Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “attribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Investigation of reliability attributes and accelerated stress factors on terrestrial solar cells

The results of accelerated stress testing of four different types of silicon terrestrial solar cells are discussed. The accelerated stress tests used included bias-temperature tests, bias-temperature-humidity tests, thermal cycle and thermal shock tests, and power cycle tests. Characterization of the cells was performed before stress testing and at periodic down-times, using electrical measurement, visual inspection, and metal adherence pull tests. Electrical parameters measured included short-circuit current, open circuit voltage, and output power, voltage, and current at the maximum power point. Incorporated in the report are the distributions of the prestress electrical data for all cell types. Data were also obtained on cell series and shunt resistance.

Prince, J. L.↗

Engineering Area Investigation of Reliability Attributes and Accelerated Stress Factors on Terrestrial Solar Cells

Results obtained include the definition of a simplified stress test schedule for terrestrial solar cells based on the work performed during the first program year, and the design and fabrication of improved jigs and fixtures for electrical measurement and stress testing. Implementation of these advanced techniques for accelerated stress testing is underway on three solar cell types. In addition, review of the literature on second quadrant phenomena was begun and some preliminary second-quadrant electrical measurements were performed. Results obtained at the first down time for 75 C B-T testing and biased and unbiased T-H pressure cooker testing of type F cells showed little or no degradation in electrical parameters. Significant physical effects (large solder bubbles) were noted for type F cells subjected to the pressure cooker stress test.

Lathrop, J. W.↗

Investigation of reliability attributes and accelerated stress factors on terrestrial solar cells

Major effort during this reporting period was devoted to two tasks: improvement of the electrical measurement instrumentation through the design and construction of a microcomputer controlled short interval tester, and better understanding of second quadrant behavior by developing a mathematical model relating cell temperature to electrical characteristics. In addition, some preliminary work is reported on an investigation into color changes observed after stressing.

Lathrop, J. W.↗

Investigation of reliability attributes and accelerated stress factors on terrestrial solar cells

The accelerated stress test results obtained on all terrestrial solar cells since the inception of the program are summarized. Tested cells were grouped according to the method used to form the conductive metallization layer: solder dipped, vacuum deposited, screen printed, and copper plated. Although metallization systems within each group were quite similar, they differed in numerous details according to the procedures employed by each manufacturer. Test results were summarized for all cells according to both electrical degradation and catastrophic mechanical changes. These results indicated a variability within each metallization category which was dependent on the manufacturer. Only one manufacturer was represented in the copper plated category and, although these showed no signs of detrimental copper diffusion during high temperature testing, their metallization was removed easily during high humidity pressure cooker testing. Preliminary testing of encapsulated cells showed no major differences between encapsulated and unencapsulated cells when subjected to accelerated testing.

Lathrop, J. W.↗

Space station needs, attributes, and architectural options study

The top level, time-phased total space program support system architecture is described including progress from the use of ground-based space shuttle, teleoperator system, extended duration orbiter, and multimission spacecraft, to an initial 4-man crew station at 29 deg inclination in 1991, to a growth station with an 8-man crew with capabilities for OTV high energy orbit payload placement and servicing, assembly, and construction of mission payloads in 1994. System Z, proposed for Earth observation missions in high inclination orbit, can be accommodated in 1993 using a space station derivative platform. Mission definition, system architecture, and benefits are discussed.

Source record↗

Space station needs, attributes, and architectural options study. Volume 1: Missions and requirements

Science and applications, NOAA environmental observation, commercial resource observations, commercial space processing, commercial communications, national security, technology development, and GEO servicing are addressed. Approach to time phasing of mission requirements, system sizing summary, time-phased user mission payload support, space station facility requirements, and integrated time-phased system requirements are also addressed.

Source record↗

Space station needs, attributes, and architectural options study. Volume 2: Program options, architecture, and technology

Mission scenarios and space station architectures are discussed. Electrical power subsystems (EPS), environmental control and life support, subsystems (ECLSS), and reaction control subsystem (RCS) architectures are addressed. Thermal control subsystems, (TCS), guidance/navigation and control (GN and C), information management systems IMS), communications and tracking (C and T), and propellant transfer and storage systems architectures are discussed.

Source record↗

Space station needs, attributes and architectural options study. Volume 1: Executive summary

Planetary explorations, Earth observations, space physics, astronomy-astrophysics, solar physics, life/biological/medical sciences, materials processing in space, communications, and technology development are addressed. Mission requirements, integrated user requirements, and space station user accommodation requirements are discussed. Mission implementation concepts and cost, benefits and programmatic analysis are discussed.

Source record↗

Space station needs, attributes and architectural options study. Volume 3: Mission requirements

User missions that are enabled or enhanced by a manned space station are identified. The mission capability requirements imposed on the space station by these users are delineated. The accommodation facilities, equipment, and functional requirements necessary to achieve these capabilities are identified, and the economic, performance, and social benefits which accrue from the space station are defined.

Source record↗

Space station needs, attributes and architectural options study review report

A manned space station (SS) produces a significant net economic benefit over its cost, as well as providing substantial social and performance benefits. The largest space station benefits arise from the ability of the SS to warehouse parts, orbit replacement units (ORUs) and fuel and thereby increase the Space Transportation System (STS) load factor. Substantial other benefits are made possibly by the basing of a returnable orbital transfer vehicles (ROTV) and the servicing of geosynchronous Earth orbit (GEO) satellites at the SS. It is recommended that a manned space station be placed in a 28.5 degree inclination orbit in 1990. This SS can be designed to grow, to be maintained and to incorporate new technology as it becomes available. It should be augmented with unmanned space platforms at both 28.5 degree and polar inclinations. These platforms are designed to have very high commonality with the SS resource models.

Source record↗

Space station needs, attributes and architectural options study commercialization working group briefing

The benefits for each of the following commercial areas was investigated: communications, remote sensing, materials processing in space, low Earth orbit (LEO) satellite assembly, testing, and servicing, and space tourism. In each case, where economic benefits are derived, the costs for accomplishing tasks with the Space Station are compared with the cost with the Space Transportation System only.

Source record↗

Space station needs, attributes and architectural options study costing working group briefing

The interface between tasks and the sequence of information flow are charted. The mission model and the requirements of each mission. These requirements along with the mission model schedule resulted in a further definition of the mission payloads, the Space Station architecture and the STS requirements was developed in task 2. The information was used to estimate the cost parameters necessary to generate cost estimates for the system with the aid of cost models for the Missions, Space Station and Space Transportation.

Source record↗