Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

High Performance Flow Battery with Inexpensive Inorganic Reactants: DAYS Program (Final Technical Report)

RTRC’s DAYS projects focused on new flow battery (FB) chemistries for long duration energy storage: one that pairs aqueous polysulfide and manganese active materials in strongly alkaline electrolytes (S/Mn); another explores ligand-modified metal (LMM) chemistries in moderate pH electrolyte conditions. The S/Mn chemistry met durability targets by running for over 500 cycles and 1000 hours. Combined with this durability, power densities of up to 60 mW/cm2 at 80% round-trip efficiency, and exceptionally low-cost S and Mn active materials, the S/Mn FB offers a pathway to meeting the <5¢/kW-hr levelized cost of storage (LCOS) target first proposed by the DAYS Program and accepted by the DOE Energy Storage Grand Challenge. The LMM chemistry made impressive progress as well, including durability tests that retained performance over 600 hours of cycling. Cell optimization allowed this chemistry to operate as high as 500 mW/cm2 at 80% round-trip efficiency, nearly 10x the power density of S/Mn and comparable to the power density achieved in RTRC’s flow battery stacks using acidic vanadium battery solutions. This enabled the LMM chemistry to also offer a pathway to the <5¢/kW-hr LCOS DAYS and DOE targets. The promising results from the LMM chemistry have led to a recent DOE AMO award to advance the technology to a 5 kW, 20 kW-hr prototype.

25 ENERGY STORAGE↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

Residential Solar-Adopter Income and Demographic Trends: 2024 Update [Slides]

The report describes income, demographic, and other socio-economic trends among U.S. residential rooftop solar adopters. The report is based on address-level data for roughly 4.1 million residential rooftop solar systems installed through 2023, representing 87% of all U.S. systems. With its unique size, geographic scope, and level of detail, this report is intended to serve as a foundational reference document for policy-makers, industry stakeholders, and researchers. Key findings include the following: -The median income of households that installed solar in 2023 was about $\$$115k/year, compared to a U.S. median of $\$$75k/year for all households and $\$$94k/year for all U.S. owner-occupied households. -Compared to owner-occupied households in the same state, 2023 solar-adopter incomes were 7% higher in the median case, and in 10 states, median solar-adopter incomes were below the corresponding median income for all owner-occupied households. -Roughly 49% of solar adopters in 2023 had incomes below 120% of their area median income (AMI), a threshold sometimes used to define “low-and-moderate income” (or LMI), while 26% were below 80% of AMI, often used to define “low-income”. -Solar adoption continues to shift toward less affluent households over time, with the median present-day income of solar adopters dropping from $\$$141k for households that installed systems in 2010 to $\$$115k in 2023. -PV systems installed in 2023 by households earning less than $\$$50k had a median size of 6.4 kW, 33% were third-party owned, and 6% included battery storage, compared to corresponding values of 8.0 kW, 18%, and 14% for households earning more than $\$$200k. -Compared to all households in their respective state, solar adopters in 2023 were slightly more likely to be college educated and to live in rural areas; had higher home values; and were more likely to live outside a disadvantaged community (DAC), be middle-aged, identify as non-Hispanic white, work in a business or financial occupation, and own a single-family home. In conjunction with the report, Berkeley Lab has published an updated accompanying set of online data visualizations that allow users to further explore the underlying data. Berkeley Lab is also offering related analytical support to states, local agencies, and other organizations on issues related to solar adoption among low-to-moderate income households; requests for analytical support may be submitted through this online form.

14 SOLAR ENERGY↗

Flow Sensor Test Article (F-STAr) - Water Testing and Commissioning Report for FY2024

Argonne National Laboratory’s Mechanism Engineering Test Loop (METL) facility is developing new experimental testing capabilities with the Flow Sensor Test Article (F-STAr). F-STAr’s mission is to provide high flowrate, sodium submersible testing capabilities to support the development of sodium cooled nuclear fission reactors. Figure 1 shows a model of F-STAr (left) and a photo of the partially assembled test article (right) with several of the main components labeled. The system currently includes a large pump with desired flowrates of up to 100 GPM; an immersion heater with a maximum power of 5 kW; an immersion cooler with an estimated maximum cooling power of 2 kW; and an experimental test section to support sub-test articles. Initially, F-STAr will be setup for testing flow sensors, specifically Eddy Current Flow Sensors (ECFS). However, the system can be reconfigured to support a wide range of testing needs. For example, F-STAr could be setup to complete testing of hydraulic components, heat exchangers, hydrodynamic bearings, seals, and more. This report will provide an update on the development of F-STAr with a focus on the water testing and commissioning activities during Fiscal Year 2024 (FY24). First, the report will focus on describing the pump development. Specifically, updates will be provided on troubleshooting the pump’s excessive vibrational issues. In addition to updates on the pump, pressure-flowrate performance testing in water will be described. Furthermore, updates will be provided on a pump shaft bushing development as well as rigging procedures. Future work and paths forward for F-STAr will be described. Finally, a short summary on the ECFS development will be described at the end of the report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving Cost and Efficiency of the Scalable Solid Oxide Fuel Cells Power System

The objective of this project was to design and develop a 20kW range small-scale solid oxide fuel cells (SOFC) power system for applications such as data centers and commercial buildings. The original plan included a 5,000 hours demonstration and a Techno-Economic Analysis (TEA) which were dropped as part of project termination. The original project plan was to use a stack with a cross-flow cell design which had previously been tested for 500 hours at a community college in Malta, NY. However, it was decided to move to the advanced R-SOFC co-flow cell developed under Department of Energy Award DE-FE0031971. The advanced cell design has the advantage of a larger active area for the same manufacturing footprint which results in fewer required cells for the same stack power, hence a higher volumetric power density (kW/L) and lower cost per kW than the original cross-flow cell design. A full SOFC system Simulink model was developed and calibrated with testing data from a fuel cell stack and BOP (balance of plant) components. The simulation results from the calibrated model showed an acceptable match with the experimental data. A structural analysis conducted for various load scenarios indicated no high stress areas for all spatial directions. Major electrical system components were acquired, built and successfully tested. System sensors were verified and validated against controls. Safety checks, a diagnostic check, PID tuning, and control software commissioning tasks were also conducted. The power electronics prototype was delivered and trial testing completed. Balance of Plant component testing and simulation work was conducted to characterize Reformer-Heat Exchanger heat transfer and backpressure and reformer catalyst methane conversion and product selectivity. Simulations were conducted to design the Anode and Cathode fluid passages and size the air-air and fuel-fuel heat exchangers. A Burner operation map was created from test data and the Anode Gas Recirculation blower was tested to evaluate its durability. The SOFC system used a horizontal style design where components sit directly on a casting with a direct connection to the skid. This design has efficient packaging and a small footprint with approximate dimensions of 750 mm x 700 mm x 1700 mm. An SOFC system was built and successfully tested at the Malta, NY facility The system for over 500 hours under load of which over 300 hours was at full load of 20 kW.

30 DIRECT ENERGY CONVERSION↗

PV Inverter Systems Enabled by Monolithically Integrated SiC based Four Quadrant Power Switch (4-QPS) [BiDFET]

The purpose of this project was to develop a new breed of Power Conversion Systems (PCS) for PV integration that is enabled by the newly developed 4-Quadrant Single Die SiC Power Semiconductor Switches (4-QPS) or also referred to as “Bidirectional FET (BIDFET)”. This work includes semiconductor die development, advanced packaging, converter design, development, and testing of 4-QPS enabled hardware prototypes at 1 kW (for single phase residential application) and 10 kW (for three phase commercial application). The BiDirectional Field-Effect Transistor (BiDFET) can enable circuit topologies requiring four-quadrant switches, that were earlier designed using discrete combinations of MOSFETs, IGBTs, GaN HEMTs, and PiN diodes. The monolithic nature of the BiDFET allows lower device count, smaller switch volume, lower inductance, and simpler packaging, and hence more reliable and commercially viable implementation in power electronics converters. The matrix converter topologies, now feasible using BiDFETs, can eliminate the bulky and unreliable dc link capacitors or inductors required for conventional voltage-source or current-source converters in ac–ac and ac–dc applications. The 1.2 kV BiDFET has the potential to disrupt all the applications utilizing 1.2 kV switches, including electric vehicle (EV) drivetrain, bidirectional EV chargers, industrial motor drives, solid-state transformers, datacenter power supplies, elevator drives, dc microgrids, energy storage grid integration, solid-state breakers, etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Window Cooling Studies and Disk Vibration Testing on a Subset of Mo-100 Disks

Production of metastable Technetium-99 (Tc-99m), a radioactive tracer that emits gamma rays, is vital to the medical imaging community. Tc-99m is extracted from the decay of Molybdenum-99 (Mo-99) which has a half-life of about 2-3 days. The work presented in this report is part of the NNSA’s mission to produce Mo-99 commercially, within the US, without the use of highly enriched uranium (HEU) in support of nonproliferation and global security. Los Alamos National Laboratory (LANL) is working with NorthStar Medical Radioisotopes (NMR) on their efforts to produce Mo-99 through the irradiation of Mo-100 targets using an electron beam. The NMR target comprises a stack of approximately 60-70 Mo-100 disks with diameter 24 mm and thickness 0.74 mm held in stainless steel laminations, each separated using 0.25 mm thick stainless-steel spacers. The symmetric target stack is housed in an Inconel vessel with two Inconel windows on either side. Two electron accelerators are used to produce 40 MeV, 3.16 µA electron beams each that penetrate the Inconel windows and irradiate the Mo-100 disks. Approximately 90% of the total 250 kW beam power is deposited in the NMR target during the irradiation process, with a smaller percentage adding up to 2.2 kW of heat deposited on the Inconel window. During irradiation, pressurized helium gas flows through thin gaps between the disks cooling the beam window, target disks, disk laminations and spacers. Both NMR and LANL have found during cold testing of the target system (no heat deposition) that the Mo 100 disks undergo significant mass loss and disk breakage due to vibrations induced by the flowing helium gas. The mass loss is not only undesirable due to monetary loss from reduced final quantities of Mo-99, but also due to the hazards associated with radioactive material trapped in the cooling lines and particle filters. The effect of flow rate and target geometry on the flow induced vibrations need to be quantified, and recommendations provided to minimize this mass loss. LANL has previously also tested NMR’s Inconel beam window by heating the window, while flowing pressurized helium, using the average heat deposited on the window. However, the NMR beam is pulsed with a duty cycle of 12.5%, which introduces oscillation in temperature around the nominal 600 °C steady state value with each pulse. Available fatigue curves for Inconel are few, established for room temperature, and they are based on mechanical strain cycles not thermally induced strain as in the NMR target. The effect of pulsed beam heating on the Inconel window therefore needs to be quantified. This report details the experiments conducted to assess the factors that lead to mass loss in the NMR target disks as well as to understand the effect of a pulsed beam on NMR’s Inconel window. This work describes LANL’s experimental characterization of the flow induced vibrations and disk mass loss in a reduced scale set-up containing 5 to 10 Mo-100 disks. We use high speed imaging, displacement measurements and microphone measurements combined with signal processing to estimate the vibration frequency of each disk. The effect of disk thickness, target fit and duration of testing on the mass loss is described. We find that in the current configuration of NMR targets, the vibrations and mass loss on the first disk are minimized, while those in the adjacent disks are highest. The microphone and high-speed image data show that increased flow rates and increased duration of testing increases vibration frequency and mass loss. The mass loss is due to both disk rotation and back and forth motion. There are visible wear marks on the disks with the highest mass loss. We also note that the current NMR window gap reduces flow induced vibrations compared to the previous smaller gaps. Improved target holders significantly reduce disk mass loss to almost negligible quantities. This work finds that the larger window to first disk gap and improved target holder geometry should allow NMR to successfully conduct irradiations with minimal mass loss. The window tests were conducted to understand the effect of a pulsed beam on both the window longevity and to estimate the window temperature and displacement during pulsing. The experiments presented here were performed at significantly low power, due to the limitations of the induction heating system. The window temperature rose to approximately 73 °C with a significantly reduced power of 45 W without beam pulsing. With a 5 Hz pulse rate, 12.5% duty cycle, the window temperature remained constant at 26 °C. These experiments will be repeated with improved coil geometry and reported in upcoming journal papers.

42 ENGINEERING↗

Implementation of WBG devices in circuits - Electric Drive Technologies Project (Final Technical Report)

The objective of the project is to ensure that SiC devices are reliable and rugged as required in automotive applications for operational life of 300,000 hrs and create new device designs to address various weaknesses in currently available commercial devices. OSU has worked closely with SUNY Polytechnic. OSU has carried out the reliability and ruggedness evaluations of commercial devices as well as those fabricated by SUNY Polytechnic, discussed the results with SUNY Poly, and collaborated with the PI at SUNY Poly to improve the designs with respect to reliability/ruggedness. OSU work focused on reliability/ruggedness evaluation of SiC devices by individually testing them and then evaluate them in a 10 kW, 3 phase inverter system built with a specific purpose of stressing devices using realistic drive cycles such as a 10-minute hill climb. It should be noted that the primary purpose of the 10 kW inverter is to provide a platform for stressing the SiC devices under accelerated but realistic drive conditions.

33 ADVANCED PROPULSION SYSTEMS↗

Building Resiliency into Grand Canyon West Micro-Grid

The objective of the project was to improve the resilience of the non-regional-grid-connected electrical generation system at Grand Canyon West (GCW) to withstand short-term disruptions and rising energy costs by installing an 885-kW solar photovoltaic (PV) array and 750-kilowatts (kW)/2,145-kilowatt hour (kWh) battery energy storage system (BESS). The system is designed to provide 50% of the annual energy needed for the essential facilities at GCW, supplementing the existing diesel generators, saving approximately $\$$463,339 per year and an estimated $\$$11,583,475 over the 25-year life of the system. The project aligns with the Tribe’s conservation ethic and self-determination in the area of energy development.

14 SOLAR ENERGY↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Jijak Gises Project

The Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians, d.b.a. Gun Lake Tribe (Gun Lake Tribe/Tribe), installed a grid connected 68.87 kW solar photovoltaic array at the Tribe’s Jijak Property located in Hopkins, MI. The array generated 95,070 kWh its first year of operation, 7,014 kWh more than projected. The Jijak Gises solar array saved $\$$12,214 during the first year of production including $\$$6,022 in generation credit and $\$$6,192 in offset electrical cost. The array will save the Tribe more than $\$$312,000 with increasing electric rates during the normal life of the system reducing Gun Lake Tribe’s reliance on other energy resources. Competitive pricing allowed the Tribe to install a second smaller array to power the Jijak Garden. The 4.85kW Jijak Garden Array produced 6,643.96 kWh during its first year of production, 475.95 kwh more than projected saving $\$$1,126 during year one of production including invoice credits and offset energy consumption. Over the first 20 years of the array, it is expected to produce 132,879 kWh of electrical energy, saving over $26,000 over the life of the system.

14 SOLAR ENERGY↗

Unalakleet Microgrid Optimization for Tribal Community Resilience

The Unalakleet Microgrid Optimization Project aimed to strengthen the reliability and efficiency of the isolated electric power system that serves the Tribal community of Unalakleet, Alaska. The community relies entirely on a local wind-diesel microgrid, consisting of four 475 kW diesel generators and six 100 kW wind turbines, to provide electricity to approximately 745 residents and Tribal facilities. Because Unalakleet is not on a road system and is located nearly 400 miles from the nearest major power grid, maintaining a resilient and efficient local energy system is critical. The scope of this project included upgrading a portion of the transmission line between the wind farm and the power plant to increase voltage and reduce line losses, along with modernizing the Supervisory Control and Data Acquisition (SCADA) system to improve monitoring, control, and data management of the power system. These upgrades were designed to increase wind energy utilization, reduce diesel fuel consumption by tens of thousands of gallons annually, and improve overall grid stability. By allowing more of the community’s electricity to be supplied by local renewable wind resources, the project was designed to lower operating costs, reduce dependence on imported fuel, and strengthen the long-term resilience of the power system. These improvements represent an important step toward the community’s long-term energy vision of expanding renewable generation, incorporating energy storage, and eventually achieving “diesels-off” operation, where essential Tribal loads are powered primarily by local renewable resources.

17 WIND ENERGY↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗