Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “records”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses

The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.

54 ENVIRONMENTAL SCIENCES↗

Record of Treatment for Concrete Preservation Work at TA-6-0037 Concrete Bowl, TA-08 Gun Site, TA-16-0518 Stem Wall, and TA-18 Battleship Bunkers (Historic Buildings Report)

This completion report documents concrete preservation work that occurred in Fiscal Years 2019 and 2020. Work took place at four sites (Technical Areas [TAs] -06, -08, -16, and -18) that hold Manhattan Project–era significance. Seven buildings and structures were included in the project scope, with concentrated assessments and treatment plans accomplished before the start of preservation activities. The attended buildings and structures represent eligible or included Manhattan Project National Historical Park resources. The stabilization of original fabric and the retention of integrity and significance remained paramount throughout all phases of this project.

42 ENGINEERING↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Historic Source Inspection Records

To create true counts of number of containers, each container can be identified by a combination of the purchase order, unique part number and type of inspection. The column TestEventName and any columns derived from TestEventName should not be used in the instance of presource inspection because the vendor may mete out testing over multiple months, meaning that a container would be counted twice if a single test was completed in one month and another test in a different month. By counting on this combination of values, we are able to drop row entries that signify multiple tests completed on a single container. Inspection type must be used because each container will be tested by the vendor and re-tested by the LANL container engineering team. Recall that the vendor will complete action limit tests for the full set of containers during pre-source inspection but during source inspection, action limit tests are completed for only a random subset. However, LANL SMEs will complete a manual inspection for the full set of containers.

42 ENGINEERING↗

A New Class of SiC Power MOSFETs with Record-Low Resistance

Silicon carbide (SiC) power transistors are used in the main traction inverter of electric vehicles (EVs). Tesla began installing SiC power MOSFETs in 2017, and has now produced 4.8 million EVs containing over 169 million SiC power MOSFETs. Looking ahead, the worldwide EV market is projected to exceed 50 million vehicles per year by 2030 (Reuters, Oct. 25, 2022). This will create a demand for over two billion SiC power MOSFETs per year. Our program aims to double the efficiency of today's commercial power MOSFETs. This will cut the number of MOSFETs per EV in half, reducing cost, simplifying assembly, decreasing weight, and increasing vehicle reliability through reduced parts count. Our approach is to apply innovative design and advanced processing to increase the density of current-controlling channels in SiC power MOSFET. We have developed two new MOSFET devices, each of which increases the channel density by a factor of six over today's best commercial MOSFETs. This required implementing new fabrication processes, creating new device designs, and integrating the processing steps and device designs into a manufacturable technology. In this project we have developed two innovative devices: (i) a novel three-dimensional structure, the "tri-gate MOSFET," and (ii) a deeply-scaled, fully self-aligned trench MOSFET, the "IMOSFET". Both products were experimentally demonstrated during this project and meet the program goals of increased efficiency relative to the current state-of-the art commercial products. In the process we have generated significant IP, with two US patents issued and three applications pending. We have also published three journal articles and given reports on this technology at seven international conferences. The success of this program has led to significant follow-on funding from industry. In May 2023 Purdue University signed a five-year R&D contract with GlobalFoundries to transfer our novel technology to commercial production. With headquarters in Malta, NY, Global Foundries is one of the largest pure-play silicon foundries in the world, with annual revenue of $\$$8.1B. Their SiC foundry will be built around the next-generation 200-mm diameter SiC wafers, which will double the number of die per wafer and reduce per-die production cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗