Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “departure time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Non-relativistic solar electron events during December 1990 - Results from Ulysses

Several groups of impulsive flare accelerated nonrelativistic solar electron events occurred in November and December 1990. In a total of 18 separate events, most show the characteristic dispersion in arrival times at the Ulysses spacecraft corresponding to travel time for the various particle energy groups. After maximum development, the electron intensities generally decay smoothly with characteristic times of 10 to 15 hours. In a few cases there are marked departures from this 'classic' behavior. On 15 December 1990, these departures are associated with a structure in the interplanetary magnetic field having a width of about 4 x 10 exp 6 km at 1.37 AU. The particle intensities inside this structure varied greatly with spatial position. Some of the changes occurred over distances as small as 3 x 10 exp 4 km. It is believed that this interplanetary structure had its origin in the complex magnetic fields that overlay the solar active region in which the electron accelerating flares occurred, and that it is these fields near the sun that determine access of the flare accelerated electrons to interplanetary field lines. A solar electron event on 11 December 1990 is similar in many respects to the one on 15 December. Neither of these events is directly related to an interplanetary shock wave.

Anderson, K. A.↗

Coordination Between Sectors in Shared Airspace Operations

Recent studies have shown that a more efficient use of airspace may involve shared airspace operations, i.e., temporal as well as spatial separation of arrival and departure flows [1][2]. Temporal separation would permit a departure aircraft to fly through an arrival flow, depending on an available gap. This would necessitate careful and precise coordination between controllers in different sectors. Three methods of coordination which permit the penetration of a controller's airspace by another controller's aircraft are described: point out, look-and-go, and prearranged coordination procedure. Requirements of each method are given, along with associated problems that have surfaced in the field as described by Aviation Safety and Reporting System (ASRS) and other reports. A Human-in-the-Loop simulation was designed to compare two of the methods: point out and prearranged coordination procedures. In prearranged coordination procedures (P-ACP), the controllers control an aircraft in another controller's airspace according to specified prearranged procedures, without coordinating each individual aircraft with another controller, as is done with point outs. In the simulation, three experienced controllers rotated through two arrival sectors and a non-involved arrival sector of a Terminal Radar Approach Control (TRACON) airspace. Results of eighteen one-hour simulation runs (nine in each of the two conditions) showed no impact of the coordination method on separation violations nor on arrival times for 208 departing aircraft crossing an arrival stream. Participant assessment indicated that although both coordination conditions were acceptable, the prearranged coordination procedure condition was slightly safer, more efficient, timely, and overall, worked better operationally. Problems arose in the point out condition regarding controllers noticing acceptance of point outs. Also, in about half of the point-out runs, time pressure was felt to have had an impact on when and if the departures could cross an arrival stream. An additional problem with point outs may be confusion in the field about which controller has responsibility for separating point-out aircraft from other aircraft.

Parke, Bonny↗

Airport Choice in Sao Paulo Metropolitan Area: An Application of the Conditional Logit Model

Using the conditional LOGIT model, this paper addresses the airport choice in the Sao Paulo Metropolitan Area. In this region, Guarulhos International Airport (GRU) and Congonhas Airport (CGH) compete for passengers flying to several domestic destinations. The airport choice is believed to be a result of the tradeoff passengers perform considering airport access characteristics, airline level of service characteristics and passenger experience with the analyzed airports. It was found that access time to the airports better explain the airport choice than access distance, whereas direct flight frequencies gives better explanation to the airport choice than the indirect (connections and stops) and total (direct plus indirect) flight frequencies. Out of 15 tested variables, passenger experience with the analyzed airports was the variable that best explained the airport choice in the region. Model specifications considering 1, 2 or 3 variables were tested. The model specification most adjusted to the observed data considered access time, direct flight frequencies in the travel period (morning or afternoon peak) and passenger experience with the analyzed airports. The influence of these variables was therefore analyzed across market segments according to departure airport and flight duration criteria. The choice of GRU (located neighboring Sao Paulo city) is not well explained by the rationality of access time economy and the increase of the supply of direct flight frequencies, while the choice of CGH (located inside Sao Paulo city) is. Access time was found to be more important to passengers flying shorter distances while direct flight frequencies in the travel period were more significant to those flying longer distances. Keywords: Airport choice, Multiple airport region, Conditional LOGIT model, Access time, Flight frequencies, Passenger experience with the analyzed airports, Transportation planning

Moreno, Marcelo Baena↗

Preliminary design of an Orbiter/IUS separation sequence

An orbiter/IUS separation sequence to satisfy the assumed requirements of Shuttle Flight 8 was defined for the purpose of gaining an insight into the flight design software requirements. The key to economical and effective flight design for orbiter/IUS proximity operations is considered to be the capability for rapid and accurate generation of graphical displays that will facilitate not only decision making on the part of the designer, but also lucid documentation of rationale and the resulting design features. The data indicate that (1) an OMS burn is required to attain the necessary velocity without subjecting the IUS and its payload to undue plume impingement, and (2) a departure trajectory that places the orbiter above and behind the IUS at SRM ignition time is preferred over the alternative which would place it below and ahead.

Wilson, S. W.↗

Human Mars Mission Transit Abort Options for Ballistic High Thrust and Hybrid Transportation Systems

Throughout the entire history of human spaceflight, astronauts have never been more than a few day's journey from Earth. For missions to the International Space Station, or even to the Moon, aborting the mission and returning home is a relatively straightforward operation in the event of a life-threatening contingency. But on the journey to Mars, a mission abort is complicated by a single factor: the sheer distance to Mars that will take time to cover regardless of how powerful the propulsion system is. In a significant departure from the entire human spaceflight experience to date, a Mars mission abort will not mean an immediate return to Earth due to the heliocentric nature of the transit. After escaping Earth’s gravity and entering heliocentric space, aborting a mission to Mars will be measured in months not days even if the abort is initiated relatively early in the mission. This represents a fundamental shift in the way mission aborts are utilized to reduce mission risks and this change must be part of the narrative when discussing reliability, crew risk, contingency planning, and mission operations. Abort capability will vary between transportation propulsion systems depending on final design, operational implementation, and actual mission parameters such as departure date, but the difference is relatively insignificant given that ``mission abort'' in the heliocentric frame of reference is a wildly different paradigm than that historically used for Earth-centric missions which rely on abort as a risk mitigation strategy. The primary objective of this paper is to provide a clearer definition of human Mars mission aborts from a celestial physics and orbital mechanics perspective in the context of different propulsion systems.

Mars Architecture Team↗

Human Outer Solar System Exploration via Q-Thruster Technology

Propulsion technology development efforts at the NASA Johnson Space Center continue to advance the understanding of the quantum vacuum plasma thruster (QThruster), a form of electric propulsion. Through the use of electric and magnetic fields, a Q-thruster pushes quantum particles (electrons/positrons) in one direction, while the Qthruster recoils to conserve momentum. This principle is similar to how a submarine uses its propeller to push water in one direction, while the submarine recoils to conserve momentum. Based on laboratory results, it appears that continuous specific thrust levels of 0.4 - 4.0 N/kWe are achievable with essentially no onboard propellant consumption. To evaluate the potential of this technology, a mission analysis tool was developed utilizing the Generalized Reduced Gradient non-linear parameter optimization engine contained in the Microsoft Excel® platform. This tool allowed very rapid assessments of "Q-Ship" minimum time transfers from earth to the outer planets and back utilizing parametric variations in thrust acceleration while enforcing constraints on planetary phase angles and minimum heliocentric distances. A conservative Q-Thruster specific thrust assumption (0.4 N/kWe) combined with "moderate" levels of space nuclear power (1 - 2 MWe) and vehicle specific mass (45 - 55 kg/kWe) results in continuous milli-g thrust acceleration, opening up realms of human spaceflight performance completely unattainable by any current systems or near-term proposed technologies. Minimum flight times to Mars are predicted to be as low as 75 days, but perhaps more importantly new "retro-phase" and "gravity-augmented" trajectory shaping techniques were revealed which overcome adverse planetary phasing and allow virtually unrestricted departure and return opportunities. Even more impressively, the Jovian and Saturnian systems would be opened up to human exploration with round-trip times of 21 and 32 months respectively including 6 to 12 months of exploration at the destinations. Finally, interstellar trip times are assessed at milli-g acceleration levels.

Joosten, B. Kent↗

NASA ATD-2 Trajectory Option Set Prototype Capability for Rerouting Departures in Metroplex Airspace

This paper describes NASA’s Airspace Technology Demonstration 2 (ATD-2) Phase 3 prototype capability that is being tested in the North Texas region through summer 2021. For the first time, a shared Decision Support Tool (DST) provides opportunities for participating Flight Operators (FOs) and Air Traffic Controllers (ATCs) to coordinate using a Trajectory Option Set (TOS). When the metroplex airspace is impacted by demand/capacity imbalances, TOS enables departure flights to be rerouted to alternative departure routes with less surface delay.

trajectory option set↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions

Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times of the aircraft. Findings from these initial experiments indicate that it is possible to schedule arrivals into Anchorage with minimal delays under low-visibility conditions with less disruption to high-cost, international flights.

Grabbe, Shon↗

Statistical studies of animal response data from USF toxicity screening test method

Statistical examination of animal response data obtained using Procedure B of the USF toxicity screening test method indicates that the data deviate only slightly from a normal or Gaussian distribution. This slight departure from normality is not expected to invalidate conclusions based on theoretical statistics. Comparison of times to staggering, convulsions, collapse, and death as endpoints shows that time to death appears to be the most reliable endpoint because it offers the lowest probability of missed observations and premature judgements.

Hilado, C. J.↗

Mars Mission Design Handbook: 2009-2024 Opportunities

A Mars Mission Design Handbook which is designed for a Human Mars Mission for 2009-2024 is presented in viewgraph form. Mission architecture, Piloted Design Reference Mission (DRM) trajectory, tools used, departure energies, Earth-Mars 2013/14 trajectories, reduced piloted mission durations, velocity losses, piloted total time of flight trades, and all-chemical configurations are outlined.

George, Lynnane↗

Optimizing Flight Departure Delay and Route Selection Under En Route Convective Weather

This paper presents a linear Integer Programming model for managing air traffic flow in the United States. The decision variables in the model are departure delays and predeparture reroutes of aircraft whose trajectories are predicted to cross weather-impacted regions of the National Airspace System. The model assigns delays to a set of flights while ensuring their trajectories are free of any conflicts with weather. In a deterministic setting, there is no airborne holding due to unexpected weather incursion in a flight s path. The model is applied to solve a large-scale traffic flow management problem with realistic weather data and flight schedules. Experimental results indicate that allowing rerouting can reduce departure delays by nearly 57%, but it is associated with an increase in total airborne time due to longer routes flown by aircraft. The computation times to solve this problem were significantly lower than those reported in the earlier studies.

Mukherjee, Avijit↗

End-to-End Trajectory for Conjunction Class Mars Missions Using Hybrid Solar-Electric/Chemical Transportation System

NASA's Human Spaceflight Architecture Team is developing a reusable hybrid transportation architecture in which both chemical and solar-electric propulsion systems are used to deliver crew and cargo to exploration destinations. By combining chemical and solar-electric propulsion into a single spacecraft and applying each where it is most effective, the hybrid architecture enables a series of Mars trajectories that are more fuel efficient than an all chemical propulsion architecture without significant increases to trip time. The architecture calls for the aggregation of exploration assets in cislunar space prior to departure for Mars and utilizes high energy lunar-distant high Earth orbits for the final staging prior to departure. This paper presents the detailed analysis of various cislunar operations for the EMC Hybrid architecture as well as the result of the higher fidelity end-to-end trajectory analysis to understand the implications of the design choices on the Mars exploration campaign.

Chai, Patrick R.↗

Predicting Gate Conflicts at Charlotte Douglas International Airport Using NASA ATD-2 Fused Data Sources

NASA is conducting the Airspace Technology Demonstration-2 to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system. The IADS system is powered by real-time System Wide Information Management feeds which provide an accurate and high fidelity view of the lifecycle of a flight. This data can be leveraged to drive efficiencies in the National Airspace System. For non safety critical applications there is opportunity for third party service providers to offer this type of data-driven prediction service in near real-time. This paper investigates the gate conflict prediction problem as a concrete use case which could help drive efficiencies. We model gate conflicts as a regression problem and describe the iterative process of model building, model validation, and evaluation used to assess the efficacy of our approach. We quantify our predictive accuracy and identify paths for improvement. Through this iterative process we hope to evolve our models and methods to a near real-time prediction service.

Airspace Technology Demonstration 2↗

Piloted Mars missions using cryogenic and storable propellants

The paper presents an analyses of piloted long-duration stay Mars missions using a chemical or nuclear thermal propulsion Earth-departure stage, storable propellant Mars arrival and departure stages (to avoid propellant boiloff), and an Earth entry vehicle, conducted for three-year segments from 2000 to 2020. The study initially determines the minimum initial mass in low-Earth orbit (IMLEO) missions and then investigates their radiation exposure levels and Mars parking orbit selection. The impact of reducing the outbound (Earth-Mars) transfer time on IMLEO and predicted radiation exposure levels is included. The results indicate that a vehicle using an advanced chemical propulsion system (Isp = 480 s) for Earth departure is feasible throughout 2000-2020 with an IMLEO less than 640 metric tons, while an Earth departure stage using a nuclear thermal propulsion (NTP) system with Isp of 925 s is even more appealing with IMLEO's less than 405 tons. Vehicles with 875 and 825 s specific impulse Earth departure stages have only slightly higher IMLEO's than the advanced NTP system (10 and 20 tons higher, respectively). Reducing the time spent in space may not always result in a significantly reduced level of radiation exposure, especially if the mission encounter dates are changed to a less favorable period of the solar cycle.

Striepe, Scott A.↗

Planetary mission departures from Space Station orbit

The concept of orbital assembly and launch of oversized planetary (or lunar) spacecraft from a Space Station is rapidly coming of age. This prospect raises a host of new problems demanding timely resolution. The one most serious issue involved in launch from a rapidly precessing Space Station orbit (about -7.2 deg/day) is the need to cope with the generally out-of-plane orientation of the V-infinity departure vector. Methods dealing with single or multiple injection maneuvers, deep space plane changes, nodal shift caused by reboost strategy modifications, and departure window duration analysis are discussed.

Sergeyevsky, Andrey B.↗

Taxi Time Prediction at Charlotte Airport Using Fast-Time Simulation and Machine Learning Techniques

Accurate taxi time prediction is required for enabling efficient runway scheduling that can increase runway throughput and reduce taxi times and fuel consumptions on the airport surface. Currently NASA and American Airlines are jointly developing a decision-support tool called Spot and Runway Departure Advisor (SARDA) that assists airport ramp controllers to make gate pushback decisions and improve the overall efficiency of airport surface traffic. In this presentation, we propose to use Linear Optimized Sequencing (LINOS), a discrete-event fast-time simulation tool, to predict taxi times and provide the estimates to the runway scheduler in real-time airport operations. To assess its prediction accuracy, we also introduce a data-driven analytical method using machine learning techniques. These two taxi time prediction methods are evaluated with actual taxi time data obtained from the SARDA human-in-the-loop (HITL) simulation for Charlotte Douglas International Airport (CLT) using various performance measurement metrics. Based on the taxi time prediction results, we also discuss how the prediction accuracy can be affected by the operational complexity at this airport and how we can improve the fast time simulation model before implementing it with an airport scheduling algorithm in a real-time environment.

airport surface traffic↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗