Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Risk-informed Graded Approach for Reliability and Performance Assessment for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

99 - GENERAL AND MISCELLANEOUS↗

MELDI2 Do No Harm Test Series

Mars 2020 will fly the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) sensor suite consisting of a total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer embedded in the thermal protection system (TPS). Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020's predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12" by 12" test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuum/ cycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation. This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.

Heatshield↗

GSFC Technical Outreach: The Capitol College Model

In February 2005, as part of the National Aeronautic and Space Administration (NASA) Technical Outreach Program, Goddard Space Flight Center (GSFC) awarded Capitol College of Laurel, Maryland an Educational Grant to establish a Space Operation academic curriculum to meet the future needs of mission operations engineers. This was in part due to the aerospace industry and GSFC concerns that a large number of professional engineers are projected to retire in the near term with evidence showing that current enrollment in engineering schools will not produce sufficient number of space operation trained engineers that will meet industry and government demands. Capitol College, under the agreement of the Educational Grant, established the Space Operations Institute (SOI) with a new curriculum in Space Operations that was approved and certified by the State of Maryland. The SO1 programs focuses on attracting, recruiting, and training a pipeline of highly qualified engineers with experience in mission operations, system engineering and development. The selected students are integrated as members of the engineering support team in any of the missions supported by the institute. The students are mentored by professional engineers from several aerospace companies that support GSFC. Initially, the institute was involved in providing console engineers and mission planning trainees for the Upper Atmosphere Research Satellite (UARS), the Earth Radiation Budget Satellite (ERBS) and the Total Ozone Mapping Spectrometer mission (TOMS). Subsequently, the students were also involved in the technology refresh of the TOMS ground system and other mission operations development. Further mission assignment by GSFC management included participation in the Tropical Rainfall Measuring Mission (TRMM) mission operations and ground system technology refresh. The SOI program has been very successful. Since October 2005, sixty-four students have been enrolled in the SOI program and twenty-five have already graduated from the program, nineteen of whom are employed by company's supporting GSFC. Due to the success of the program, the initial grant period was extended for another period of two years. This paper presents the process that established the SOI as a viable pipeline of mission operations engineers, the lessons learned in the process of dealing with grants, and experience gained in mentoring engineering students that are responsible for particular areas of expertise and functionality. This paper can also be considered a case study and model for integrating a student team with government and industry professionals in the real world of mission operations.

Marius, Julio L.↗

The Ensemble Canon

Ensemble is an open architecture for the development, integration, and deployment of mission operations software. Fundamentally, it is an adaptation of the Eclipse Rich Client Platform (RCP), a widespread, stable, and supported framework for component-based application development. By capitalizing on the maturity and availability of the Eclipse RCP, Ensemble offers a low-risk, politically neutral path towards a tighter integration of operations tools. The Ensemble project is a highly successful, ongoing collaboration among NASA Centers. Since 2004, the Ensemble project has supported the development of mission operations software for NASA's Exploration Systems, Science, and Space Operations Directorates.

applications programs (computers),↗

Colorado State University (CSU) X-Band Precipitation Radar Plan Position Indicator Data Processed with Corrected Moments in Antenna Coordinates (CMAC) Value-Added Product Report

In 2010 the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility procured 3- and 5-cm wavelength radars for documenting the macrophysical, microphysical, and dynamical structure of precipitating systems. To maximize the scientific impact, ARM supported the development of an application chain to correct for various phenomena in order to retrieve the “point” values of moments of the radar spectrum and polarimetric measurements. We have now used the lessons learned from the processing of the 3- and 5-cm wavelength radars obtained by ARM to help process X-band radar data from the Surface Atmospheric Integrated Field Laboratory (SAIL) field campaign. This report details the motivation, science, and progress to date as well as charting a path forward.

54 ENVIRONMENTAL SCIENCES↗

Completable scheduling: An integrated approach to planning and scheduling

The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

Gervasio, Melinda T.↗

Design for Safety - The Ares Launch Vehicles Paradigm Change

The lessons learned from the S&MA early involvement in the Ares I launch vehicle design phases proved that performing an in-line function jointly with engineering is critical for S&MA to have an effective role in supporting the system, element, and component design. These lessons learned were used to effectively support the Ares V conceptual design phase and planning for post conceptual design phases. The Top level Conceptual LOM assessment for Ares V performed by the S&MA community jointly with the engineering Advanced Concept Office (ACO) was influential in the final selection of the Ares V system configuration. Post conceptual phase, extensive reliability effort should be planned to support future Heavy Lift Launch Vehicles (HLLV) design. In-depth reliability analysis involving the design, manufacturing, and system engineering communities is critical to understand design and process uncertainties and system integrated failures.

Safie, Fayssal M.↗

Scheduling Spitzer: The SIRPASS Story

NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

flight systems↗

A Petri-net coordination model for an intelligent mobile robot

The authors present a Petri net model of the coordination level of an intelligent mobile robot system (IMRS). The purpose of this model is to specify the integration of the individual efforts on path planning, supervisory motion control, and vision systems that are necessary for the autonomous operation of the mobile robot in a structured dynamic environment. This is achieved by analytically modeling the various units of the system as Petri net transducers and explicitly representing the task precedence and information dependence among them. The model can also be used to simulate the task processing and to evaluate the efficiency of operations and the responsibility of decisions in the coordination level of the IMRS. Some simulation results on the task processing and learning are presented.

Wang, F.-Y.↗

Microgravity Workstation and Restraint Evaluations

Confined workstations, where the operator has limited visibility and physical access to the work area, may cause prolonged periods of unnatural posture. Impacts on performance, in terms of fatigue and posture, may occur especially if the task is tedious and repetitive or requires static muscle loading. The glovebox design is a good example of the confined workstation concept. Within the scope of the 'Microgravity Workstation and Restraint Evaluation' project, funded by the NASA Headquarters Life Sciences Division, it was proposed to conduct a series of evaluations in ground, KC-135 and Shuttle environments to investigate the human factors issues concerning confined/unique workstations, such as gloveboxes, and also including crew restraint requirements. As part of the proposed integrated evaluations, two Shuttle Detailed Supplementary Objectives (DSOs) were manifested; one on Space Transportation System (STS)-90 and one on STS-88. The DSO on STS-90 evaluated use of the General Purpose Workstation (GPWS). The STS-88 mission was planned to evaluate a restraint system at the Remote Manipulator System (RMS). In addition, KC- 1 35 flights were conducted to investigate user/workstation/restraint integration for long-duration microgravity use. The scope of these evaluations included workstations and restraints to be utilized in the ISS environment, but also incorporated other workstations/ restraints in an attempt to provide findings/requirements with broader applications across multiple programs (e.g., Shuttle, ISS, and future Lunar-Mars programs). In addition, a comprehensive electronic questionnaire has been prepared and is under review by the Astronaut Office which will compile crewmembers' lessons learned information concerning glovebox and restraint use following their missions. These evaluations were intended to be complementary and were coordinated with hardware developers, users (crewmembers), and researchers. This report is intended to provide a summary of the findings from each of the evaluations.

Chmielewski, C.↗

Necessity and Utility of a Virtual Laboratory in AVT-113

The Virtual Laboratory (VL) was to be an integral part of the database service that NASA provided to the international community, and for a brief period the VL was fully operational in the CAWAPI facet of the AVT-113 task group. This chapter details how one can construct a VL and also some of the lessons learned along the way that required changes to be made. The VL was to support both the CAWAPI and VFE-2 facets but due to the lack of funding and sufficient Information Technology (IT) support people with the right skills, the VFE-2 facet only reached the advanced planning stage with little software in place. However, both efforts point out the value of a VL in a task group like AVT-113 and illustrate that there needs to be a budgeted item for the IT effort to bring the VL to full operational status in each application.

Lamar, John E.↗

Independent Reliability Assessment of the NASA GSFC Laser Transmitter for the LISA Program

The Laser Interferometer Space Antenna (LISA) is a partnership between the European Space Agency (ESA) and NASA to build a Gravitational Wave (GW) observatory. The observatory, which consists of a three-spacecraft constellation with a nominal separation of 2.5 million km between each spacecraft, provides a tool for scientists to directly detect gravitational waves generated from various astronomical phenomena in a waveband that is not accessible from Earth. NASA is developing laser transmitters as one of the potential US contributions to LISA. The NASA laser design leverages lessons learned from previous flight missions and included the latest technologies in photonics packaging and reliability engineering to ensure a laser lifetime of >16 years covering integration and test through a possible extended mission phase. As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The NESC team comprised of a team of subject matter experts (SMEs) and performed a 12-month review of every aspect of the laser design. We present the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LSIA mission by late 2023.

LISA↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Rucio at LSST/Rubin

In this presentation, we will explore the Rucio experience with the Rubin Observatory experiment. Our discussion will cover several key areas: Scalability Tests: Insights into the performance and scalability evaluations of Rucio in the context of Rubin's data needs and what we have learned, especially with many small files. Role in Rubin's Data Curation: Rubin's Data Butler: An overview of how Rucio, along with with Rubin's Data Butler using Hermes-K, which involves message passing through Kafka, is integrated in the Rubin's data curation system. Monitoring and Support: Current status of Rucio and PostgreSQL monitoring and Rucio deployment and support within the Rubin environment. Tape RSE Implementation: Deal with the order of magnitude more files going to tape than HEP. Future Needs: An examination of Rubin's evolving requirements for Rucio services and how we plan to address them.

Lee, Dennis [Fermilab]↗

Human factors aspects of control room design

A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

Jenkins, J. P.↗

Developing Scenario‐Based Strategies for Health, Climate, and Environmental Preparedness: The One Health, One Earth Approach

Climate change amplifies many threats to human health. Despite advances in understanding climate change dynamics and impacts, there remains a critical gap in translating scientific knowledge into equitable, and community-driven health interventions. The inaugural One Earth, One Health workshop sought to explore this gap through human-centered design exercises involving interdisciplinary researchers from climate and Earth sciences, engineering, epidemiology, microbiology, and environmental health. Although participants did not co-develop solutions with affected communities, they used stakeholder role-playing to guide ideation and lay groundwork for actionable plans. Through these methods, participants identified community needs and proposed prototype solutions to alleviate health threats exacerbated by global environmental change. Prototypes were organized around infectious diseases, extreme weather, and air quality, as illustrative themes rather than an exhaustive set of risks. Key solutions included strategies for anticipatory systems and early warning (e.g., integrating environmental signals with health data), inclusive communication and infrastructure needs for responding to extreme weather events, and integrated platforms visualizing air quality trends to support tailored, context-aware guidance beyond one-size-fits-all alerts. The workshop highlighted opportunities such as leveraging machine learning, Earth observation, and real-time surveillance to protect communities, but also noted barriers including data quality, technological redundancy, privacy, and governance challenges. Additionally, participants emphasized the need for interdisciplinary teams capable of collaborating across sectors, breaking down silos and addressing gaps in training and education. Overall, the workshop illustrates how process-driven, human-centered approaches can help surface user needs and generate testable prototype concepts, while underscoring the importance of direct community partnership for implementation.

Abadi, Azar M. [University of Alabama, Birmingham,↗

CORE-CM in The Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset (Final Report)

The following document summarizes project results from “CORE-CM in the Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset”. This project is part of the U.S. Department of Energy’s (“DOE”) National Energy Technology Laboratory’s (“NETL”) Carbon Ore, Rare Earth Elements, and Critical Minerals (CORE-CM) Initiative. This report concludes that the Greater Green River and Wind River Basins (GGRB-WRB) Area-of-Interest (AOI 9) is the ideal region for continued research and development in progressing the broader CORE-CM goals outlined by the DOE. Based upon the extensive analyses of technical, social, and community criteria, this report illustrates that the GGRB-WRB hosts numerous potential CORE-CM feedstocks (both coal- and non-coal based), diverse opportunities for utilizing existing industrial waste streams, ample infrastructure and industry to support new CORE-CM-focused technologies, and a highly motivated, well educated, and adaptable workforce to further develop the regional and national CORE-CM supply chain. Additionally, some potential solutions for technological gaps suggest that the GGRB-WRB's diverse resources can play a significant role in achieving the national goal of critical materials independence. With full community participation, meaningful involvement of regional Tribal Nations, and building upon the stakeholder engagement demonstrated here, the GGRB-WRB region presents a unique opportunity for advancing the CORE-CM Initiative. This project was designed to bring together coal-based communities and stakeholders from across the GGRB-WRB to advance new industries for CORE-CM resources. The University of Wyoming (UWyo) School of Energy Resources (SER) led a project team of experts from the Colorado Geological Survey (CGS), Colorado School of Mines (CSM), Los Alamos National Lab (LANL), and local community colleges. Input from basinal, regional, and national experts bolstered the coalition in order to advance the mission of DOE’s CORE-CM initiative and develop the domestic CORE-CM supply chain. Phase I of this project was designed to address the goal of developing and catalyzing economic growth, job creation, and technology innovation in the GGRB-WRB of Wyoming and Colorado, by increasing the supply of CORE-CM to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM. The GGRB-WRB CORE-CM project worked toward providing benefit through several avenues of performance and research. • Develop a coalition team to achieve project objectives • Complete detailed assessments, including State-of-the-Art (SOTA) Data acquisition of potential CORE-CM materials across the AOI, and meaningfully contributes to DOE’s CORE-CM goals nationally. • Strategic planning for regional economic growth, job creation, and associated technology innovation around coal materials, including plans to maximize the development of potential CORE-CM resources and technology by creating regional public-private partnerships. • Define regional economic growth potential around existing strengths, energy infrastructure, business and industry, including planning for the leveraging of highly trained workforces, existing and novel coal technologies, and energy infrastructure in development of CORE-CM supply chains. • Develop a preliminary strategic plan for increasing the supply of CORE-CM materials to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM, focusing on regional strengths that result in an emerging diversified CORE-CM economy. • Assemble a committed network of stakeholders and communities that learn about, accept, and grow new energy technologies within coal regions. Additionally, the project team significantly contributed to the CORE-CM Initiative’s national goals, through cross-regional scoping, collaborating with CORE-CM projects in other AOIs, and including parallel regional project experts. In addition to active inclusion and meaningful engagement and contribution to DOE-led working groups, the project team focused on engaging with regional communities including Tribal Nations, economic development groups, and regional government organizations. The project’s CORE-CM development and commercialization plan identified diverse CORECM feedstocks, potential routes towards integration with existing industries, methods for supply-chain development that leverage existing infrastructure and businesses considering the regional economy, identified entry barriers for incorporating traditional and new technologies in those supply chains, recognized opportunities for public-private partnerships to develop technology innovation centers, identified diverse workforces, and conducted stakeholder outreach and education to build a community of understanding on CORE-CM potential in the GGRB-WRB region. Detailed task descriptions can be found in each chapter.

01 COAL, LIGNITE, AND PEAT↗

The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (≥ 5) and mass (≥ 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

Graham, L.↗