Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Storage Effectiveness in Enabling Variable Generation and Avoiding Fossil Emissions

In this paper, we investigate the relationship between storage and variable generation (VG) and how they can be used to replace fossil-fired technologies and their associated emissions. Unlike fossil generation, VG relies on variable resources (wind, solar, etc.), and the timing of these resources does not always match system needs, creating challenges both in terms of when energy is delivered and the reliability of that delivery. These challenges are typically addressed in one of two ways: paring VG with storage to provide firmed, time-shiftable energy or by building additional VG throughout an interconnection so that adequate amounts of VG are always available. The choice of how much to build of each (storage and VG) is typically an economic one. In this work, we focus on the former case - investigating the role of storage in bringing renewables onto the grid.

13 HYDRO ENERGY↗

Grid Integration and Market Analysis of Adjustable-Speed Pumped Storage Hydropower: Preprint

Many of the products and services on the electrical grid are currently provided by the conventional power plants, however the response time from conventional power plants is slow compared to hydropower. Similarly, some services such as spinning reserve can be provided by modern renewable generation (wind or PV), however the renewable generation must be curtailed down, thus there is loss of opportunity to harvest clean energy while operating in spinning reserve mode. On the other hand, Adjustable Speed - Pumped Storage Hydropower (AS-PSH) can readily perform these functions while pumping or generating, thus also taking benefit of energy arbitrage which can increase system efficiency. This paper will present results from production cost models showing the effect of adding AS-PSH 50 MW in size to three regional ISO areas which have different ancillary service markets available and different generation mixes. The benefits to these market areas from the ancillary services that can be provided by the AS-PSH and also the load shifting benefits will be measured with cost savings and additional system flexibility in the day-ahead and real-time markets. The main metrics to provide this insight will be savings in the total system production cost and in variable renewable energy curtailment respectively. The simulated operation of the additional hydropower will be analyzed to determine the breakdown of system cost reduction by ancillary services provided and load shifting.

13 HYDRO ENERGY↗

Basin-Scale Opportunity Assessment Initiative Background Literature Review

As called for in the March 24, 2010, Memorandum of Understanding (MOU) for Hydropower, the U.S. Department of Energy (DOE), the U.S. Department of the Interior (DOI), the U.S. Army Corps of Engineers (USACE), environmental stakeholders, and the hydropower industry are collaborating to identify opportunities to simultaneously increase electricity generation and improve environmental services in river basins of the United States. New analytical tools provide an improved ability to understand, model, and visualize environmental and hydropower systems. Efficiencies and opportunities that might not be apparent in site-by-site analyses can be revealed through assessments at the river-basin scale. Information from basin-scale assessments could lead to better coordination of existing hydropower projects, or to inform siting decisions (e.g., balancing the removal of some dams with the construction of others), in order to meet renewable energy production and environmental goals. Basin-scale opportunity assessments would inform energy and environmental planning and address the cumulative effects of hydropower development and operations on river basin environmental quality in a way that quantifies energy-environment tradeoffs. Opportunity assessments would create information products, develop scenarios, and identify specific actions that agencies, developers, and stakeholders can take to locate new sustainable hydropower projects, increase the efficiency and environmental performance of existing projects, and restore and protect environmental quality in our nation's river basins. Government agencies and non-governmental organizations (NGO) have done significant work to understand and assess opportunities for both hydropower and environmental protection at the basin scale. Some initiatives have been successful, others less so, and there is a need to better understand the legacy of work on which this current project can build. This background literature review is intended to promote that understanding. The literature review begins with a discussion in Section 2.0 of the Federal regulatory processes and mission areas pertaining to hydropower siting and licensing at the basin scale. This discussion of regulatory processes and mission areas sets the context for the next topic in Section 3.0, past and ongoing basin-scale hydropower planning and assessment activities. The final sections of the literature review provide some conclusions about past and ongoing basin-scale activities and their relevance to the current basin-scale opportunity assessment (Section 4.0), and a bibliography of existing planning and assessment documents (Section 5.0).

13 HYDRO ENERGY↗

Electricity from coal and utilization of coal combustion by-products

Most electricity in the world is conventionally generated using coal, oil, natural gas, nuclear energy, or hydropower. Due to environmental concerns, there is a growing interest in alternative energy sources for heat and electricity production. The major by-products obtained from coal combustion are fly ash, bottom ash, boiler slag, and flue gas desulfurization (FGD) materials. The solid wastes produced in coal-fired power plants create problems for both power-generating industries and environmentalists. The coal fly ash and bottom ash samples may be used as cementitious materials.

01 COAL, LIGNITE, AND PEAT↗

Intersection of Hydrologic Change and Hydropower in the United States: Needs for Future Research and Practice

Hydropower is crucial for electric‐grid stability in the context of variable renewables but faces threats from changing hydrology. Here, we summarize the state of the science at the intersection of hydropower operations and planning, hydrologic science, and climate. We focus on the United States, outlining research, development, and training needs. Key knowledge gaps include the risk that intensification of compound extreme events poses to future generation, as well as uncertainties surrounding greenhouse gas emissions from hydropower reservoirs with relevance to hydropower's role in energy decarbonization. Quantifying such impacts and reducing uncertainty are critical where possible, but remaining irreducible or deep uncertainty will require new approaches. Future monitoring and modeling methods must provide a better understanding of the complexity inherent in large watersheds that is critical to managing both hydropower and watersheds in the context of hydrologic change. Yet, research and development will have little impact if they do not inform practice. Standardization and consolidation of platforms are essential for data, modeling, and tool translation to local scales and small operators. An enhanced industry‐academia dialog is pivotal for fostering a robust pipeline of hydropower professionals. Collaboration among researchers, policymakers, authorities, and industry stakeholders emerges as a recurring theme, highlighting the imperative for collective efforts.

13 HYDRO ENERGY↗

Clean Energy Technology Applications on US Mine Land: Technical Analysis

As the United States transitions toward a clean energy economy, an opportunity exists for redeveloping the more than 17,000 mine land sites located across the nation with clean energy technologies, which have a combined potential for generating more than 85 GW of clean electricity. This report provides an overview of the potential of demonstrating and deploying clean energy projects on current and former mine land. Clean energy project refers to a project that demonstrates one or more of the following technologies: solar; microgrids; geothermal; direct air capture; fossil-fueled electricity generation with carbon capture, utilization, and sequestration; energy storage, including pumped storage hydropower and compressed air energy storage; and advanced nuclear technologies. The report discusses the following technologies and their potential for creating jobs and generating tax revenue that would result in direct and indirect benefits to the local economy: Solar photovoltaics (PV) is being developed on current and former mine land in various parts of the world, including the United States. This approach is attractive because it requires limited infrastructure investment and would utilize the bare surfaces of mines and tailing ponds. Solar resource availability may be greater in the southern regions, including the Interior and Appalachian Basins and the southwestern United States. However, since some mine land sites include areas of significant change in elevation, the deployment of PV on mine land may require sophisticated planning to account for shading and irradiance, or may require regrading of the areas. PV does not create significant environmental risks and generally does not face public resistance; Geothermal systems are often spatially and genetically associated with ore deposits, and in some cases, they have been discovered while in search for epithermal mineral resources. Numerous diverse geothermal applications have been employed at mine land around the world, including power generation, mineral extraction from geothermal brines, process heating, direct use for other mining operations, and direct use for non-mining operations and subsurface energy storage, including geothermal heat pumps. Case studies highlighting these applications provide key lessons relating to identifying drivers and barriers to geothermal resource deployment and can be used to create screening tools for identifying the types and locations of mine land most amenable to utilizing geothermal resources; Carbon capture, utilization, and sequestration technologies include direct air capture (DAC) and enhanced weathering. DAC technologies include air contactors, regeneration systems, and CO 2 compression systems. Captured CO 2 can be converted to valuable feedstocks or possibly injected into abandoned subsurface mines where it would be absorbed by alkaline rock waste and mine tailings or by the porous minerals along the walls of the mine. DAC systems can be coupled with energy sources such as wind, solar, grid, or geothermal. Many DAC systems require a source of water or steam; however, some are expected to be net producers of water. Local impacts of DAC systems are expected to be low, and are related to land footprint, material disposal, and upstream impacts of energy and material production; Compressed air energy storage is an established energy storage technology in salt caverns. It has the potential for implementation in underground mines by pressurizing and storing a large amount of air using electrical compressors when excess electricity is available. When a need for discharge emerges, the air is used to spin turbines and produce the necessary volume of electricity. Abandoned or unused mine openings, including shafts, adits, access tunnels, and mined workings of any orientation, offer potential for vast amounts of compressed air energy storage if the site characteristics meet operational requirements; Pumped hydropower storage can be implemented in surface and subsurface mines. In surface mine applications, both reservoirs may be located in a mine pit or artificial reservoirs made of excavated materials. In subsurface mines, the lower reservoir may be implemented by waterproofing and flooding mine shafts and tunnels. The water is then pumped from the lower reservoir to the upper reservoir during periods of low load and high production, and it is discharged through the turbines during periods of peak demand. The potential environmental damages associated with acidity of mine water or the presence of toxic chemicals incentivizes the development of closed-loop technologies, in which water circulates inside the pumped hydropower facility without being discharged into the external water basins; Advanced nuclear energy technologies include small modular reactors, which can be deployed locally to produce electricity and heat. Such units require seismic stability and a supply of cooling water, but population constraints may exist in some areas. Therefore, remote mine land could represent an optimal location for siting advanced nuclear energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic Frequency Regulation Improvement in Hydropower-Hybrid System using Variational Mode Decomposition

Providing frequency response, especially fast frequency response such as Red D in the Pennsylvania-New Jersey-Maryland Interconnection (PJM) market, is challenging for many generation plants to deliver on their own. If they have adequate flexibility, hydropower plants are typically able to provide slower regulation support (e.g., Reg A in PJM), but do not respond fast enough to provide Reg D. The ability to provide Reg D would improve their revenue because this service is typically more valuable. This work presents a control approach to use hydropower, battery, and ultracapacitor systems to provide fast regulation in a way that uses the response contribution of each asset. In particular, the proposed control architecture applies a variational mode decomposition (VMD) technique on the incoming Reg D signal to extract multiple dynamic-regulation components with non-overlapping frequencies. With the response-speed dependent alignment, these regulation components are fed to the hydrogenator and hybrid energy storage system (HESS). The paper evaluates the proposed approach on a direct-current (DC)-coupled active system by computing several performance measures and analyzing sensitivity based on HESS component proportional capacities. The results reveal that the proposed VMD-based signal conditioning performs well and that optimizing the sizing of the battery and ultracapacitor components further enhances performance.

13 HYDRO ENERGY↗

Hydropower Projects: Fiscal Years 2008 - 2014

The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

13 HYDRO ENERGY↗

Lower Snake River Dams Contribution to Grid Services

Hydroelectric generation and water storage have long been components of the clean energy mix, providing both reliable steady output and operational flexibility. As variable renewable energy sources such as wind and solar increasingly replace traditional generation, the role of all flexible resources—including hydropower—in balancing supply and demand continues to evolve. This study examined the contribution of the Lower Snake River (LSR) Dam plants to Bonneville Power Administration grid services in maintaining power system reliability within the Western Interconnection. By analyzing publicly available data, the study evaluated various reliability services through performance metrics including energy capacity, balancing and ramping, voltage and reactive power support, frequency response, and transmission impact. Results indicated that the LSR plants deliver services as expected based on their size, contributing to the balancing process, ramping capabilities, and operational reserves, particularly during peak load conditions and weather events, while also providing measurable frequency and voltage support to the grid.

13 HYDRO ENERGY↗

Adaptively Learned Modeling for a Digital Twin of Hydropower Turbines with Application to a Pilot Testing System

In the development of a digital twin (DT) for hydropower turbines, dynamic modeling of the system (e.g., penstock, turbine, speed control) is crucial, along with all the necessary data interface, virtualization, and dashboard designs. Since the DT must mimic the actual dynamics of the hydropower turbine accurately, adaptive learning is required to train these dynamic models online so that the models in the DT can effectively follow the representation of the actual hydropower turbine dynamics accurately and reliably. This study presents an adaptive learning method for obtaining the hydropower turbine models for DT development of hydropower systems using the recursive least squares algorithm. To simplify the formulation, the hydropower turbine under consideration was assumed to operate near a fixed operating point, where the system dynamics can be well represented by a set of linear differential equations with constant parameters. In this context, the well-known six-coefficient model for the Francis turbine was formulated as the starting point to obtain input and output models for the turbine. Then, an adaptive learning mechanism was developed to learn model parameters using real-time data from a hydropower turbine testing system. This led to semi-physical modeling, in which first principles and data-driven modeling are integrated to produce dynamic models for DT development. Applications to a pilot system at the Norwegian University of Science and Technology (NTNU) were made, and the models learned adaptively using the data collected from the university’s pilot system. Desired modeling and validation results were obtained.

13 HYDRO ENERGY↗

GPRA Representation of the Wind and Hydropower Technologies Program

The wind component of the Wind and Hydropower Program seeks to reduce the cost and improve the performance of wind generation. The GPRA benefits are based primarily on projecting the market share for wind technologies based on their economic characteristics. The hydropower program goal is to reduce the environmental impact of hydroelectric facilities. Because this program is driven more by environmental than economic concerns, a program office estimate for the market penetration is the primary source for the GPRA benefits estimate.

13 HYDRO ENERGY↗

Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques

Revenue estimation for integrated renewable energy and energy storage systems is important to support plant owners or operators’ decisions in battery sizing selection that leads to maximized financial performances. A common approach to optimizing revenues of a hybrid hydro and energy storage system is using mixed-integer linear programming (MILP). Although MILP models can provide accurate production cost estimations, they are typically very computationally expensive. To provide a fast yet accurate first-step information to hydropower plant owners or operators who consider integrating energy storage systems, we propose an innovative approach to predicting optimal revenues of an integrated energy generation and storage system. In this study, we examined the performance of two prediction techniques: Generalized Additive Models (GAMs) and machine learning (ML) models developed based on artificial neural networks (ANN). Predictive equations and models are generated based on optimized solutions from a market participation optimization model, the Conventional Hydropower Energy and Environmental Resource System (CHEERS) model. The two predicting techniques reduce the computational time to evaluate annual revenue for one set of battery configurations from 3 h to 1 to 4 min per run while also being implementable with significantly less data. The model validation prediction errors of developed GAMs and ML models are generally below 5%; for model testing predictions, the ML models consistently outperform the regression equations in terms of root mean square errors. This new approach allows plant owners, operators, or potential investors to quickly access multiple battery configurations under different energy generation and market scenarios. This new revenue prediction method will therefore help reduce the barriers, and thereby promoting the deployment of battery hybridization with existing renewable energy sources.

13 HYDRO ENERGY↗

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

NREL Helps Hydropower Projects Navigate Complex Regulatory Currents

Hydropower accounts for about 37% of U.S. renewable electricity generation. But before industry members can license and construct new projects or relicense existing projects, they must navigate complex approvals from federal, state, and tribal authorities. These regulations provide critical protections for water quality, species, cultural resources, and recreation, but they can also increase the costs, risks, and uncertainties to license or relicense projects.

HYDRO ENERGY↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Cost-Disruptive, Low Impact, Modular Form Factor Low-Head Hyropower System

Littoral Power Systems, Inc. (LPS) is writing a new story when it comes to turning the natural power of water into electricity. h-Modulor™ is a new way of designing and building hydropower plants that addresses the crucial issues of cost, environmental impact and regulatory time frames. For decades hydropower developers, owners and operators have struggled to build new or expanded facilities that didn’t cost so much, were friendlier to the environment and didn’t take so much time to license or build. The problem is particularly acute in smaller installations. The burdensome regulatory pathway for projects under 10MW in capacity have eased the licensing requirements for small hydro projects. But in small projects are still very hard, because capital costs are a much larger percentage of the generation revenues than they are in large facilities. There is an acute need for a cost effective solution. Understanding this need and opportunity, LPS conceived a new type of hydropower equipment – a kit of standard, pre-fabricated modular parts for dam safety, power generation, spill control and other hydropower facility functions to be used to build and operate a hydro plant at substantially lower costs than are currently achievable. This system of prefabricated parts also showed promise to reduce environmental impacts, reduce engineering time involved in the licensing process, and possibly provide a new way for regulators to think about licensing that could lead to reduced regulatory timeframes. Because of this invention’s compelling and intriguing promise the Department of Energy’s (DOE) Water Power Technology Office (WPTO) awarded funding to LPS through the Office of Energy Efficiency and Renewable Energy (EERE) to develop this new type of hydropower equipment to meet a levelized cost of energy (LCOE) goal and analyze it for dam safety. LPS teamed with professional engineers, PhDs, and geotechnical consultants from GZA GeoEnvironental, Inc. (GZA), Alden Research Laboratory (Alden), University of Massachusetts – Dartmouth (UMass-D), the National Renewable Energy Laboratory (NREL) and AECOM. In collaboration with the engineers and managers at the WPTO and EERE they matured the concepts through substantial design shifts. The project exceeded the original goals and delivered designs beyond the proof-of-concept stage backed up by thorough professional engineering analysis of stability, seepage, and structural integrity. A full-scale section with seals successfully retained water in full-head leakage tests. Construction plans and professional engineering cost estimates indicated an LCOE half of the original LCOE goal. A system of these modules is now on track to be used in a 4.5 MW commercial installation.

13 HYDRO ENERGY↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Fish Friendly Water Rules' Impact On the Power Grid with High VRE Levels

Columbia River basin multipurpose reservoirs are operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. When conventional thermal power plants are retired, hydropower flexibility balances the wind and solar variability of the power grid and provides grid services to maximize the high renewable power absorption. On the other hand, over-reliance on hydropower could harm the river basin fish habitat. For example, water release pulses during peak electricity demand hours and shorter-term water release variation could harm the fish population. Power grid planners, environmentalists, Columbia Basin tribes, hydro regulators, and water resource planners work together to understand the impacts of Columbia River basin operation in a fish-friendly way in the current power grid and power grid with higher renewable power share. We examine different levels of renewable share in the Western Interconnection to understand the multiple weather years and future climate projection and operating scenario impact on the power grid and water system. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

environmental↗