two countries (79%) had increases in CHI from 2008 to 2013. Climate change pressures had the highest proportional contribution to CHI across all reefs and in all but one country (Singapore), but 18 BCUs (35%) and nine countries containing BCUs (32%) had relatively high land and marine impacts. There was a significant positive relationship between climate impact and the climate management index across countries (R 2 = 0.43, p = 0.02), potentially signifying that countries with greater climate impacts are more committed to managing them. However, this trend was driven by climate management intent in Fiji and Bangladesh. Our results can be used to guide future fine-scale analyses, national policies, and local management decisions, and our management indices reveal areas where management components can be improved. Cost-effectively managing local pressures (e.g., fishing and nutrients) in BCUs is essential for building a climate-ready future that benefits coral reefs and people.

59 BASIC BIOLOGICAL SCIENCES↗

A Queuing Theory Approach to Pilot-Controller Coordination for m:N Operations

In recent years, attention and interest by industry and researchers has grown in a control paradigm for remotely piloted aircraft termed “m:N operations.” In an m:N operation, a team of m remote pilots in command (RIPCs) collaboratively manage the flights of N aircraft. A consequence of an m:N concept of operations is that the RPICs will have to switch attention from one aircraft to another and from one task to another. Previous research in m:N operations has focused on the workload experienced by an RPIC and their level of situation awareness on their flights. Researchers have found that RPIC workload and situation awareness are generally sensitive to increasing N, although NASA’s Multi-Vehicle (m:N) Working Group has suggested that the driver of workload/situation awareness is the number of exceptions requiring human intervention as opposed to the value of N itself. In any case, a natural antecedent of workload is task load. In this paper, queueing theory is applied to a 1:N Urban Air Mobility (UAM) air taxi operation in order to estimate pilot task load for managing radio communications with air traffic controllers (ATCs) under increasing N. An M/M/1 queueing system is used to model the RIPC’s servicing of calls and clearance requests (e.g., departure, arrival, or airspace transition) to ATC for the N aircraft. Important parameters for the queueing model are the task arrival rate and the average service time for task completion. Radio communication times from past human-in-the-loop simulation studies are used to measure service times for a 1:4 and 1:12 UAM operation and to interpolate service times for 4 < N < 12. A Monte Carlo method is then employed, using the measured and interpolated service times, to estimate arrival rate and related queueing statistics. The paper concludes by considering the estimated queuing statistics, particularly the RPIC’s utilization (i.e., proportion of time actively servicing tasks), the length of the task queue over time, and the implications for task-balanced system design.

task load↗

Exploration Medical System Demonstration

BACKGROUND: Exploration class missions will present significant new challenges and hazards to the health of the astronauts. Regardless of the intended destination, beyond low Earth orbit a greater degree of crew autonomy will be required to diagnose medical conditions, develop treatment plans, and implement procedures due to limited communications with ground-based personnel. SCOPE: The Exploration Medical System Demonstration (EMSD) project will act as a test bed on the International Space Station (ISS) to demonstrate to crew and ground personnel that an end-to-end medical system can assist clinician and non-clinician crew members in optimizing medical care delivery and data management during an exploration mission. Challenges facing exploration mission medical care include limited resources, inability to evacuate to Earth during many mission phases, and potential rendering of medical care by non-clinicians. This system demonstrates the integration of medical devices and informatics tools for managing evidence and decision making and can be designed to assist crewmembers in nominal, non-emergent situations and in emergent situations when they may be suffering from performance decrements due to environmental, physiological or other factors. PROJECT OBJECTIVES: The objectives of the EMSD project are to: a. Reduce or eliminate the time required of an on-orbit crew and ground personnel to access, transfer, and manipulate medical data. b. Demonstrate that the on-orbit crew has the ability to access medical data/information via an intuitive and crew-friendly solution to aid in the treatment of a medical condition. c. Develop a common data management framework that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all activities pertaining to crew health and life sciences. d. Ensure crew access to medical data during periods of restricted ground communication. e. Develop a common data management framework that allows for scalability, extensibility, and interoperability of data sources and data users. f. Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management. g. Provide a better standard of healthcare for crew members through reductions in the time required by crew and ground personnel to provide medical treatment and the number of crew errors experienced during treatment.

Rubin, D. A.↗

Locality-Aware Scheduling for Scalable Heterogeneous Environments

Heterogeneous computing promise boost performance of scientific applications by allowing massively parallel execution of computational tasks. However, manually managing extremely heterogeneous, multi-device systems is complicated and may result in sub-optimal performance. Specifically, data management is an extremely challenging problem on multi-device systems. In this work, we introduce two locality-aware schedulers for the Minos Computing Library (MCL), an asynchronous, task-based programming model and runtime for extremely heterogeneous systems. The first scheduler implements a pure locality-aware algorithm to maximize data reuse, though it might incur in ”hot-spots” that limit system utilization. The second scheduler mitigates this drawback by dynamically targeting between locality-awareness and system utilization based on the current workload and available computing devices. Our results show that locality-awareness greatly benefit applications that exhibit data reuse, providing up to 6.9x and 7.9x over the original MCL scheduler and equivalent OpenCL implementations, respectively. Moreover, our schedulers introduce negligible overhead compared with the original MCL scheduler and achieve similar performance for applications that don’t benefit from data locality.

Architecture, co-design, Task-based programming mo↗

Improving Decommissioning Success using the Tool of Virtual Reality; Increasing Worker Safety and Project Schedule Stability - 17193

operations, especially underwater, is essential. Equally essential is a precise game plan for disassembly which focuses attention on the skilled remote handling operators who must produce the results. Project success is based on clean, efficient cuts and take-aways, prepared paths for waste placement and containment, programmed return paths; and practice, practice, practice on the part of the operators. Recently, our Partner, WAK Ruackbau- und Entsorgungs- GmbH (Decommissioning and Waste Management Company) was tasked with dismantling and decommissioning the Karlsruhe Reprocessing Plant. The most difficult task in this project is the dismantling of the vitrification plant. Waelischmiller was selected to address this high-consequence project. Together, WAK and Waelischmiller determined that development of a virtual reality suite, where management and operators could create a virtual vitrification layout and subsequently map and rehearse their dismantling plan was essential. This approach, using Virtual Reality (VR) as a tool in streamlining operations and rehearsing difficult moves and cuts, will be a game changer for this and future projects. It will be a first-of-a-kind in Germany. The VR suite is contained in a room at the Karlsruhe facility with a large screen, control cabinet, simulation computer, a Waelischmiller Joyarm and Masterarm. To support the dismantling of the vitrification plant, WAK/HWM will conduct interactive feasibility studies for each dismantling step. All movements; cuts, take-aways and vessel segment insertion into transportation and disposal casks will be established, programed and practiced within virtual test suite. This allows savings in cost-intensive and complex construction of test rigs. Operating personnel can be trained in the VR suite, without taking the risk of damaging expensive remote handling equipment.While the operators are working on the operating element, they stand in front of a wide screen. Instead of a real TELBOT{sup R}, a virtual TELBOT{sup R} is moving on the screen in virtual reality. While practicing, the operators cannot damage the arm and the equipment, which is a big advantage. Moreover an interactive feasibility study can be realized without building a real test rig (mock-up). Consequently significant cost-expenses can be reduced. This paper will describe the virtual suite used by the WAK in Karlsruhe and the advantages of this new and innovative approach, which is unique in decommissioning of nuclear facilities. The viewpoint of each (WAK and HWM), and the decisions and benefits realized along the project path will be detailed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancing the practice of systems engineering at JPL

In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

process improvement↗

Capturing Safety Requirements to Enable Effective Task Allocation Between Humans and Automaton in Increasingly Autonomous Systems

There is a current drive towards enabling the deployment of increasingly autonomous systems in the National Airspace System (NAS). However, shifting the traditional roles and responsibilities between humans and automation for safety critical tasks must be managed carefully, otherwise the current emergent safety properties of the NAS may be disrupted. In this paper, a verification activity to assess the emergent safety properties of a clearly defined, safety critical, operational scenario that possesses tasks that can be fluidly allocated between human and automated agents is conducted. Task allocation role sets were proposed for a human-automation team performing a contingency maneuver in a reduced crew context. A safety critical contingency procedure (engine out on takeoff) was modeled in the Soar cognitive architecture, then translated into the Hybrid Input Output formalism. Verification activities were then performed to determine whether or not the safety properties held over the increasingly autonomous system. The verification activities lead to the development of several key insights regarding the implicit assumptions on agent capability. It subsequently illustrated the usefulness of task annotations associated with specialized requirements (e.g., communication, timing etc.), and demonstrated the feasibility of this approach.

Neogi, Natasha A.↗

Nondestructive Assay Technical Infrastructure Program Mission and Vision

The Nondestructive Assay Program (NDAP) mission and vision is achieved by identifying and accomplishing a set of programmatic goals that correspond with eight broad technical program elements. The NDAP was created as a result of Defense Nuclear Facility Safety Board Recommendation 2007-1, entitled “Safety-Related In Situ Nondestructive Assay of Radioactive Materials,” which emphasized the need to improve in situ measurements of radioactive material at US Department of Energy (DOE) defense nuclear facilities. An NDAP five-year plan will define tasks to accomplish specific goals identified in the NDAP mission and vision. This mission and vision is applicable for eight technical program elements: Hardware/Software Development, Algorithm Development and Nuclear Data, Uncertainty Quantification, Nuclear Materials, Staffing, Personnel, And Training, Data Management, Requirement and Standards, and Information Preservation and Dissemination. An additional program element is technical support, which provides daily execution management support for the NDAP, site scope, and deliverable tracking via site task managers, along with technical advisement and support from the technical support group. The NDAP mission and vision provides attributes with specific goals for each program element, and some goals benefit multiple program elements. The goals and attributes defined herein are implemented via an NDAP five-year execution plan that defines site work scope, budget, and deliverables, all of which are updated annually. The NDAP is designed to benefit nondestructive assay (NDA) needs to support DOE nuclear criticality safety programs, ensuring that NDA technology is sufficiently capable of guaranteeing the safety of those who handle, store, process, or transport fissionable materials in the complex. Especially important for the NDAP is to maximize capabilities to identify, characterize, and manage in situ fissile material deposits in process equipment to ensure nuclear criticality safety at processing facilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Initiating the 2002 Mars Science Laboratory (MSL) Technology Program

The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to investigate the Martian environment and requires new capabilities that are currently are not available. The MSL Technology Program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by JPL and is divided into a Focused Program and a Base Program. The MSL Technology Program is under the focused program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology's requirements and the development process are tightly coordinated with the Project. The MSL Technology Program combines the proven management techniques of flight projects with the commercial technology management strategies of industry and academia, to create a technology management program that meets the short-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment. This paper also provides an update of the 2003 MSL technology program and examines some of the drivers that changed the program from its initiation.

Caffrey, Robert T.↗

Initiating the 2002 Mars Science Laboratory (MSL) Focused Technology Program

The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to deliver a new generation of rover safely to the surface of Mars and conduct comprehensive in situ investigations using a new generation of instruments. This system will be designed to land with precision and be capable of operating over a large percentage on the surface of Mars. It will have capabilities that will support NASA's scientific goals into the next decade of exphation. The MSL Technology program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by the Jet Propulsion Laboratory (JPL) and is divided into a Focused Program and a Base Program. The Focused Technology Program addresses technologies that are specific and critical to near-term missions, while the Base Technology Program addresses those technologies that are applicable to multiple missions and which can be characterized as longer term, higher risk, and high payoff technologies. The MSL Technology Program is under the Focused Program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology s requirements and the development process are tightly coordinated with the Project. The Technology Program combines proven management techniques of flight projects with commercial and academic technology management strategies, to create a technology management program that meets the near-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment.

Caffrey, Robert T.↗

AC and DC Fault Management for Megawatt Electrified Aircraft Electrical Powertrains Task 3: Lifetime and Reliability of Electrical Insulators

This research project was a collaborative investigation between researchers at the RTX Technology Research Center (RTRC) and the University of Texas at Austin and made a significant contribution to enabling electric aircraft. The transport of electric power between the points of generation and use requires power cables. These cables must be smaller, lighter and provide a more predictable life than power cables used in stationary applications. Consequently, this investigation provided heretofore unavailable information supporting the safety and reliability of smaller lighter power cables for electrified aircraft. In addition, the research identified key additional engineering data needed to support quantitative reliability assessments. Important advances included: • Demonstrated that at least one manufacturer can make a novel, smaller, lighter power cable that is free from serious defects. • Developed and published an appropriate analytical construct to describe the life of this novel cable. This is a necessary step for use in aviation where the understanding of remaining life is critical. • Demonstrated thermal-mechanical aging that suggested 1000+ flights before the thermal-mechanical processes produced defects large enough that the defect growth was accelerated electrically. • Showed that electrical aging took place at two rates. The first possibly lasting weeks to months and the second possibly days to weeks. If robust, this provides a good diagnostic for cable replacement. • Demonstrated that the traditional electrical testing of cable materials using manufactured voids can be misleading due to the size of the voids. Emerging laser drilling technology permitted demonstration that the physics of failure in realistically small voids is different from that in the unrealistically large voids used in earlier research, which is very important for high-quality, high-performance, small aircraft cables. Although this project represents a significant contribution to the specifics of cable aging in the aircraft environment, important additional research remains to be completed, including: • Non-uniform thermal cycling by applying the heat from the center conductor to maximize thermal stress next to the core area where the electric gradient is the strongest. This builds on the uniform thermal cycling that has been completed. • The augmentation of the thermal-mechanical failure rate by electrical processes. Better understanding of these time constants strongly affects the ability to predict life. • Termination design: Terminations provide not only electrical reflection potential, but a location for a series arc fault and an area where ozone can diffuse into the center conductor and negatively affect cable insulation. • The abrasion and ozone resistance of the cable jacket. • Pressure cycling as an accelerant of thermal, mechanical, and/or electrical aging. • Possible methods for online PD detection and offline PD localization

model↗