Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid connected”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Exploring Dynamic P-Q Capability and Abnormal Operations of Inverter-Based Resources

Nowadays, inverter-based resources are rapidly growing in electric power systems. On the other side, abnormal inverter operations are also occurring more often. Traditionally, inverter PQ capability charts are employed by electric utility companies to ensure safe and reliable operations of inverter-based resources. However, it is found in this paper that existing inverter PQ capability charts do not address the operating characteristics of an inverter correctly, which can result in irregular and unstable inverter operations. Here in this paper, a novel study is conducted to investigate inverter PQ capability charts, where constraints that are specific to an inverter are considered. It is found in this paper that the inverter PQ capability charts exhibit a unique dynamic nature under uncertain grid conditions. This dynamic nature has not been considered by the industry in managing, designing, and controlling an inverter as well as in developing international standards for inverter-based resources. Via both electromagnetic transient simulation and hardware experimental investigations, it is found that the dynamic PQ capability nature, together with the limitations of the existing control methods, are the underlying causes of many unusual inverter operations that have been reported in the literature.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Testbed and Experiments for Quantum-Conventional Networking

The realization of quantum networks requires the development of devices and methods unprecedented in conventional networks, and yet they critically depend on the latter for implementing foundational blocks and essential operations. We describe a testbed to support the development and testing of their functionality and performance by providing quantum and conventional data planes and devices, together with a secure conventional control plane. It incorporates a variety of entangled photon sources, qubit technologies, detector technologies, photonic components, and supporting conventional switches and workstations. It implements a novel fiber telescoping scheme that provides suites of connections using fiber spools and inground-aerial fiber loops. We briefly summarize a variety of experiments conducted over this testbed including: (i) flex-grid quantum connection experiments, (ii) quantum state and channel tomography, (iii) utilization of quantum key distribution keys to secure conventional encryption and firewall devices, (iv) comparative study of analytical capacity estimates and entanglement throughput, (v) deployed squeezing coexisting with conventional communications, and (iv) measurement of polarization time variation.

Rao, Nageswara [ORNL] (ORCID:0000000234085941)↗

Dynamic Optimal Dispatch of Energy Systems with Intermittent Renewables and Damage Model

With the increasing penetration of intermittent renewable energy sources into the grid, there is a growing need for process systems-based strategies that integrate dispatchable and variable energy systems for supplying the demand while maintaining grid reliability. The proposed framework corresponds to a dynamic mixed-integer linear programming optimization approach that integrates coal-fired and natural gas-fired power plants, NaS batteries for energy storage, and solar/wind energy to supply the demand. This optimization approach considers an economic goal and constraints to provide power balance while maintaining the overall damage of the natural gas combined cycle (NGCC) power plant drum under a maximum stress as well as avoiding the overheating of the NGCC superheater and reheater. Renewable curtailment levels are also retained at minimum levels. Case studies are analyzed considering different loads and renewable penetration levels. The results show that the demand was met for all cases. Grid flexibility was mostly provided by the NGCC, while the batteries were used sparingly. In addition, considering a CO 2 equivalent analysis, the environmental performance was intrinsically connected to grid flexibility and the level of renewable penetration. Stress analysis results reinforced the necessity for an equipment health-related constraint.

97 MATHEMATICS AND COMPUTING↗

Using a Grid-Forming Inverter to Stabilize a Low-Inertia Power System - Maui Hawaiian Island

As power systems around the world integrate greater amounts of wind and solar photovoltaic power, periods of very high instantaneous power shares of inverters, the primary interfacing technology for these generation sources, are complicating system stability and control. The contemporary, primary mode of inverter operation, grid-following, which explicitly assumes the presence of a local, stable voltage waveform, yields operational inadequacy at high instantaneous power shares potentially leading to instability due to the low-inertia conditions, as well as the correlated reduced voltage forming capacity on the respective system. Parallel connected grid-forming inverters, which directly regulate the local voltage, are a solution that is expected to bolster system stability and mitigate the shortcomings of the grid-following technology. In this paper, grid-following and two types of grid-forming inverter control, the traditional linear droop and the recently introduced nonlinear exponential droop (Droop-e), are simulated on a low-inertia, H = 0.48s, high inverter-based resource scenario, 97%, with a validated electromagentic transient domain model of the Hawaiian island of Maui power system. The benefit of a single grid-forming device over its grid-following counterpart is significant, both in terms frequency deviation and voltage stability. Further, the superiority of the Droop-e and the associated secondary power sharing control over both grid-following and linear droop grid-forming technologies is displayed, with improved nadir and rate of change of frequency over the linear droop control.

droop control↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scaling Demand Flexibility: Building on 30 Years of Energy Efficiency Success

With electricity consumption across the United States (US) and Canada anticipated to grow, energy efficiency program administrators have a key role to play in helping to ensure energy affordability and reliability in support of the broader economic systems utilities and grid support. Connected, demand side load balancing solutions, such as load shifting heating, ventilation and air conditioning (HVAC) systems and managed charging for electric vehicles (EVs), can dynamically manage energy, allowing for more volumetric electricity consumption without incurring the expense of upgraded transmission and distribution capabilities. When combined, or aggregated, many small loads can be managed to have meaningful impact on energy demand on the grid. Utilities and their partners have an opportunity to leverage decades of experience and the infrastructure needed to assess, design, implement, and measure programs to scale up the adoption of equipment with built-in load flexibility capabilities. Current efforts among a wide variety of electricity system service providers, utilities, standards agencies, regulators, national labs and private industry stakeholders aim to identify common standards, metrics, and methodologies for valuing grid services offered by demand side equipment. By combining those efforts with decades of proven energy efficiency resources, utilities are poised to effectuate a scaling up of equipment with energy management capabilities installed in homes and businesses across the US and Canada. This paper will provide an overview of how utilities are approaching this era of load growth and new peak demands across the United States and Canada. It will highlight the specific strategies that program administrators are employing to advance market transformation for grid-enabled products and devices that have the greatest potential to reduce energy use and increase load flexibility.

Grant, Peter↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Digital Twin of an ANPC inverter with integrated Design-For-Trust

Reducing costs and increasing manufacturing output while creating reliable products are three essential components needed to keep a business competitive. In the past, having an asset that could address these three challenges at the same time would be challenging. However, recent advances in computer processing capabilities coupled with increases to network speeds allowed such a system to become possible; and this is known as a Digital Twin (DT), which represents a virtual copy of a production system or a product. Here, this work exhibits a DT application of an Active Neutral Point Clamped (ANPC) inverter using a controller. The controller emulates the ANPC responses of a new Digital Signal Processing (DSP) firmware and validates this new firmware by using Design-For-Trust (DFTr) characteristics. If the new firmware is malicious, then it should be rejected, thus adding preemptive protection measures for inverter based distributed energy resources.

cybersecurity↗

Interleaved Cuk Converter Wave Energy System With Advanced Control and Grid Support Functions for Seamless Integration

This paper presents an innovative wave energy conversion system that integrates an interleaved Cuk converter with advanced nonlinear control for seamless grid integration. The system efficiently extracts power on the DC side using the interleaved Cuk converter, while an inverter manages power transfer to the grid or load on the AC side. A nonlinear control architecture, based on the Lyapunov energy function, ensures stable and optimal operation under varying wave conditions, effectively addressing the challenges of variability and unpredictability inherent in wave energy. The proposed system also incorporates features to enhance power quality and minimize losses, making it a robust solution for renewable energy integration. The system's effectiveness in harnessing wave energy and achieving smooth grid integration is validated through comprehensive computer simulations in MATLAB/Simulink, with case study results demonstrating its capabilities.

HYDRO ENERGY,TIDAL AND WAVE POWER↗

Hardware-in-the-Loop Testbed for Cyber-Physical Security of Photovoltaic Farms

In the last decades, modem grids with distributed energy resources, such as photovoltaic (PV) farms, are increasingly vulnerable to cyber-attacks that seriously affect the stability and performance of the power system. While cyber-physical security of smart grids is extensively studied, most of the existing work focuses on the grid level and neglects the modeling and features of device-level power electronics converters (PECs). Furthermore, establishing a high-fidelity simulation testbed that can simulate harmonic frequencies of the PV farm is in urgent need. In this paper, a high-fidelity and real-time hardware-in- the-loop testbed is built to simulate the harmonics of power electronics converters for cyber-physical security of PEC-enabled PV farms. Based on this testbed, the impact of typical cyber-attacks and physical faults on the PV converter can be analyzed, thus providing a foundation for cyber-attack detection, root cause diagnosis, and resilient control to mitigate the adverse effects of cyber-attacks.

14 SOLAR ENERGY↗

Bus Clustering for Distribution Grid Topology Identification

Recovering the distribution grid topology is essential to perform several distribution system operator functions. Many algorithms that address the topology recovery problem have already been proposed in the literature. Most are based on a priori information regarding which buses are fed by which substation; however, this information might not be available because frequent grid reconfigurations change the distribution grid portion connected to each substation. This paper addresses the problem of assigning every substation the set of buses that it is feeding, given field data. First, the aforementioned task is cast as a nonconvex optimization problem. Second, a relaxed version of the optimization problem is solved via the alternating direction method of multipliers. Finally, the performance of our approach is validated through numerical simulations of realistic scenarios using a standard IEEE benchmark feeder.

bus clustering↗

VDiSC: An Open Source Framework for Distributed Smart City Vision and Biometric Surveillance Networks

Recent global growth in the interest of smart cities has led to trillions of dollars of investment toward research and development. These connected cities have the potential to create a symbiosis of technology and society and revolutionize the cost of living, safety, ecological sustainability, and quality of life of societies on a world-wide scale. Some key components of the smart city construct are connected smart grids, self-driving cars, federated learning systems, smart utilities, large-scale public transit, and proactive surveillance systems. While exciting in prospect, these technologies and their subsequent integration cannot be attempted without addressing the potential societal impacts of such a high degree of automation and data sharing. Additionally, the feasibility of coordinating so many disparate tasks will require a fast, extensible, unifying framework. To that end, we propose the Distributed Smart City framework for Vision, or VDiSC. VDiSC serves as a unified biometric API harness that allows for seamless evaluation, deployment, and simple pipeline creation for heterogeneous biometric software. VDiSC additionally provides a fully declarative capability for defining and coordinating custom machine learning and sensor pipelines, allowing the distribution of processes across otherwise incompatible hardware and networks. VDiSC ultimately provides a way to quickly configure, hot-swap, and expand large coordinated or federated systems online without interruptions for maintenance. Because much of the data collected in a smart city contains Personally Identifying Information (PII), VDiSC also provides built-in tools and layers to ensure secure and encrypted streaming, storage, and access of PII data across distributed systems.

Brogan, Joel↗