Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Software for Planning Scientific Activities on Mars

Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

Ai-Chang, Mitchell↗

Mission Operations Planning and Scheduling System (MOPSS)

MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

Wood, Terri↗

Flight Planning in the Cloud

This new interface will enable Principal Investigators (PIs), as well as UAVSAR (Uninhabited Aerial Vehicle Synthetic Aperture Radar) members to do their own flight planning and time estimation without having to request flight lines through the science coordinator. It uses an all-in-one Google Maps interface, a JPL hosted database, and PI flight requirements to design an airborne flight plan. The application will enable users to see their own flight plan being constructed interactively through a map interface, and then the flight planning software will generate all the files necessary for the flight. Afterward, the UAVSAR team can then complete the flight request, including calendaring and supplying requisite flight request files in the expected format for processing by NASA s airborne science program. Some of the main features of the interface include drawing flight lines on the map, nudging them, adding them to the current flight plan, and reordering them. The user can also search and select takeoff, landing, and intermediate airports. As the flight plan is constructed, all of its components are constantly being saved to the database, and the estimated flight times are updated. Another feature is the ability to import flight lines from previously saved flight plans. One of the main motivations was to make this Web application as simple and intuitive as possible, while also being dynamic and robust. This Web application can easily be extended to support other airborne instruments.

Flores, Sarah L.↗

Planning as an Iterative Process

Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

Smith, David E.↗

The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

Stetson, Howard↗

Constraint-based Attribute and Interval Planning

In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

Jonsson, Ari↗

An Integrated Extravehicular Activity Research Plan

Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human-Suit Modeling; Suit Trauma Monitoring and Countermeasures; EVA Workload and Duration Effects; Decompression Sickness Risk Mitigation; Deconditioned EVA Performance; and Exploration EVA Concept of Operations.

Abercromby, Andrew F. J.↗

Energy Master Planning for Resilient Public Communities—Best Practices from U.S. Military Installations

Until recently, most planners at military installations addressed energy systems for new facilities on an individual facility basis without consideration of community-wide goals relevant to energy sources, renewables, storage, or future energy generation needs. Building retrofits of public buildings typically do not address energy needs beyond the minimum code requirements making it difficult, if not impossible, to achieve community-level targets on a building-by-building basis. Planning on the basis of cost and general reliability may also fail to deliver community-level resilience. For example, many building code requirements focus on hardening to specific threats, but in a multi-building community, only a few of these buildings may be mission-critical. Over the past two decades, the frequency and duration of regional power outages and water utility disruptions from weather, man-made events, and aging infrastructure have increased. Major disruptions of electric and thermal energy have degraded critical mission capabilities and caused significant economic impacts. In 2016, the U.S. Department of Defense issued guidance that each Service (Army, Navy, Air Force, Marines) complete comprehensive energy plans for the installations that consumed 75% of total building energy. Guidance was updated in 2017 to include metrics for energy resilience, and in some cases, water. This paper describes how community level quantitative and qualitative resilience analysis and metrics have been incorporated into community energy and water planning best practices for military installations in three geographically diverse locations. It is based on research performed under the International Energy Agency’s “Energy in Buildings and Communities Program Annex 73,” focusing on development of guidelines and tools that support the planning of Net Zero Energy Resilient Public Communities as well as research performed under the Department of Defense Environmental Security Technology Certification Program project EW18-D1- 5281, “Technologies Integration to Achieve Resilient, Low- Energy Military Installations.” The first case study reviews progress made on an energy and water planning study conducted at Fort Bliss, Texas. The second and third describes planning conducted at Fort Bragg, North Carolina and the Joint Region Marianas, Guam, respectively, under the updated guidance from 2017 regarding energy and water resilience. Analysis methods, key metrics, and key infrastructure and operational constraints are described, as well as technical, economic and business concepts used during the planning process.

Urban, Angela B.↗

Decarbonization in Climate Resilience Planning

Recent executive orders such as E.O. 14008 require federal agencies to address climate change by enhancing resilience and reducing emissions through decarbonization. Traditionally, federal agencies require their sites to develop preparedness plans, such as continuity of operations plans and/or more comprehensive resilience plans. When climate change is included in these plans, the focus tends to be on climate adaptation solutions such as hardening infrastructure and not on climate mitigation through decarbonization. However, with the ambitious emission reductions targets set out by the federal government, it is essential to provide resources and tools to support energy and water managers in achieving decarbonization goals. To achieve this, there is a need for decarbonization to be incorporated into existing resilience planning processes. We discuss a method of incorporating a decarbonization analysis into an existing resilience planning process to create a holistic framework that considers climate adaptation, climate mitigation, and risk reduction priorities when developing and prioritizing solutions for federal sites. Site managers and decision makers must be aware of potential opportunities and trade-offs in meeting energy and water performance goals, emission reductions goals, and climate adaptation goals when developing technological, operational, or institutional resilience solutions. By combining these processes, energy and water managers can minimize the additional level of effort to ensure that their sites are not only able to withstand climate-related energy and water disruptions, but also contribute to climate mitigation. A holistic approach can help federal agencies serve as a model for incorporating decarbonization strategies into site-level resilience planning for the rest of the nation.

Elliott, Douglas B.↗

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Distribution Planning

The contemporary distribution planning landscape is comprised of an increasing number of factors that require integration into the engineering of the modern electric grid. Expectations for electric utilities to accommodate heightened awareness of stakeholders' interest in things like decarbonization, resilience and equity are growing. As these interests are formed into objectives, many jurisdictions will experience increasing levels of load modifying technologies like DER, building and industrial electrification and electric vehicles which prove not only to challenge the capabilities of the grid; but the processes by which planning for it is traditionally done. Other related factors that strain the conventional distribution planning mold are the swelling amount and sources of data associated with these technologies and the need it creates for improved capabilities in the processes and tools that manage it. As the complexity of the distribution system expands, so will the distribution system's effects on the transmission and generation systems that it is a part of. Forecasting distribution system load and DER are examples of areas where this complexity will manifest, and harmonizing distribution forecasting with transmission and generation forecasting requires higher amounts of intentionality as these typically separate processes become a solitary one. Of course, core activities do not cease as a utility begins to integrate these other factors, and in this webinar we explore specifics of how distribution planning can be expected to evolve as progress towards Integrated Distribution System Planning is made.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Planning for a Resilient Home Electricity Supply System

Resilience of power systems is already a key issue that is getting frequent attention all over the world. It is useful to analyze resilience issues not only for bulk supply, but at all levels including at a customer level. This is because distributed energy resources can play a prominent role in enhancing resilience. Although the literature on planning models, tools and data for bulk supply and distribution systems have expanded in recent years, customer-centric planning, e.g., for an individual household, is yet to receive adequate attention. Although solar PV and battery storage at a household level have been analyzed, how these resources can be optimally combined, together with grid supply, from a resilience perspective is the focus of this study. The study demonstrates how a conceptual framework can be developed to show the trade-off between system costs and resilience including its dimensions such as duration, depth and frequency of service outages. A planning model is developed that incorporates multiple facets of resilience and individual customer preferences. The model considers power system resilience explicitly as a constraint. The model is implemented for a household level case study in Miami, Florida. The results show there are complex trade-offs among different dimensions of resilience. The study demonstrates how combined resilience metrics can be formulated and evaluated using the proposed least-cost planning model at a household level to optimize grid supply together with solar, battery storage and diesel generators. The model allows a planner to directly embed a resilience standard to drive the optimal supply mix. These concepts and the modeling construct can also be applied at other levels of planning, including community level and bulk supply system planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals

NASEO and Berkeley Lab released a new publication on State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals. State and Territory Energy Offices develop plans, programs, policies, and projects that have a substantial impact on electric distribution systems. They also can participate in distribution system planning (DSP) processes to help ensure that utilities – consumer- and investor-owned – meet the state’s future energy needs. This paper recognizes the wide spectrum of roles that State Energy Offices can play in DSP processes, including planning for distributed energy resources and grid modernization. It highlights various examples of non-regulatory activities by State Energy Offices including planning, conducting studies, convening stakeholder processes, and implementing programs that inform and contribute to distribution system planning. It also provides examples of State Energy Offices’ engagement in proceedings before their respective public utility commissions. As State Energy Offices face myriad challenges associated with meeting state policy goals, preparing for anticipated rates of distributed energy resource deployment, addressing concerns regarding grid reliability and resilience, and recommending and making long-term investment decisions, the examples provided through this guide can serve as a resource in navigating those challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗