Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “request for proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

An Evaluation of the ROSE System

A request-oriented scheduling engine, better known as ROSE, is under development within the Flight Projects Directorate for the purpose of planning and scheduling of the activities and resources associated with the science experiments to be performed aboard the International Space Station (ISS). ROSE is being designed to incrementally process requests from payload developers (PDs) to model and schedule the execution of their science experiments on the ISS. The novelty of the approach comes from its web-based interface permitting the PDs to define their request via the construction of a graphical model to represent their requirements. Based on an examination of the current ROSE implementation, this paper proposes several recommendations for changes to the modeling component and makes mention of other potential applications of the ROSE system.

John M. Usher↗

Space network scheduling benchmark: A proof-of-concept process for technology transfer

This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

Moe, Karen↗

Multi-Probe Campaign FY23 Omega EP Shot Request [Slides]

The goal of the Multi-Probe experimental campaign is to assess the feasibility of using multiple probe types (x ray, proton, neutron, and electron) in future LANL radiographic facilities. The experiments proposed for FY23 will begin developing a neutron source for radiography at Omega EP.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Investigation into Scalable and Detection-Enhanced Satellite Conjunction Assessment

Imaging opportunities (viewable conjunctions) of Resident Space Objects (RSOs) by satellites are not continuously discovered. We propose to continuously produce and report viewable conjunctions among objects in orbit. Viewable conjunctions are events in space and time when a satellite may favorably view a Resident Space Object (RSO). Favorability is defined by a set of constraints, e.g., solar illumination, distance between observer and target, orbital location for viewable event. Computing viewable conjunctions requires calculation of orbital propagation while considering constraints based on the state vectors of position, velocity, with covariance for both satellite and RSO. We propose two parallel lanes of effort: acceleration and research. The objective of acceleration is to avoid missed opportunities and reduce latency for satellite maneuver requests through continuous prediction and reporting of viewable conjunctions. The effort will begin by deploying currently available software on dedicated systems and continue with optimizing the code for high performance computing hardware. The research lane aims to expand RSO inspection and modeling capabilities. Among our current research ideas are spectral characterization of RSO materials and planning multiple observations to recover RSO 3D form. Computing resources at Oak Ridge National Laboratory (ORNL) are available for the acceleration work. Laika, Maxar conjunction prediction dashboard software, and Bluesim, Maxar orbital propagation software, are expected to be the first software in the acceleration lane. Laike and Bluesim are to be provided by the sponsor, and output will be made accessible through its dashboard. Deliverables will follow a gated schedule to the sponsor. ORNL will provide progressively more robust viewable conjunction assessments from both modelled and actual ephemerides.

97 MATHEMATICS AND COMPUTING↗

RL10 ignition limits test for Shuttle Centaur

During routine development testing of the RL10A-3-3B engine a potential no-ignition condition was encountered when operating at certain propellant inlet conditions within the Shuttle Centaur G operating region. The conditions, the resulting investigative program, and methods to correct the potential problem are discussed. The Shuttle Centaur program was cancelled prior to completion of this effort. Although the RL10 engine in the Atlas Centaur vehicle is required by specification to operate over a wide range of propellant inlet conditions. The vehicle actually operates over a narrow range of conditions. This factor, combined with configuration differences between Atlas Centaur (or Titan Centaur) and the Shuttle Centaur RL10 engines, indicates the ignition problem does not exist for these vehicles. As a precautionary measure the vehicle manufacturer was requested to coordinate with Pratt and Whitney any anticipated changes in propellant inlet conditions from the current narrow range. An engineering change will be proposed for future RL10 deliveries to provide more consistent propellant flow to the igniter. This will permit operation of the engine throughout the wide range specification inlet conditions if desired.

Source record↗

Simplified Aircraft-Based Paired Approach: Concept Definition and Initial Analysis

Simplified Aircraft-based Parallel Approach (SAPA) is an advanced concept proposed by the Federal Aviation Administration (FAA) to support dependent parallel approach operations to runways with lateral spacing closer than 2500 ft. At the request of the FAA, NASA performed an initial assessment of the potential performance and feasibility of the SAPA concept, including developing and assessing an operational implementation of the concept and conducting a Monte Carlo wake simulation study to examine the longitudinal spacing requirements. The SAPA concept was shown to have significant operational advantages in supporting the pairing of aircraft with dissimilar final approach speeds. The wake simulation study showed that support for dissimilar final approach speeds could be significantly enhanced through the use of a two-phased altitudebased longitudinal positioning requirement, with larger longitudinal positioning allowed for higher altitudes out of ground effect and tighter longitudinal positioning defined for altitudes near and in ground effect. While this assessment is preliminary and there are a number of operational issues still to be examined, it has shown the basic SAPA concept to be technically and operationally feasible.

Johnson, Sally C.↗

Cloud Giovanni: Reining in Costs and Improving Performance with Analytical Data Stores Using Scalable Serverless Architecture

Giovanni is the Geospatial Interactive Online Visualization ANd aNalysis Infrastructure developed at NASA GES DISC which provides a simple and intuitive way to visualize, analyze, and access vast amounts of Earth science data. It receives large number of user requests each day for a variety of analysis and visualization services, which leads to the big data challenge of serving gradually increasing large data volumes with diverse statistical algorithms. We hereby propose a multi-dimensional accumulation method which provides fast and cost-efficient cloud analysis for diverse services including both area averaging and time averaging. This method involves the weighted volume integration over multiple variable dimensions (time and space), and is implemented in AWS using Athena providing serverless and highly scalable data analysis. Compared to the standard method, this approach dramatically reduced the computational time by order of magnitude with a minimal AWS cost incurred. For example, for a benchmark of 10-year area averaging over the 1x1 degree daily variable, the computational time was reduced from minutes to seconds, and the Athena cost is only $5 for 100,000 requests.

Zhang, Hailiang↗

Pedestrian-Involved Traffic Signal Optimization Using Decentralized Graph-based Multi-Agent Reinforcement Learning

Incorporating pedestrian movements in traffic signal timing optimization is essential for ensuring smooth and safe urban transportation systems. To develop an effective signal timing plan, it is crucial to comprehend how various pedestrian accommodation strategies impact both vehicle and pedestrian flow. This study explores the application of the Decentralized Graph-based Multi-Agent Reinforcement Learning (DGMARL) method for signal timing optimization. It considers both pedestrian and vehicle traffic state and assesses the effects of fixed and adaptive pedestrian request response on traffic and signal timing. The evaluation of DGMARL encompasses vehicles Eco_PI which is fuel consumption impact related to vehicle stops and stop delay, and pedestrian waiting time to ensure overall system efficiency. The proposed approach was evaluated using a Digital Twin microscopic traffic simulation model of MLK Smart Corridor in Chattanooga, Tennessee. The evaluation outcomes of vehicles Eco_PI, pedestrian waiting time and serving time are compared with the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall to determine the most suitable approaches for various traffic conditions. The results indicated that, on average, the strategy of Signal timing optimization with adaptive pedestrian request response improved the Eco_PI by 32.43%, and Signal timing optimization with both automated pedestrian traffic demand and adaptive pedestrian request response improved the Eco_PI by 31.62% compared to the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall.

K Kumarasamy, Vijayalakshmi↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

Closed Environment Air Revitalization System Based on Metal Organic Framework Adsorbents

This project utilized a systems engineering methodology to develop a vacuum swing adsorption system with full Labview automated control. The project was successful and provided students with an introduction to systems engineering and air revitalization. Specifically, two stainless steel adsorption beds were custom designed and manufactured and a sequence of computer controlled valves were used to deliver CO 2 laden, humid air, to the adsorbent where the CO 2 was removed from the air stream. Runs were completed using 13X zeolite and bed timing and switching was controlled by the computer based on the data output of a CO 2 detector. Adsorption runs using the MOF have not been completed upon the writing of this report; however, the MOF material is currently being synthesized and the runs will be completed upon receipt of the material. A follow up meeting with NASA has been tentatively planned to discuss the output of these experiments. Consistent with systems engineering practice, an end of project assessment of the class was conducted with the students and several items were realized. Specifically, the short period of performance of this grant makes it necessary to maintain a narrowly focused scope on the project such that multiple experiments after systems development (T&E) need to be limited to ensure timely completion of the proposed tasks. Also, procurement of parts may need to be moved forward in time to allow for delivery delays, and it may be necessary to request SDR, PDR, and CDR dates from NASA that are ahead of the NASA anticipated schedule. These types of lessons provided valuable to both the PI and the students and ultimately illustrate the necessity of proper systems engineering schedule risk assessment. The class met the objectives of the project and provided an introduction to systems engineering to undergraduate students. As a metric of that success, the lead engineer of the undergraduate design team acquired a job with an aerospace defense contractor, which he attributed to his knowledge of systems engineering concepts that were acquired via the X-Hab class.

T. Grant Glover↗

Advanced Booster Composite Case/Polybenzimidazole Nitrile Butadiene Rubber Insulation Development

The NASA Engineering and Safety Center (NESC) was requested to examine processing sensitivities (e.g., cure temperature control/variance, debonds, density variations) of polybenzimidazole nitrile butadiene rubber (PBI-NBR) insulation, case fiber, and resin systems and to evaluate nondestructive evaluation (NDE) and damage tolerance methods/models required to support human-rated composite motor cases. The proposed use of composite motor cases in Blocks IA and II was expected to increase performance capability through optimizing operating pressure and increasing propellant mass fraction. This assessment was to support the evaluation of risk reduction for large booster component development/fabrication, NDE of low mass-to-strength ratio material structures, and solid booster propellant formulation as requested in the Space Launch System NASA Research Announcement for Advanced Booster Engineering Demonstration and/or Risk Reduction. Composite case materials and high-energy propellants represent an enabling capability in the Agency's ability to provide affordable, high-performing advanced booster concepts. The NESC team was requested to provide an assessment of co- and multiple-cure processing of composite case and PBI-NBR insulation materials and evaluation of high-energy propellant formulations.

Gentz, Steve↗

The Muon Collider

Muons offer a unique opportunity to build a compact high-energy electroweak collider at the 10 TeV scale. A Muon Collider enables direct access to the underlying simplicity of the Standard Model and unparalleled reach beyond it. It will be a paradigm-shifting tool for particle physics representing the first collider to combine the high-energy reach of a proton collider and the high precision of an electron-positron collider, yielding a physics potential significantly greater than the sum of its individual parts. A high-energy muon collider is the natural next step in the exploration of fundamental physics after the HL-LHC and a natural complement to a future low-energy Higgs factory. Such a facility would significantly broaden the scope of particle colliders, engaging the many frontiers of the high energy community. The last European Strategy for Particle Physics Update and later the Particle Physics Project Prioritisation Panel in the US requested a study of the muon collider, which is being carried on by the International Muon Collider Collaboration. In this comprehensive document we present the physics case, the state of the work on accelerator design and technology, and propose an R\&D project that can make the muon collider a reality.

Accelerator Physics (physics.acc-ph)↗

Permanence analysis of a concatenated coding scheme for error control

A concatenated coding scheme for error control in data communications is analyzed. In this scheme, the inner code is used for both error correction and detection, however, the outer code is used only for error detection. A retransmission is requested if the outer code detects the presence of errors after the inner code decoding. Probability of undetected error is derived and bounded. A particular example, proposed for the planetary program, is analyzed.

Costello, D. J., Jr.↗

Probability of undetected error after decoding for a concatenated coding scheme

A concatenated coding scheme for error control in data communications is analyzed. In this scheme, the inner code is used for both error correction and detection, however the outer code is used only for error detection. A retransmission is requested if the outer code detects the presence of errors after the inner code decoding. Probability of undetected error is derived and bounded. A particular example, proposed for NASA telecommand system is analyzed.

Costello, D. J., Jr.↗

Fostering Multilateral Involvement in Analog Research

International collaboration in space flight research is an effective means for conducting investigations and utilizing limited resources to the fullest extent. Through these multilateral collaborations mutual research questions can be investigated and resources contributed by each international partner to maximize the scientific benefits to all parties. Recently the international partners embraced this approach to initiate collaborations in ground‐based space flight analog environments. In 2011, the International Analog Research Working Group was established, and later named the International Human Space Flight Analog Research Coordination Group (HANA). Among the goals of this working group are to 1) establish a framework to coordinate research campaigns, as appropriate, to minimize duplication of effort and enhance synergy; 2) define what analogs are best to use for collaborative interests; and 3) facilitate interaction between discipline experts in order to have the full benefit of international expertise. To accomplish these goals, HANA is currently engaged in developing international research campaigns in ground‐based analogs. Plans are being made for an international solicitation for proposals to address research of common interest to all international partners. This solicitation with identify an analog environment that will best accommodate the types of investigations requested. Once selected, studies will be integrated into a campaign and implemented at the analog site. Through these combined efforts, research beneficial to all partners will be conducted efficiently to further address human risks of space exploration.

Cromwell, Ronita L.↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expert Water Quality Panel Review of Responses to the NASA Request for Information for the International Space Station On-Board Environmental Monitoring System

On August 9, 2003, NASA, with the cooperative support of the Vehicle Office of the International Space Station Program, the Advanced Human Support Technology Program, and the Johnson Space Center Habitability and Environmental Factors Office released a Request for Information, or RFI, to identify next-generation environmental monitoring systems that have demonstrated ability or the potential to meet defined requirements for monitoring air and water quality onboard the International Space Station. This report summarizes the review and analysis of the proposed solutions submitted to meet the water quality monitoring requirements. Proposals were to improve upon the functionality of the existing Space Station Total Organic Carbon Analyzer (TOCA) and monitor additional contaminants in water samples. The TOCA is responsible for in-flight measurement of total organic carbon, total inorganic carbon, total carbon, pH, and conductivity in the Space Station potable water supplies. The current TOCA requires hazardous reagents to accomplish the carbon analyses. NASA is using the request for information process to investigate new technologies that may improve upon existing capabilities, as well as reduce or eliminate the need for hazardous reagents. Ideally, a replacement for the TOCA would be deployed in conjunction with the delivery of the Node 3 water recovery system currently scheduled for November 2007.

Fishman, Julianna L.↗