Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Hanford Reach Fall Chinook Salmon Redd Monitoring Report for Calendar Year 2020

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act. DOE/EIS-0222, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement, (CLUP) evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, and ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Reach Fall Chinook Salmon Redd Monitoring Report for Calendar Year 2019

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act. DOE/EIS-0222, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement (CLUP) evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, and ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2018

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act. DOE/EIS-0222, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement (CLUP) evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, and ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2017

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). DOE/EIS-0222, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement (CLUP) evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, and ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2024

The U.S. Department of Energy, Hanford Field Office (HFO) conducts ecological monitoring at the Hanford Site to collect and maintain data to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under HFO stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities at the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement. HFO places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (i.e., federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2022

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and maintain data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Mule Deer Monitoring Report for Fiscal Year 2019

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with environmental laws, regulations, and policies governing Department of Energy activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision-making under the National Environmental Policy Act of 1969 (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act of 1980. The Hanford Site Comprehensive Land Use Plan (CLUP, DOE 1999), which is the Environmental Impact Statement that evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site, ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2023: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under RL stewardship at the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2022: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In addition, ecological monitoring helps ensure that DOE-RL, its contractors and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Ground Squirrel Monitoring Report for Calendar Year 2021

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing U.S. Department of Energy (DOE) activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision making under the National Environmental Policy Act and Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS- 0222-F, Hanford Site Comprehensive Land Use Plan (CLUP). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or Tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2021

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2021 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 52 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2021.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2020

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2020, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2020 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 41 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2020.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Analysis of Persistent Soiling Losses: Cooperative Research and Development (Final Report)

The Contractor will analyze data from sensors and equipment provided by Participant in order to provide the basis for understanding of the processes and rates for the formation of 'persistent' soiling (soiling not removed by rain). The resulting, data, technical report, and publications will provide the basis for Participant to improve it's predictive soiling model.

14 SOLAR ENERGY↗

Floating Offshore Wind U.S. Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

The American-Made FLoating Offshore Wind ReadINess (FLOWIN) Prize provides the Participant with a voucher technical support provided by DOE national laboratories, such as the Contractor. The primary goals include providing insights for the INO/INOC floating offshore wind platform on 1) an evaluation the workforce requirements for the full-scale production and deployment; and 2) an assessment of domestic supplier capabilities for the main components US regional and national supply chain constraints and gaps.

17 WIND ENERGY↗

Dynamic Wind Loading on Compliant, Floating PV Arrays: Cooperative Research and Development (Final Report)

PV panels are subjected to wind loads during normal outdoor operation, where th wind speed, wind direction, panel angle, and array layout play a large role in the overall loading magnitude. For floating PV systems, where panels are installed on floating rafts, these forces can lead to a dynamic displacement of the raft and mounted PV hardware. The Contractor and Participant will perform fluid-structure interaction simulations of this phenomenon for a variety of wind speeds, directions, and panel angles to characterize these forces and help design mooring/tethering lines to resist and anchor raft movement.

14 SOLAR ENERGY↗

Cost Effectiveness of Laser Powder Bed Fusion for Heavy Duty Applications

ORNL (Contractor) and Cummins Inc. (Participant) collaborated to determine the cost effectiveness of laser powder bed fusion (LPBF) for heavy duty applications. The team demonstrated that coupons can be fabricated with two distinct process parameters i.e., different process parameters for the bulk and surface of the material. This is important for enabling the manufacturing of components in a production environment where the bulk of the material can be processed rapidly while high quality surface finish can minimize post-process machining as well as enable superior fatigue performance if the material were to be used in as-deposited condition.

36 MATERIALS SCIENCE↗