Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Strategic Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

2024 JISEA Annual Meeting: Opening Session

This is the opening presentation for the 2024 JISEA Annual Meeting, which took place on February 26-27, 2024. The presentation includes background on the Joint Institute for Strategic Energy Analysis and the goals of the 2024 JISEA Annual Meeting.

2024↗

Basic Research Needs for Communicating Basic Science

Basic science—also known as discovery or foundational research—is the fuel that powers our innovation ecosystem and the global economy. Despite this critical role, public awareness for how and where basic research is done, how it is funded, and its need for sustainable support over the long term is negligible. The ability to engage broader publics in awareness and understanding of basic science is paramount if we are to maintain the research enterprise that has transformed the modern world. Communicating how the federal government stewards taxpayer dollars for basic science is also incumbent on the agencies and scientists who use public dollars for their research. However, science communication is a complex activity that requires advanced planning, resources, and skill. Therefore, it is important to understand what we know about communicating basic science to the broader publics, as well as what we do not know, to be strategic and better equipped for effective, meaningful engagement. To identify and explore knowledge gaps in our understanding of basic science communication, the Science Public Engagement Partnership (SciPEP), a public-private partnership of the U.S. Department of Energy (DOE) Office of Science and The Kavli Foundation, carried out a two-part landscape analysis: literature surveys of social science scholarship and a basic research needs conference.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

JISEA-CSU Sustainable Agriculture Workshop [Slides]

The JISEA-CSU Sustainable Agriculture Workshop was co-hosted by the National Renewable Energy Laboratory's Joint Institute for Strategic Energy Analysis Sustainable Agriculture Catalyzer and the Colorado State University Ag Innovation Center, and sponsored by the Colorado-Wyoming Climate Resilience Engine. The workshop brought together researchers, agricultural producers, technology innovators, investors, and policymakers to examine the past, present, and future of the U.S. agriculture and energy strategy. The workshop will feature presentations, panels, and interactive activities that dive into the successes and challenges of the industry to help inform the direction of future research efforts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVI-RoadTrip™: Electric Vehicle Infrastructure for Road Trips [SWR-22-17]

The EVI-RoadTrip™ tool offers high-resolution refueling network design and analysis to inform electric vehicle (EV) charging infrastructure development for road trips or long-distance travels. EVI-RoadTrip helps infrastructure planners, analysts, and decision makers evaluate EV energy consumption and corresponding charging demands along the routes-between origin and destination. It considers the projected location and characteristics of charging stations, potential electric grid impacts, and required infrastructure improvements. Strategically located charging stations for long-distance travel are critical to enabling the widespread adoption of EVs by allowing them to travel further beyond city or town boundaries. Sophisticated analysis and planning can identify the points (e.g., corridors) that may require increased availability of EV charging stations to support electrified road trips.

Wood, Eric↗

Strategic Qualitative Risk Assessment of Thousands of Legacy Wells within the Area of Review (AoR) of a Potential CO2 Storage Site

The subsurface confinement of anthropogenic carbon dioxide (CO2) demands robust risk assessment methodologies to identify potential leakage pathways. Legacy wells within the Area of Review (AoR) represent one potential leakage pathway. Robust methodologies require enormous amounts of data, which are not available for many old legacy wells. This study strategically categorizes 4386 legacy wells within the AoR of a potential CO2 storage site in the Illinois basin and identifies the high-risk wells by leveraging publicly available data—reports and well logs submitted to state regulatory agencies. Wells were categorized based on their proximity to the injection well location, depth, the mechanical integrity of well barriers, and the accessibility to these wells throughout the project lifecycle. Wells posing immediate risks were identified, guiding prioritized corrective actions and monitoring plans. Out of 4386 wells, 54 have high priority for corrective action, 10 have medium priority, and the remainder are of low priority. Case study results from the Illinois basin demonstrate the effectiveness and applicability of this approach, to assess the risk associated with legacy wells within the AoR of potential CO2 storage site, strategically categorizing over 4000 such wells despite data limitations.

Arbad, Nachiket (ORCID:0000000215353656)↗

Equity-driven Planning of Distributed Solar PV using Optimal Transport

Typically, distribution system planning processes do not explicitly incorporate energy equity considerations, such as identifying consumers most affected by energy costs and determining how investments in the distribution system can address existing energy burden imbalances. This paper proposes a novel optimal transport (OT)-based method to improve the energy burden distribution of consumers. The approach involves the strategic siting and sizing of solar PV in order to assist customers with high energy burden and improve the overall energy burden distribution of the community. The desired energy burden distribution is defined using the equal distribution equivalent (EDE) concept. The OT-based method is then used to estimate the distributed solar PV capacity to be installed at various locations and the tariffs to be adjusted, all while improving the energy burden distribution and providing valuable insights into distributed generation (DG) planning. The results on IEEE 37 bus test system demonstrate how DG planning, considering EDE and OT, can help reduce the energy burden of low-income consumers. Additionally, the approach also reveals optimal tariff adjustments needed to ensure revenue neutrality for distribution utilities.

Optimal transport, equal distribution equivalent, ↗

Updated design of the CMB polarization experiment satellite LiteBIRD

Recent developments of transition-edge sensors (TESs), based on extensive experience in ground-based experiments, have been making the sensor techniques mature enough for their application on future satellite CMB polarization experiments. LiteBIRD is in the most advanced phase among such future satellites, targeting its launch in Japanese Fiscal Year 2027 (2027FY) with JAXA's H3 rocket. It will accommodate more than 4000 TESs in focal planes of reflective low-frequency and refractive medium-and-high-frequency telescopes in order to detect a signature imprinted on the cosmic microwave background (CMB) by the primordial gravitational waves predicted in cosmic inflation. The total wide frequency coverage between 34GHz and 448GHz enables us to extract such weak spiral polarization patterns through the precise subtraction of our Galaxy's foreground emission by using spectral differences among CMB and foreground signals. Telescopes are cooled down to 5Kelvin for suppressing thermal noise and contain polarization modulators with transmissive half-wave plates at individual apertures for separating sky polarization signals from artificial polarization and for mitigating from instrumental 1/f noise. Passive cooling by using V-grooves supports active cooling with mechanical coolers as well as adiabatic demagnetization refrigerators. Sky observations from the second Sun-Earth Lagrangian point, L2, are planned for three years. An international collaboration between Japan, USA, Canada, and Europe is sharing various roles. In May 2019, the Institute of Space and Astronautical Science (ISAS), JAXA selected LiteBIRD as the strategic large mission No. 2.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Least-cost Optimal Distribution Grid Expansion (LODGE): Utility Pilots

The Least-cost Optimal Distribution Grid Expansion (LODGE) model provides the optimal portfolio of distribution system upgrades—e.g., voltage regulators, feeder reconductoring, transformer upgrades and non-wires alternatives (NWA), such as strategic siting of storage and distributed generation—to interconnect distributed energy resources (DERs) and enable load growth. It can be used to assess grid infrastructure costs and explore policy and regulatory solutions for distribution planning and DER valuation.In 2025, Berkeley Lab conducted three pilot analyses to validate LODGE results with empirical utility data before the model’s first release in 2026. The pilots, done with utilities in Washington, Colorado, and New Mexico, provide examples that illustrate how the model works, what it can do, and the value of the analysis.

Heleno, Miguel↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fleet Utilization

A key goal of NextGen Profiles' fleet utilization study was to conduct a comprehensive, strategic, and standardized assessment of the operational behavior and utilization patterns across EV and EVSE production-ready fleets. These data-driven insights were intended to inform current fleet management strategies and support future infrastructure planning, ensuring the effective adoption and adaptation of the growing EV fleet market. The study applied a series of metrics defined in NextGen Profiles to evaluate diverse fleet operations across various use cases, emphasizing trends in charging, routing, and other critical behaviors. The fleet utilization dataset includes these three sets of metrics from 17 EV fleets, each consisting of a wide range of vehicle types and operational categories, as well as two EVSE fleets. Data were collected from a variety of sources and reformatted into a unified structure before metric computation, ensuring consistency and comparability across all fleets. To protect confidentiality, all fleet metadata are anonymized, and the publicly released metric datasets are aggregated to an hourly cadence.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What Crime? Legal Jurisdiction over Civilians in the Pacific Proving Ground

In late 1948 the Atomic Energy Commission “designated Enewetak Atoll as a permanent proving ground.” Subsequently renamed, the Pacific Proving Ground (PPG), six nuclear tests, including Mike, were conducted on the atoll. When Mike vaporized an entire island, it became clear that Enewetak’s small islands were insufficient and Bikini Atoll, abandoned after Operation Crossroads, was made part of the PPG. Authority to create the PPG resided in a “Trusteeship” agreement between the United States and the United Nations. Following the first World War, the Marshall Islands became a “Mandate” of the League of Nations. After World War II, the League’s successor, the United Nations, converted the Marshall Islands to a “Strategic Trusteeship” with the United States as its administrator. The Strategic Trust designation gave the U.S. nearly unfettered control over the islands, including the right to establish the PPG.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

South Africa: Energy Efficiency Demand Side Management Experience (2004-2022)

In July 2022, President Cyril Ramaphosa announced an emergency response plan to address the growing electricity crisis in South Africa, which included the necessity for customers of Eskom, South Africa’s primary electricity supplier, to implement demand-side energy efficiency measures. This report is the first of two reports that provides the foundation for a strategic Demand-Side Management (DSM) approach to reduce load shedding and maximize energy savings in South Africa, through inter-governmental collaboration and increased coordination of energy efficiency activities. This first report focuses on the experience of Eskom’s rate-funded Integrated Demand Management (IDM) programme, from its beginning in 2004 to today, highlighting the factors that led to failed support for the programme, and emphasizing the measures that will need to be addressed to meet the government’s energy efficiency (EE) goals, as well as other socio-economic and environmental priorities, such as job creation, affordability and greenhouse gas (GHG) emission reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A novel machine learning based identification of potential adopter of rooftop solar photovoltaics

With the proliferation of rooftop solar photovoltaic installations, there is a need to proactively predict consumer potential for solar photovoltaic adoption, for improved electric utility planning and operation. Traditional analytical modeling approaches are limited to a few survey features and a larger part of the survey would remain untouched by the decision model. This article presents a novel, data-driven modeling approach that strategically prunes a large set of consumer profile features using a machine learning framework to train a model for predicting potential solar adoption. The approach utilizes the Gradient Boosting Decision Tree model through a Light Gradient Boosting framework that improves significantly over the poor prediction accuracy of the existing approaches. Model training using focal-loss based supervision is used to overcome the difficulty in identifying the potential adopters that is inherent in conventional data-driven models. In addition, to overcome possible data sparsity in a limited survey sample, a Generative Adversarial Network is presented to create synthetic user samples and its effectiveness on model performance is assessed. A Bayesian optimization approach is used to systematically arrive at the hyperparameters of the proposed model. Validation of the presented approach on a survey data collected by the National Rural Electric Cooperative Association in Virginia in 2018 demonstrates the excellent predictive capability of the machine learning based approach to modeling solar adoption reliably.

14 SOLAR ENERGY↗

Gulf of Mexico Offshore Wind Transmission - Literature Review and Gaps Analysis: Environmental Considerations, Community Readiness, and Infrastructure

The ability to effectively and efficiently connect offshore wind energy resources to end users in the Gulf of Mexico, requires coordinated transmission planning to ensure that electric transmission facilities can adequately support future offshore development. The Gulf of Mexico has substantial wind resources in both shallow shelf waters and deeper waters off the shelf where fixed bottom and floating wind technologies would be most appropriate. Most interest in offshore wind development to date has been in the central and western portions of the Gulf of Mexico (Louisiana and Texas) in federal and state waters. As a companion study to other federal activities in the offshore wind transmission space, including the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis, the Atlantic Offshore Wind Transmission Study, the West Coast Offshore Wind Transmission Literature Review and Gaps Analysis, the West Coast Offshore Wind Transmission Study, and the Advancing Offshore Wind Energy in the United States: U. S. Department of Energy Strategic Contributions Toward 30 Gigawatts and Beyond Report, this literature review and gaps analysis for offshore wind transmission in the Gulf of Mexico builds off previous literature reviews and supports the role of federal leadership to facilitate offshore wind energy. The overarching goal of this document is to identify gaps and lay the groundwork to inform coordinated transmission planning, ocean co-use, existing energy infrastructure, and siting associated with offshore wind energy development in the Gulf of Mexico. There are unique regional considerations for offshore wind transmission, which are summarized herein based on a review and assessment of publicly available information.

08 HYDROGEN↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Community Atlas

The Energy Community Atlas provides efficient access to authoritative, curated, and relevant data that is vital to supporting energy planning, development, and economic growth across the U.S. In this effort, researchers at the National Energy Technology Laboratory (NETL) are utilizing advanced data visualization and transformation capabilities to develop an integrated, data atlas and resource focused on supporting energy community transitions to new manufacturing opportunities. Specifically, this project is working to find, acquire, integrate, and virtually host in a user-friendly, public and private solution from available resources, relevant to understanding and characterizing fossil energy communities themselves and inform energy planning, development, and economic growth opportunities, including opportunities for co-development to support manufacturing, critical materials, and more. This Atlas when complete is to offer a one-stop-shop for stakeholders to derive new insights to accelerate energy investments and strategic decision support needs. These are following datasets that are available as part of this ongoing project • Energy Community Atlas Map Package - This is ArcPro Map package and it contains all of the symbolized layers along with ArcPro map and geodatabase • Energy Community Atlas ArcGIS REST service - https://www.arcgis.com/apps/mapviewer/index.html?panel=gallery&suggestField=true&layers=537ced69bd88440380a62c2ec8aca30c • README Energy Community Atlas - Read me word document that has details about feature classes in Map package, ArcPro map and ArcGIS Rest Service

Bipartisan Infrastructure Law↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗