Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

An unconditionally stable staggered algorithm for transient finite element analysis of coupled thermoelastic problems

An unconditionally stable second order accurate implicit-implicit staggered procedure for the finite element solution of fully coupled thermoelasticity transient problems is proposed. The procedure is stabilized with a semi-algebraic augmentation technique. A comparative cost analysis reveals the superiority of the proposed computational strategy to other conventional staggered procedures. Numerical examples of one- and two-dimensional thermomechanical coupled problems demonstrate the accuracy of the proposed numerical solution algorithm.

Farhat, Charbel↗

Analysis of advanced programs (Study 2.3). Volume 1: Executive summary

An analysis of advanced programs for space missions is presented. The subjects discussed are (1) alternate space shuttle configurations, (2) space transportation systems, (3) computer programs and methodology to estimate program cost implications of space vehicle program uncertainties, (4) vehicle synthesis program, (5) relative effectiveness of various proposals for space vehicles, and (6) cost analysis of solid propellant rocket engine program to support space shuttle vehicle.

Source record↗

Cost characteristics of tilt-rotor, conventional air and high speed rail short-haul intercity passenger service

The cost analysis done to support an assessment of the potential for a small tilt-rotor aircraft to operate in short-haul intercity passenger service is described in detail. Anticipated costs of tilt-rotor air service were compared to the costs of two alternatives: conventional air and high speed rail (HSR). Costs were developed for corridor service, varying key market characteristics including distance, passenger volumes, and minimum frequency standards. The resulting cost vs output information can then be used to compare modal costs for essentially identical service quality and passenger volume or for different service levels and volumes for each mode, as appropriate. Extensive sensitivity analyses are performed. The cost-output features of these technologies are compared. Tilt-rotor is very attractive compared to HSR in terms of costs over the entire range of volume. It also has costs not dramatically different from conventional air, but tilt-rotor costs are generally higher. Thus some of its other advantages, such as the VTOL capability, must offset the cost disadvantage for it to be a preferred or competitive mode in any given market. These issues are addressed in the companion report which considers strategies for tilt-rotor development in commercial air service.

Schoendorfer, David L.↗

Ceramic automotive Stirling engine study

A conceptual design study for a Ceramic Automotive Stirling Engine (CASE) is performed. Year 1990 structural ceramic technology is assumed. Structural and performance analyses of the conceptual design are performed as well as a manufacturing and cost analysis. The general conclusions from this study are that such an engine would be 10-26% more efficient over its performance map than the current metal Automotive Stirling Reference Engine (ASRE). Cost of such a ceramic engine is likely to be somewhat higher than that of the ASRE but engine cost is very sensitive to the ultimate cost of the high purity, ceramic powder raw materials required to fabricate high performance parts. When the design study is projected to the year 2000 technology, substantinal net efficiency improvements, on the order of 25 to 46% over the ASRE, are computed.

Musikant, S.↗

The use of activity-based cost estimation as a management tool for cultural change

It will be shown that the greatest barrier to American exploration of the planet Mars is not the development of the technology needed to deliver humans and return them safely to earth. Neither is it the cost of such an undertaking, as has been previously suggested, although certainly, such a venture may not be inexpensive by some measures. The predicted costs of exploration have discouraged serious political dialog on the subject. And, in fact, even optimistic projections of the NASA budget do not contain the resources required, under the existing development and management paradigm, for human space exploration programs. It will be demonstrated that the perception of the costs of such a venture, and the cultural responses to the perceptions are factors inhibiting American exploration of the moon and the planet Mars. Cost models employed in the aerospace industry today correctly mirror the history of past space programs, and as such, are representative of the existing management and development paradigms. However, if, under this current paradigm no major exploration programs are feasible, then cost analysis methods based in the past may not have great utility in exploring the needed cultural changes. This paper explores the use of a new type of model, the activity based cost model, which will treat management style as an input variable, in a sense providing a tool whereby a complete, affordable program might be designed, including both the technological and management aspects.

Mandell, Humboldt↗

C-130 Advanced Technology Center wing box conceptual design/cost study

A conceptual design was developed by Northrop/LTV for an advanced C-130 Center Wing Box (CWB) which could meet the severe mission requirements of the SOF C-130 aircraft. The goals for the advanced technology CWB relative to the current C-130H CWB were: (1) the same acquisition cost; (2) lower operating support costs; (3) equal or lower weight; (4) a 30,000 hour service life for the SOF mission; and (5) minimum impact on the current maintenance concept. Initially, the structural arrangement, weight, external and internal loads, fatigue spectrum, flutter envelope and design criteria for the SOF C-130 aircraft CWB were developed. An advanced materials assessment was then conducted to determine the suitability of advanced materials for a 1994 production availability and detailed trade studies were performed on candidate CWB conceptual designs. Finally, a life-cycle cost analysis was performed on the advanced CWB. The study results showed that a hybrid composite/metallic CWB could meet the severe SOF design requirements, reduce the CWB weight by 14 pct., and was cost effective relative to an all metal beefed up C-130H CWB.

Whitehead, R. S.↗

Cost Models for MMC Manufacturing Processes

Processes for the manufacture of advanced metal matrix composites are rapidly approaching maturity in the research laboratory and there is growing interest in their transition to industrial production. However, research conducted to date has almost exclusively focused on overcoming the technical barriers to producing high-quality material and little attention has been given to the economical feasibility of these laboratory approaches and process cost issues. A quantitative cost modeling (QCM) approach was developed to address these issues. QCM are cost analysis tools based on predictive process models relating process conditions to the attributes of the final product. An important attribute, of the QCM approach is the ability to predict the sensitivity of material production costs to product quality and to quantitatively explore trade-offs between cost and quality. Applications of the cost models allow more efficient direction of future MMC process technology development and a more accurate assessment of MMC market potential. Cost models were developed for two state-of-the art metal matrix composite (MMC) manufacturing processes: tape casting and plasma spray deposition. Quality and Cost models are presented for both processes and the resulting predicted quality-cost curves are presented and discussed.

Elzey, Dana M.↗

Evaluation of solar thermal power plants using economic and performance simulations

An energy cost analysis is presented for central receiver power plants with thermal storage and point focusing power plants with electrical storage. The present approach is based on optimizing the size of the plant to give the minimum energy cost (in mills/kWe hr) of an annual plant energy production. The optimization is done by considering the trade-off between the collector field size and the storage capacity for a given engine size. The energy cost is determined by the plant cost and performance. The performance is estimated by simulating the behavior of the plant under typical weather conditions. Plant capital and operational costs are estimated based on the size and performance of different components. This methodology is translated into computer programs for automatic and consistent evaluation.

El-Gabawali, N.↗

Remote Sensing Requirements Development: A Simulation-Based Approach

Earth science research and application requirements for multispectral data have often been driven by currently available remote sensing technology. Few parametric studies exist that specify data required for certain applications. Consequently, data requirements are often defined based on the best data available or on what has worked successfully in the past. Since properties such as spatial resolution, swath width, spectral bands, signal-to-noise ratio (SNR), data quantization and band-to-band registration drive sensor platform and spacecraft system architecture and cost, analysis of these criteria is important to optimize system design objectively. Remote sensing data requirements are also linked to calibration and characterization methods. Parameters such as spatial resolution, radiometric accuracy and geopositional accuracy affect the complexity and cost of calibration methods. However, few studies have quantified the true accuracies required for specific problems. As calibration methods and standards are proposed, it is important that they be tied to well-known data requirements. The Application Research Toolbox (ART) developed at the John C. Stennis Space Center provides a simulation-based method for multispectral data requirements development. The ART produces simulated datasets from hyperspectral data through band synthesis. Parameters such as spectral band shape and width, SNR, data quantization, spatial resolution and band-to-band registration can be varied to create many different simulated data products. Simulated data utility can then be assessed for different applications so that requirements can be better understood.

Zanoni, Vicki↗

Remote Sensing System Requirements Development: A Simulation-Based Approach

Earth science research and application requirements for multispectral data have often been driven by currently available remote sensing technology. Few parametric studies exist that specify data required for certain applications. Consequently, data requirements are often defined based on the best data available or on what has worked successfully in the past. Since properites such as spatial resolution, swath width, spectral bands, signal-to-noise ratio (SNR), data quantization, and band-to-band registration drive sensor platform and spaceraft system architecture and cost, analysis of these criteria is important to objectively optimize system design. Remote sensing data requirements are also linked to calibration and characterization methods. Parameters such as spatial resolution, radiometric accuracy, and geopositional accuracy affect the complexity and cost of calibration methods. However, there are few studies that quantify the true accuracies required for specific problems. As calibration methods and standards are proposed, it is important that they be tied to well-known data requirements. The Application Research Toolbox (ART) developed at Stennis Space Center provides a simulation-based method for multispectral data requirements development. The ART produces simulated data sets from hyperspectral data through band synthesis. Parameters such as spectral band shape and width, SNR, data quantization, spatial resolution, and band-to-band registration can be varied to create many different simulated data products. Simulated data utility can then be assessed for different applications so that requirements can be better understood. This paper describes the ART and its applicability for rigorously deriving remote sensing data requirements.

Zanoni, Vicki↗

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.↗

Antenna optimization and cost consideration for the Solar Power Satellite microwave system

The sizing, criteria, cost analysis, and optimized taper of the Solar Power Satellite (SPS) transmitting antenna are discussed. The sizing parameters considered were a thermal limit of 23 kW/sq m in the antenna, a peak power density of 23 mW/sq cm in the ionosphere, and cost effectiveness. Cost schedules and equations are presented for the SPS, and four antenna tapers are analyzed and compared, including the reference 10 dB Gaussian taper. An even powered quadratic series is formulated to minimize electricity cost and stay within thermal and ionospheric power level limits. The optimized Johnson Space Center taper is found to display the lowest energy costs, 4% below the 10 dB Gaussian, and can deliver 5.69 GW at 45.4 mills/kWh to the grid. Further studies are indicated for the optimal antenna and rectenna sizes

Kerwin, E. M.↗

Supersonic combustion engine testbed, heat lightning

The design of a supersonic combustion engine testbed (SCET) aircraft is presented. The hypersonic waverider will utilize both supersonic combustion ramjet (SCRAMjet) and turbofan-ramjet engines. The waverider concept, system integration, electrical power, weight analysis, cockpit, landing skids, and configuration modeling are addressed in the configuration considerations. The subsonic, supersonic and hypersonic aerodynamics are presented along with the aerodynamic stability and landing analysis of the aircraft. The propulsion design considerations include: engine selection, turbofan ramjet inlets, SCRAMjet inlets and the SCRAMjet diffuser. The cooling requirements and system are covered along with the topics of materials and the hydrogen fuel tanks and insulation system. A cost analysis is presented and the appendices include: information about the subsonic wind tunnel test, shock expansion calculations, and an aerodynamic heat flux program.

Hoying, D.↗

Space transfer vehicle concepts and requirements. Volume 4: Summary of special studies

Our final report for Phase 1 addressed the future space transportation needs and requirements based on the current assets, at the time, and their evolution through technology/advanced development using a path and schedule that supported the world leadership role of the United States in a responsible and realistic financial forecast. Always, and foremost, the recommendations placed high values on the safety and success of missions both manned and unmanned through a total quality management philosophy at Martin Marietta. The second phase of the STV contract involved the use of Technical Directives (TD) to provide short-term support for specialized tasks as required by the COTR. Three of these tasks were performed in parallel with Phase 1. These tasks were the Liquid Acquisition Experiment (LACE), Liquid Reorientation Experiment (LIRE), and Expert System for Design, Operation, and Technology Studies (ESDOTS). The results of these TD's were reported in conjunction with the Phase 1 Final Report. Cost analysis of existing launch systems has demonstrated a need for a new upper stage that will increase America's competitiveness in the global launch services market. To provide a growth path of future exploration class STV's, near-term low-cost upper stages featuring modularity, portability, scalability, and evolvability must be developed. These recommendations define a program that: leverages ongoing activities to establish a new development environment, develop technologies that benefit the entire life cycle of a system, and result in a scalable hardware platform that provides a growth path to future upper stages.

Source record↗

Technology Benefit Estimator (T/BEST): User's Manual

The Technology Benefit Estimator (T/BEST) system is a formal method to assess advanced technologies and quantify the benefit contributions for prioritization. T/BEST may be used to provide guidelines to identify and prioritize high payoff research areas, help manage research and limited resources, show the link between advanced concepts and the bottom line, i.e., accrued benefit and value, and to communicate credibly the benefits of research. The T/BEST software computer program is specifically designed to estimating benefits, and benefit sensitivities, of introducing new technologies into existing propulsion systems. Key engine cycle, structural, fluid, mission and cost analysis modules are used to provide a framework for interfacing with advanced technologies. An open-ended, modular approach is used to allow for modification and addition of both key and advanced technology modules. T/BEST has a hierarchical framework that yields varying levels of benefit estimation accuracy that are dependent on the degree of input detail available. This hierarchical feature permits rapid estimation of technology benefits even when the technology is at the conceptual stage. As knowledge of the technology details increases the accuracy of the benefit analysis increases. Included in T/BEST's framework are correlations developed from a statistical data base that is relied upon if there is insufficient information given in a particular area, e.g., fuel capacity or aircraft landing weight. Statistical predictions are not required if these data are specified in the mission requirements. The engine cycle, structural fluid, cost, noise, and emissions analyses interact with the default or user material and component libraries to yield estimates of specific global benefits: range, speed, thrust, capacity, component life, noise, emissions, specific fuel consumption, component and engine weights, pre-certification test, mission performance engine cost, direct operating cost, life cycle cost, manufacturing cost, development cost, risk, and development time. Currently, T/BEST operates on stand-alone or networked workstations, and uses a UNIX shell or script to control the operation of interfaced FORTRAN based analyses. T/BEST's interface structure works equally well with non-FORTRAN or mixed software analysis. This interface structure is designed to maintain the integrity of the expert's analyses by interfacing with expert's existing input and output files. Parameter input and output data (e.g., number of blades, hub diameters, etc.) are passed via T/BEST's neutral file, while copious data (e.g., finite element models, profiles, etc.) are passed via file pointers that point to the expert's analyses output files. In order to make the communications between the T/BEST's neutral file and attached analyses codes simple, only two software commands, PUT and GET, are required. This simplicity permits easy access to all input and output variables contained within the neutral file. Both public domain and proprietary analyses codes may be attached with a minimal amount of effort, while maintaining full data and analysis integrity, and security. T/BESt's sotware framework, status, beginner-to-expert operation, interface architecture, analysis module addition, and key analysis modules are discussed. Representative examples of T/BEST benefit analyses are shown.

Generazio, Edward R.↗

Optical Relay for Future NASA Geosynchronous Orbiting Satellite for High Data Rate Links to NASA User Missions

NASA is exploring options for its Next Generation Relay (NGR) architecture while the current Tracking Data Relay Satellite System (TDRSS) completes its mission. The plan is to start implementation of the NGR beginning around 2025. The new system of proposed relay satellites will greatly increase the data rates between low Earth orbiting (LEO) satellite missions and the NASA TDRSS relay satellites. This increase in data rates will allow an unprecedented increase in data throughput from the LEO satellite missions back to the principal investigators (PI). This can be accomplished at Ka-band frequencies with high order modulation or at optical frequencies using Differential Phase Shift Keying (DPSK). The first satellite in the next set of relay satellites will have to be backward compatible with current technology to support ongoing and planned missions. The new set of satellites will be launched over a 10-year period with design lifetimes of at least 15 years. To meet these requirements, we analyzed various architectures and designed both the communication payloads on the relay satellite and candidate payloads on the user spacecraft by utilizing optical heads already designed. From this analysis, a demonstration optical satellite named “the Next Generation Optical Relay Pathfinder” with Ka-band capabilities was proposed to be built and launched with the purpose of evaluating an integrated high-speed optical and Ka-band communication system. Given a cost limit for the demonstration satellite, various satellite configurations were developed by varying the number of optical communication payloads. The communication payload on the relay satellite consisted of three major sub-systems: 1) Optical communication payload, 2) Ka-band communication payload, 3) Digital processing and routing of signals. The size, mass (weight), and power (SWaP) of the communication payload and other sub-systems of the satellite were obtained. The NASA Glenn Research Center COMPASS team designed the Pathfinder satellite and performed a cost analysis for its build and launch. In this paper, we first describe the needs, drivers, and the associated challenges for the Next Generation Optical Relay Pathfinder to be capable of connecting multiple LEO and GEO satellites at high data rates. Second, we detail the concept of operations (ConOps) and the system architecture, including the satellite configurations considered, their attributes and limitations, and the size of the satellite needed for each configuration. Third, we provide a summary of the Next Generation Optical Relay Pathfinder satellite design trades and its key elements. Finally, we present the path needed for implementation and operations.

Warner, Joseph H. D.↗

Salton Sea Solar Pond Power Plant Design Study and Regional Applicability

Ormat collected and organized the data base and conducted conceptual plant design, performance, and cost analysis. JPL conducted site-specific studies related to solar pond chemistry, soil biological activity, and dike design and construction. WESTEC conducted environmental investigation studies and performed an environmental assessment. SCE provided planning support for licensing and permitting and technical evaluations of the system design and cost estimate.

R. L. French↗

Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

Source record↗