Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Using Hardware-In-The-Loop Methodology to Develop Test Systems

Hardware in the Loop (HIL) testing methodologies have become widespread in industry. Typically, they focus on developing control algorithms for systems such as autonomous vehicles or aircraft. An oft overlooked aspect of product development is the design and fabrication of a test system for validating that the product meets requirements. Abstractly, a test system differs little from a control system—testers provide signals to the unit, monitor feedback, and base decisions on the results. While the time scales may differ, the functionalities are conceptually similar. Viewed in this light, it becomes natural to extend HIL approaches to tester development. By replacing a physical unit with a proxy model deployed to a real-time or pseudo real-time target, test systems can be developed in parallel with the design and fabrication of a first production unit. This saves considerable time in the life cycle from conceptual design to realized product. This manuscript demonstrates the process flow using a capacitive discharge unit as an exemplar.

42 ENGINEERING↗

Analysis and application of a velocity command motor as a reaction mass actuator

A commercially available linear stepper motor is applied as a reaction mass (RM) actuator. With the actuator operating in the (RM) relative-velocity command mode, open-loop and closed-loop testing is performed to determine operational limits. With the actuator mounted on a simple beam structure, root strain, RM acceleration, or beam acceleration is used in the feedback loop to augment the structural damping. The RM relative position is also used as feedback to ensure that the RM remains centered.

Sulla, Jeffrey L.↗

Integration Test of the High Voltage Hall Accelerator System Components

NASA Glenn Research Center is developing a 4 kilowatt-class Hall propulsion system for implementation in NASA science missions. NASA science mission performance analysis was completed using the latest high voltage Hall accelerator (HiVHAc) and Aerojet-Rocketdyne's state-of-the-art BPT-4000 Hall thruster performance curves. Mission analysis results indicated that the HiVHAc thruster out performs the BPT-4000 thruster for all but one of the missions studied. Tests of the HiVHAc system major components were performed. Performance evaluation of the HiVHAc thruster at NASA Glenn's vacuum facility 5 indicated that thruster performance was lower than performance levels attained during tests in vacuum facility 12 due to the lower background pressures attained during vacuum facility 5 tests when compared to vacuum facility 12. Voltage-Current characterization of the HiVHAc thruster in vacuum facility 5 showed that the HiVHAc thruster can operate stably for a wide range of anode flow rates for discharge voltages between 250 and 600 volts. A Colorado Power Electronics enhanced brassboard power processing unit was tested in vacuum for 1,500 hours and the unit demonstrated discharge module efficiency of 96.3% at 3.9 kilowatts and 650 volts. Stand-alone open and closed loop tests of a VACCO TRL 6 xenon flow control module were also performed. An integrated test of the HiVHAc thruster, brassboard power processing unit, and xenon flow control module was performed and confirmed that integrated operation of the HiVHAc system major components. Future plans include continuing the maturation of the HiVHAc system major components and the performance of a single-string integration test.

Hall propulsion system↗

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Test act system validation

The primary objective of the Test Active Control Technology (ACT) System laboratory tests was to verify and validate the system concept, hardware, and software. The initial lab tests were open loop hardware tests of the Test ACT System as designed and built. During the course of the testing, minor problems were uncovered and corrected. Major software tests were run. The initial software testing was also open loop. These tests examined pitch control laws, wing load alleviation, signal selection/fault detection (SSFD), and output management. The Test ACT System was modified to interface with the direct drive valve (DDV) modules. The initial testing identified problem areas with DDV nonlinearities, valve friction induced limit cycling, DDV control loop instability, and channel command mismatch. The other DDV issue investigated was the ability to detect and isolate failures. Some simple schemes for failure detection were tested but were not completely satisfactory. The Test ACT System architecture continues to appear promising for ACT/FBW applications in systems that must be immune to worst case generic digital faults, and be able to tolerate two sequential nongeneric faults with no reduction in performance. The challenge in such an implementation would be to keep the analog element sufficiently simple to achieve the necessary reliability.

Source record↗

Experimental and Analytical Study of Two-Phase Flow in Microgravity

A two-phase test loop has been designed and constructed to generate the necessary data for two-phase pressure drop and Critical Heat Flux (CHF) under reduced gravity conditions. A series of airplane trajectory tests aboard NASA KC-135 were performed and the data was used to evaluate the applicability of the earth gravity models for prediction of the reduced gravity data. Several commonly used correlations for the two-phase friction multiplier and critical heat flux were used to predict the data. It was generally concluded that the two-phase pressure drop can be predicted by the earth gravity correlations. The critical heat flux under reduced gravity conditions did not show a strong dependence on mass flow rate and the measured CHF were generally lower than the equivalent 1g conditions. The earth gravity models need to be modified for application to reduced gravities.

Abdollahian, D.↗

Challenges of the Cassini Test Bed Simulating the Saturnian Environment

The Cassini-Huygens mission is a joint NASA and European Space Agency (ESA) mission to collect scientific data of the Saturnian system and is managed by the Jet Propulsion Laboratory (JPL). After having arrived in Saturn orbit and releasing the ESA's Huygens probe for a highly successful descent and landing mission on Saturn's moon Titan, the Cassini orbiter continues on its tour of Saturn, its satellites, and the Saturnian environment. JPL's Cassini Integrated Test laboratory (ITL) is a dedicated high fidelity test bed that verifies and validates command sequences and flight software before upload to the Cassini spacecraft. The ITL provides artificial stimuli that allow a highly accurate hardware-in-the-loop test bed model that tests the operation of the Cassini spacecraft on the ground. This enables accurate prediction and recreation of mission events and flight software and hardware behavior. As we discovered more about the Saturnian environment, a combination of creative test methods and simulation changes were necessary to simulate the harmful effect that the optical and physical environment has on the pointing performance of Cassini. This paper presents the challenges experienced and overcome in that endeavor to simulate and test the post Saturn Orbit Insertion (SOI) and Probe Relay tour phase of the Cassini mission.

Titan atmospheric drag↗

Modular, Autonomous Command and Data Handling Software with Built-In Simulation and Test

The spacecraft system that plays the greatest role throughout the program lifecycle is the Command and Data Handling System (C&DH), along with the associated algorithms and software. The C&DH takes on this role as cost driver because it is the brains of the spacecraft and is the element of the system that is primarily responsible for the integration and interoperability of all spacecraft subsystems. During design and development, many activities associated with mission design, system engineering, and subsystem development result in products that are directly supported by the C&DH, such as interfaces, algorithms, flight software (FSW), and parameter sets. A modular system architecture has been developed that provides a means for rapid spacecraft assembly, test, and integration. This modular C&DH software architecture, which can be targeted and adapted to a wide variety of spacecraft architectures, payloads, and mission requirements, eliminates the current practice of rewriting the spacecraft software and test environment for every mission. This software allows missionspecific software and algorithms to be rapidly integrated and tested, significantly decreasing time involved in the software development cycle. Additionally, the FSW includes an Onboard Dynamic Simulation System (ODySSy) that allows the C&DH software to support rapid integration and test. With this solution, the C&DH software capabilities will encompass all phases of the spacecraft lifecycle. ODySSy is an on-board simulation capability built directly into the FSW that provides dynamic built-in test capabilities as soon as the FSW image is loaded onto the processor. It includes a six-degrees- of-freedom, high-fidelity simulation that allows complete closed-loop and hardware-in-the-loop testing of a spacecraft in a ground processing environment without any additional external stimuli. ODySSy can intercept and modify sensor inputs using mathematical sensor models, and can intercept and respond to actuator commands. ODySSy integration is unique in that it allows testing of actual mission sequences on the flight vehicle while the spacecraft is in various stages of assembly, test, and launch operations all without any external support equipment or simulators. The ODySSy component of the FSW significantly decreases the time required for integration and test by providing an automated, standardized, and modular approach to integrated avionics and component interface and functional verification. ODySSy further provides the capability for on-orbit support in the form of autonomous mission planning and fault protection.

Cuseo, John↗

Report of METL Mutual Inductance Level Sensor Development for Use in Liquid Metals – FY2023

A robust mutual inductance level sensor (MILS) for use in high temperature liquid metals has been developed at Argonne National Laboratory (ANL). The current design utilizes mineral insulated cables with a 300-series stainless steel sheath, magnesium oxide insulation, and a single copper conductor. Two coils are wrapped on a common core made of a 300-series stainless steel tube. One coil is energized with an alternating current (AC) source, and this electromagnetically couples with the second coil to generate an induced voltage. The voltage is measured to determine the mutual induction between the coils, and the mutual inductance measurement can be used to determine the level of a nearby liquid metal volume. The MILS can be located in an isolating thimble that is fully sealed to a vessel containing liquid metal for ease of maintenance and replacement. When the primary coil is energized with the AC source, the coil not only electromagnetic (EM) couples with the second coil, but also the surrounding liquid metal. The EM coupling with the surrounding liquid metal reduces the EM coupling with the second coil, producing an inverse-linear relationship between liquid metal level and secondary coil voltage. This has all been demonstrated at the Mechanisms Engineering Test Loop (METL) liquid sodium facility at ANL. The most current iteration of the MILS system is the MILS-MK-II. This sensor system has been commissioned in a non-sodium test stand where calibrations were performed using a sodium analog. The calibrations proved to be highly linear and repeatable. The MILS-MK-II has been installed in the METL expansion tank where high temperature sodium tests have been performed. The MILS-MK-II has been calibrated against a known standard at temperature of 300°C, and the calibrations have proved to be highly linear and repeatable. The calibrated MILS-MK-II has been in operation in the METL facility for several thousands of hours at temperatures around 300°C. The experimental data has been used to develop and validate electromagnetic finite element models in COMSOL Multiphysics, and now these models can be used to advance the development of the sensor system. Next steps will include temperature compensation to allow for operation at various temperatures. Additionally, efforts to incorporate a self-calibration methodology are underway.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING↗

Development of a Test Facility for Air Revitalization Technology Evaluation

Development of new air revitalization system (ARS) technology can initially be performed in a subscale laboratory environment, but in order to advance the maturity level, the technology must be tested in an end-to-end integrated environment. The Air Revitalization Technology Evaluation Facility (ARTEF) at the NASA Johnson Space Center serves as a ground test bed for evaluating emerging ARS technologies in an environment representative of spacecraft atmospheres. At the center of the ARTEF is a hypobaric chamber which serves as a sealed atmospheric chamber for closed loop testing. A Human Metabolic Simulator (HMS) was custom-built to simulate the consumption of oxygen, and production of carbon dioxide, moisture and heat of up to eight persons. A multitude of gas analyzers and dew point sensors are used to monitor the chamber atmosphere upstream and downstream of a test article. A robust vacuum system is needed to simulate the vacuum of space. A reliable data acquisition and control system is required to connect all the subsystems together. This paper presents the capabilities of the integrated test facility and some of the issues encountered during the integration.

Lu, Sao-Dung↗

Gear Test Assembly – Experimental Testing and Gear Analysis (FY2021 Year End Report)

The Gear Test Assembly (GTA) is an experimental apparatus designed to test mechanical components used in fuel handling systems of liquid-sodium cooled fast-spectrum nuclear reactors. The performance and lifetime of gears, bearings, and dynamic seals are the primary focus of study. Three experimental campaigns have been completed since the start of operation in 2019, and the GTA is currently assembled and ready to begin the fourth experimental campaign. Sodium operations at the Mechanisms Engineering Test Loop (METL) have been paused while repairs are made to the Building 308 Alkali Metal Scrubber. This work is nearly complete, and once METL is brought back into operation the GTA will begin sodium testing immediately.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The J-2X Upper Stage Engine: From Heritage to Hardware

NASA's Global Exploration Strategy requires safe, reliable, robust, efficient transportation to support sustainable operations from Earth to orbit and into the far reaches of the solar system. NASA selected the Ares I crew launch vehicle and the Ares V cargo launch vehicle to provide that transportation. Guiding principles in creating the architecture represented by the Ares vehicles were the maximum use of heritage hardware and legacy knowledge, particularly Space Shuttle assets, and commonality between the Ares vehicles where possible to streamline the hardware development approach and reduce programmatic, technical, and budget risks. The J-2X exemplifies those goals. It was selected by the Exploration Systems Architecture Study (ESAS) as the upper stage propulsion for the Ares I Upper Stage and the Ares V Earth Departure Stage (EDS). The J-2X is an evolved version ofthe historic J-2 engine that successfully powered the second stage of the Saturn I launch vehicle and the second and third stages of the Saturn V launch vehicle. The Constellation architecture, however, requires performance greater than its predecessor. The new architecture calls for larger payloads delivered to the Moon and demands greater loss of mission reliability and numerous other requirements associated with human rating that were not applied to the original J-2. As a result, the J-2X must operate at much higher temperatures, pressures, and flow rates than the heritage J-2, making it one of the highest performing gas generator cycle engines ever built, approaching the efficiency of more complex stage combustion engines. Development is focused on early risk mitigation, component and subassembly test, and engine system test. The development plans include testing engine components, including the subscale injector, main igniter, powerpack assembly (turbopumps, gas generator and associated ducting and structural mounts), full-scale gas generator, valves, and control software with hardware-in-the-loop. Testing expanded in 2007, accompanied by the refinement of the design through several key milestones. This paper discusses those 2007 tests and milestones, as well as updates key developments in 2008.

Byrd, THomas↗

Ammonia Offgassing from SA9T

NH3 is a degradation product of SA9T, a solid-amine sorbent developed by Hamilton Sundstrand, that is continually emitted into the gas stream being conditioned by this sorbent. NH3 offgassing rates were measured using FTIR spectroscopy using a packed bed at similar contact times as offgassing tests conducted at Hamilton Sundstrand and at the Ames Research Center. The bed was challenged with moist air at several flow rates and humidities and NH3 concentration of the effluent was measured for several hours. The NH3 offgassing rates in open-loop testing were calculated from the steady state outlet NH3 concentration and flow rate. NH3 offgassing rates from SA9T were found to be influenced by the contact time with the adsorbent (flow rate) and by the humidity of the inlet gas stream, which are consistent with previous studies. Closed-loop vacuum-swing adsorption cycling rates verified that NH3 offgassing continues when a constant source of water vapor is present.

Monje, Oscar↗

Real-Time Optimization and Control of Next-Generation Distribution Infrastructure

This presentation highlights the key developments of the ARAP-e NODES project, including the innovative real-time optimal power flow (RT-OPF) algorithm for distributed energy resource (DER) management, trip planning for T+D coordination, and extensive validation of the RT-OPF algorithm in NREL ESIF laboratory with 100+ physical hardware devices, controller-hardware-in-the-loop test at Southern California Edison (SCE), and two field demonstrations.

hardware-in-the-loop↗

Low Flow Vortex Shedding Flow Meter for Hypergolics/all Media

A family of vortex shedding flow meters, for measurement of hypergol flows, was designed and fabricated. The test loops to evaluate the flow meters for water flow, as well as Freon -113 flow which simulates the hypergolic fluids, were modified and constructed to utilize a pump system which has an output capacity of 200 gpm. Test runs were conducted on the small 1/2 inch model with Freon 113 and on the larger models with water. Results showed that the linearity between the frequency of the vortices and the flow rate of the fluids was very close to that of the turbine flow meter. It is suggested that the vortex shedding flow meter is a possible replacement for the existing turbine type.

Thinh, Ngo Dinh↗

SILHIL Replication of Electric Aircraft Powertrain Dynamics and Inner-Loop Control for V&V of System Health Management Routines

Software-in-the-loop and Hardware-in-the-loop testing of failure prognostics and decision making tools for aircraft systems will facilitate more comprehensive and cost-effective testing than what is practical to conduct with flight tests. A framework is described for the offline recreation of dynamic loads on simulated or physical aircraft powertrain components based on a real-time simulation of airframe dynamics running on a flight simulator, an inner-loop flight control policy executed by either an autopilot routine or a human pilot, and a supervisory fault management control policy. The creation of an offline framework for verifying and validating supervisory failure prognostics and decision making routines is described for the example of battery charge depletion failure scenarios onboard a prototype electric unmanned aerial vehicle.

Verification and Validation↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Demonstrating autonomous controls on hardware test beds is a necessity for successful missions to Mars and beyond

NASA and the Department of Defense are planning for a mission to Mars in the 2030s–2040s using nuclear thermal propulsion (NTP). NTP uses a nuclear reactor to heat flowing hydrogen and create thrust. A serious concern for crewed and uncrewed missions to Mars is the loss of reactor control. The reactor startup and initial rocket impulse are initiated in cislunar or near-earth orbital regions; therefore, radio communications between ground control and the NTP engine should occur in real time. However, radio communications can take more than 20 min, depending on planet positions, to reach Mars orbiters from ground control. To address this delay, local autonomous controls are implemented onboard the NTP engine to ensure acceptable operation. However, autonomous controls have not been demonstrated or implemented in research or power reactor contexts because of safety and reliability concerns. To enable autonomous controls development, demonstration, and validation, Oak Ridge National Laboratory has created a nonnuclear hardware-in-the-loop test bed. Sensors throughout the test bed relay system status and hardware response to the user control algorithm, including measurements of temperature, flow, pressure of a loop, control drum position, and drum speed. This paper discusses the development of this facility and user accessibility.

33 ADVANCED PROPULSION SYSTEMS↗