Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Testing methods and techniques: Testing electrical and electronic devices: A compilation

The methods, techniques, and devices used in testing various electrical and electronic apparatus are presented. The items described range from semiconductor package leak detectors to automatic circuit analyzer and antenna simulators for system checkout. In many cases the approaches can result in considerable cost savings and improved quality control. The testing of various electronic components, assemblies, and systems; the testing of various electrical devices; and the testing of cables and connectors are explained.

Source record↗

Leak Tester for Cryogenic Flowlines

Gas chromatography measures leakage into cavity surrounding joint under test. System surrounds joint being tested with sealed cavity. Presence of leakage gas in cavity monitored by gas chromatograph. Leakage rate found by multiplying relative leakage gas concentration by mass flow rate of purge as into cavity.

Mortensen, G. D.↗

Liquid Oxygen Cooling of Hydrocarbon Fueled Rocket Thrust Chambers

Rocket engines using liquid oxygen (LOX) and hydrocarbon fuel as the propellants are being given serious consideration for future launch vehicle propulsion. Normally, the fuel is used to regeneratively cool the combustion chamber. However, hydrocarbons such as RP-1 are limited in their cooling capability. Another possibility for the coolant is the liquid oxygen. Combustion chambers previously tested with LOX and RP-1 as propellants and LOX as the collant demonstrated the feasibility of using liquid oxygen as a coolant up to a chamber pressure of 13.8 MPa (2000 psia). However, there was concern as to the effect on the integrity of the chamber liner if oxygen leaks into the combustion zone through fatigue cracks that may develop between the cooling passages and the hot gas side wall. In order to study this effect, chambers were fabricated with slots machined upstream of the throat between the cooling passage wall and the hot gas side wall to simulate cracks. The chambers were tested at a nominal chamber pressure of 8.6 MPa (1247 psia) over a range of mixture ratios from 1.9 to 3.1 using liquid oxygen as the coolant. The results of the testing showed that the leaking LOX did not have a deleterious effect on the chambers in the region of the slots. However, there was unexplained melting in the throat region of both chambers, but not in line with the slots.

Armstrong, Elizabeth S.↗

Liquid oxygen cooling of hydrocarbon fueled rocket thrust chambers

Rocket engines using liquid oxygen (LOX) and hydrocarbon fuel as the propellants are being given serious consideration for future launch vehicle propulsion. Normally, the fuel is used to regeneratively cool the combustion chamber. However, hydrocarbons such as RP-1 are limited in their cooling capability. Another possibility for the coolant is the liquid oxygen. Combustion chambers previously tested with LOX and RP-1 as propellants and LOX as the coolant demonstrated the feasibility of using liquid oxygen as a coolant up to a chamber pressure of 13.8 MPa (2000 psia). However, there was concern as to the effect on the integrity of the chamber liner if oxygen leaks into the combustion zone through fatigue cracks that may develop between the cooling passages and the hot gas side wall. In order to study this effect, chambers were fabricated with slots machined upstream of the throat between the cooling passage wall and the hot gas side wall to simulate cracks. The chambers were tested at a nominal chamber pressure of 8.6 MPa (1247 psia) over a range of mixture ratios from 1.9 to 3.1 using liquid oxygen as the coolant. The results of the testing showed that the leaking LOX did not have a deleterious effect on the chambers in the region of the slots. However, there was unexplained melting in the throat region of both chambers, but not in line with the slots.

Armstrong, Elizabeth S.↗

Thermal Design of the Micrometeoroid Satellite S-55

The thermal design of the micrometeoroid satellite S-55 involves both experimental and analytical approaches in selecting materials and coatings. A cutaway drawing of the S-55 satellite is shown. The purpose of which is to obtain scientific and engineering design data on the frequency and penetration hazard of micrometeoroids at altitudes between about 250 nautical miles and 700 nautical miles. The passive method of thermal control used involves the selection of materials and coatings that give the desired ratio of absorptivity to emissivity alpha/epsilon for keeping the telemetry temperature within narrow limits and also to prevent overheating of the separate experiments. The selection of a material or coating for this purpose, however, is dictated not only by its absorptivity and emissivity values, but also by its reliability and the constancy of these values under long exposure to the space environment. Several test programs have been conducted in order to evaluate the materials and coatings being considered. Some of these are as follows: (1) Ultraviolet radiation in a vacuum to study discoloration and weight change. (2) Solar radiation in a vacuum to determine maximum equilibrium temperature, discoloration, and weight loss. (3) Thermal cycling and thermal shock to study material integrity (leaking, spalling, melting, etc.). (4) Proton radiation to observe effects on color, crystal structure, and strength. (5) Determination of effects of heat associated with coating application on the leak rate of pressurized parts. (6) Absorptivity and emissivity measurements. The experimental tests outlined and the maximum use of coating methods successfully employed on previous satellites should provide high reliability of the material used for the thermal design of this vehicle. A theoretical analysis was made to determine the values of alpha/epsilon required for different areas in order that the telemetry remain within the desired temperature limits.

Hastings, Earl C., Jr.↗

Testing the Effects of Helium Pressurant on Thermodynamic Vent System Performance with Liquid Hydrogen

In support of the development of a zero gravity pressure control capability for liquid hydrogen, testing was conducted at the Marshall Space Flight Center using the Multipurpose Hydrogen Test Bed (MHTB) to evaluate the effects of helium pressurant on the performance of a spray bar thermodynamic vent system (TVS). Fourteen days of testing was performed in August - September 2005, with an ambient heat leak of about 70-80 watts and tank fill levels of 90%, 50%, and 25%. The TVS successfully controlled the tank pressure within a +/- 3.45 kPa (+/- 0.5 psi) band with various helium concentration levels in the ullage. Relative to pressure control with an "all hydrogen" ullage, the helium presence resulted in 10 to 30 per cent longer pressure reduction durations, depending on the fill level, during the mixing/venting phase of the control cycle. Additionally, the automated control cycle was based on mixing alone for pressure reduction until the pressure versus time slope became positive, at which time the Joule-Thomson vent was opened. Testing was also conducted to evaluate thermodynamic venting without the mixer operating, first with liquid then with vapor at the recirculation line inlet. Although ullage stratification was present, the ullage pressure was successfully controlled without the mixer operating. Thus, if vapor surrounded the pump inlet in a reduced gravity situation, the ullage pressure can still be controlled by venting through the TVS Joule Thomson valve and heat exchanger. It was evident that the spray bar configuration, which extends almost the entire length of the tank, enabled significant thermal energy removal from the ullage even without the mixer operating. Details regarding the test setup and procedures are presented in the paper. 1

Flachbart, R. H.↗

Thin-metal lined PRD 49-III composite vessels

Filament wound pressure vessels of various configurations were evaluated for burst strength and fatigue performance. The dimensions and characteristics of the vessels are described. The types of tests conducted are explained. It was determined that all vessels leaked in a relatively few cycles (20 to 60 cycles) with failure occurring in all cases in the metallic liner. The thin liner would de-bond from the composite and buckling took place during depressurization. No composite failures or indications of impeding composite failures were obtained in the metal-lined vessels.

Hoggatt, J. T.↗

Which calibration-pulse location method is robust?

The Threshold method, with high threshold and contiguous-block parameter values, was found to be a robust method of locating calibration pulses in the presence of light-leak and shutter-edge pulses within the calibration window. Tests used digitized calibration-window background and light-pulse data from the Landsat-5 Thematic Mapper (TM) instrument, analyzed by special software on an Apple II+ personal computer and on a VAX 11/780 minicomputer.

Gunther, F. J.↗

An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

Cathy L Padolewski↗

The development of a non-cryogenic nitrogen/oxygen supply system

A hydrazine/water electrolysis process system module design was fabricated and tested to demonstrate component and module performance. This module is capable of providing both the metabolic oxygen for crew needs and the oxygen and nitrogen for spacecraft leak makeup. The component designs evolved through previous R and D efforts, and were fabricated and tested individually and then were assembled into a complete module which was successfully tested for 1000 hours to demonstrate integration of the individual components. A survey was made of hydrazine sensor technology and a cell math model was derived.

Greenough, B. M.↗

Dust Tolerance Characterization of Lunar Docking and Hatch Seals

Low-leakage seals are an enabling technology for future lunar surface systems, and they must be kept clean to ensure that crews have sufficient breathable air for extended lunar surface missions. Previous testing has shown that contamination and debris on seals can cause them to exhibit higher leak rates. However, seal performance in the presence of lunar dust has not been thoroughly characterized, and the size and concentration of dust particles that cause seal leak rates to become unacceptable have not been defined or well understood. To address this knowledge gap, researchers at the NASA Glenn Research Center have been executing a multiphase study to better understand and mitigate seal dust-exposure risks. The focus of this paper is on the first phase of that study, in which tests were conducted to develop a performance database for two representative state-of-the-art seal designs. Leak rates are presented for seals with varying levels of dust contamination, and breakthrough points are identified at which seal leak rates exceeded equivalent leak rate requirements. This phase of the study also investigated the effects of temperature on the seals’ ability to hold pressure when contaminated with dust.

Dust Mitigation↗

High Pressure Electrolyzer System Evaluation

This report documents the continuing efforts to evaluate the operational state of a high pressure PEM based electrolyzer located at the NASA Glenn Research Center. This electrolyzer is a prototype system built by General Electric and refurbished by Hamilton Standard (now named Hamilton Sunstrand). It is capable of producing hydrogen and oxygen at an output pressure of 3000 psi. The electrolyzer has been in storage for a number of years. Evaluation and testing was performed to determine the state of the electrolyzer and provide an estimate of the cost for refurbishment. Pressure testing was performed using nitrogen gas through the oxygen ports to ascertain the status of the internal membranes and seals. It was determined that the integrity of the electrolyzer stack was good as there were no appreciable leaks in the membranes or seals within the stack. In addition to the integrity testing, an itemized list and part cost estimate was produced for the components of the electrolyzer system. An evaluation of the system s present state and an estimate of the cost to bring it back to operational status was also produced.

Prokopius, Kevin↗

Calibration of a calorimeter for measuring the performance of thermal control surfaces

The calibration to evaluate the heat leak in terms of the deviation from a perfect calorimeter is described. A thermal vacuum test was carried out to characterize the performance of the calorimeter. The calorimeter was equipped with a heater to control the sample disc temperature and with specific instrumentation to measure the heat leak. The radiation sink temperature of the black cavity target was varied from -192 to +31C, while the heater power was varied from 0 to 311 milliwatts. A steady state thermal model was developed to correlate the results. The calorimeter performance was characterized in terms of the heat leak as a percentage of the ideal heat flow of the calorimeter disc. Large deviations from ideal performance occur at low sink temperatures. The effect of the use of the heater is discussed. The effects of transient conditions during low Earth orbit are discussed. It is concluded that heat leak calibrations are necessary for a wide range of conditions.

Houseman, John↗

Pressure-Fed LOX/LCH4 Reaction Control System for Spacecraft: Transient Modeling and Thermal Vacuum Hotfire Test Results

An integrated cryogenic liquid oxygen, liquid methane (LOX/LCH4) reaction control system (RCS) was tested at NASA Glenn Research Center's Plum Brook Station in the Spacecraft Propulsion Research Facility (B-2) under vacuum and thermal vacuum conditions. The RCS is a subsystem of the Integrated Cryogenic Propulsion Test Article (ICPTA), a pressure-fed LOX/LCH4 propulsion system composed of a single 2,800 lbf main engine, two 28 lbf RCS engines, and two 7 lbf RCS engines. Propellants are stored in four 48 inch diameter 5083 aluminum tanks that feed both the main engine and RCS engines in parallel. Helium stored cryogenically in a composite overwrapped pressure vessel (COPV) flows through a heat exchanger on the main engine before being used to pressurize the propellant tanks to a design operating pressure of 325 psi. The ICPTA is capable of simultaneous main engine and RCS operation. The RCS engines utilize a coil-on-plug (COP) ignition system designed for operation in a vacuum environment, eliminating corona discharge issues associated with a high voltage lead. There are two RCS pods on the ICPTA, with two engines on each pod. One of these two engines is a heritage flight engine from Project Morpheus. Its sea level nozzle was removed and replaced by an 85:1 nozzle machined using Inconel 718, resulting in a maximum thrust of 28 lbf under altitude conditions. The other engine is a scaled down version of the 28 lbf engine, designed to match the core and overall mixture ratios as well as other injector characteristics. This engine can produce a maximum thrust of 7 lbf with an 85:1 nozzle that was additively manufactured using Inconel 718. Both engines are film-cooled and capable of limited duration gas-gas and gas-liquid operation, as well as steady-state liquid-liquid operation. Each pod contains one of each version, such that two engines of the same thrust level can be fired as a couple on opposite pods. The RCS feed system is composed of symmetrical 3/8 inch lines that tap off of the main propellant manifold to send LOX and LCH4 outboard to the RCS pods. A Thermodynamic Vent System (TVS) is used to condition propellants at each pod by venting through an orifice and then routing the cold expansion products back through tubing that is welded along a large portion of the main RCS feed lines. Prior to final installation on the ICPTA, the RCS engines were tested in a small vacuum chamber at the Johnson Space Center (JSC) Energy Systems Test Area (ESTA) to verify functionality of the new COP ignition system and check out operation of the vacuum nozzles. After engine-level testing, the RCS engines were installed on the vehicle and a series of integrated hot-fire tests were performed at JSC consisting of various pulsing and steady-state firings as well as integrated main engine/RCS operation. The ICPTA was then integrated into the Plum Brook B-2 facility for vacuum and thermal/vacuum testing. Testing in the B-2 facility was composed of multiple thermal and pressure environments. The first set of tests were performed under ambient temperature and altitude pressure conditions. These tests consisted of a range of minimum impulse bit (MIB) pulsing sequences with low duty cycle, analogous to a coast phase in which the RCS is primarily used for station keeping. The primary goal of this sequence is to understand how propellant conditions were effected without an active TVS. In this scenario, consistent gas-gas operation is desirable since it results in a smaller MIB and more efficient propellant consumption. Multiple skin thermocouples are mounted on the feedlines, in addition to a submerged thermocouple on each commodity, in order to gather thermal data on the system. Higher duty cycle pulsing tests were then performed, analogous to an ascent or landing mission phase. The primary goal of this sequence was to examine how well the engines self-conditioned without active TVS when starting from a quiescent state. The TVS was then activated during some tests to demonstrate the capability to quickly condition the engines for higher pulsing demand scenarios. A thermocouple at the TVS outlet allows for the calculation of energy absorbed by the vented propellant. Lastly, tests with longer pulses and multiple engines firing either in sequence or simultaneously were run in order to gather transient system response data on waterhammer. Six total high-speed pressure transducers are installed on the RCS system, one sensor at the end of each propellant manifold line on the pods, and one at the tap-off location for each commodity. This will allow for the accurate characterization of waterhammer in the system under various propellant conditions and firing sequences. Other instrumentation for this test series includes nozzle throat thermocouples, chamber pressure measurement, heat soakback measurement, and tank wall plume impingement temperature measurement. The next set of tests were performed to demonstrate simultaneous main engine and RCS operation. Data from this test will be used to examine if there is any change to nominal operation of the RCS as a result of feed system interaction or other phenomenon. Some of these tests began under high vacuum conditions (target ambient pressure less than 1x10(exp -3) torr) and others began at altitude conditions. The last set of tests were performed with the B-2 cold wall active. Under these tests, many of the same low duty cycle MIB tests were repeated in order to characterize how propellant conditions changed with the lower heat leak. In this scenario the RCS manifold experiences much less heat leak, resulting in a change to how well the engines self-condition. As a result, an increase in maximum waterhammer pressures and a change in natural frequency of the system was expected due to higher density propellants. The lower heat leak should also result in a change to the MIB pulse profile, and data will be examined to understand how MIB repeatability is affected in the different operating environments. Parallel to the test efforts, a set of transient model development efforts were made to predict RCS performance. The primary effort was aimed at producing a SINDA/FLUINT model to predict propellant conditioning up to the engine inlet as a function of different environmental and operating parameters, with the goal of predicting chamber pressure, TVS performance, and propellant consumption over time. Preliminary results for this effort will be presented in comparison with test data. Additional modeling efforts were made using SINDA/FLUINT to predict waterhammer in the system since the software is capable of handling multiphase transient fluid dynamics. These results will be compared with the high-speed pressure transducer test data for validation purposes.

Atwell, Matthew J.↗

Low thermal flux glass-fiber tubing for cryogenic service

This paper describes analytical techniques, fabrication development, and test results for composite tubing that has many applications in aerospace and commercial cryogenic installations. Metal liner fabrication is discussed in detail with attention given to resistance-welded liners, fusion-welded liners, chem-milled tubing liners, joining tube liners and end fittings, heat treatment and leak checks. Composite overwrapping, a second method of tubing fabrication, is also discussed. Test programs and analytical correlation are considered along with composite tubing advantages such as minimum weight, thermal efficiency and safety and reliability.

Hall, C. A.↗

ORION - Crew Module Side Hatch: Proof Pressure Test Anomaly Investigation

The Orion Multi-Purpose Crew Vehicle program was performing a proof pressure test on an engineering development unit (EDU) of the Orion Crew Module Side Hatch (CMSH) assembly. The purpose of the proof test was to demonstrate structural capability, with margin, at 1.5 times the maximum design pressure, before integrating the CMSH to the Orion Crew Module structural test article for subsequent pressure testing. The pressure test was performed at lower pressures of 3 psig, 10 psig and 15.75 psig with no apparent abnormal behavior or leaking. During pressurization to proof pressure of 23.32 psig, a loud 'pop' was heard at ~21.3 psig. Upon review into the test cell, it was noted that the hatch had prematurely separated from the proof test fixture, thus immediately ending the test. The proof pressure test was expected be a simple verification but has since evolved into a significant joint failure investigation from both Lockheed Martin and NASA.

Evernden, Brent A.↗

Browser-Based Application for Telemetry Monitoring of Robotic Assets

AEGSE Virtuoso Charting is an application that enables animated, real-time charting of telemetry streams of data from a rover. These automatically scaled charts are completely interactive, and allow users to choose the variables that they want to monitor. The charts can process data from streams with many variables. This application allows for the simultaneous viewing of up to four individually configured charts on a small touch-screen laptop. The charting application has been tested and found to be extremely robust during long operations. It was left running overnight, with incoming telemetry at 100 Hz, and it did not experience any signs of lost functionality or memory leaks. This robustness is critical for an application that will be used to support vital tests for the Mars Science Laboratory rover. The charting component also provides an interactive interface that allows the engineers to decide how many charts they want on their screen, and which attributes should be plotted on each chart. The application is optimized to make the charts on display take up as much of the available space as possible to maximize the use of the screen real estate. Engineers are also able to plot multiple attributes on the same chart, which enables them to observe the correlation between various attributes.

Breed, Kelly S.↗

Enough Is Enough

The spacecraft was nearly integrated and had passed some of its early mechanical and electrical testing. One of its instruments, the Proportional Counter Array (PCA), had a gas leak in one of the five proportional counter modules that made up the array. The science division where the instrument was being developed wanted a gas replenishment system added to assure the PCA would last for the entire mission. Adding a gas replenishment system would mean interrupting spacecraft integration and testing; developing a new subsystem and integrating it onto the spacecraft; modifying all the PCA modules; including a complex integration of the instrument onto the spacecraft; and implementing a more complex performance and environmental test process. It was the wrong answer because it made a simple design more complex and added little value to the mission at a major cost in time and dollars. Our mission couldn't afford the additional budget and schedule risks. XTE was the latest of a long line of projects being managed by my Explorer Program Office, but it was unique in being the first project we had agreed to do for a fixed price. NASA HQ agreed, in return, to provide us with the funding profile we needed to make it happen. We were both trying to break the unhealthy spiral in the Explorer program that saw current missions overrunning and pushing subsequent missions downstream to the point where their science was becoming marginal. The science community was upset and wanted better performance from NASA. I summarized my arguments to the director. The Engineering Directorate had taken responsibility for the spacecraft development when we established XTE as an in-house project at Goddard Space Flight Center, and also was supporting the PCA development. "It adds complexity," I reiterated. "It's a significant cost impact for only a marginal reliability increase". His response was music to my ears, "Jim, I won't stand in your way, but you'll have to convince the scientists and engineers."

Barrowman, James↗