Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Strategies GeoCape Intelligent Observation Studies @ GSFC

This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.

0000↗

A Decision-Theoretic Approach to Autonomous Planetary Rover Control

The report discusses the: Decentralized Control of Markov Decision Processes. Study the complexity of decentralized control of Markov decision processes, and develop algorithms for finding optimal control policies. Scheduling Contract Algorithms. Develop an optimal method for scheduling runs of a contract anytime algorithm (one that takes the deadline as input) in situations where the deadline is unknown, multiple problem instances must be solved, and a multi-processor machine is available. Planetary Rover Control as a Markov Decision Process.Use the Markov decision process framework to formalize and solve problems in planetary rover control. Adaptive Peer Selection. Use reinforcement learning to maximize the expected down-load speed for a client in a peer-to-peer file sharing system.

Zilberstein, Shlomo↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Route Optimization for Energy Efficient Airport Shuttle Operations - A Case Study from Dallas Fort Worth International Airport

Air travel and requisite surface traffic supporting passenger arrival/departure constitutes a significant portion of travel and emissions in cities with large airports. An airport trip can segment into three parts namely: i) travel from a location in the city to the airport; ii) travel from a parking lot or rental car center to the terminal (i.e., within the airport premises), and iii) travel inside the terminal. Depending on the airport access mode all or a part of these legs comprise a traveler’s journey to the airport. The priority of airport ground transport management teams is to provide passengers with a seamless travel experience within the airport, so it is understandable that within airport shuttle routes might not be optimized for minimizing energy consumption. Solutions that meet the dual objective of reducing energy consumption from airport shuttle operations without compromising on passenger travel experience are key to improving system efficiency. There is currently a dearth of research and tools that can inform airports in making such decisions. Addressing this need, this research effort puts forth an optimization model that generates optimal shuttle routes for a given set of constraints, and a discrete-event simulator that evaluates the optimal solutions in a stochastic environment to understand the tradeoffs between passenger wait times, and within airport shuttle energy consumption. The proposed set of tools are tested in the context of optimizing airport shuttles routes within the Dallas Fort Worth International Airport (DFW). In addition to shuttle spatial positioning, and passenger demand information, high-fidelity vehicle data was collected using data loggers installed on DFW shuttles. Results show that 20% energy reduction in shuttle operations is possible with a modest two-minute increase in average passenger wait times. The tools developed in this research effort are designed to be generalizable and can help optimize shuttle operations planning at any major airport.

air travel↗

Driving Next-Generation Workflows from the Data Plane

We observe the emergence of a new generation of scientific workflows that process data produced at a sustained rate by scientific instruments and large scale numerical simulations. This data is consumed by multiple analysis, visualization, or Machine Learning components not only to enable inference and justify the scientific program, but also to monitor and steer the evolution of these experiments. In such workflows, moving intermediate data efficiently is key to performance, more than efficiently scheduling computational tasks. However, most traditional workflow management systems focus on optimizing task scheduling and then deal with data management, assuming a “move little, compute for long” model, which makes them unfit to the efficient management of this new generation of workflows. Therefore, we advocate for a new way to manage scientific workflows. We propose to consider an efficiently and independently managed data plane that can store and stream data. Workflows compute components, in the application plane can then interact with the data plane, abstracted from complexities of data management. Then, the role of a workflow management system would become that of a control plane that allows users to connect services together to execute the workflow and manages connections between the application and data planes. In this position paper, we characterize several next-generation workflow motifs and describe how their interaction with the data plane is a challenge to traditional workflow management systems. Then, we express a set of requirements that a workflow management system should meet to efficiently manage next-generation workflows at different scales. Based on these requirements, we expose our vision of driving next-generation workflows from the data plane and list remaining open challenges.

Suter, Fred↗

A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

Montoya, Justin Vincent↗

Economy analysis of second-life battery in wind power systems considering battery degradation in dynamic processes: Real case scenarios

Energy storage system plays an important role in modern power systems for mitigating the variation and intermittency of renewable energy sources. The Lithium-ion battery is currently the most widely used solution for energy storage system. However, its high cost is considered as one of the major barriers hampering the integration of renewable energy and the adoption of electric vehicles. Reusing electric vehicle batteries seems a promising solution to the aforementioned problem. Based on a dynamic degradation model of Lithium-ion batteries, this paper first compares the profits that second-life and fresh batteries can bring to the wind farm. Model predictive control is adopted to solve an hourly optimal wind scheduling problem and maximize the profit of wind farm owner. Here, the optimal size of battery is determined and then the comparison of second-life and fresh batteries is conducted taking the battery degradation, the profit of the wind farm owner, and various remaining capacities of battery into account. Two case studies in USA and Denmark are conducted and the analysis shows that given the current prices of wind energy and Lithium-ion batteries, reusing batteries is not worthwhile for the studied wind farms, but it may outperform fresh batteries in the future if the wind energy price decreases much faster than the battery price.

17 WIND ENERGY↗

Autonomous Energy Management Software System for Small Commercial Buildings in Support of Decarbonization (Abstract)

The primary goal for the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage vast experience of Pacific Northwest National Laboratory (PNNL) research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation LLC who plans to use it to scale their building energy efficiency offering. The project plan will include collaboratively working with Intellimation to package a set of solutions into the AEMS system, validate and demonstrate their capability, and value proposition through field demonstrations. If the deployment of the AEMS system optimizes RTUs’ set points, schedules, setbacks and optimal start and results in energy consumption reduction of 20%, the technical potential savings is approximately 675 trillion Btus of site energy savings and 2,000 trillion Btus of source energy. It will also result in carbon reductions of approximately 2.4 MMTCO2 and contribute to the climate change mitigation plans of many cities and states across the United States. Additional cost savings and emissions reduction are possible from management of peak electricity demand. The primary outcome will be an AEMS system that can be deployed at scale on small commercial buildings to improve operating efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.

To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank

97 MATHEMATICS AND COMPUTING↗

The CPAT Domain Model - How CPAT "Thinks" from an Analyst Perspective

To help effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decentralized Failure-Tolerant Optimization of Electric Vehicle Charging

We present a decentralized failure-tolerant algorithm for optimizing electric vehicle (EV) charging, using charging stations as computing agents. The algorithm is based on the alternating direction method of multipliers (ADMM) and it has the following features: (i) It handles capacity, peak demand, and ancillary services coupling constraints. (ii) It does not require a central agent collecting information and performing coordination (e.g. an aggregator), instead all agents exchange information and computations are carried out in a fully decentralized fashion. (iii) It can withstand the failure of any number of computing agents, as long as the remaining computing agents are in a connected communications network. We construct this algorithm by reformulating the optimal EV charging problem in a decomposable form, amenable to ADMM, and then developing efficient decentralized solution methods for the subproblems dealing with coupling constraints. We conduct numerical experiments on industry-scale synthetic EV charging datasets, with up to 1,152 charging stations, using a high performance computing cluster. The experiments demonstrate that the proposed algorithm can solve the optimal EV charging problem fast enough to permit the integration of EV charging with real-time electricity markets, even in the presence of failures.

42 ENGINEERING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor- ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.

97 MATHEMATICS AND COMPUTING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis.

In order to effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thorough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The 4-D descent trajectory generation techniques under realistic operating conditions

NASA-Langley has been conducting and sponsoring research in airborne energy management for a number of years. During the course of this research, two fundamental techniques for the generation of 4D (fixed time) descent trajectories have emerged as viable candidates for advanced flight management systems. The first technique utilizes speed schedules of constant Mach number transitioning to constant calibrated airspeed chosen empirically to produce minimum fuel usage. The second technique computes cost optimized speed schedules of variable airspeed developed through application of optimal control theory. Both techniques have been found to produce reasonable and flyable descent trajectories. The formulation of the algorithms for each technique is evaluated and their suitability for operations in realistic conditions is discussed. Operational factors considered include: airplace speed, thrust, and altitude rate constaints; wind, temperature, and pressure variations; Air Traffic Control altitude, speed, and time constaints; and pilot interface and guidance considerations. Time flexibility, fuel usage, and airborne computational requirements were the primary performance measures.

Williams, David H.↗

Optimal Allocation Of Tasks In Hypercube Computers

Uniform tasks distributed uniformly or else assigned to one processor. Investigation in theory of scheduling yielded optimal scheme for allocation of tasks among digital data processors in hypercube ensemble. Applies to tasks that require equal time to execute, performed in any order, and between any two of which equal amounts of communication required. Reduces overall processing time for given set of computational tasks.

Salama, Moktar A.↗

Scheduler Design Criteria: Requirements and Considerations

This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

NASA-KAIA/KARI research collaboration↗

Decentralized Distributed Proximal Policy Optimization (DD-PPO) for High Performance Computing Scheduling on Multi-User Systems

Resource allocation in High Performance Computing (HPC) environments presents a complex and multifaceted challenge for job scheduling algorithms. Beyond the efficient allocation of system resources, schedulers must account for and optimize multiple performance metrics, including job wait time and system throughput. Traditional heuristic-based scheduling algorithms increasingly struggle and lack the efficiency needed to meet the demands and address the complexity and scale of modern HPC systems. Consequently, recent research efforts have focused on leveraging advancements in Artificial Intelligence (AI) and Deep Learning (DL), particularly Reinforcement Learning (RL), to develop more adaptable and intelligent scheduling strategies. Previous RL-based scheduling approaches have explored a range of algorithms, from Deep Q-Networks (DQN) to Proximal Policy Optimization (PPO), and more recently, hybrid methods that integrate Graph Neural Networks (GNNs) with RL techniques. However, a common limitation across these methods is their reliance on relatively small datasets, with few methods being evaluated using large-scale, multi-million-job trace datasets representative of real-world HPC workloads. Moreover, existing RL schedulers face scalability issues due to centralized policy updates, which hinder training efficiency and performance when applied to large datasets. This study introduces a novel RL-based scheduler utilizing Decentralized Distributed Proximal Policy Optimization (DD-PPO) algorithm, which supports large-scale distributed training across multiple workers without requiring parameter synchronization at every step. By eliminating reliance on centralized updates to a shared policy, the DD-PPO scheduler enhances scalability, training efficiency, and sample utilization. Experimental validation using a large real-world dataset containing over 11.5 million job traces collected from petascale HPC systems over six years assesses the influence of dataset scale on training effectiveness and compares DD-PPO performance to traditional and advanced scheduling approaches. The experimental results demonstrate improved scheduling performance in comparison to both heuristic-based schedulers and existing RL-based scheduling algorithms.

AI↗