Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “information criterion”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

282 records · Page 16

Advanced timeline systems

The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

Bulfin, R. L.↗

Evaluating Materials Design Parameters of Hole-Selective Contacts for Silicon Heterojunction Solar Cells

Silicon heterojunction (SHJ) solar cell efficiencies are limited by parasitic absorption from the hydrogenated amorphous silicon (a-Si:H) front contact, but this may be mitigated by selecting an alternative carrier selective contact material with a wider band gap. When choosing such a material as the hole-selective contact (“p-layer”), the alignment of the material's valence band edge energy (E VB ) with that of crystalline silicon (c-Si) is an important criterion, but several other material parameters can also influence the band bending at the contact interface. Here, we simulate an (n)c-Si/(i)a-Si:H/p-layer interface to explore the influence of six materials parameters in a variable p-layer on the SHJ performance. We find a strong influence on the fill factor (FF) from thickness, doping, and E VB , and on V OC from the interfacial defect density; notably, optimal E VB is ~ 0.1 eV higher than the valence band edge energy of a-Si:H. Multiparameter sensitivity analyses demonstrate how performance is simultaneously influenced by E VB and doping; thus, both parameters should be optimized alongside one another. To assess the influence of these parameters experimentally, we grow p-type NiO x as a test-case p-layer, which shows that FFs decrease with the oxygen content likely from the increased misalignment of E VB . Although modest efficiencies are achieved experimentally (>7%), what is important is that our model simulates performance trends. With these results, we apply a materials discovery pipeline to suggest new materials (e.g., ZnTe and BeTe) to try as p-layers in the SHJ. This combination of simulations, experiments, and materials discovery informs a better understanding of contact selection in SHJ cells.

14 SOLAR ENERGY↗

A prediction model of failure threshold for shear deformation in a Zr-based bulk metallic glass

The failure of bulk metallic glasses (BMGs) during plastic deformation at room temperature is abrupt and instantaneous, while the analysis of precursor information based on avalanche events helps predict catastrophic failure. An acoustic emission (AE) signal can provide accurate precursor information for material failure, due to its sensitive and high fast calculation ability. In the current study, AE monitoring tests are carried out during uniaxial compression tests of BMGs at different strain rates. The AE experimental failure threshold, E max , is proposed on the basis of AE cumulative energy, which reflects the intensity of damage evolution at different loading conditions. Compared with the critical shear band velocity (CSBV) associated with stick-slip dynamics of serrated flow, E max is a more sensitive failure parameter since it is connected with the local microscopic changes that occur during the material response process. Here, the E max is obtained prior to reaching the CSBV since the calculation of these two avalanches analysis focuses on the different stages of shear band growth. In particular, AE events are related to the “dry” friction process in the first stage, however, the CSBV is responsible for the “viscous” glide in the second stage. Therefore, Emax is not affected by the complex interactions between the shear bands during the stick-slip process. The maximum avalanche of serrated flow, S max , is proposed as the experimental failure threshold, which depends on the applied strain rate as S max ~ $\dot{ε}$ –λ . According to the relationship of E max and S max , the theoretical failure threshold, E max , follows a criterion E max = 2545$\dot{ε}$ –λ - 4468, where λ is equivalent to 0.15 for this work. Finally, combining the different calculations and AE measurements, this model gives new insights to predict the deformation failure behavior of Zr-based BMGs.

36 MATERIALS SCIENCE↗

Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E-Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA) issued back in 2008, along with several subsequent supporting Special Analyses (SA). The Savannah River National Laboratory (SRNL) developed the prior PAs and SAs and has been tasked to update the facility’s PA. For operating the E-Area facility, a Waste Inventory Tracking System (e.g., WITS) is actively employed by waste generators where every radionuclide entering the facility (to be buried in one of its many disposal units) must be either directly or indirectly accounted for. Since there is a large number of radionuclides in existence (>3,000), the International Commission on Radiological Protection (ICRP-107) has provided guidance on the subset of radionuclides requiring further assessment in landfills such as the E-Area LLWF. The ICRP-107 publication provides critical radiological information on 1,252 radionuclides of 97 elements. This database is the critical starting point for developing a consistent inventory limit system. The explicit measurement and tracking of all radionuclides are not necessary when process knowledge, burial history, and radiological aspects are factored into conservative groundwater and intruder screening processes. Across the DOE complex these screening processes have been historically performed using the methodology suggested by the National Council on Radiation Protection and Measurements (NCRP) as presented in their original report (NCRP 1984) and then refined in a later report (NCRP 1996). In the recommended screening models employed within this report the traditional NCRP models are updated to better handle progeny and better reflect the known characteristics of E-Area. This improved screening process is referred to as the “NCRP-like” method. Various upgrades to the traditional NCRP methodology have been used by others (e.g., NRC funded effort by Kennedy and Strenge 1992). The more detailed models by Kennedy and Strenge (1992) were considered in this effort and are compared to the results from the more traditional NCRP-like models. The groundwater and inadvertent intruder screening analyses presented in this report start with this 1,252 radionuclide list and reduces it down to more manageable lists that are applicable to the various disposal unit types contained within E-Area. In order to reduce this starting list, some level of exposure risk must be considered acceptable. Historically, a dose (or concentration level) has been compared with a screening criterion set to 1% of a performance measure (e.g., a beta-gamma dose not to exceed the 4 mrem/yr beta-gamma performance measure x 0.01 = 0.04 mrem/yr). Thus, if a radionuclide produced a bounding or screening-level dose (or concentrations) less than the screening criterion, it could be safely removed from further consideration. Several tiers of screening and bounding level analyses have been considered in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Range of Stress and of Special Notches on Fatigue Properties of Aluminum Alloys Suitable for Airplane Propellers

Laboratory tests were made to obtain information on the load-resisting properties of X76S-T aluminum alloy when subjected to static, impact, and repeated loads. Results are presented from static-load test of unnotched specimens in tension and in torsion and of notched specimens in tension. Charpy impact values obtained from bend tests on notched specimens and tension impact values for both notched and unnotched specimens tested at several different temperatures are included. The endurance limits obtained from repeated bending fatigue tests made on three different types of testing machine are given for unnotched polished specimens, and the endurance limits of notched specimens subjected to six different ranges of bending stress are also reported. The results indicated that: (a) polished rectangular specimens had an endurance limit about 30 percent less than that obtained for round specimens; (b) a comparison of endurance limits obtained from tests on three different types of machine indicated that there was no apparent effect of speed of testing on the endurance limit for the range of speeds used (1,750 to 13,000 rpm). (c) the fatigue strength (endurance limit) of the X76S-T alloy was greatly decreased by the presence of a notch in the specimens; (d) no complete fractures of the entire specimens occurred in notched fatigue specimens when subjected to stress cycles for which the mean stress at the notch during the cycle was a compressive stress; for this test condition a microscopic cracking occurred near the root of the notch and was used as a criterion of failure of the specimen. (e) as the mean stress at the notch was decreased from a tensile (+) stress to a compressive (-) stress, it was found that the alternating stress that could be superimposed on the mean stress in the cycle without causing failure of the specimens was increased.

ALUMINUM ALLOYS-ALCOA X76ST-FATIGUE↗

Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E-Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA) issued back in 2008, along with several subsequent supporting Special Analyses (SA). The Savannah River National Laboratory (SRNL) developed the prior PAs and SAs and has been tasked to update the facility’s PA. For operating the E-Area facility, a Waste Inventory Tracking System (e.g., WITS) is actively employed by waste generators where every radionuclide entering the facility (to be buried in one of its many disposal units1) must be either directly or indirectly accounted for. Since there is a large number of radionuclides in existence (>3,000), the International Commission on Radiological Protection (ICRP-107) has provided guidance on the subset of radionuclides requiring further assessment in landfills such as the E-Area LLWF. The ICRP-107 publication provides critical radiological information on 1,252 radionuclides of 97 elements. This database is the critical starting point for developing a consistent inventory limit system. The explicit measurement and tracking of all 1,252 ICRP-107 radionuclides can be reduced when process knowledge, burial history, and radiological aspects are factored into conservative groundwater and intruder screening processes. Across the DOE complex these screening processes have been historically performed using the methodology suggested by the National Council on Radiation Protection and Measurements (NCRP) as presented in their original report (NCRP 1984) and then refined in a later report (NCRP 1996). In the recommended screening models employed within this report the traditional NCRP models are updated to better handle progeny and better reflect the known characteristics of E-Area. This improved screening process is referred to as the “NCRP-like” method. Various upgrades to the traditional NCRP methodology have been used by others (e.g., NRC funded effort by Kennedy and Strenge 1992). The more detailed models by Kennedy and Strenge (1992) were considered in this effort and are compared to the results from the more traditional NCRP-like models. The groundwater and inadvertent intruder screening analyses presented in this report start with this 1,252 radionuclide list and reduces it down to more manageable lists that are applicable to the various disposal unit types contained within E-Area. In order to reduce this starting list, some level of exposure risk must be considered acceptable. Historically, a dose (or concentration level) has been compared with a screening criterion set to 1% of a performance measure (e.g., a betagamma dose not to exceed the 4 mrem/yr beta-gamma performance measure x 0.01 = 0.04 mrem/yr). Thus, if a radionuclide produced a bounding or screening-level dose (or concentrations) less than the screening criterion, it could be safely removed from further consideration. Several tiers of screening and bounding level analyses have been considered in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Stability While Exercising on a VIS Device in Zero Gravity

BACKGROUND: A Vibration Isolation and Stabilization (VIS) system is being designed for use with the European Enhanced Exploration Exercise Device (E4D) [1]. The exercise bar is attached to cables that extend and retract through openings in the E4D platform, which the subject stands on while exercising. Since the E4D is mounted on a moving VIS device, the whole system moves under the subject’s feet. While tension in the cables does help stabilize a crew member in 0g by bracing him or her against the moving platform, flexible cables do not offer full support against falling. This raises the question of whether various exercises that are successfully performed in 1g on a stationary device can be performed without losing balance in 0g on a moving device. Quantifying stability conditions and establishing stability requirements for exercise countermeasure systems is a long-standing challenge and this work helped to inform this specific need for integrated E4D/VIS flight project development. METHODS AND RESULTS: A simplified stability analysis can be attempted based on platform accelerations generated by the VIS device simulation. In this type of analysis, the subject is conceived as standing on the platform in 0g while being held down to it by the tension in the cables. If the sideways acceleration of the platform is such that the cables cannot generate a sufficient moment relative to, e.g., the heels or the toes of the subject to overcome the tipping moment from the inertial forces on the accelerated subject’s body, the subject becomes unstable. This approach, which we refer to as the ‘static’ approximation, indicated failure of all the exercises that were considered in the comprehensive VIS analysis of the E4D. It was realized, however, that platform accelerations are not externally imposed but are themselves induced by the motion of the subject’s body during exercise, and a model calculation confirmed that this drastically altered the tipping moment on the subject, with the potential to even switch the direction in which the body would tip over. This made it imperative to consider in a coupled manner both the motion of the exercising subject’s body and the induced VIS platform motion while considering stability. The coupled dynamics requirement was met by the VIS simulation incorporating time-dependent human mass properties atop the platform and driven by the inertial forces from the prescribed subject motion relative to the platform based on motion-capture recorded human trajectories in 1g on a stationary E4D [2]. To analyze simulation results, a stability criterion was also needed. We do not know how to account for the human ‘control system’ that would take visual and vestibular cues as inputs as the platform moves in 0g. We thus chose to follow an approach we had previously used to analyze the dynamic feasibility of performing a task in lunar gravity along the human body trajectory recorded in 1g [3]. In this approach, one analyzes the center of pressure (COP) between the shoes and the ground (or platform) and checks if the COP remains within the convex hull of the footprints on the ground (or platform), commonly referred to as base of support (BOS). Since pressure is vertical and, in the absence of foot restraints, positive, the COP going outside the BOS indicates that the trajectory recorded in 1g is not dynamically feasible in microgravity and/or on the moving platform of the device. The outcome of the COP-based analysis was that some of the key exercises, especially the deadlift and the back squat exercises, were found to be dynamically feasible for at least some number of the exercise cycles, this number increasing with the cable tension. While this type of stability analysis does not account for the likely alteration of the exercise trajectory from its 1g form in space, it does show that there exist at least some realistic trajectories that pass the dynamic feasibility criterion. This adds confidence that, with further adjustment by the subject of the exercise form in 0g on a moving device, a number of exercises can be performed without losing balance.

D Frenkel↗

Analytical Approach for Estimating Preliminary Mass of ARES I Crew Launch Vehicle Upper Stage Structural Components

In January 2004, President Bush gave the National Aeronautics and Space Administration (NASA) a vision for Space Exploration by setting our sight on a bold new path to go back to the Moon, then to Mars and beyond. In response to this vision, NASA started the Constellation Program, which is a new exploration launch vehicle program. The primary mission for the Constellation Program is to carry out a series of human expeditions ranging from Low Earth Orbit to the surface of Mars and beyond for the purposes of conducting human exploration of space, as specified by the Vision for Space Exploration (VSE). The intent is that the information and technology developed by this program will provide the foundation for broader exploration activities as our operational experience grows. The ARES I Crew Launch Vehicle (CLV) has been designated as the launch vehicle that will be developed as a "first step" to facilitate the aforementioned human expeditions. The CLV Project is broken into four major elements: First Stage, Upper Stage Engine, Upper Stage (US), and the Crew Exploration Vehicle (CEV). NASA's Marshall Space Flight Center (MSFC) is responsible for the design of the CLV and has the prime responsibility to design the upper stage of the vehicle. The US is the second propulsive stage of the CLV and provides CEV insertion into low Earth orbit (LEO) after separation from the First Stage of the Crew Launch Vehicle. The fully integrated Upper Stage is a mix of modified existing heritage hardware (J-2X Engine) and new development (primary structure, subsystems, and avionics). The Upper Stage assembly is a structurally stabilized cylindrical structure, which is powered by a single J-2X engine which is developed as a separate Element of the CLV. The primary structure includes the load bearing liquid hydrogen (LH2) and liquid oxygen (LOX) propellant tanks, a Forward Skirt, the Intertank structure, the Aft Skirt and the Thrust Structure. A Systems Tunnel, which carries fluid and electrical power functions to other Elements of the CLV, is included as secondary structure. The MSFC has an overall responsibility for the integrated US element as well as structural design an thermal control of the fuel tanks, intertank, interstage, avionics, main propulsion system, Reaction Control System (RCS) for both the Upper Stage and the First Stage. MSFC's Spacecraft and Vehicle Department, Structural and Analysis Design Division is developing a set of predicted mass of these elements. This paper details the methodology, criterion and tools used for the preliminary mass predictions of the upper stage structural assembly components. In general, weight of the cylindrical barrel sections are estimated using the commercial code Hypersizer, whereas, weight of the domes are developed using classical solutions. HyperSizer is software that performs automated structural analysis and sizing optimization based on aerospace methods for strength, stability, and stiffness. Analysis methods range from closed form, traditional hand calculations repeated every day in industry to more advanced panel buckling algorithms. Margin-of-safety reporting for every potential failure provides the engineer with a powerful insight into the structural problem. Optimization capabilities include finding minimum weight panel or beam concepts, material selections, cross sectional dimensions, thicknesses, and lay-ups from a library of 40 different stiffened and sandwich designs and a database of composite, metallic, honeycomb, and foam materials. Multiple different concepts (orthogrid, isogrid, and skin stiffener) were run for multiple loading combinations of ascent design load with and with out tank pressure as well as proof pressure condition. Subsequently, selected optimized concept obtained from Hypersizer runs was translated into a computer aid design (CAD) model to account for the wall thickness tolerance, weld land etc for developing the most probable weight of the components. The flow diram summarizes the analysis steps used in developing these predicted mass.

Aggarwal, Pravin↗

Lunar Transient Accelerations White Paper

Recently, the United States announced a plan to return astronauts to the moon by 2024 [8]. Lunar landing (and subsequent Mars landing) architecture was not considered when the current NASA standards and vehicle design requirements for crew injury risk were developed. Therefore a gap exists in protecting the crew in planetary landing scenarios. One of the interesting aspects of this design reference mission (DRM)is the consideration of having the crew stand during dynamic phases of flight. Although this approach was contemplated for the Apollo Lunar Module, current NASA standards do not address design solutions that allow the crew to stand. Currently, NASA uses several tools and associated limits to mitigate crew injury because of dynamic loads. Some of these tools are the Brinkley Dynamic Response Criterion (BDRC) model and Hybrid III Anthropomorphic Test Devices (ATDs) [10]; and these have several limitations for assessing spaceflight loading environments, as well as specific underlying assumptions that may not be applicable in planetary landing vehicles. The BDRC is a simple lumped mass parameter model developed by the U.S. military, and has been used primarily to evaluate injury risk associated with aircraft ejection systems. The model evaluates seat accelerations in each axis to determine injury risk. Because the model treats the human-seat-restraint system as a single system, it is contingent on a restraint system and seat with similar characteristics of the original test data underlying the model. In particular, the model requires a rigid seat with a minimum natural frequency of 15Hz, minimal seat pan padding, side supports, and multipoint harness. The BDRC model uses undamped natural frequency and damping coefficients based on these requirements and any deviations may render the model injury predictions void. In lunar landing, one expects that a minimal or even no seat with minimal restraints will be employed. In this case, the original model parameters are likely to not be applicable. For capsule-based spacecraft returning crew to Earth, the Hybrid III ATD in various sizes also is used to supplement the BDRC. This analytical tool was added to address limitations in the BDRC related to spacecraft landings while wearing a pressure garment and helmet. Although the Hybrid III ATD has additional measurement capability; head, neck,and lumbar spine responses were the only metrics included because of the limitations imposed by the model.Lunar landing acceleration limits must assume the crew is standing during landing, an orientation for which we have limited data.Although the Apollo missions did employ a standing orientation for the crew, much of the data is lost. Therefore data from othersources havebeen examined to inform lunar landing acceleration limits.

Jeffrey T Somers↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Open Architecture for Cost Savings in Advanced Nuclear Reactors

Recently, nuclear power plant build projects in the West have run over budget due to high capital costs and schedule overruns. Compared to other sources of energy, nuclear power plants have higher capital costs. Reactors are often different at every site, resulting in a lack of standardization. Nuclear is expected to compete with other low carbon sources of energy which have lower capital costs making it essential for nuclear to develop ways of reducing costs. Strategies such as standardization, learning rates, modularization, and schedule reduction in advanced reactors can reduce nuclear costs by about 40%. Standardization as a way of cutting capital costs has been explored even in large nuclear power plants. Standardization of certain plant components can result in lower component and installation costs and higher learning from experience. Standardization can be achieved by adopting a criterion of key performance indicators and general design principles for a specific system or component such as the balance of plant. Modularization allows the construction of certain components of SMRs in a factory, which saves time, increases productivity, and encourages higher learning rates. Production learning decreases the time and the cost related to an activity. The potential for modularized components of advanced reactors to be manufactured in factories makes it conducive to achieving higher learning rates. Developing large-capacity nuclear programs through sequential builds cultivates a higher learning rate, which in effect may reduce schedule overruns. Open architecture has been identified as a way to drive standardization among advanced reactor designs and result in cost savings. Open architecture (OA) is defined as a design enabling a diverse supply chain by defining and publishing requirements of systems or equipment in functional and/or interface terms, utilizing technical standards in widespread use. Currently, the nuclear industry’s approach is to use closed architecture, making most designs proprietary. However, collaboration between various advanced reactor vendors and suppliers utilizing the concept of open architecture can result in modular and standardized architecture of subsystems or subcomponents of a nuclear power plant. Completely standardizing nuclear power plants may be impossible, however, certain common subsystems amongst the various reactor designs could be standardized and/or access a wider supply chain and leverage existing learning from other sectors. Open architecture will save time and allocate resources to the parts of the plants that have the most unique features. A key advantage of open architecture is its ability to improve production learning across advanced reactors (AR) types in the industry, by providing and utilizing the same kind of component. Sodium fast reactor (SFR), High Temperature Gas Reactor (HTGR) and Molten Salt Reactor (MSR) are the advanced reactors considered for this project. This paper aims to determine the cost savings in advanced reactor programs due to open architecture learning rate. This work is an extension of work done on light water reactor small modular reactors; the cost methodology was utilized to investigate the impact of open architecture on advanced reactors with a particular focus on sodium fast reactors. The cost data on sodium fast reactors used in the model presented the most adequate information required for the analysis.

Advanced Nuclear Reactors↗

Petrophysical and geomechanical properties of gas hydrate-bearing sediments recovered from Alaska North Slope 2018 Hydrate-01 Stratigraphic Test Well

Knowledge of petrophysical and geomechanical properties of gas hydrate-bearing sediments are essential for predicting reservoir response due to gas production from gas hydrate reservoirs. That information will be critical parameters for designing production well completion such as specification of depressurization pump, water storage tank, and mesh size of sand screen. In December 2018, Stratigraphic Test Well Hydrate-01 was drilled in the western part of the Prudhoe Bay Unit, Alaska North Slope as part of the technical planning effort for a future long-term production test by collaborative team of DOE/NETL, USGS, and MH21-S (Boswell et al., 2020, Collett et al., 2020, Okinaka et al., 2020). Data set of logging-while-drilling (LWD) were acquired (Haines et al., 2020, Suzuki et al., 2019) and core sampling depth was determined on-site.Side-wall pressure coring was conducted to recover gas hydrate-bearing sediments from two reservoir sections named Unit-B and Unit-D. A total of 34 cores were successfully recovered by 5 runs of a wire-line deployed pressure corer (CoreVault® System - Halliburton). Core analysis scheme of this project are shown in Figure 1. All cores were quenched in liquid nitrogen while at high pressure in the laboratory of Stratum Reservoir, LLC. at Anchorage (Figure 1, a)). And the cores were removed from the pressure corer autoclave with temperature support of dry ice and stored under liquid nitrogen at atmospheric pressure. 19 damaged cores were processed to index property measurements directly such as grain size, grain density. 4 of another 17 cores were depressurized and trimmed for making a plug to analyze petrophysical properties of host sediments. Unsteady-state permeability test was conducted to obtain relative water permeability to gas and core scale NMR T2 distribution measurement was performed for evaluating pore size distribution at Houston (Figure 1, b)). Remained high quality 13 cores were preserved with gas hydrate for advanced laboratory analysis. National Institute of Advanced Industrial Science and Technology, as a part of the Japanese National Hydrate Research Program (MH21-S, funded by Ministry of Economy, Trade and Industry), received the samples at Sapporo, Japan for advanced core analysis. High-resolution X-ray CT was used to analyze the quality of the samples, which showed undisturbed lithological layers. Cores were lathed into cylindrical shape and distributed for multi property measurements (Figure 1, c)).<p>As a result, sediment from Unit-D is categorized as silty sand at ~37% porosity with ~80% gas hydrate saturation. An average hydration number n = 6.16 was measured by Raman spectroscopy. An average intrinsic permeability of ~400 mD and in situ effective permeability (with hydrate) on the order of ~10 mD. The Unit B recovered cores consisted of well sorted sand at ~40% porosity with ~95% gas hydrate saturation. An average intrinsic permeability of ~1 Darcy and in situ effective permeability on the order of ~30 mD was measured for the Unit B cores. There was a small permeability reduction due to porosity loss with increasing effective stress that simulated consolidation behavior along with depressurization in the highly permeable sandy sediment. The apparent minimum change in porosity and permeability may be caused by the low compressibility of quartz sand grains in the recovered cores. XRD and thermal conductivity analysis also suggested high quartz content. Triaxial compression tests established internal friction angles based on the Mohr-Coulomb's failure criterion, which are 40° for hydrate-bearing sediment and 29.8° for hydrate free sediment.</p>

Yoneda, Jun↗