Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

NASA HAT Lab Activities

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N). This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT). This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust).

multi-vehicle control↗

m:N Working Group

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N). This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT). This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the background and progress of the m:N working group.

multi-vehicle control↗

Future Operations

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N). This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT). This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the future of GCS control stations and need for Human Systems Integration.

multi-vehicle control↗

m:N Operations and Future

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N).This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT).This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the barriers and requirements for future m:N operations.

multi-vehicle control↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

Future long duration exploration missions (LDEMs) bring new challenges to astronaut crews in deep space, one of which is increased communication latencies with ground stations. As a result, crews will have to behave more autonomously by self-scheduling their own operational timelines in an efficient and effective manner. To support crew autonomy, our team has spent the last few years developing Playbook, a mission planning and scheduling tool. Our research focuses on investigating scheduling performance using Playbook to inform the deployment of novel aids that streamline the timeline creation process and proposing relevant standards and guidelines for autonomous crews in LDEMs. Summarizing yearly progress of research analysis and experiment in HERA.

user experience↗

Human Mars Surface Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B. Chappell↗

Human Mars Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B Chappell↗

Space Communications and Navigation (SCaN) Integrated Network Architecture Definition Document (ADD): Executive Summary - Volume 1

The SCaN Program has defined an integrated network architecture that fully meets the Administrator s mandate to the Program, and will result in a NASA infrastructure capable of providing the needed and enabling communications services to future space missions. The integrated network architecture will increase SCaN operational efficiency and interoperability through standardization, commonality and technology infusion. It will enable NASA missions requiring advanced communication and tracking capabilities such as: a. Optical communication b. Antenna arraying c. Lunar and Mars Relays d. Integrated network management (service management and network control) and integrated service execution e. Enhanced tracking for navigation f. Space internetworking with DTN and IP g. End-to-end security h. Enhanced security services Moreover, the SCaN Program has created an Integrated Network Roadmap that depicts an orchestrated and coherent evolution path toward the target architecture, encompassing all aspects that concern network assets (i.e., operations and maintenance, sustaining engineering, upgrade efforts, and major development). This roadmap identifies major NASA ADPs, and shows dependencies and drivers among the various planned undertakings and timelines. The roadmap is scalable to accommodate timely adjustments in response to Agency needs, goals, objectives and funding. Future challenges to implementing this architecture include balancing user mission needs, technology development, and the availability of funding within NASA s priorities. Strategies for addressing these challenges are to: define a flexible architecture, update the architecture periodically, use ADPs to evaluate options and determine when to make decisions, and to engage the stakeholders in these evaluations. In addition, the SCaN Program will evaluate and respond to mission need dates for technical and operational capabilities to be provided by the SCaN integrated network. In that regard, the architecture defined in this ADD is scalable to accommodate programmatic and technical changes.

Younes, Badri A.↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

Creating Fantastic PI Workshops

The goal of this SAND report is to provide guidance for other groups hosting workshops and peerto-peer learning events at Sandia. Thus this SAND report provides detail about our team structure, how we brainstormed workshop topics and developed the workshop structure. A Workshop “Nuts and Bolts” section provides our timeline and check-list for workshop activities. The survey section provides examples of the questions we asked and how we adapted the workshop in response to the feedback.

Biedermann, Laura B.↗

Hydropower Geotechnical Foundations: Executive Summary on Current Practice and Innovation Opportunities for Low-Head Applications

The following content provides a companion executive summary of Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications (DeNeale et al. 2020), a technical report developed by Oak Ridge National Laboratory (ORNL) and Knight Piésold Consulting, with funding from the US Department of Energy (DOE) Water Power Technologies Office (WPTO). This executive summary provides a brief synopsis of the broader information contained in the technical report. This study (and the associated technical report): (1) covers background information on hydropower; (2) describes various characteristics relevant to hydropower foundations for undeveloped US streams; (3) presents the current state of practice in foundation development; (4) provides a representative assessment of conventional hydropower foundation costs and timelines; (5) addresses key challenges facing conventional hydropower foundations; and (6) presents opportunity areas and examples for innovative hydropower foundation technologies while highlighting some advances in non-hydropower industries.

13 HYDRO ENERGY↗

Nuclear fuel irradiation testbed for nuclear security applications

The nuclear security community has long been interested in the identification and quantification of nuclear material signatures to understand a material’s provenance, use, and ultimate application. New forensics signatures and methods intended for non-traditional or advanced nuclear fuel applications require fuel irradiation experiments to demonstrate viability and validity. Integral fuel irradiations have historically required significant costs and long timelines to design, irradiate, and characterize. This paper describes how a recently developed nuclear fuel irradiation testbed can be used to provide a low cost, rapid turnaround, modular test environment for irradiation and evaluation of nuclear fuel specimens for nuclear security applications. The irradiation testbed houses six small ‘MiniFuel’ samples within hermetically sealed capsules inside targets that can be removed in between each ∼25-day operating cycle of the High Flux Isotope Reactor (HFIR). As many as nine targets can be irradiated using a single irradiation position (reflector region) in HFIR, allowing for varying irradiation temperatures and burnups. A suite of hot cell capabilities have been established to perform post-irradiation examination for measuring performance (e.g., fuel swelling, fission gas release) and facilitating experiment disassembly for subsequent property measurements, microstructural analysis, or chemical assay. This new testbed allows fuel irradiations to be conducted on an accelerated timeframe to enable rapid proof of concept testing and to provide reference material for nuclear fuel security applications. Recent applications using this testbed include the testing of isotopic taggants in UO 2 fuel (intentional forensics), testing of U-10Mo fuel for down-conversion of highly enriched uranium–fueled reactors, and the production of irradiated UO 2 fuel material for signature analysis of its isotopic composition (plutonium, fission gases, etc.).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Orbiter transfer vehicle concept definition and system analysis study. Volume 4: Space station accommodations. Revision 1

A brief summary is given of the key objectives of Task 5 of the Space Station Accommodations Concept Definition. Space station accommodations were assessed and defined for each potential candidate Space-Based OTV concept and for the composite OTV fleet. To accomplish this, the functional and physical interactions between each OTV concept and the space station were defined. Then, conceptual accommodation designs were prepared and optimized for approach and configuration. Initial space station requirements were identified, including the ability to accommodate and support evolution to maturity, and then a time-phasing of accommodations was prepared showing that evolution. In the process of developing physical and functional interactions, operational requirements were defined, together with associated timelines. In that the crew complement is subject to limitations, the operational requirements derivation is biased toward automation wherever possible. For each candidate Ground-Based OTV concept, operating in conjunction with the space station, the above process was repeated.

Randall, Roger M.↗

Rapid Application of Space Effects for the Small Satellites Systems and Services Symposium

NASA Ames Research Center (ARC) has engaged Military Branches, the Department of Defense, and other Government Agencies in successful partnerships to design, develop, deliver and support various space effects capabilities and space vehicles on timeline of need. Contracts with Industry are in place to execute operational and enabler missions using physical and informational infrastructures including Responsive Manufacturing capabilities and Digital Assurance. The intent is to establish a secure, web-enabled "store front" for ordering and delivering any capabilities required as defined by the users and directed by NASA ARC and Partner Organizations. The capabilities are envisioned to cover a broad range and include 6U CubeSats, 50-100 kg Space Vehicles, Modular Space Vehicle architecture variations, as well as rapid payload integration on various Bus options. The paper will discuss the efforts underway to demonstrate autonomous manufacturing of low-volume, high-value assets, to validate the ability of autonomous digital techniques to provide Mission Assurance, and to demonstrate cost savings through the identification, characterization, and utilization of Responsive Space components. The culmination of this effort will be the integration of several 6U satellites and their launch in 2016.

Small Satellite Systems↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Affordable and Scalable Modular Multifamily Housing: A Case Study on Cost, Construction Time Savings, and Waste Reduction in California: Preprint

Modular construction can significantly reduce waste when compared to traditional methods. This case study evaluates cost, construction time, and waste metrics for a 195-unit stick-built project and for a 66-unit modular project both based in Los Angeles, CA. We partner with SoLa Impact (real estate developer) and Model/Z (modular manufacturer) to evaluate the impact of Model/Z's 1-bedroom modular unit which is produced in a 160,000 sq ft local factory in South Los Angeles. We compare them to similar stick-built/site-built multifamily construction by the same developer in Los Angeles. This study finds that modular production reduced construction waste through precise prefabrication, concentrated workforce expertise, and streamlined logistics while cutting transportation needs, improving project efficiency and lowering associated timelines and costs. Economies of scale are being realized as Model/Z has produced over 500 affordable housing units and supplied for projects up to 188 units, shortening schedules and lowering per-unit costs and supporting affordable housing goals in income-challenged South Los Angeles. Modular methods offer a scalable, resource-efficient pathway to increasing affordable housing supply while reducing total development costs by 10-15% and project timelines by 50%, while simultaneously creating local jobs and training opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗