Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost of wind”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Inverter Listing Awardee: Eocycle America Corporation

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Eocycle America Corporation for Inverter Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NLR on behalf of DOE, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project 2024 Technology Commercialization Awardee: Intelligent Energy Systems

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Intelligent Energy Systems for technology commercialization. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NLR on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed-generation technology option.

17 WIND ENERGY↗

Large experimental wind turbines: Where we are now

Several large wind turbine projects have been initiated by NASA-Lewis as part of the ERDA wind energy program. The projects consist of progressively large wind turbine ranging from 100 kW with a rotor diameter of 125 feet to 1500 kW with rotor diameters of 200 to 300 feet. Also included is supporting research and technology for large wind turbines and for lowering the costs and increasing the reliability of the major wind turbine components. The results and status of the above projects are briefly discussed in this report. In addition, a brief summary and status of the plans for selecting the utility sites for the experimental wind turbines is also discussed.

Thomas, R. L.↗

Large experimental wind turbines - Where we are now

Several large wind turbine projects have been initiated by NASA-Lewis as part of the ERDA wind energy program. The projects consist of progressively large wind turbines ranging from 100 kW with a rotor diameter of 125 feet to 1500 kW with rotor diameters of 200 to 300 feet. Also included is supporting research and technology for large wind turbines and for lowering the costs and increasing the reliability of the major wind turbine components. The results and status of the above projects are briefly discussed in this report. In addition, a brief summary and status of the plans for selecting the utility sites for the experimental wind turbines is also discussed.

Thomas, R. L.↗

Balloon-based interferometric techniques

A balloon-borne triple-etalon Fabry-Perot Interferometer, observing the Doppler shifts of absorption lines caused by molecular oxygen and water vapor in the far red/near infrared spectrum of backscattered sunlight, has been used to evaluate a passive spaceborne remote sensing technique for measuring winds in the troposphere and stratosphere. There have been two successful high altitude balloon flights of the prototype UCL instrument from the National Scientific Balloon Facility at Palestine, TE (May 80, Oct. 83). The results from these flights have demonstrated that an interferometer with adequate resolution, stability and sensitivity can be built. The wind data are of comparable quality to those obtained from operational techniques (balloon and rocket sonde, cloud-top drift analysis, and from the gradient wind analysis of satellite radiance measurements). However, the interferometric data can provide a regular global grid, over a height range from 5 to 50 km in regions of clear air. Between the middle troposphere (5 km) and the upper stratosphere (40 to 50 km), an optimized instrument can make wind measurements over the daylit hemisphere with an accuracy of about 3 to 5 m/sec (2 sigma). It is possible to obtain full height profiles between altitudes of 5 and 50 km, with 4 km height resolution, and a spatial resolution of about 200 km, along the orbit track. Below an altitude of about 10 km, Fraunhofer lines of solar origin are possible targets of the Doppler wind analysis. Above an altitude of 50 km, the weakness of the backscattered solar spectrum (decreasing air density) is coupled with the low absorption crosssection of all atmospheric species in the spectral region up to 800 nm (where imaging photon detectors can be used), causing the along-the-track resolution (or error) to increase beyond values useful for operational purposes. Within the region of optimum performance (5 to 50 km), however, the technique is a valuable potential complement to existing wind measuring systems and can provide a low cost addition to powerful active (LIDAR) wind measuring systems now under development.

Rees, David↗

Algorithm and code development for unsteady three-dimensional Navier-Stokes equations

Aeroelastic tests require extensive cost and risk. An aeroelastic wind-tunnel experiment is an order of magnitude more expensive than a parallel experiment involving only aerodynamics. By complementing the wind-tunnel experiments with numerical simulations, the overall cost of the development of aircraft can be considerably reduced. In order to accurately compute aeroelastic phenomenon it is necessary to solve the unsteady Euler/Navier-Stokes equations simultaneously with the structural equations of motion. These equations accurately describe the flow phenomena for aeroelastic applications. At ARC a code, ENSAERO, is being developed for computing the unsteady aerodynamics and aeroelasticity of aircraft, and it solves the Euler/Navier-Stokes equations. The purpose of this cooperative agreement was to enhance ENSAERO in both algorithm and geometric capabilities. During the last five years, the algorithms of the code have been enhanced extensively by using high-resolution upwind algorithms and efficient implicit solvers. The zonal capability of the code has been extended from a one-to-one grid interface to a mismatching unsteady zonal interface. The geometric capability of the code has been extended from a single oscillating wing case to a full-span wing-body configuration with oscillating control surfaces. Each time a new capability was added, a proper validation case was simulated, and the capability of the code was demonstrated.

Obayashi, Shigeru↗

Large wind turbines: A utility option for the generation of electricity

The wind resource is such that wind energy generation has the potential to save 6-7 quads of energy nationally. Thus, the Federal Government is sponsoring and encouraging the development of cost effective and reliable wind turbines. One element of the Federal Wind Energy Programs, Large Horizontal Axis Wind Turbine Development, is managed by the NASA Lewis Research Center for the Department of Energy. There are several ongoing wind system development projects oriented primarily toward utility application within this program element. In addition, a comprehensive technology program supporting the wind turbine development projects is being conducted. An overview is presented of the NASA activities with emphasis on application of large wind turbines for generation of electricity by utility systems.

Robbins, W. H.↗

Insights for Canadian electricity generation planning from an integrated assessment model: Should we be more cautious about hydropower cost overruns?

Hydropower accounts for approximately 60% of electricity generation in Canada, with growth expected in the coming decades as part of renewable energy transitions; however, frequent cost overruns threaten the viability of this growth. Here, using the integrated assessment model GCAM, we develop an endogenous representation of hydropower for Canada that accounts for market dynamics, thus permitting analysis of hydropower competition with other electricity generation technologies, both with and without cost overruns. Results show that modelling hydropower resources endogenously increases Canadian hydropower deployment relative to an assumption of fixed hydropower production, from 417 to 495 TWh annually by 2050. In scenarios that apply cost overruns at historical levels, hydropower loses market share to more easily scalable technologies like wind power. When including high cost overrun assumptions, the model determines that hydropower falls from about 73% to 65% of Canadian electricity generation by 2050, while wind power increases from about 8% to 11%. Countries may be better able to achieve electrification and renewable energy targets at lower cost by avoiding large-scale, overrun-prone hydropower and nuclear generation projects. Model results support that cost overruns are important considerations for policy decisions related to electricity sector development in Canada and elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modified Adaptive Control for Region 3 Operation in the Presence of Wind Turbine Structural Modes

Many challenges exist for the operation of wind turbines in an efficient manner that is reliable and avoids component fatigue and failure. Turbines operate in highly turbulent environments resulting in aerodynamic loads that can easily excite turbine structural modes, possibly causing component fatigue and failure. Wind turbine manufacturers are highly motivated to reduce component fatigue and failure that can lead to loss of revenue due to turbine down time and maintenance costs. The trend in wind turbine design is toward larger, more flexible turbines that are ideally suited to adaptive control methods due to the complexity and expense required to create accurate models of their dynamic characteristics. In this paper, we design an adaptive collective pitch controller for a high-fidelity simulation of a utility-scale, variable-speed horizontal axis wind turbine operating in Region 3. The objective of the adaptive pitch controller is to regulate generator speed, accommodate wind gusts, and reduce the excitation of structural modes in the wind turbine. The control objective is accomplished by collectively pitching the turbine blades. The adaptive collective pitch controller for Region 3 was compared in simulations with a baseline classical Proportional Integrator (PI) collective pitch controller. The adaptive controller will demonstrate the ability to regulate generator speed in Region 3, while accommodating gusts, and reducing the excitation of certain structural modes in the wind turbine.

Frost, Susan Alane↗

HybridBOSSE (Hybrid Balance-of-System (BOS) Systems Engineering Model)

Hybrid Power Plants (HPPs) have the potential to increase the value of renewable energy systems and decrease their costs through shared development (e.g., permitting) and infrastructure (e.g., collection system). Prior work has identified potential cost savings and technical and economic performance improvements for solar plus storage plants. However, additional research is needed to understand cost drivers that are specific to hybrid wind plants. Here we analyze the potential for shared infrastructure cost savings at one type of hybrid plant: wind plus solar photovoltaic (PV). To perform this analysis, we developed a new open-source, Python-based cost modeling tool: the Hybrid Balance-of-System (BOS) Systems Engineering model (HybridBOSSE). HybridBOSSE is an extension of NREL's LandBOSSE tool.

Barker, Aaron↗

Reliability‐based layout optimization in offshore wind energy systems

Abstract Existing methods for optimizing wind array layouts typically use power or cost objectives and rarely consider reliability‐based objectives. Component and system failure rates, however, are dependent on location‐specific wind conditions, are influenced by array layout and wake interactions, and have a direct and significant impact on capital costs, operational costs, and power production. Although wind power plant models exist that calculate wind loads with sufficient resolution to capture component loading dynamics from wind conditions, they are computationally expensive and thus not suitable for research applications requiring many evaluations, particularly optimization. This study describes the development of computationally efficient, reliability‐based layout optimization methods, enabling us to explore the relationship between component reliability and layout optimization. These methods include the surrogate modeling of the planet bearing life based on varying wind conditions simulated in FAST.Farm and the formulation of reliability‐based objectives based on failure cost and power production models. Through demonstration of this method, we explore how wind conditions, objective functions, and capacity density influence reliability‐based layout optimization. Results indicate that considering reliability alongside power production can reduce failure costs associated with replacement costs and downtime while maintaining or improving power production. Our conclusions highlight the opportunity for wind power plant developers to integrate reliability and operational expenditures alongside performance and capital expenditure objectives in plant design and development to improve plant performance and costs.

17 WIND ENERGY↗

Hybrid AFP/Hand Layup Optimized Blades to Enhance Wind Tunnel Capability Summary of PREDICT 2018 Efforts

A project spanning four-months in 2018 was conducted at the NASA Langley Research Center (LaRC) to advance the state of the art in Automated Fiber Placement (AFP) fabrication of complex carbon fiber wind tunnel blades for NASA wind tunnels. This effort was the first step in developing a methodology for fabricating these complex parts. An AFP robotic system was used to explore whether manufacturing time and cost for production of wind tunnel blades could be reduced. Computer aided design models of the blade surfaces were created, and AFP process planning and programming was employed to study the manufacturability of the shapes. A manufacturing demonstration unit was fabricated to demonstrate a methodology to fabricate a complex shape representative of a wind tunnel blade. The present study revealed that the heater configuration on the LaRC AFP robotic system was the primary constraint that limited its ability to use AFP for wind tunnel blade manufacturing.

carbon-epoxy↗

Computing Aerodynamics Of Propfans

Cost and duration of wind-tunnel tests reduced. Computer program developed to predict interference of slipstream of propfan on supercritical wing at subsonic speeds. Use of program reduces cost and time involved in wind-tunnel testing of newly-designed wing/nacelle configurations. Program written in FORTRAN V.

Chandrasekaran, B.↗

Land-Based Wind Market Report: 2023 Edition

Wind power additions in the United States totaled 8.5 gigawatts (GW) in 2022. Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as myriad state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions. Nonetheless, 2022 was a relatively slow year in terms of new wind power deployment—the lowest since 2018—due in part to ongoing supply chain pressures, higher interest rates, and interconnection and siting challenges, but also the reduction in the value of the PTC that was in place up until the passage of the Inflation Reduction Act (IRA) in August 2022.

17 WIND ENERGY↗

Land-Based Wind Market Report: 2024 Edition

Wind power additions in the United States totaled 6.5 gigawatts (GW) of capacity in 2023. 1 Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as numerous state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions, yielding low-priced wind energy for utility, corporate, and other power purchasers. Nonetheless, 2023 was a slow year in terms of new wind deployment, the lowest since 2014. Elevated interest rates played a role in slowing deployment, as did interconnection and siting challenges.

17 WIND ENERGY↗

The transmission ramifications of social and environmental siting considerations on wind energy deployment

Increasing the capacity of wind power is critical to achieving climate goals, however its continued deployment faces environmental and social siting challenges. For example, the United States government is increasingly emphasizing the importance of a just energy transition by considering the social impacts of energy and environmental justice (EEJ). In this study, we investigate the impact of considering available EEJ metrics and environmental impacts into siting wind power and transmission by applying SimWIND PRO . SimWIND PRO is an infrastructure optimization tool that can site wind energy technologies and transmission by concurrently considering wind resource potential, transmission costs, EEJ, and environmental impacts. We demonstrate the impacts of considering EEJ and environmental factors in the context of Midcontinent Independent System Operator’s (MISO) western region, which includes some of the best wind energy potential in the United States. We show that prioritizing EEJ and environmental considerations in wind deployment can result in exponentially more transmission deployment for the same amount of wind power delivered, and results in selecting different wind farm sites. Our results also show that, depending on how it is considered, it is possible that constraining sites based on EEJ and environmental factors can reduce the available capacity of wind energy enough that energy transition capacity targets cannot be met.

17 WIND ENERGY↗

FY21 NREL Wind Energy Accomplishments and Mid Year Performance Report

This report takes stock of the research NREL conducted on behalf of DOE’s Wind Energy Technologies Office (WETO), other funding and research partners, and the people of the United States during the first half of FY21 (between Oct. 1, 2020 and March 30, 2021). While diverse, all of these efforts shared a common goal to accelerate the deployment of wind energy technologies by helping to improve wind power performance, lower costs, and reduce market barriers to create a more sustainable, secure, and resilient power grid and a cleaner energy future.

49 EE - Wind and Water Power Program - Wind (EE-4W↗