Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “future accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): A Sub-Basin Framework for Future CO 2 Infrastructure Development (Task 4.1.a)

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARB-USA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made since 2003 by the Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The SECARB-USA regional initiative encompasses the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia as noted in Figure 1.1. The primary objective of the project is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) technologies.

42 ENGINEERING↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Optimization of transformer ratio and beam loading in a plasma wakefield accelerator with a structure-exploiting algorithm

Plasma-based acceleration has emerged as a promising candidate as an accelerator technology for a future linear collider or a next-generation light source. We consider the plasma wakefield accelerator (PWFA) concept where a plasma wave wake is excited by a particle beam and a trailing beam surfs on the wake. For a linear collider, the energy transfer efficiency from the drive beam to the wake and from the wake to the trailing beam must be large, while the emittance and energy spread of the trailing bunch must be preserved. One way to simultaneously achieve this when accelerating electrons is to use longitudinally shaped bunches and nonlinear wakes. In the linear regime, there is an analytical formalism to obtain the optimal shapes. In the nonlinear regime, however, the optimal shape of the driver to maximize the energy transfer efficiency cannot be precisely obtained because currently no theory describes the wake structure and excitation process for all degrees of nonlinearity. In addition, the ion channel radius is not well defined at the front of the wake where the plasma electrons are not fully blown out by the drive beam. We present results using a novel optimization method to effectively determine a current profile for the drive and trailing beam in PWFA that provides low energy spread, low emittance, and high acceleration efficiency. We parameterize the longitudinal beam current profile as a piecewise-linear function and define optimization objectives. For the trailing beam, the algorithm converges quickly to a nearly inverse trapezoidal trailing beam current profile similar to that predicted by the ultrarelativistic limit of the nonlinear wakefield theory. For the drive beam, the beam profile found by the optimization in the nonlinear regime that maximizes the transformer ratio also resembles that predicted by linear theory. Furthermore, the current profiles found from the optimization method provide higher transformer ratios compared with the linear ramp predicted by the relativistic limit of the nonlinear theory.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

Analysis of Nb$_3$Sn Accelerator Magnet Training

Nb 3 Sn accelerator magnet technology has made significant progress during the past decades. For the first time, it is planned to be used in a real accelerator. A relatively small number of Nb 3 Sn quadrupoles and dipoles will be installed in the LHC to increase machine luminosity. Although it will prove the possibility of using Nb 3 Sn magnets in real machines, many questions of scaling this technology up remain. One of them is related to slow training of Nb 3 Sn magnets compared to the traditional Nb-Ti accelerator magnets. Since the goal is to operate thousands of Nb 3 Sn magnets in a future post-LHC accelerator, the slow training will affect both the practical design margin and the nominal operation field. Consequently, the cost of the project to reach the design field level is also increased. Furthermore, to improve our understanding of slow magnet training the existing Fermilab data from Nb 3 Sn magnet tests were re-analyzed. A summary of coil training features and correlations with fabrication parameters observed is presented in this paper.

43 PARTICLE ACCELERATORS↗

Modernizing to an AI-Ready Control System

The Accelerator Controls Operations Research Network (ACORN) project will modernize the accelerator control system and upgrade power supplies to enable future operations of the Fermilab Accelerator Complex with megawatt proton beams. By focusing on MLOps, ACORN enables full integration of AI into the control system to allow safe and reliable improvements to accelerator beam operations.

43 PARTICLE ACCELERATORS↗

PIP-II Particle Accelerator

Fermilab’s Proton Improvement Plan II will power the long-term future of the U.S. accelerator-based particle physics program and enable the world’s most powerful high-energy neutrino beamfor the international Deep Underground Neutrino Experiment.

43 PARTICLE ACCELERATORS↗

PIP-II Particle Accelerator

Fermilab’s Proton Improvement Plan II will power the long-term future of the U.S. accelerator-based particle physics program and enable the world’s most powerful high-energy neutrino beam for the international Deep Underground Neutrino Experiment.

43 PARTICLE ACCELERATORS↗

Evaluation of Data Lake Design for the Accelerator Control System

In this modern world, the user expects faster processing and real-time response to operate accelerator control devices. The existing framework with its infrastructure does not have the ability to satisfy these future needs. Therefore, modernization is required to reach industry standards and develop a modular framework that can provide flexibility and dynamic scalability. The data lake architecture, comprising three layers, ingestion, processing, and data consumption, provides flexibility and scalability to meet current and future demands for the accelerator control system.

Jaikar, Amol [Fermilab]↗

How will PIP-II take Fermilab to the next level?

The PIP-II project (http://pip2.fnal.gov) is an upgrade of Fermilab’s particle accelerator complex and includes the construction of a 215-meter-long linear particle accelerator. PIP-II will become the new heart of the Fermilab accelerator complex. Its high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program. The upgrade will enable Fermilab’s accelerator complex to create the world’s most intense high-energy neutrino beams, which will power the Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). http://www.fnal.gov/dune Want to learn more? Fermilab’s Dr. Don Lincoln tells you all about it.

43 PARTICLE ACCELERATORS↗

PIP-II: the new heart of Fermilab

The PIP-II project http://pip2.fnal.gov is an essential upgrade of Fermilab’s particle accelerator complex and includes the construction of a 215-meter-long linear particle accelerator. It is the first U.S. particle accelerator project with significant contributions from international partners. Research institutions in France, India, Italy and the UK will build major components of the new particle accelerator. PIP-II will become the new heart of the Fermilab accelerator complex. Its high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program. The upgrade will enable Fermilab’s accelerator complex to generate an unprecedented stream of neutrinos—subtle, subatomic particles that could hold the key to understanding the universe’s evolution—by creating the world’s most intense high-energy neutrino beams. This capability positions Fermilab to be the world leader in accelerator-based neutrino research. It enables the scientific program for the international, Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). http://www.fnal.gov/dune

43 PARTICLE ACCELERATORS↗

Accelerator challenges in the Fermilab Neutrino Program

In Fermilab's 2022-2023 proton complex run, Fermilab recovered from an unexpected failure in the neutrino focusing horn to achieve a record beam power of 960 kW. For Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, is the ACE Main Injector Ramp and Targetry upgrade, would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, the ACE Booster Replacement, would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The core accelerator challenges, present and future, for operating intense neutrino beams at Fermilab will be highlighted.

43 PARTICLE ACCELERATORS↗

Perspectives on Emerging/Novel Computing Paradigms and Future Aerospace Workforce Environments

The accelerating pace of the computing technology development shows no signs of abating. Computing power reaching 100 Tflop/s is likely to be reached by 2004 and Pflop/s (10(exp 15) Flop/s) by 2007. The fundamental physical limits of computation, including information storage limits, communication limits and computation rate limits will likely be reached by the middle of the present millennium. To overcome these limits, novel technologies and new computing paradigms will be developed. An attempt is made in this overview to put the diverse activities related to new computing-paradigms in perspective and to set the stage for the succeeding presentations. The presentation is divided into five parts. In the first part, a brief historical account is given of development of computer and networking technologies. The second part provides brief overviews of the three emerging computing paradigms grid, ubiquitous and autonomic computing. The third part lists future computing alternatives and the characteristics of future computing environment. The fourth part describes future aerospace workforce research, learning and design environments. The fifth part lists the objectives of the workshop and some of the sources of information on future computing paradigms.

Noor, Ahmed K.↗

Accelerator Physics Center at Fermilab : History and Accomplishments (2007-2018)

Fermilab’s Accelerator Physics Center (APC) was created in June 2007 with mission to carry out research and development to keep the US leading high-energy physics laboratory at the forefront of accelerator science, technology and facility operation. In support of the FNAL high-energy physics research mission, APC scientists and enginners conducted accelerator R&D aimed at next-generation and beyond accelerator facilities; provided accelerator physics support for existing operational programs and the evolution thereof; trained accelerator scientists and engineer and established experimental programs for a broad range of accelerator R&D that can be accessed by both Fermilab staff and the US and world HEP community. APC was a center-place for in-depth design, research and development efforts which allowed the Laboratory to make intelligent decisions on the ILC in the US, on the Muon Collider, as well as originate projects like PIP-II (through the Proton Driver/Project-X work), LHC-AUP (via LARP) and the IOTA/FAST R&D facility. APC was also the birthplace and host of many national and international collaborations and several educational/training programs in beam physics resulted in 27 PhD theses. In the Fall 2018, following an important milestone of the first beam circulating in the IOTA ring, the APC was re-organized into several departments in Accelerator Division, charged to carry out the accelerator physics research with IOTA/FAST beams and making it relevant for future upgrades of the Fermilab accelerator complex.

43 PARTICLE ACCELERATORS↗

JLab E12-14-012 (e,e'p) cross section measurements for Ar and Ti

One of the limitations of accelerator based neutrino oscillation experiments including the Deep Underground Neutrino Experiment (DUNE), is the lack of understanding on how neutrino interact in matter. As an indispensable part of the neutrino physics future, DUNE is an accelerator based experiment that will use Argon as the neutrino target. Argon is a complicated target and a well defined theoretical model for neutrino interaction on Argon is needed. Thus, the JLab E12-14-012 experiment was performed in Hall A at Jefferson Lab in Newport, News, VA to help develop a neutrino-nucleus model for Argon. Data was collected on five targets (Argon, titanium, carbon, dummy and optical) for five different kinematic set-ups. The primary goal of this experiment is to measure the spectral functions of Argon and Titanium through (e,e?p) reactions. This thesis will present an overview of the experimental setup and results from the data analysis

Gu, Linjie↗

High-Entropy Alloy R&D for Accelerator Beam Window Applications

High-Entropy Alloys are a class of novel material that can offer improved resistance to beam-induced radiation damage and thermal shock. Development of these new alloys to serve as beam windows in multi-megawatt accelerator target applications is ongoing at Fermilab. Currently we are investigating AlCoCrMnTiV alloy systems of 4-6 components for service as beam windows; these compositions are predicted by CALPHAD simulation to have a low density and single-phase BCC crystal structure. The microstructures of these systems are being studied by electron microscopy techniques such as energy dispersive X-ray spectroscopy (EDS) to determine elemental homogeneity and composition, electron backscatter diffraction (EBSD) to quantify grain structure and orientation, and transmission electron microscopy (TEM) to observe defect structures and precipitate formation; nanoindentation is used to probe microstructural mechanical properties. Initial bulk property characterization utilizes differential scanning calorimetry to quantify specific heat capacity (cp), dilatometry to determine the coefficient of thermal expansion (CTE), and time-domain thermoreflectance (TDTR) to measure thermal conductivity (K). A miniature tensile testing apparatus is also being developed to test tensile properties. Post-irradiation examination is currently ongoing for several of these compositions that have been irradiated by low-energy ions to damage levels and at a temperature relevant to beam window applications at future next-generation accelerator facilities. This talk will briefly describe the alloy design and synthesis before going into more depth covering microstructural pre-characterization, and post-irradiation examination results from low-energy ion irradiated specimens. This will be followed by the plans for alloy down selection and future prototypic proton irradiations.

43 PARTICLE ACCELERATORS↗

Lamp reliability studies for improved satellite rubidium frequency standard

In response to the premature failure of Rb lamps used in Rb atomic clocks onboard NAVSTAR GPS satellites experimental and theoretical investigations into their failure mechanism were initiated. The primary goal of these studies is the development of an accelerated life test for future GPS lamps. The primary failure mechanism was identified as consumption of the lamp's Rb charge via direct interaction between Rb and the lamp's glass surface. The most effective parameters to accelerate the interaction between the Rb and the glass are felt to be RF excitation power and lamp temperature. Differential scanning calorimetry is used to monitor the consumption of Rb within a lamp as a function of operation time. This technique yielded base line Rb consumption data for GPS lamps operating under normal conditions.

Frueholz, R. P.↗