Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “function as a service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Low cost Ku-band earth terminals for voice/data/facsimile

A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.

Kelley, R. L.↗

Transportation and electricity systems integration via electric vehicle charging-as-a-service: A review of techno-economic and societal benefits

Here, in support of global decarbonization efforts, the adoption of electric vehicles is proceeding rapidly across transportation sectors, population groups, and regions. However, access to electric vehicle charging infrastructure remains sparse and inequitable, and technical, economic, and procedural challenges have encumbered its expansion. Charging-as-a-service, which can mitigate cost and effort risks of charging equipment ownership, adds a means of meeting many of these challenges. As charging-as-a-service has not been analyzed or addressed in the scholarly literature, we synthesize media, marketing, and analogous scholarly publications to categorize and describe the functions asserted by existing charging-as-a-service vendors. We demonstrate and quantify the benefits of many of these functions via four example business cases, sited at a detached residence, a multi-unit dwelling, a consumer-facing business, and a commercial fleet depot. Outcomes show that savings and revenues realized via charging-as-a-service can reduce charging costs, beneficially shape grid loads, and make charging installation economical where it otherwise would not be. Discussion highlights the need to deploy charging-as-a-service in cooperation with initiatives promoting societal benefits, including charging access equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wireless Avionics Packet to Support Fault Tolerance for Flight Applications

In this protocol and packet format, data traffic is monitored by all network interfaces to determine the health of transmitter and subsystems. When failures are detected, the network inter face applies its recover y policies to provide continued service despite the presence of faults. The protocol, packet format, and inter face are independent of the data link technology used. The current demonstration system supports both commercial off-the-shelf wireless connections and wired Ethernet connections. Other technologies such as 1553 or serial data links can be used for the network backbone. The Wireless Avionics packet is divided into three parts: a header, a data payload, and a checksum. The header has the following components: magic number, version, quality of service, time to live, sending transceiver, function code, payload length, source Application Data Interface (ADI) address, destination ADI address, sending node address, target node address, and a sequence number. The magic number is used to identify WAV packets, and allows the packet format to be updated in the future. The quality of service field allows routing decisions to be made based on this value and can be used to route critical management data over a dedicated channel. The time to live value is used to discard misrouted packets while the source transceiver is updated at each hop. This information is used to monitor the health of each transceiver in the network. To identify the packet type, the function code is used. Besides having a regular data packet, the system supports diagnostic packets for fault detection and isolation. The payload length specifies the number of data bytes in the payload, and this supports variable-length packets in the network. The source ADI is the address of the originating interface. This can be used by the destination application to identify the originating source of the packet where the address consists of a subnet, subsystem class within the subnet, a subsystem unit, and the local ADI number. The destination ADI is used to route the packet to its ultimate destination. At each hop, the sending interface uses the destination address to determine the next node for the data. The sending node is the node address of the interface that is broadcasting the packet. This field is used to determine the health of the subsystem that is sending the packet. In the case of a packet that traverses several intermediate nodes, it may be the node address of the intermediate node. The target node is the node address of the next hop for the packet. It may be an intermediate node, or the final destination for the packet. The sequence number is used to identify duplicate packets. Because each interface has multiple transceivers, the same packet will appear at both receivers. The sequence number allows the interface to correlate the reception and forward a single, unique packet for additional processing. The subnet field allows data traffic to be partitioned into segregated local networks to support large networks while keeping each subnet at a manageable size. This also keeps the routing table small enough so routing can be done by a simple table lookup in an FPGA device. The subsystem class identifies members of a set of redundant subsystems, and, in a hot standby configuration, all members of the subsystem class will receive the data packets. Only the active subsystem will generate data traffic. Specific units in a class of redundant units can be identified and, if the hot standby configuration is not used, packets will be directed to a specific subsystem unit.

Block, Gary L.↗

Functional Allocation Approach for Separation Assurance for Remotely Piloted Aircraft

A functional analysis framework is employed with the objective of exploring the separation assurance function for the remotely piloted aircraft system. The architecture of the remotely piloted aircraft system—highlighting several of the component systems and the functions resident onboard the remotely piloted aircraft and in the ground control station—is described to provide the context for understanding the complexity of the said system for a detailed functional analysis. The interactions between the agents of the separation assurance function belonging to the air traffic service provider, remotely piloted aircraft system operator and remotely piloted aircraft are described. Separation assurance by air traffic control, remain well clear by the remotely piloted aircraft system and collision avoidance onboard the remotely piloted aircraft are briefly discussed. The functional analysis framework is illustrated by relating the agents to the actions of (a) acquiring the surveillance information, (b) checking for conflicts, (c) creating the solutions for resolving conflicts and (d) implementing the conflict resolution solutions. This example is offered as a template by which a more detailed functional analysis of this and other functions could be developed. The architecture of the remotely piloted aircraft system is described to aid this process.

functional analysis↗

Functional Allocation Approach for Separation Assurance for Remotely Piloted Aircraft

A functional analysis framework is employed with the objective of exploring the separation assurance function for the remotely piloted aircraft system. The architecture of the remotely piloted aircraft system—highlighting several of the component systems and the functions resident onboard the remotely piloted aircraft and in the ground control station—is described to provide the context for understanding the complexity of the said system for a detailed functional analysis. The interactions between the agents of the separation assurance function belonging to the air traffic service provider, remotely piloted aircraft system operator and remotely piloted aircraft are described. Separation assurance by air traffic control, remain well clear by the remotely piloted aircraft system and collision avoidance onboard the remotely piloted aircraft are briefly discussed. The functional analysis framework is illustrated by relating the agents to the actions of (a) acquiring the surveillance information, (b) checking for conflicts, (c) creating the solutions for resolving conflicts and (d) implementing the conflict resolution solutions. This example is offered as a template by which a more detailed functional analysis of this and other functions could be developed. The architecture of the remotely piloted aircraft system is described to aid this process.

Functional analysis↗

Modeling the Functional Forms of Grid Disturbances

This report introduces a functional form that may be used to quantitatively predict the impacts of new grid tools and changing system qualities on the likelihoods, durations, and depths of various grid disturbances. Each disturbance scenario is modeled to have three component stages—avoidance, reactance and recovery, which together parametrically estimate one disturbance’s impacts. The modeled scenario is then placed and replicated within an analysis period to represent the likelihood or frequency of the scenario and its consequent impacts. Whereas analysts have struggled to define and apply metrics for grid resilience, the functional form introduced by this report shares units of measurement with accepted grid-status measures (e.g., numbers of customers currently experiencing a service outage). Furthermore, the integrated and averaged functional form over an analysis period provides a meaningful normalized performance metric (e.g., customer outage minutes per year) that is ultimately independent of the duration of the period of. The approach may be applied similarly regardless of the severity or frequency of the disturbances that are being analyzed. Because metrics can be chosen to be identical in both the hypothetical future and the actual historical past, the historical past eventually becomes the test of the future predictions, at least in a statistical sense. The authors originally developed this approach to facilitate analysis of the effects of transactive energy (TE) systems effects on electric power grid resilience. TE systems invite energy suppliers and consumers to actively collaborate toward the discovery of, and their responses to, the locational value of energy. The findings from this process are often embodied as energy prices, the dynamics of which indicate the locational value of energy and can further represent important grid service needs. While some academic papers claim to quantify the value of a specific TE system design toward grid resilience, the answer, in general, has been elusive. Not only do multiple and conflicting definitions of resilience and reliability exist, but countless TE systems are being invented. We conclude the following: (1) The ideal analysis should harmonize rather than differentiate resilience and reliability. Therefore, this report uses the more general term disturbance whenever the overloaded terms resilience and reliability can be avoided. (2) The effectiveness of TE systems must be mapped to underlying qualities of a TE system, thereby avoiding presumptions that every TE design offers similar advantages. The authors seek to evaluate the parametric effects of TE system qualities (e.g., spatial granularity, granularity of time steps, length of future prediction horizon) on avoiding, reacting to, and recovering from grid disturbances. Furthermore, any advantages (or disadvantages) must be fairly compared with the many alternative tools, systems, and strategies that might offer comparable benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗

Asynchronous Message Service Reference Implementation

This software provides a library of middleware functions with a simple application programming interface, enabling implementation of distributed applications in conformance with the CCSDS AMS (Consultative Committee for Space Data Systems Asynchronous Message Service) specification. The AMS service, and its protocols, implement an architectural concept under which the modules of mission systems may be designed as if they were to operate in isolation, each one producing and consuming mission information without explicit awareness of which other modules are currently operating. Communication relationships among such modules are self-configuring; this tends to minimize complexity in the development and operations of modular data systems. A system built on this model is a society of generally autonomous, inter-operating modules that may fluctuate freely over time in response to changing mission objectives, modules functional upgrades, and recovery from individual module failure. The purpose of AMS, then, is to reduce mission cost and risk by providing standard, reusable infrastructure for the exchange of information among data system modules in a manner that is simple to use, highly automated, flexible, robust, scalable, and efficient. The implementation is designed to spawn multiple threads of AMS functionality under the control of an AMS application program. These threads enable all members of an AMS-based, distributed application to discover one another in real time, subscribe to messages on specific topics, and to publish messages on specific topics. The query/reply (client/server) communication model is also supported. Message exchange is optionally subject to encryption (to support confidentiality) and authorization. Fault tolerance measures in the discovery protocol minimize the likelihood of overall application failure due to any single operational error anywhere in the system. The multi-threaded design simplifies processing while enabling application nodes to operate at high speeds; linked lists protected by mutex semaphores and condition variables are used for efficient, inter-thread communication. Applications may use a variety of transport protocols underlying AMS itself, including TCP (Transmission Control Protocol), UDP (User Datagram Protocol), and message queues.

Burleigh, Scott C.↗

Ground Simulation of an Autonomous Satellite Rendezvous and Tracking System Using Dual Robotic Systems

A hardware-in-the-loop ground system was developed for simulating a robotic servicer spacecraft tracking a target satellite at short range. A relative navigation sensor package "Argon" is mounted on the end-effector of a Fanuc 430 manipulator, which functions as the base platform of the robotic spacecraft servicer. Machine vision algorithms estimate the pose of the target spacecraft, mounted on a Rotopod R-2000 platform, relay the solution to a simulation of the servicer spacecraft running in "Freespace", which performs guidance, navigation and control functions, integrates dynamics, and issues motion commands to a Fanuc platform controller so that it tracks the simulated servicer spacecraft. Results will be reviewed for several satellite motion scenarios at different ranges. Key words: robotics, satellite, servicing, guidance, navigation, tracking, control, docking.

Trube, Matthew J.↗

Service Life Extension of the ISS Propulsion System Elements

The International Space Station (ISS) is a result of international collaboration in building a sophisticated laboratory of an unprecedented scale in Low Earth Orbit. After a complex assembly sequence spanning over a decade, some of the early modules launched at the beginning of the program would reach the end of their certified lives, while the newer modules were just being commissioned into operation. To maximize the return on global investments in this one-of-a-kind orbiting platform that was initially conceived for a service life until 2016, it is essential for the cutting edge research on ISS to continue as long as the station can be sustained safely in orbit. ISS Program is assessing individual modules in detail to extend the service life of the ISS to 2024, and possibly to 2028. Without life extension, Functional Cargo Block (known by its Russian acronym as FGB) and the Service Module (SM), two of the early modules on the Russian Segment, would reach the end of their certified lives in 2013 and 2015 respectively. Both FGB and SM are critical for the propulsive function of the ISS. This paper describes the approach used for the service life extension of the FGB propulsion system. Also presented is an overview of the system description along with the process adopted for developing the life test plans based on considerations of system failure modes, fault tolerance and safety provisions. Tests and analyses performed, important findings and life estimates are summarized. Based on the life extension data, FGB propulsion system, in general, is considered ready for a service life until 2028.

Kamath, Ulhas↗

An Approach for the Assessment of System Upset Resilience

This report describes an approach for the assessment of upset resilience that is applicable to systems in general, including safety-critical, real-time systems. For this work, resilience is defined as the ability to preserve and restore service availability and integrity under stated conditions of configuration, functional inputs and environmental conditions. To enable a quantitative approach, we define novel system service degradation metrics and propose a new mathematical definition of resilience. These behavioral-level metrics are based on the fundamental service classification criteria of correctness, detectability, symmetry and persistence. This approach consists of a Monte-Carlo-based stimulus injection experiment, on a physical implementation or an error-propagation model of a system, to generate a system response set that can be characterized in terms of dimensional error metrics and integrated to form an overall measure of resilience. We expect this approach to be helpful in gaining insight into the error containment and repair capabilities of systems for a wide range of conditions.

Torres-Pomales, Wilfredo↗

Space Shuttle RTOS Bayesian Network

With shrinking budgets and the requirements to increase reliability and operational life of the existing orbiter fleet, NASA has proposed various upgrades for the Space Shuttle that are consistent with national space policy. The cockpit avionics upgrade (CAU), a high priority item, has been selected as the next major upgrade. The primary functions of cockpit avionics include flight control, guidance and navigation, communication, and orbiter landing support. Secondary functions include the provision of operational services for non-avionics systems such as data handling for the payloads and caution and warning alerts to the crew. Recently, a process to selection the optimal commercial-off-the-shelf (COTS) real-time operating system (RTOS) for the CAU was conducted by United Space Alliance (USA) Corporation, which is a joint venture between Boeing and Lockheed Martin, the prime contractor for space shuttle operations. In order to independently assess the RTOS selection, NASA has used the Bayesian network-based scoring methodology described in this paper. Our two-stage methodology addresses the issue of RTOS acceptability by incorporating functional, performance and non-functional software measures related to reliability, interoperability, certifiability, efficiency, correctness, business, legal, product history, cost and life cycle. The first stage of the methodology involves obtaining scores for the various measures using a Bayesian network. The Bayesian network incorporates the causal relationships between the various and often competing measures of interest while also assisting the inherently complex decision analysis process with its ability to reason under uncertainty. The structure and selection of prior probabilities for the network is extracted from experts in the field of real-time operating systems. Scores for the various measures are computed using Bayesian probability. In the second stage, multi-criteria trade-off analyses are performed between the scores. Using a prioritization of measures from the decision-maker, trade-offs between the scores are used to rank order the available set of RTOS candidates.

Morris, A. Terry↗

Satellite ATM Networks: Architectures and Guidelines Developed

An important element of satellite-supported asynchronous transfer mode (ATM) networking will involve support for the routing and rerouting of active connections. Work published under the auspices of the Telecommunications Industry Association (http://www.tiaonline.org), describes basic architectures and routing protocol issues for satellite ATM (SATATM) networks. The architectures and issues identified will serve as a basis for further development of technical specifications for these SATATM networks. Three ATM network architectures for bent pipe satellites and three ATM network architectures for satellites with onboard ATM switches were developed. The architectures differ from one another in terms of required level of mobility, supported data rates, supported terrestrial interfaces, and onboard processing and switching requirements. The documentation addresses low-, middle-, and geosynchronous-Earth-orbit satellite configurations. The satellite environment may require real-time routing to support the mobility of end devices and nodes of the ATM network itself. This requires the network to be able to reroute active circuits in real time. In addition to supporting mobility, rerouting can also be used to (1) optimize network routing, (2) respond to changing quality-of-service requirements, and (3) provide a fault tolerance mechanism. Traffic management and control functions are necessary in ATM to ensure that the quality-of-service requirements associated with each connection are not violated and also to provide flow and congestion control functions. Functions related to traffic management were identified and described. Most of these traffic management functions will be supported by on-ground ATM switches, but in a hybrid terrestrial-satellite ATM network, some of the traffic management functions may have to be supported by the onboard satellite ATM switch. Future work is planned to examine the tradeoffs of placing traffic management functions onboard a satellite as opposed to implementing those functions at the Earth station components.

vonDeak, Thomas C.↗

Space Station data management system architecture

Within the Space Station program, the Data Management System (DMS) functions in a dual role. First, it provides the hardware resources and software services which support the data processing, data communications, and data storage functions of the onboard subsystems and payloads. Second, it functions as an integrating entity which provides a common operating environment and human-machine interface for the operation and control of the orbiting Space Station systems and payloads by both the crew and the ground operators. This paper discusses the evolution and derivation of the requirements and issues which have had significant effect on the design of the Space Station DMS, describes the DMS components and services which support system and payload operations, and presents the current architectural view of the system as it exists in October 1986; one-and-a-half years into the Space Station Phase B Definition and Preliminary Design Study.

Mallary, William E.↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design, Processing, and Properties of WTaCrV-Hf Multi-principal Element Alloys

Refractory multi-principal element alloys are candidates for high-temperature structural components due, in part, to their high strength and high melting points. Single-phase materials are initially preferred for isotropic material properties as a function of time and temperature in service conditions. This work outlines a computational rank-ordering and experimental validation methodology for single-phase body-centered-cubic phase stability in WTaCrV-Hf alloys using order–disorder transition temperature. Eight compositions were fabricated by arc-melting and heat-treated at 1400 °C for 24 hrs. X-ray diffraction, energy-dispersive x-ray spectroscopy, and Vickers hardness testing showed alloys with order–disorder transition temperatures below 600 °C formed a single-phase body-centered-cubic structure during solidification and remained single-phase after heat-treatment. The sample possessing the lowest order–disorder transition temperature exhibited slip traces suggestive of room-temperature plastic deformation under Vickers indentation, with both heat-treated single-phase samples exhibiting hardnesses over 800 HV with little cracking compared to tungsten. These results establish order–disorder transition temperature as a viable predictive parameter for multi-principal element alloy phase stability. The methodology outlined in this work provides a framework for future design, fabrication, and characterization of high-temperature structural multi-principal element alloys.

CALPHAD↗

Design and optimization of a modular hydrogen-based integrated energy system to maximize revenue via nuclear-renewable sources

Here, this paper demonstrates a novel modular distributed framework that uses optimal energy-dispatching strategies to enable greater flexibility and profitability in nuclear-renewable integrated energy systems (NR-IES). Hydrogen is used as a commodity in this framework since its production can improve grid stability and system operational flexibility, decarbonize heavy industry, and create an additional revenue stream for electricity generators, particularly nuclear power plants with high operational expenses. The proposed solution addresses the challenges associated with merging multiple software and services from various domains by using functional mock-up units (FMU) to co-simulate diverse subsystems designed in various platforms. The tightly coupled integrated energy system (IES) is optimized to maximize revenue by utilizing the deep reinforcement learning (DRL) technique to make smart dispatching decisions based on variable electricity prices and the availability of renewable energy. Proximal policy optimization (PPO) algorithm is used in training and testing the DRL agent. Over a period of 120 days, the proposed hydrogen-based IES framework showed about 10% revenue boost compared to a non-hydrogen generating baseline IES while also providing an easily-adoptable framework which can help to improve the flexibility of future generation nuclear power plants.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗