Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “negotiation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Articulated Suspension Without Springs

Wheels negotiate bumps and holes with minimal tilting of vehicle body. In new suspension, wheel climbs obstacle as high as 1 1/2 times its diameter without excessive tilting of chassis. Provides highly stable ride over rough ground for such vehicles as wheelchairs, military scout cars, and police and fire robots. System of levers distributes weight to wheels. Sized to distribute equal or other desired portions of load among wheels.

Bickler, Donald B.↗

Stabilizing Wheels For Rover Vehicle

Proposed articulated, normally-four-wheeled vehicle holds extra pair of wheels in reserve. Deployed to lengthen wheelbase on slopes, thereby making vehicle more stable, and to aid vehicle in negotiating ledge or to right vehicle if turned upside down. Extra wheels are drive wheels mounted on arms so they pivot on axis of forward drive wheels. Both extra wheels and arms driven by chains, hydraulic motors, or electric motors. Concept promises to make remotely controlled vehicles more stable and maneuverable in such applications as firefighting, handling hazardous materials, and carrying out operations in dangerous locations.

Collins, Earl R., Jr.↗

Final Environmental Impact Statement for the Ulysses Mission (Tier 2)

This Final (Tier 2) Environmental Impact Statement (FEIS) addresses the environmental impacts which may be caused by implementation of the Ulysses mission, a space flight mission to observe the polar regions of the Sun. The proposed action is completion of preparation and operation of the Ulysses spacecraft, including its planned launch at the earliest available launch opportunity on the Space Transportation System (STS) Shuttle in October 1990 or in the backup opportunity in November 1991. The alternative is canceling further work on the mission. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. This alternative was further evaluated and eliminated from consideration when, in November 1988, the U.S. Air Force, which procures the Titan 4, notified that it could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The Titan 4 launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) for the November 1991 launch opportunity. The only expected environment effects of the proposed action are associated with normal launch vehicle operation and are treated elsewhere. The environmental impacts of normal Shuttle launches were addressed in existing NEPA documentation and are briefly summarized. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects were judged insufficient to preclude Shuttle launches. There could also be environmental impacts associated with the accidental release of radiological material during launch, deployment, or interplanetary trajectory injection of the Ulysses spacecraft. Intensive analysis indicates that the probability of release is small. There are no environmental impacts in the no-action alternative; however, the U.S. Government and the European Space Agency would suffer adverse fiscal and programmatic impacts if this alternative were adopted. The scientific benefits of the mission would be delayed and possibly lost. There could be significant impacts on the ability of the U.S. to negotiate international agreements for cooperative space activities.

Source record↗

Experiments and other methods for developing expertise with design of experiments in a classroom setting

The only way to gain genuine expertise in Statistical Process Control (SPC) and the design of experiments (DOX) is with repeated practice, but not on canned problems with dead data sets. Rather, one must negotiate a wide variety of problems each with its own peculiarities and its own constantly changing data. The problems should not be of the type for which there is a single, well-defined answer that can be looked up in a fraternity file or in some text. The problems should match as closely as possible the open-ended types for which there is always an abundance of uncertainty. These are the only kinds that arise in real research, whether that be basic research in academe or engineering research in industry. To gain this kind of experience, either as a professional consultant or as an industrial employee, takes years. Vast amounts of money, not to mention careers, must be put at risk. The purpose here is to outline some realistic simulation-type lab exercises that are so simple and inexpensive to run that the students can repeat them as often as desired at virtually no cost. Simulations also allow the instructor to design problems whose outcomes are as noisy as desired but still predictable within limits. Also the instructor and the students can learn a great deal more from the postmortum conducted after the exercise is completed. One never knows for sure what the true data should have been when dealing only with real life experiments. To add a bit more realism to the exercises, it is sometimes desirable to make the students pay for each experimental result from a make-believe budget allocation for the problem.

Patterson, John W.↗

NASA's experience in the international exchange of scientific and technical information in the aerospace field

The early NASA international scientific and technical information (STI) exchange arrangements were usually detailed in correspondence with the librarians of the institutions involved. While this type of exchange, which involved only hardcopy (paper) products, grew to include some 220 organization in 43 countries, NASA's main focus shifted substantially to the STI relationship with the European Space Agency (ESA) which began in 1964. The NASA/ESA Tripartite Exchange Program, which now has more than 500 participants, provides more than 4,000 highly-relevant technical reports, fully processed, for the NASA produced 'Aerospace Database'. In turn, NASA provides an updated copy of this Database, known in Europe as the 'NASA File', for access, through ESA's Information Retrieval Service, by participating European organizations. Our experience in the evolving cooperation with ESA has established the 'model' for our more recent exchange agreements with Israel, Australia, Canada, and one under negotiation with Japan. The results of these agreements are made available to participating European organizations through the NASA File.

Thibideau, Philip A.↗

Analytic solution for vertical launch into orbit

An approximate analytic solution is presented for the motion and heating of nonlifting spacecraft launched vertically for ascending flight through the atmosphere into earth orbit. The solution is based on Chapman's Z-function transformation of the equations of motion with the assumption of an exponential atmosphere. The transformed equations have been modified to include the effects of thrusting with mass loss. It is assumed that the vehicle negotiates a gravity turn during ascent so that the thrust vector is aligned in the flight-path direction. Numerical results are presented to document the analytic solution and provide evidence of the useful information generated by it.

Boltz, Frederick W.↗

The space telescope: A study of NASA, science, technology, and politics

Scientific, technological, economic, and political aspects of NASA efforts to orbit a large astronomical telescope are examined in a critical historical review based on extensive interviews with participants and analysis of published and unpublished sources. The scientific advantages of large space telescopes are explained; early plans for space observatories are summarized; the history of NASA and its major programs is surveyed; the redesign of the original Large Space Telescope for Shuttle deployability is discussed; the impact of the yearly funding negotiations with Congress on the development of the final Hubble Space Telescope (HST) is described; and the implications of the HST story for the future of large space science projects are explored. Drawings, photographs, a description of the HST instruments and systems, and lists of the major contractors and institutions participating in the HST program are provided.

Smith, Robert William↗

Evaluation of advanced microelectronics for inclusion in MIL-STD-975

The approach taken by NASA and JPL (Jet Propulsion Laboratory) in the development of a MIL-STD-975 section which contains advanced technology such as Large Scale Integration and Very Large Scale Integration (LSI/VLSI) microelectronic devices is described. The parts listed in this section are recommended as satisfactory for NASA flight applications, in the absence of alternate qualified devices, based on satisfactory results of a vendor capability audit, the availability of sufficient characterization and reliability data from the manufacturers and users and negotiated detail procurement specifications. The criteria used in the selection and evaluation of the vendors and candidate parts, the preparation of procurement specifications, and the status of this activity are discussed.

Scott, W. Richard↗

An innovative approach for distributed and integrated resources planning for the Space Station Freedom

This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

Hornstein, Rhoda S.↗

A proposal for risk sharing in the development of a lunar oxygen plant

The production of lunar oxygen for use in a NASA lunar outpost program could provide a profitable investment for nongovernment development, savings for government, and an initiation of a new resource of capital financing for space industrialization. A joint endeavor to share development risks between government and nongovernment investment is proposed, based on some early assessments of technical and financial feasibility for the project. Successful initial negotiations between government and nongovernment investors can establish the requirements for financing the project with private funds.

Duke, Michael B.↗

The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

Clark, John S.↗

Towed Articulated Housing For Geophysical Measurements

Snakelike articulated string of rigid shells towed by helicopter, boat, kite or balloon, carries scientific instruments over land and sea surfaces. Nested shells connected to internal chain by bolt covered by preceding cone. String articulates readily to negotiate obstacles, but locally stiff to lie across a narrow crevasse.

Burke, James D.↗

High-speed civil transport flight- and propulsion-control technological issues

Technology advances required in the flight and propulsion control system disciplines to develop a high speed civil transport (HSCT) are identified. The mission and requirements of the transport and major flight and propulsion control technology issues are discussed. Each issue is ranked and, for each issue, a plan for technology readiness is given. Certain features are unique and dominate control system design. These features include the high temperature environment, large flexible aircraft, control-configured empennage, minimizing control margins, and high availability and excellent maintainability. The failure to resolve most high-priority issues can prevent the transport from achieving its goals. The flow-time for hardware may require stimulus, since market forces may be insufficient to ensure timely production. Flight and propulsion control technology will contribute to takeoff gross weight reduction. Similar technology advances are necessary also to ensure flight safety for the transport. The certification basis of the HSCT must be negotiated between airplane manufacturers and government regulators. Efficient, quality design of the transport will require an integrated set of design tools that support the entire engineering design team.

Ray, J. K.↗

Cooperative research and development opportunities with the National Cancer Institute

The Office of Technology Development (OTD) of the National Cancer Institute (NCI) is responsible for negotiating Cooperative Research and Development Agreements (CRADAs), whereby the knowledge resulting from NCI investigators' government-sponsored research is developed in collaboration with universities and/or industry into new products of importance for the diagnosis and treatment of cancer and acquired immunodeficiency syndrome (AIDS). The NCI has recently executed a unique 'clinical trials' CRADA and is developing a model agreement based upon it for the development and commercialization of products for the diagnosis and treatment of cancer and AIDS. NCI drug screening, preclinical testing, clinical trials, and AIDS program capabilities form the basis for this new technology development/technology transfer vehicle. NCI's extensive drug screening program and 'designer foods' program serve as potential sources of investigational new drugs (INDs) and cancer preventatives. Collaborations between NCI and pharmaceutical companies having the facilities, experience, and expertise necessary to develop INDs into approved drugs available to the public are being encouraged where the companies have proprietary rights to INDs, or where NCI has proprietary rights to INDs and invites companies to respond to a collaborator announcement published in the Federal Register. The joint efforts of the NCI and the chosen collaborator are designed to generate the data necessary to obtain pharmaceutic regulatory approval from the Food and Drug Administration (FDA) to market the drugs developed, and thereby make them available to health care providers for the diagnosis and treatment of cancer and AIDS.

Sybert, Kathleen↗

Standard terminology in the laboratory and classroom

Each of the materials produced by modern technologists is associated with a family of immaterials--all the concepts of substance, process, and purpose. It is concepts that are essential to transfer knowledge. It is concepts that are the stuff of terminology. Terminology is standardized today by companies, standards organizations, governments, and other groups. Simply described, it is the pre-negotiation of the meanings of terms. Terminology has become a key issue in businesses, and terminology knowledge is essential in understanding the modern world. The following is a introductory workshop discussing the concepts of terminology and methods of its standardization.

Strehlow, Richard A.↗

The post Challenger era Get Away Special program January 1992

The Get Away Special (GAS) program is described in terms of the changes that have taken place in both NASA and the GAS itself. Attention is given to the relationships developed between NASA and GAS customers in the context of programmatic and technical issues. The background of the GAS program is outlined with reference given to policy publications, the design of the Flight Verification Payload, and the first GAS payload launched. A review process is described that facilitates the management of the payloads through flight certification. The GAS Bridge was developed to carry up to 12 payloads simultaneously, and the recent period of GAS inactivity is explained. A price increase is introduced for future GAS payloads with negotiable access to optional services, and the ease and accessibility of the GAS programs for private experiments is emphasized.

Prouty, Clarke↗

Pressurized Lunar Rover

The pressurized lunar rover (PLR) consists of a 7 m long, 3 m diameter cylindrical main vehicle and a trailer which houses the power and heat rejection systems. The main vehicle carries the astronauts, life support systems, navigation and communication systems, directional lighting, cameras, and equipment for exploratory experiments. The PLR shell is constructed of a layered carbon-fiber/foam composite. The rover has six 1.5 m diameter wheels on the main body and two 1.5 m diameter wheels on the trailer. The wheels are constructed of composites and flex to increase traction and shock absorption. The wheels are each attached to a double A-arm aluminum suspension, which allows each wheel 1 m of vertical motion. In conjunction with a 0.75 m ground clearance, the suspension aids the rover in negotiating the uneven lunar terrain. The 15 N-m torque brushless electric motors are mounted with harmonic drive units inside each of the wheels. The rover is steered by electrically varying the speeds of the wheels on either side of the rover. The PLR trailer contains a radiosotope thermoelectric generator providing 6.7 kW. A secondary back-up energy storage system for short-term high-power needs is provided by a bank of batteries. The trailer can be detached to facilitate docking of the main body with the lunar base via an airlock located in the rear of the PLR. The airlock is also used for EVA operation during missions. Life support is a partly regenerative system with air and hygiene water being recycled. A layer of water inside the composite shell surrounds the command center. The water absorbs any damaging radiation, allowing the command center to be used as a safe haven during solar flares. Guidance, navigation, and control are supplied by a strapdown inertial measurement unit that works with the on-board computer. Star mappers provide periodic error correction. The PLR is capable of voice, video, and data transmission. It is equipped with two 5 W X-band transponder, allowing simultaneous transmission and reception. An S-band transponder is used to communicate with the crew during EVA. The PLR has a total mass of 6197 kg. It has a nominal speed of 10 km/hr and a top speed of 18 km/hr. The rover is capable of towing 3 metric tons (in addition to the RTG trailer).

Creel, Kenneth↗

Planetary surface exploration: MESUR/autonomous lunar rover

Planetary surface exploration micro-rovers for collecting data about the Moon and Mars was designed by the Department of Mechanical Engineering at the University of Idaho. The goal of both projects was to design a rover concept that best satisfied the project objectives for NASA-Ames. A second goal was to facilitate student learning about the process of design. The first micro-rover is a deployment mechanism for the Mars Environmental SURvey (MESUR) Alpha Particle/Proton/X-ray instruments (APX). The system is to be launched with the sixteen MESUR landers around the turn of the century. A Tubular Deployment System and a spiked-legged walker was developed to deploy the APX from the lander to the Martian surface. While on Mars the walker is designed to take the APX to rocks to obtain elemental composition data of the surface. The second micro-rover is an autonomous, roving vehicle to transport a sensor package over the surface of the moon. The vehicle must negotiate the lunar-terrain for a minimum of one year by surviving impacts and withstanding the environmental extremes. The rover is a reliable track-driven unit that operates regardless of orientation which NASA can use for future lunar exploratory missions. A detailed description of the designs, methods, and procedures which the University of Idaho design teams followed to arrive at the final designs are included.

Stauffer, Larry↗