Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Flexible Airspace Management (FAM) Research 2010 Human-in-the-Loop Simulation

A human-in-the-Ioop (HITL) simulation was conducted to assess potential user and system benefits of Flexible Airspace Management (FAM) concept, as well as designing role definitions, procedures, and tools to support the FAM operations in the mid-term High Altitude Airspace (HAA) environment. The study evaluated the benefits and feasibility of flexible airspace reconfiguration in response to traffic overload caused by weather deviations, and compared them to those in a baseline condition without the airspace reconfiguration. The test airspace consisted of either four sectors in one Area of Specialization or seven sectors across two Areas. The test airspace was assumed to be at or above FL340 and fully equipped Vvith data communications (Data Comm). Other assumptions were consistent with those of the HAA concept. Overall, results showed that FAM operations with multiple Traffic Management Coordinators, Area Supervisors, and controllers worked remarkably well. The results showed both user and system benefits, some of which include the increased throughput, decreased flight distance, more manageable sector loads, and better utilized airspace. Also, the roles, procedures, airspace designs, and tools were all very well received. Airspace configuration options that resulted from a combination of algorithm-generated airspace configurations with manual modifications were well acceptec and posed little difficuIty and/or workload during airspace reconfiguration process. The results suggest a positive impact of FAM operations in HAA. Further investigation would be needed to evaluate if the benefits and feasibility would extend in either non-HAA or mixed equipage environment.

Lee, Paul U.↗

Search and Rescue Operations of Aircraft in Africa: Some Compelling Issues

The world aviation community has felt the compelling need for a well-coordinated global programme for search and rescue operations of aircraft ever since commercial aviation was regulated in 1944. Guidelines and plans of action for search and rescue have therefore been considered critical in the event of an aircraft accident. This fact is eminently brought to bear in the continental regions of Africa and South America in particular, where vast expanses of land are still uninhabited or sparsely populated and controlled flight into terrain (CFIT-where an aircraft may crash on land while still under the control of technical crew) is a common occurrence. There are numerous guidelines that have been adopted under the umbrella of the International Civil Aviation Organization which are already in place for the provision of search and rescue operations pertaining to aircraft. However, when an accident occurs in the territory of a State, there are sensitivities involving the State in which the aircraft concerned was registered and issues of sovereignty which have to be considered. Additionally. issues such as the voluntary nature of the search and rescue services offered. confidentiality, timeliness of such operations, fairness and uniformity all play a critical role. This article addresses the issue of search and rescue operations in Africa and examines in some detail where the world aviation community is right now and where it is headed in this important field of human endeavour.

Abeyratne, Ruwantissa I. R.↗

Denver TMA assessment

This report describes the assessment of the Traffic Management Advisor (TMA) conducted at the Denver Center and TRACON, January 11-February 5, 1993. The assessment addressed the effectiveness of TMA for supporting various traffic management activities. At the Center, traffic management coordinators (TMC's) shadowed traffic operations, using TMA to make metering time and internal release decisions. At the TRACON, TMC's accessed TMA in an advisory mode for different planning activities such as staffing, distributing the traffic load, and changing the airport acceptance rate. These different opportunities for assessing TMA provide insight into TMA as a potential communication aid and planning tool. Findings from this assessment indicate that TMA can be used to support traffic management planning and decisions. TMC's at the center were able to use information provided by TMA to determine metering times as well as internal release times. At the TRACON, TMA supported decisions on airport configuration, airport acceptance rate, load distribution, proactive coordination with the center, and staffing. While findings of TMA use are generally positive, it must be kept in mind that this assessment is a snapshot in time. Not all TMA capabilities were assessed, nor were TMC's fully trained and knowledgeable on all features. Feature use will continue to evolve and strategies emerge as the TMC's gain experience with TMA over a variety of traffic situations and their understanding of TMA capabilities broadens with continued training.

Harwood, Kelly↗

Multi-limbed locomotion systems for space construction and maintenance

A well developed technology of coordination of multi-limbed locomotory systems is now available. Results from a NASA sponsored study of several years ago are presented. This was a simulation study of a three-limbed locomotion/manipulation system. Each limb had six degrees of freedom and could be used either as a locomotory grasping hand-holds, or as a manipulator. The focus of the study was kinematic coordination algorithms. The presentation will also include very recent results from the Adaptive Suspension Vehicle Project. The Adaptive Suspension Vehicle (ASV) is a legged locomotion system designed for terrestrial use which is capable of operating in completely unstructured terrain in either a teleoperated or operator-on-board mode. Future development may include autonomous operation. The ASV features a very advanced coordination and control system which could readily be adapted to operation in space. An inertial package with a vertical gyro, and rate gyros and accelerometers on three orthogonal axes provides body position information at high bandwidth. This is compared to the operator's commands, injected via a joystick to provide a commanded force system on the vehicle's body. This system is, in turn, decomposed by a coordination algorithm into force commands to those legs which are in contact with the ground.

Waldron, K. J.↗

Mishap Investigation Team (MIT) - Barksdale AFB, Louisiana

The Shuttle Program is organized to support a Shuttle mishap using the resources of the MIT. The afternoon of Feb. 1, 2003, the MIT deployed to Barksdale AFB. This location became the investigative center and interim storage location for crewmembers received from the Lufkin Disaster Field Office (DFO). Working under the leadership of the MIT Lead, the medical team executed a short-term plan that included search, recovery, and identification including coordination with the Armed Forces Institute of Pathology Temporary operations was set up at Barksdale Air Force Base for two weeks. During this time, coordination with the DFO field recovery teams, AFIP personnel, and the crew surgeons was on going. In addition, the crewmember families and NASA management were updated daily. The medical team also dealt with public reports and questions concerning biological and chemical hazards, which were coordinated with SPACEHAB, Inc., Kennedy Space Center (KSC) Medical Operations and the Johnson Space Center (JSC) Space Medicine office. After operations at Barksdale were concluded the medical team transitioned back to Houston and a long-term search, recovery and identification plan was developed.

Stepaniak, Philip↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Orbital operations studies

Nautical units being developed for coordinating the space-time positions of things throughout the earth's atmosphere and the earth-centered region of space are considered. Three aspects of the problem are briefly summarized.

Bellamy, J. C.↗

Constellation Coordination System (CCS) Status

This presentation will be given at the Mission Operations Working Group meeting June 13-15, 2017 to discuss the Constellation Coordination System status.

Constellation coordination system↗

Methods of satellite oceanography

The theoretical basis for remote sensing measurements of climate and ocean dynamics is examined. Consideration is given to: the absorption of electromagnetic radiation in the atmosphere; scattering in the atmosphere; and satellite observations using visible light. Consideration is also given to: the theory of radio scatter from the sea; scatter of centimeter waves from the sea; and the theory of operation of synthetic aperture radars. Additional topics include: the coordinate systems of satellite orbits for oceanographic remote sensing applications; the operating features of the major U.S. satellite systems for viewing the ocean; and satellite altimetry.

Stewart, R. H.↗

An assembly to provide a time reference for the JPL Network Operations Control Center, Real-Time

A device is described which provides the value of date coordinated universal time (date UTC) to the JPL Network Operations Control Center, Real Time (NOCC-RT) facility. The NOCC-RT is the real time portion of the NOCC upgrade task. The time scale is generated in the NOCC-RT clock processor; however, there is a continuous reference to UTC, as realized by the National Institute of Standards and Technology and transmitted by Earth orbiting satellites. An important functional design requirement is the 99.9 pct. availability.

Clements, P. A.↗

Design of a Mach 8.0 axisymmetric nozzle for a hypersonic test facility

An axisymmetric nozzle has been designed to produce test section flow at a Mach number of 8.0 for use in a hypersonic test facility at MSFC. Nominal design conditions used to calculate the viscous correction to the wall contour were selected from the results of a parametric boundary layer investigation so that the widest possible range of satisfactory operating conditions could be obtained. Coordinates for the nozzle are presented in a tabular form suitable for design and manufacturing. The basic analysis techniques have been used to generate results to compare with experimental data from a facility at Langley Research Center. The agreement was reasonably good.

Sims, J. L.↗

Operation Aurorozone: An experiment in sun/weather

Operation Aurorozone was a highly coordinated sequence of 33 rocket flights launched from Poker Flat, Alaska, in September 1976. The effects of aurorally produced X-rays on stratospheric neutral and electrical parameters was studied. The sun/weather coupling between upper and lower regions of the atmosphere is thought to be related to these middle atmospheric parameters. The results show a consistent depletion of ozone above 1 mb during three independent auroral events, with magnitudes in excess of those expected from the measured energy radiation sources. Simultaneously, enhanced conductivity changes were observed to occur in accord with the measured ionizing radiations.

Goldberg, R. A.↗

A simultaneous coordinate relaxation algorithm for large, sparse matrix eigenvalue problems

An algorithm is proposed for a scheme of simultaneous coordinate relaxation. A variant of root-shifting coordinate relaxation, this procedure consists of iterating several vectors at the same time, instead of one at a time. Results of application of the algorithm to test matrices are discussed. For many matrix eigenvalue problems for which coordinate relaxation is a viable approach, the present algorithm is more effective than previous implementations of coordinate relaxation. Total central processor operations should be decreased due to significantly improved convergence.

Raffenetti, R. C.↗

Study of EVA operations associated with satellite services

Extravehicular mobility unit (EMU) factors associated with satellite servicing activities are identified and the EMU improvements necessary to enhance satellite servicing operations are outlined. Areas of EMU capabilities, equipment and structural interfaces, time lines, EMU modifications for satellite servicing, environmental hazards, and crew training are vital to manned Eva/satellite services and as such are detailed. Evaluation of EMU capabilities indicates that the EMU can be used in performing near term, basic satellite servicing tasks; however, satellite servicing is greatly enhanced by incorporating key modifications into the EMU. The servicing missions involved in contamination sensitive payload repair are illustrated. EVA procedures and equipment can be standardized, reducing both crew training time and in orbit operations time. By standardizing and coordinating procedures, mission cumulative time lines fall well within the EMU capability.

Nash, J. O.↗

The Newcastle meteor radar

A brief history and development of the Newcastle Meteor Radar system is given. Also described are its geographical coordinates and its method of operation. The initial objective when the project was commenced was to develop an entirely digital analyzer capable of recognizing meteor echo signals and recording as many of their parameters as possible. This objective was achieved.

Keay, Colin↗

Communications among elements of a space construction ensemble

Space construction projects will require careful coordination between managers, designers, manufacturers, operators, astronauts, and robots with large volumes of information of varying resolution, timeliness, and accuracy flowing between the distributed participants over computer communications networks. Within the CSC Operations Branch, we are researching the requirements and options for such communications. Based on our work to date, we feel that communications standards being developed by the International Standards Organization, the CCITT, and other groups can be applied to space construction. We are currently studying in depth how such standards can be used to communicate with robots and automated construction equipment used in a space project. Specifically, we are looking at how the Manufacturing Automation Protocol (MAP) and the Manufacturing Message Specification (MMS), which tie together computers and machines in automated factories, might be applied to space construction projects. Together with our CSC industrial partner Computer Technology Associates, we are developing a MAP/MMS companion standard for space construction and we will produce software to allow the MAP/MMS protocol to be used in our CSC operations testbed.

Davis, Randal L.↗

Generalized seismic analysis

There is a constant need to be able to solve for enforced motion of structures. Spacecraft need to be qualified for acceleration inputs. Truck cargoes need to be safeguarded from road mishaps. Office buildings need to withstand earthquake shocks. Marine machinery needs to be able to withstand hull shocks. All of these kinds of enforced motions are being grouped together under the heading of seismic inputs. Attempts have been made to cope with this problem over the years and they usually have ended up with some limiting or compromise conditions. The crudest approach was to limit the problem to acceleration occurring only at a base of a structure, constrained to be rigid. The analyst would assign arbitrarily outsized masses to base points. He would then calculate the magnitude of force to apply to the base mass (or masses) in order to produce the specified acceleration. He would of necessity have to sacrifice the determination of stresses in the vicinity of the base, because of the artificial nature of the input forces. The author followed the lead of John M. Biggs by using relative coordinates for a rigid base in a 1975 paper, and again in a 1981 paper . This method of relative coordinates was extended and made operational as DMAP ALTER packets to rigid formats 9, 10, 11, and 12 under contract N60921-82-C-0128. This method was presented at the twelfth NASTRAN Colloquium. Another analyst in the field developed a method that computed the forces from enforced motion then applied them as a forcing to the remaining unknowns after the knowns were partitioned off. The method was translated into DMAP ALTER's but was never made operational. All of this activity jelled into the current effort. Much thought was invested in working out ways to unshakle the analysis of enforced motions from the limitations that persisted.

Butler, Thomas G.↗