Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “multi year plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Science Planning for Multi-Spacecraft Coordinated Observations

Fulfilling the promise of an era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to single observatory observations. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. Each year, a number of proposals are accepted by a space-based observatory for conduction of astronomical observations and gathering of science data for the study of galactic events. Since each space-based observatory uses a set of instruments designed to operate in specific energy regions, most such studies are conducted by submitting observation proposals to multiple observatories, with requests to coordinate among themselves. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. In order to exploit new paradigms for observatory operation, the Goddard Space Flight Center's Advanced Architectures and Automation Branch has developed a prototype tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the science planning of coordinated observations for multiple spacecraft, as well as to increase the scheduling probability of observations. However, VOLT is also useful for single observatory planning to optimize observatory control. Three space-based missions are interested in using VOLT (the Hubble Space Telescope, the Chandra X-Ray Observatory, and the Far Ultraviolet Spectroscopic Explorer). The VOLT team members have collaborated with these missions to gather requirements and obtain feedback on their mission planning processes. VOLT has been developed as a cross-platform Java client application for use by scientists and observatory science planning staff to visualize scheduling options and constraints. It also supports a lightweight graphical user interface for remote viewing via a Web front end. Additionally, it uniquely supports the ability to interact with multiple, diverse scheduling packages in order to determine windows of opportunity for observations and visually portray the constraints of each observation request. VOLT enables science data capture scenarios which are currently either impossible, or which require extensive time and manpower to coordinate amongst multiple observatories. it supports early detection of planning conflicts by generating coordinated solutions based on observatory schedulability and constraints. The project development approach has included frequent prototype demonstrations to our interested missions to obtain feedback after each release of the software. We will present an overview of our lessons learned in infusing the VOLT tool into the operations of the missions we have collaborated with and a brief demonstration of the software.

Maks, Lori↗

FY2020 Technology Integration Annual Progress Report

The 2020 Technology Integration Annual Progress Report covers 46 multi-year projects funded by the Vehicle Technologies Office. The report includes information on competitively awarded projects, ranging from rural shared mobility demonstration projects to medium- and heavy-duty electric vehicle deployment to statewide alternative fuel resiliency planning. It also includes projects conducted by several of the Vehicle Technologies Office’s (VTO) National Laboratory partners, Argonne National Laboratory, Oak Ridge National Laboratory and the National Renewable Energy Laboratory. These projects range from a Technical Assistance project for business, industry, government and individuals, to the EcoCar Advanced Vehicle Technology Competition, and the Fuel Economy Information Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hypermedia and visual technology

Applications of a codified professional practice that uses visual representations of the thoughts and ideas of a working group are reported in order to improve productivity, problem solving, and innovation. This visual technology process was developed under the auspices of General Foods as part of a multi-year study. The study resulted in the validation of this professional service as a way to use art and design to facilitate productivity and innovation and to define new opportunities. It was also used by NASA for planning Lunar/Mars exploration and by other companies for general business and advanced strategic planning, developing new product concepts, and litigation support. General Foods has continued to use the service for packaging innovation studies.

Walker, Lloyd↗

Prospective new transportation application initiatives in NASA's earth-to-orbit propulsion technology program

NASA's Earth-to-Orbit (ETO) Propulsion Technology Program, a multi-year/multi-task focused technology effort is, today, highly focused on conventional high-thrust cryogenic liquid chemical rocket engines and their envisioned future technology needs. But as highlighted in the U.S. National Ten-Year Space Launch Technology Plan, a set of less-conventional propulsion subjects, ones which offer significant promise for both, improving the state of the art and opening up new propulsion-capability possibilities, is now directed to the space propulsion planning community's attention. In conducting its forward-planning activities, it is highly appropriate that the ETO Program (and other programs as well) carefully consider integrating these "new initiative" subjects into the taskwork of future years. After an introductory consideration of the National Plan's propulsion-related directives, followed by a brief background overview of the ETO Program, the following specific new-initiative candidates are discussed from the standpoint of technology-program planning: operationally efficient propulsion systems; high-thrust hybrid rocket propulsion; low-cost, low-pressure expendable propulsion subsystems; advanced cryogenic in-space propulsion systems; integrated modular engine (IME) configured propulsion systems, and combined-cycle airbreathing/rocket propulsion systems.

Escher, William J. D.↗

Evolution of the NASA long-duration balloon program

The development of long-duration ballooning techniques to support flights of 1-2 ton payloads for periods up to 2 weeks, possibly even longer, offers a near-space scientific mission capability with an order of magnitude improvement over traditional balloon flights. This revolution in scientific research ballooning began with the solution of the manufacturing difficulties that plagued the program in the first half of the 1980's, and it has culminated in the early 1990's with three successive circumnavigations of the Antarctic continent in 9 to 14 day flights. A complementary capablity in the Northern hemisphere, which would approximately double the number of flights that could be supported each year, is needed to accommodate the trend for conventional payloads to be modified, or developed, for long-duration flights. Plans are already underway to employ the order-of-magnitude increased flight time for support of multi-flight research programs that will produce results comparable to some space missions. An overview of the current status and near-term plans for ballooning will be presented, along with a discussion of some major science initiatives that have been enabled.

Jones, W. Vernon↗

Solar Absorptivity Degradation of Spacecraft Materials Due to UV and Charged Particles in the Gateway Environment

The Gateway Passive Thermal Control System (PTCS) Group has identified charged particle and UV degradation of Gateway materials as a knowledge gap for the Near Rectilinear Halo Orbit (NRHO) and transit environment. Candidate materials and coatings were subjected to expected mission UV and charged particle environments at NASA Goddard Space Flight Center (GSFC). In situ change in reflectivity was observed at specified intervals during testing such that change in solar absorptivity could be plotted as a function of time of solar exposure. Gateway will be an outpost in cislunar space designed to survive a 15-year mission to support human moon landings and future deep space exploration. The Gateway Passive Thermal Control System (PTCS) Group has identified charged particle and UV degradation of potential Gateway materials as a knowledge gap for the Near Rectilinear Halo Orbit (NRHO) and transit environment, especially the slow spiral transit planned for the first two modules. Solar absorptivity degradation is important to quantify because the end-of-life absorptivity impacts thermal performance of the system. To address this, ground testing is being completed at NASA Goddard Space Flight Center in which potential Gateway materials, including radiators, multi-layer insulation (MLI), and structural materials are subjected to the expected transit plus 15-year on-orbit charged particle fluence (9.86x1015 protons/cm2 at 2.5 keV and 3.1x1016 electrons/cm2 at 10 keV) and up to 5000 Equivalent Solar Hours (ESH). Reflectivity of a single sample of each material was measured in atmosphere and in vacuum inside the chamber after exposure to incremental levels of ESH and charged particle fluence. Increase in absorptivity of most samples were seen throughout the test including large differences in absorptivity of materials of the same category. Future testing will validate these results and include additional materials of interest.

materials in the space environment↗

Importance of incorporating spatial and temporal variability of biomass yield and quality in bioenergy supply chain

Abstract Biofuels made from biomass and waste residues will largely contribute to United States’ 2050 decarbonization goal in the aviation sector. While cellulosic biofuels have the potential fuel performance equivalent to petroleum-based jet fuel, the biofuel industry needs to overcome the supply chain barrier caused by temporal and spatial variability of biomass yield and quality. This study highlights the importance of incorporating spatial and temporal variability during biomass supply chain planning via optimization modeling that incorporates 10 years of drought index data, a primary factor contributing to yield and quality variability. The results imply that the cost of delivering biomass to biorefinery may be significantly underestimated if the multi-year temporal and spatial variation in biomass yield and quality is not captured. For long term sustainable biorefinery operations, the industry should optimize supply chain strategy by studying the variability of yield and quality of biomass in their supply sheds.

09 BIOMASS FUELS↗

Implementation of Software QA for SAS4A/SASSYS-1 Rev. 1

In an effort to support closure of gaps in advanced reactor licensing pathways, a multi-year task to systematically develop sodium-cooled fast reactor (SFR) codes and methods for use in a licensing framework was launched as part of the DOE-NE Advanced Reactor Technologies (ART) Program’s Regulatory Technology Development Plan (RTDP). This report documents Phase 2 of this task, which was focused on the finalization and initial implementation of a software quality assurance (SQA) program for SAS4A/SASSYS-1 and completion of high-priority SQA-related technical activities. The ultimate goal of this ongoing RTDP task is to develop an SQA framework that satisfies the fundamental requirements of relevant SQA standards and guidance while still maintaining sufficient flexibility and efficiency such that the framework can be sustained with modest resources.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ECP ALCC Quarterly Report (Oct-Dec 2017)

The scientific goal of ExaWind Exascale Computing Project (ECP) is to advance our fundamental understanding of the flow physics governing whole wind plant performance, including wake formation, complex terrain impacts, and turbine-turbine-interaction effects. Current methods for modeling wind plant performance fall short due to insufficient model fidelity and inadequate treatment of key phenomena, combined with a lack of computational power necessary to address the wide range of relevant length scales associated with wind plants. Thus, our ten-year exascale challenge is the predictive simulation of a wind plant composed of O(100) multi-MW wind turbines sited within a 100 km2 area with complex terrain, involving simulations with O(100) billion grid points. The project plan builds progressively from predictive petascale simulations of a single turbine, where the detailed blade geometry is resolved, meshes rotate and deform with blade motions, and atmospheric turbulence is realistically modeled, to a multi turbine array in complex terrain. The ALCC allocation will be used continually throughout the allocation period. In the first half of the allocation period, small (e.g., for testing Kokkos algorithms) and medium (e.g., 10K cores for highly resolved ABL simulations) sized jobs will be typical. In the second half of the allocation period, we will also have a number of large submittals for our resolved-turbine simulations. A challenge in the latter period is that small time step sizes will require long wall-clock times for statistically meaningful solutions. As such, we expect our allocation-hour burn rate to increase as we move through the allocation period.

17 WIND ENERGY↗

Office of the Chief Financial Officer Annual Report 2007

2007 was a year of progress and challenges for the Office of the Chief Financial Officer (OCFO). I believe that with the addition of a new Controller, the OCFO senior management team is stronger than ever. With the new Controller on board, the senior management team spent two intensive days updating our strategic plan for the next five years ending in 2012, while making sure that we continue to execute on our existing strategic initiatives. In 2007 the Budget Office, teaming with Human Resources, worked diligently with our colleagues on campus to reengineer the Multi-Location Appointment (MLA) process, making it easier for our Principal Investigators (PIs) to work simultaneously between the Laboratory and UC campuses. The hiring of a point-of-contact in Human Resources to administer the program will also make the process flow smoother. In order to increase our financial flexibility, the OCFO worked with the Department of Energy (DOE) to win approval to reduce the burden rates on research and development (R&D) subcontracts and Intra-University Transfers (IUT). The Budget Office also performed a 'return on investment' (ROI) analysis to secure UCRP funding for a much needed vocational rehabilitation counselor. This new counselor now works with employees who are on medical leave to ensure that they can return to work in a more timely fashion, or if not able to return, usher them through the various options available to them. Under the direction of the new Controller, PriceWaterhouse Coopers (PWC) performed their annual audit of the Laboratory's financial data and reported positive results. In partnership with the Financial Policy and Training Office, the Controller's Office also helped to launch self-assessments of some of our financial processes, including timekeeping and resource adjustments. These self assessments were conducted to promote efficiencies and mitigate risk. In some cases they provided assurance that our practices are sound, and in others highlighted opportunities to improve. A third, and most important assessment on funds control was also conducted that proved very useful in making sure that our financial processes are sound and of the highest ethical standards. In June of 2007 the Procurement Department was awarded the DOE's FY2006 Secretarial Small Business Award for the advancement of small business contracts at Lawrence Berkeley National Laboratory (LBNL). The award was presented in Washington, D.C. Procurement also distinguished itself by passing the tri-ennial Procurement Evaluation and Re-engineering Team (PERT) Review of its systems and processes. We continue to reduce costs through the Supply Chain Initiative saving the Laboratory {approx}$6M to date and have placed over 11,000 orders with over seven vendors using the eBuy system. Our wall-to-wall inventory, which was completed in March of 2007, reported a result of 99+% for item count and 99.51% by value. This was a remarkable achievement that required the hard work of every Division and the Property Department working together. Training continues to be a major initiative for the OCFO and in 2007 we rolled out financial training programs specifically tailored to meet the needs of the scientific divisions. FY2008 presents several opportunities to enhance and improve our service to the scientific community. With the awarding of the HELIOS and JBEI programs, we will be developing new financial paradigms to provide senior management flexibility in decision making. Last year we heard the Laboratory community loud and clear when they expressed their frustration with our current travel system. As we head into the new fiscal year, a cross-functional travel team has identified a new model for how we provide travel services. We will be implementing the Oracle PeopleSoft Travel Reimbursement system by July of 2008. The new system will be more user-friendly and provide better information to the divisions and travel operations. We will also continue to review the travel disbursements operation for further improvement. Also in FY2008, several key information systems implementation projects are under way which will strengthen the Laboratory's financial and business processes. These include Supply Chain Management, and the Budget and Planning System. Future planned systems development includes an electronic sponsored research administration system. Continuing to improve the procurement process at the Laboratory is another major priority for the OCFO. To that end, we will be working to re-engineer the 'procure-to-pay' process. The goal will be to correct process flow to maximize efficiency and effectiveness, while implementing sound business practices and incorporating strong internal controls. Along the same lines, we will also be working with the divisions to implement the Property Management Improvement Program that was identified in FY2007.

57↗

Observation Planning Made Simple with Science Opportunity Analyzer (SOA)

As NASA undertakes the exploration of the Moon and Mars as well as the rest of the Solar System while continuing to investigate Earth's oceans, winds, atmosphere, weather, etc., the ever-existing need to allow operations users to easily define their observations increases. Operation teams need to be able to determine the best time to perform an observation, as well as its duration and other parameters such as the observation target. In addition, operations teams need to be able to check the observation for validity against objectives and intent as well as spacecraft constraints such as turn rates and acceleration or pointing exclusion zones. Science Opportunity Analyzer (SOA), in development for the last six years, is a multi-mission toolset that has been built to meet those needs. The operations team can follow six simple steps and define his/her observation without having to know the complexities of orbital mechanics, coordinate transformations, or the spacecraft itself.

observation planning operations↗

California CO 2 Storage Assurance Facility Enterprise (C2SAFE): Final Technical Report

The California CO 2 Storage Assurance Facility Enterprise (C2SAFE) project conducted a preliminary study into the feasibility of a commercial-scale carbon dioxide (CO 2 ) storage complex located in California’s Southern San Joaquin Valley (SSJV). The work represents the first phase of a multi-phased development approach outlined by the United States Department of Energy’s (DOE’s) Carbon Storage Assurance and Facility Enterprise (CarbonSAFE) program meant to develop carbon storage sites capable of permanently storing 50 million metric tonnes of CO 2 , or greater, injected over a typical facility life of 20 to 30 years. This report represents the culmination of work performed under C2SAFE and outlines a phased implementation plan for large-scale, industrial carbon capture and permanent storage in California’s SSJV. The report is meant to be a standalone document and as such provides high-level summaries of all tasks of the project, but is also meant to complement the other three topical reports issued by the project – reports referenced herein. The study considered multiple scenarios including an east-side storage facility, a west-side storage facility, and potential multi-site storage facilities. The east-side storage facility is to be located at Clean Energy Systems, Inc.’s Kimberlina Power Plant, or nearby, and the west-side facility will be located at the California Resources Corporation’s (CRC’s) Elk Hills oil field. The majority of carbon emissions are planned to be captured from existing sources and transported to the selected and verified storage site(s). Capture from the single closest source to the eastern storage facility and the sources within the Elk Hills field would meet the CarbonSAFE storage goal of 50 million tonnes. The study has shown there is sufficient storage capacity to meet this requirement and more; thus, capture from any of the numerous additional large nearby sources would substantially leverage the CarbonSAFE investment. A comparison of preliminary CO 2 capture, transportation, and storage costs to economic value and incentives in the state shows current market conditions make it economically feasible to develop large-scale industrial storage sites in California’s SSJV. The business case for Carbon Capture and Storage (CCS) in California’s SSJV appears economically viable today for large CO 2 point sources involved in the production of transportation fuels, such as oilfield cogeneration units and steam boilers. The overall levelized CCS cost is estimated at roughly 125 per tonne of CO 2 , which includes CO 2 amine-solvent post-combustion capture, transportation, and storage. The levelized CO 2 capture cost is based on today’s technology, with no future cost reduction factored in for technology improvement. The sum of the value of incentives and revenue from California Low Carbon Fuel Standard (LCFS) credits (discounted roughly 20% from their current transaction value), sale of California cap-and-trade emission allowances, and Section 45Q tax credits—either for saline storage or the Enhanced Oil Recovery (EOR) credit plus CO 2 sales revenue—is about 165/tonne-CO 2 . The economic viability of CCS for Natural Gas Combined Cycle (NGCC) power plants in the SSJV is more site-specific. A plant providing power solely to the electric grid, if it added CCS, should be eligible for Section 45Q tax credits and could sell its excess cap-and-trade emission allowances, but it would not generate LCFS credits. Using the cost and incentive values detailed in this report, it would not be economical for such a plant to add CCS today, barring other considerations. An NGCC plant within an oilfield (e.g., CRC Elk Hills and NRG Sunrise) that provides power to the oilfield as well as to the grid should receive “partial credit” in terms of generating LCFS credits if it added CCS (pro-rated for the fraction of power going to the oilfield). Such a plant should also be eligible for Section 45Q tax credits and garner revenue from selling its excess cap-and-trade emission allowances. Using the cost and incentive values described in this report, the economic viability of adding CCS today would depend on the relative fractions of electricity supplied to the oilfield and the grid. As the value of cap-and-trade emission allowances grows over time (either by market forces or the escalating floor price), the relative fraction of power needing to remain in the oilfield to achieve “breakeven” would diminish. At some point, even plants providing all their power to the grid would be candidates for economical CCS application. The C2SAFE team has proposed to expand upon the knowledge gained during this study by conducting a detailed feasibility assessment under a follow-on phase of the program, Phase II – Feasibility. This would include detailed data collection at the two sites, analysis, reporting, stakeholder outreach, and risk mitigation activities to support the development of a commercial carbon storage complex in the SSJV.

58 GEOSCIENCES↗

NASA's Unsteady Pressure-Sensitive Paint Research and Operational Capability Developments

In the last three years, several advancements have been made to produce a new state-of-the-art capability in the field of Aerosciences. NASA’s Aerosciences Evaluations and Test Capabilities (AETC) Portfolio Office has funded a multi-year project to produce the unsteady Pressure-Sensitive Paint (uPSP) technology as an operational capability in key ground test facilities at NASA. The research and development has primarily been conducted at NASA Ames Research Center’s (ARC) Unitary Plan Wind Tunnel (UPWT) 11-by 11-ft Transonic Wind Tunnel (TWT). The NASA ARC UPWT is one of the ground test facilities under NASA AETC’s Portfolio Office. AETC’s goals are to provide the tools to deliver the technology innovations and breakthroughs necessary to address increasingly complex research and development challenges. AETC’s integrated approach will consider the complimentary high-end compute capabilities necessary to advance analysis in conjunction with ground experimental capabilities. The uPSP Capability Challenge Project is a demonstration of several different technologies: 1) the unsteady Pressure-Sensitive Paint (uPSP) technology, and 2) Project: Red Rover, establishing a secure, reliable, fast connection between experimental and computation facilities, leveraging NASA’s computational resources within the High-End Compute Capability (HECC) Project for processing, storing, and sharing data efficiently. This project demonstrates the technical diversity and technical inclusion need to advance the field of Aerosciences. The approach to combine subject matter experts in experimental methods, optical methods, production wind tunnel testing, network engineering, high-end computing, signal processing, grid generation, and visualization while establishing the required infrastructure for subject matter experts to have access to the data while the wind tunnel test is being conducted. The most recent advancements for the uPSP technology have focused on three key areas: development of data products, robust processing pipeline, operational efficiencies and uncertainty quantification.

buffet↗

Hydraulic Isolation of Waste Disposal Areas at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) is the location of several large waste disposal areas that received waste from more than 50 years of operation, production, and research activities at ORNL and the U.S. Atomic Energy Commission's Southern Regional Burial Ground for wastes from more than 50 other facilities. The major burial grounds in the valley are Solid Waste Storage Areas (SWSAs) 4, 5, and 6, where wastes were buried in more than 850 unlined trenches and more than 1500 unlined auger holes. The area includes 3 seepage pits and 3 gravel-filled trenches used by ORNL for the disposal of liquid low level wastes. The burial grounds contained several hundred thousand cubic yards of waste, and the combined inventory of the burial grounds and liquid disposal sites was well over 1 million curies. The Record of Decision for Interim Actions for the Melton Valley Watershed at ORNL selected hydraulic isolation of major waste sources as the primary mechanism for remediation of the watershed. Isolation was to be accomplished mainly through the construction of multi-layer caps over the burial grounds, seepage pits, and trenches. Groundwater diversion and collection systems were installed along the up-gradient and down-gradient edges, respectively, of selected caps to enhance the performance of the isolation system. The waste areas were covered with both Resource Conservation and Recovery Act (RCRA)-type and isolation multi-layer caps. A total of 13 multi-layer caps covering 58.7 hectares (ha) (plan view) were constructed in Melton Valley between 2003 and 2006. The project encountered considerable challenges, not the least of which was its scale, involving simultaneous construction activities at widely scattered sites across the 430-ha watershed. Detailed planning and coordination enabled year-round fieldwork, an essential requirement necessary to retain a skilled, experienced workforce and meet the contract milestone for completion. Other factors key to the success of the project involved the use of an on-site borrow area and construction of a dedicated haul road for transfer of materials from the borrow area to the capping sites. In summary: Remedy effectiveness data obtained during 2007 for the Melton Valley ROD actions collectively indicate that the remedy is generally operating and functioning as planned. Contaminant releases of the principal contaminants of concern in Melton Valley have decreased significantly during and since remediation of the contaminant source areas. Hydrologic isolation systems at the burial grounds functioned as intended as demonstrated by attainment of groundwater level goals in most areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of the ATLAS PanDA Production and Distributed Analysis System

Evolution of the ATLAS PanDA Production and Distributed Analysis System T Maeno1,5, K De2, T Wenaus1, P Nilsson2, R Walker3, A Stradling2, V Fine1, M Potekhin1, S Panitkin1 and G Compostella4 Published under licence by IOP Publishing Ltd Journal of Physics: Conference Series, Volume 396, Part 3 Article PDF References Citations Metrics 101 Total downloads Cited by 8 articles Turn on MathJax Share this article Article information Abstract The PanDA (Production and Distributed Analysis) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at LHC data processing scale. PanDA has performed well with high reliability and robustness during the two years of LHC data-taking, while being actively evolved to meet the rapidly changing requirements for analysis use cases. We will present an overview of system evolution including automatic rebrokerage and reattempt for analysis jobs, adaptation for the CernVM File System, support for the multi-cloud model through which Tier-2 sites act as members of multiple clouds, pledged resource management and preferential brokerage, and monitoring improvements. We will also describe results from the analysis of two years of PanDA usage statistics, current issues, and plans for the future.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Phase 1 Methyl Iodide Deep-Bed Adsorption Tests

Nuclear fission results in the production of fission products (FPs) and activation products including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Research, demonstrations, and some reprocessing plant experience have indicated that diatomic iodine can be captured with efficiencies high enough to meet regulatory requirements. Research on the capture of organic iodides has also been performed, but to a lesser extent [Jubin 2012b]. Several questions remain open regarding the capture of iodine bound in organic compounds. Deep-bed methyl iodide adsorption testing has progressed according to a multi-laboratory methyl iodide adsorption test plan. This report summarizes the first phase of methyl iodide adsorption work performed according to this test plan using the deep-bed iodine adsorption test system at the Idaho National Laboratory (INL), performed during Fiscal Year (FY) 2013 and early FY-2014. Testing has been performed to address questions posed in the test plan, and followed the testing outline in the test plan. Tests established detection limits, developed procedures for sample analysis with minimal analytical interferences, and confirmed earlier results that show that the methyl iodide reacts when in contact with the AgZ sorbent, and not significantly in the gas flow upstream of the sorbent. The reaction(s) enable separation of the iodine from the organic moiety, so that the iodine can chemisorb onto the sorbent. The organic moiety can form other compounds, some of which are organic compounds that are detected and can be tentatively identified using GC-FID and GCMS. Test results also show that other gas constituents (NOx and/or H2O) can affect the methyl iodide reactions. With NOx and H2O present in the gas stream, the majority of uncaptured iodine exiting iodine-laden sorbent beds is in the form of I2 or HI, species that are soluble in NaOH scrubbing solution for iodine analysis. But when NOx and H2O are not present, then the majority of the uncaptured iodine exiting iodine-laden sorbent is in the form of methyl iodide. Methyl iodide adsorption efficiencies have been high enough so that initial DFs exceed 1,000 to 10,000. The methyl iodide mass transfer zone depths are estimated at 4-8 inches, possibly deeper than mass transfer zone depths estimated for I2 adsorption on AgZ. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption under various conditions specified in the methyl iodide test plan, and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Renewable Energy Data for Facilitating the Clean Energy Transition in Vietnam

Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transition from Consultation to Monitoring-NRC's Increasingly Focused Review of Factors Important to F-Area Tank Farm Facility Performance - 13153

In consultation with the NRC, DOE issued a waste determination for the F-Area Tank Farm (FTF) facility in March 2012. The FTF consists of 22 underground tanks, each 2.8 to 4.9 million liters in capacity, used to store liquid high-level waste generated as a result of spent fuel reprocessing. The waste determination concluded stabilized waste residuals and associated tanks and auxiliary components at the time of closure are not high-level and can be disposed of as LLW. Prior to issuance of the final waste determination, during the consultation phase, NRC staff reviewed and provided comments on DOE's revision 0 and revision 1 FTF PAs that supported the waste determination and produced a technical evaluation report documenting the results of its multi-year review in October 2011. Following issuance of the waste determination, NRC began to monitor DOE disposal actions to assess compliance with the performance objectives in 10 CFR Part 61, Subpart C. To facilitate its monitoring responsibilities, NRC developed a plan to monitor DOE disposal actions. NRC staff was challenged in developing a focused monitoring plan to ensure limited resources are spent in the most cost-effective manner practical. To address this challenge, NRC prioritized monitoring areas and factors in terms of risk significance and timing. This prioritization was informed by NRC staff's review of DOE's PA documentation, independent probabilistic modeling conducted by NRC staff, and NRC-sponsored research conducted by the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗