Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “control room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

RF mixing modules for superconducting qubit room temperature control systems v1.0

We have developed a series of compact RF mixing boards by integrating I/Q quadrature mixing, IF(intermediate frequency)/LO(local oscillator)/RF power level adjustments, and DC (direct current) bias fine tuning on a 40 mm × 80 mm 4-layer PCB (printed circuit board) board with EMI (electromagnetic interference) shielding.

Huang, Gang↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of Video Analysis System for Working Posture Evaluations

In a work environment, it is important to identify and quantify the relationship among work activities, working posture, and workplace design. Working posture may impact the physical comfort and well-being of individuals, as well as performance. The Posture Video Analysis Tool (PVAT) is an interactive menu and button driven software prototype written in Supercard (trademark). Human Factors analysts are provided with a predefined set of options typically associated with postural assessments and human performance issues. Once options have been selected, the program is used to evaluate working posture and dynamic tasks from video footage. PVAT has been used to evaluate postures from Orbiter missions, as well as from experimental testing of prototype glove box designs. PVAT can be used for video analysis in a number of industries, with little or no modification. It can contribute to various aspects of workplace design such as training, task allocations, procedural analyses, and hardware usability evaluations. The major advantage of the video analysis approach is the ability to gather data, non-intrusively, in restricted-access environments, such as emergency and operation rooms, contaminated areas, and control rooms. Video analysis also provides the opportunity to conduct preliminary evaluations of existing work areas.

McKay, Timothy D.↗

Kennedy Space Center's Command and Control System - "Toasters to Rocket Ships"

This slide presentation reviews the history of the development of the command and control system at Kennedy Space Center. From a system that could be brought to Florida in the trunk of a car in the 1950's. Including the development of larger and more complex launch vehicles with the Apollo program where human launch controllers managed the launch process with a hardware only system that required a dedicated human interface to perform every function until the Apollo vehicle lifted off from the pad. Through the development of the digital computer that interfaced with ground launch processing systems with the Space Shuttle program. Finally, showing the future control room being developed to control the missions to return to the moon and Mars, which will maximize the use of Commercial-Off-The Shelf (COTS) hardware and software which was standards based and not tied to a single vendor. The system is designed to be flexible and adaptable to support the requirements of future spacecraft and launch vehicles.

Lougheed, Kirk↗

Significance of Dynamic and Transient Analysis in the Design and Operation of Hybrid Energy Systems

Energy systems were historically designed and operated with a specific energy conversion objective, while managing loads and resources. In the recent years, the increased utilization of non-dispatchable renewable sources such as wind and solar has played a role in power quality and the reliability of power systems. In order to mitigate the risk associated with the non-dispatchable resources an integrated approach, such as Hybrid Energy Systems (HES), has to be taken, integrating the loads and resource management between the traditional thermal power plants and the non-dispatchable resources. As our electric energy becomes more diverse in its generation resources, the HES with its operational control system, its real-time view and its dynamic decisions making will become an essential part of the integrated energy systems and improve the overall grid reliability. The operational constraints of the energy sources on both the thermal power plants and the non-dispatchable resources in HES, plays a vital role in the planning and design stage. It is an established fact that the choice of energy source depends on the available natural resources and possible infrastructure. A critical component of decision-making depends on the complementary nature and controllability of the energy sources to supply the load demands with high reliability. Controllability of complex HES to achieve desired performance and flexibility is implemented via coordinated control systems while simultaneously generating electricity and other useful products such as useful heat or hydrogen. These systems are based on instrumentation, signal processing, control theory, and engineering system design. The entire HES along with the control systems are characterized by widely varying time constants. Hence, for a well-coordinated control and operation, we propose physics based modeling of the subsystems to assist in a dynamic and transient analysis. Dynamic and transient analysis in real and non-real time domain of the potential sources is capable of providing satisfactory results at the feasibility analysis stage. A simplified HES consisting of complementary energy sources is used to demonstrate the proposed approach. Suitable real time simulations to perform dynamic and transient analysis will be performed to verify results from the non-real time analysis. The role of such analyses, especially the real time dynamic and transient analysis for manual controls is elaborated. It is also discussed that faster than real time simulation will pave the future for controller rooms and hence manual control procedures. Multiple tools such as Real Time Simulator, Matlab®, Simulink®, PSCAD®, MOOSE, etc. are expected to be used for the HES analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uniformity of environmental conditions and plant growth in a hydroponic culture system for use in a growth room with aerial CO2 control

A portable system of hydroponic culture was developed that maintained temperature, pH, and nutrient concentrations of circulating nutrient solutions. The hydroponic system is used within a controlled-environment room (CER) for control of aerial environment. The CER was equipped with an auto-calibrating system for atmospheric CO2 control. The control systems for the hydroponic chambers were able to maintain acidity within +/- 0.2 pH units and the temperature with +/- 0.5 degree C. Mixing time for the 200-liter volume of solution within a hydroponic chamber was less than 12 min. The CO2 control system was able to maintain aerial concentrations within +/- 10 ppm CO2 during the light period. The only gradient found to occur within the hydroponic chambers or CER was a slight gradient in aerial temperature along the length of hydroponic chambers. Growth of soybeans [Glycine max (L.) Merr.] was characterized during a 3-week period of vegetative development by leaf number and area, plant dry weight, total N content of plants, and N depletion from the nutrient solution. The growth characteristics among populations for three hydroponic chambers within the CER were not significantly different, and the percent standard errors of means of the measurements within populations from each chamber were nearly all less than 10%. Thus, the uniformity of plant growth reflected the uniformity of environmental conditions.

NASA Discipline Life Support Systems↗

Demonstration and Evaluation of the Human-Technology Integration Function Allocation Methodology

There is an imminent need for the existing nuclear power plants to reduce their operating and maintenance (O&M) costs to remain economically viable. Digital technology, including automation, provides a significant opportunity for the existing nuclear power plant fleet to transform the way in which work is accomplished, reducing O&M costs, and allowing the fleet to remain economically competitive. One notable opportunity to significantly reduce O&M costs pertains to modifications to the plant equipment and main control room (MCR). Existing instrumentation and control (I&C) technologies in the MCR are highly analog, costly to operate and maintain, and demand a high cognitive and physical workload from plant staff (i.e., operators). Digitalizing the MCR has a range of broad economic benefits, including improved plant performance and reduced manual work. Further, digital I&C systems can fundamentally change the way in which plant staff operate the plant; this is the concept of operation. Human-technology integration is important to ensure that impacts to the concept of operation are done in a way that account for capabilities of people and technology. Human-technology integration employs human factors engineering (HFE) methods and principles to maximize the benefits of digital technology, reducing human error, improving overall decision-making and usability. The U.S. Department of Energy Light Water Reactor Sustainability Program is applying human-technology integration research to ensure digital technologies are safe, reliable, and efficient. This paper documents the demonstration of the human-technology guidance developed by the Light Water Reactor Sustainability Program from a first-of-a-kind digital I&C upgrade, specifically addressing function analysis and allocation for a new digital I&C system that included changes in automation levels. The program’s specific approach is included in this work, following lessons learned. This document serves as a resource for industry to follow in applying human-technology integration and HFE to digital modifications, specific to function analysis and allocation. The lessons learned should be considered in the planning and execution of HFE activities that support such digital modifications.

99 GENERAL AND MISCELLANEOUS↗

Instrument Records Magnetic Fields Generated By Lightning

Portable, self-contained, compact instrument measures and records transient magnetic fields particularly those generated by nearby lightning strikes. Designed to be placed near sensitive electronic equipment in anticipation of thunderstorms. Data recorded during thunderstorms analyzed afterward to determine whether magnetic effects of lightning strong enough to have damaged and/or affected operation of sensitive equipment. Provides data helping engineers decide whether sensitive equipment should be tested for damage and/or other effects caused by lightning. Typical installations in which instrument beneficial include outdoor sensing equipment, computer rooms, broadcasting stations, and powerplant control rooms.

Medelius, Pedro J.↗

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments.

Iverson, David L.↗

Software Development for Remote Control and Firing Room Displays

The Launch Control System (LCS) developed at NASA's Kennedy Space Center (KSC) will be used to launch future spacecraft. Two of the many components of this system are the Application Control Language (ACL) and remote displays. ACL is a high level domain specific language that is used to write remote control applications for LCS. Remote displays are graphical user interfaces (GUIs) developed to display vehicle and Ground Support Equipment (GSE) data, they also provide the ability to send commands to control GSE and the vehicle. The remote displays and the control applications have many facets and this internship experience dealt with several of them.

LCS↗

The effect of support functions in a computerized procedure system on interface management tasks - 235

By adapting digital and computer technology, the design of main control rooms (MCR) in nuclear power plants has been changed. When operators operate a nuclear power plant, the tasks using soft controls in advanced MCRs include primary tasks and secondary tasks. Primary tasks are to control nuclear power plant devices and secondary tasks are to find appropriate screens or devices by screen navigations and selections before performing the primary task. The secondary task including interface management tasks is newly introduced in advanced MCRs. In this paper, the tasks are analyzed based on the simulation data of APR1400 which is one of the digitalized nuclear power plants. For analyzing tasks, the unit tasks are divided into three types: navigation, manipulation, and acknowledgement. The primary task represents the manipulation of devices and the secondary task indicates the navigating screens, opening control panels, closing control panels, and confirming the acknowledging alarms. To analyze the effect of support functions of a computerized procedure system (CPS), one of the functions which is expected to have a significant effect on the secondary tasks was considered, that is 'related screen link button.' Two factors, 'ratio of screen alteration' and 'ratio of using screen link button', were used to see the effect of 'related screen link button'. From the task analysis result, it was observed that the secondary tasks which is one of the unique features in advanced MCRs have a quite much portion than that of the primary tasks. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AVESTAR Center for Operational Excellence of Clean Energy Plants

To address challenges in attaining operational excellence for clean energy plants, the U.S. Department of Energy's National Energy Technology Laboratory has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTAR{trademark}). The AVESTAR Center brings together state-of-the-art, real time,high-fidelity dynamic simulators with operator training systems and 3D virtual immersive training systems into an integrated energy plant and control room environment. This presentation will highlight the AVESTAR Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission energy plants.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

A Case Study of Tunable White LED Lighting with Networked Lighting Controls (Emory University Cognitive Empowerment Program)

Emory University and Georgia Institute of Technology (Georgia Tech) partnered to create the Charlie and Harriet Schaffer Cognitive Empowerment Program (CEP) facility in northeast Atlanta. Together with the funders they are building a program to help individuals experiencing mild cognitive impairment (MCI) to maintain their physical and cognitive health, and independence as long as possible. In addition to applying effective strategies and therapies, the two research groups are investigating the responses of the MCI members to treatments that involve acoustical conditions, exercise and movement, and lighting changes that may support retention or relearning of skills. Care partners and family members receive support and instruction to improve home and work life, promoting joy, purpose, and wellness in the family groups. The lighting system uses tunable-white LEDs, employing luminaires with both warm and cool-color emitters that can be dimmed separately to produce any white correlated color temperature (CCT) between 2700 K and 6500 K. All luminaires were dimmable to achieve subdued or lively surroundings for different treatments, time-of-day, and mood. A central networked digital control system was employed to allow tuning of multiple spaces together (for example, bright, cool morning light could be programmed for extra stimulation, or lighting in all spaces at the end of the day could be reduced in both light output and CCT to promote relaxation and not interfere with the melatonin cycle of occupants). Almost all spaces were equipped with individual room control of dimming and color temperature with touch screens to allow users to tune the lighting as desired, but each room’s controls could also be specially programmed through the server in case the research staff were investigating lighting settings on learning, for example. The server incorporates a timeclock, and it is able to send signals to switch off all lighting after occupancy hours, or enable occupancy sensors to control the lighting. The bulk of the construction work was completed in January 2020. It was clear from an initial walk-through that although the lighting system produced the expected high light level with low-glare qualities of light, that there were issues and inconsistencies to be resolved. These were noted in an initial punchlist visit and expected to be resolved when the tech representatives from the agency visited with the electrical contractor in the following few weeks. What followed was 2.5 years of identifying unexpected lighting performance in terms of light output, color, scheduling, and occupancy. This report documents the issues encountered in the effort to get the lighting and controls systems to operate as intended. It concludes with guidance for design professionals and manufacturers to help avoid problematic complexity in future projects.

42 ENGINEERING↗

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

17 WIND ENERGY↗

Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy

Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970’s vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performance improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE’s program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security . The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: 1. Highly integrated control rooms 2. Highly automated plant 3. Integrated operations 4. Human performance improvement for field workers 5. Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Recent results from a testbed for the reliability of the digital instrumentation and control systems and cybersecurity in nuclear power plants - 392

Transition from analog to digital instrumentation and control systems requires a systematic study of the modifications, and assessment of their reliability. Such studies are often carried out on a test bed. The test bed developed earlier includes a commercially available triple modular redundant (TMR) programmable logic controller (PLC) for testing not only the reliability of the digital I and C but also the cyber-security of the system during plant operation. This paper reports results of our preliminary analyses carried out using the test bed following the injection of faults mimicking faulty sensors. The fault injection tool generates faulty signals in single or multiple sensors located in the primary loop. These scenarios studied under steady-state operation conditions simulate a bad sensor, a cut wire, noise, etc. The faults injected can lead to information being displayed in the main control room (MCR) to not match the conditions in the plant. In addition to a fault injection module, a result analyzer module is also a part of this testbed. Operator actions can be based on information displayed in the MCR, or they can be informed by the result analyzer. Potential operator actions following these single- or multiple faulty signals are assessed. It is concluded that the result analyzer in some cases can be helpful in guiding operators to make the right decisions. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗