Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Solar photovoltaics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Frequency Stability Enhancement in a Fully Solar Power Grid: A Case Study on the Saudi Model

Recently, renewable energy sources (RES) such as solar photovoltaic (PV) have been recognized for their significant potential. Several studies have explored the issue of frequency stability with high RES penetration. A significant observation related to this issue is the decline in the weighted short circuit ratio (WSCR), which has the potential to adversely affect system stability. This research uniquely focuses on the gradual transition of the Saudi Electricity Company (SEC) system to a fully integrated solar PV grid, offering insight and methodology that can be adapted for other power systems. While a variety of mitigation methods are available, synchronous condensers (SC) were used in this study to stabilize grid frequency, and their implementation has been shown to improve the overall performance of the system. In response to the observed decline in WSCR, a comprehensive short circuit analysis was applied across all regions in the Saudi power grid model to evaluate the reduction in short circuit power and highlight areas requiring enhancement. Finally, scenarios illustrating frequency response with a gradual increase in SCR were analyzed, with the objective of establishing a stable, fully solar PV power system that is resilient to sudden power grid disturbances.

14 SOLAR ENERGY↗

Addressing Regulatory Challenges to Tribal Solar Deployment (Abbreviated Final Technical Report)

Tribal land in the United States represents approximately 2% of the country’s total landmass and holds more than 5% of the solar photovoltaic potential (Doris, Lopez, and Beckley 2013). Though many Tribes have explored options to install solar photovoltaic (PV) generation capacity on their land, regulatory hurdles have often prevented them from doing so. The National Renewable Energy Laboratory (NREL) and the Midwest Tribal Energy Resources Association (MTERA) partnered on this 3-year project, Addressing Regulatory Challenges to Tribal Solar Deployment. The project sought to unlock Tribal solar potential by bringing together Tribal, regulatory, utility, and other stakeholders to articulate key barriers to Tribal solar PV adoption and develop replicable solutions.

14 SOLAR ENERGY↗

Electricity Produced from Photovoltaic Systems in Apartment Buildings and Self-Consumption: Comparison of the Situation in Various IEA PVPS Countries

Over the last two decades, grid-connected solar photovoltaic systems have increased from a niche market to one of the leading power generation capacity additions annually. In 2018 the total installed photovoltaic electricity generation capacity exceeded 500 GW. Another doubling is forecasted until the early 2020s. Therefore, the further development is coupled with the question at what prices solar photovoltaic electricity can be provided and delivered to the customers. The installation of PV systems for self-consumption is already now an interesting option for many people but in general limited to those who have access to a rooftop they own or can use. A new envelopment to enable residents of multi apartment buildings to commonly use electricity generated by a PV system (collective self-consumption) is a relatively new development and is still facing a lot of administrative and regulatory challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power Converters Maximize Outputs Of Solar Cell Strings

Microprocessor-controlled dc-to-dc power converters devised to maximize power transferred from solar photovoltaic strings to storage batteries and other electrical loads. Converters help in utilizing large solar photovoltaic arrays most effectively with respect to cost, size, and weight. Main points of invention are: single controller used to control and optimize any number of "dumb" tracker units and strings independently; power maximized out of converters; and controller in system is microprocessor.

Frederick, Martin E.↗

Performance Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents performance evaluation of a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of sub-transmission and distribution networks, the DERMS software controller, and 84 power hardware solar photovoltaic (PV) inverters, standard communication protocols, and a capacitor bank controller. The DERMS algorithm is also called, Grid-Optimization of Solar (GO-Solar) platform which includes predictive state estimation (PSE) and online multiple objective optimization (OMOO) to dispatch the legacy devices and distributed energy resources (e.g., PV). The voltage regulation performance is evaluated under three scenarios, volt-var smart inverter (baseline), and DERMS control for 100% and 30% of PV. The results show that controlling 30% of PV systems with the GO-Solar platform may provide the best balance of control performance and implementation cost.

distributed energy resource management system (DER↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Cybersecurity Assessment for a Behind-the-Meter Solar PV System: A Use Case for the DER-CF

The world's energy production is shifting toward lower-cost, cleaner, more efficient, and sustainable sources. The increasing numbers of distributed energy resources (DERs) are allowing for the rapid transformation of electric grids toward achieving the goal of energy decarbonization. Along with cleaner and more efficient energy, however, we must also aim for a secure energy future. Solar photovoltaic (PV) systems are an important part of this transition. This paper discusses a cybersecurity risk assessment for behind-the-meter DERs using a solar PV system as a use case of the Distributed Energy Resource Cybersecurity Framework (DER-CF) developed by the National Renewable Energy Laboratory. This poster presents a conference paper on the risk assessment processes and summarizes the DER-CF's use case recommendations to strengthen the cybersecurity posture of the electric grid.

cybersecurity↗

Solar cell array design handbook - The principles and technology of photovoltaic energy conversion

Photovoltaic solar cell array design and technology for ground-based and space applications are discussed from the user's point of view. Solar array systems are described, with attention given to array concepts, historical development, applications and performance, and the analysis of array characteristics, circuits, components, performance and reliability is examined. Aspects of solar cell array design considered include the design process, photovoltaic system and detailed array design, and the design of array thermal, radiation shielding and electromagnetic components. Attention is then given to the characteristics and design of the separate components of solar arrays, including the solar cells, optical elements and mechanical elements, and the fabrication, testing, environmental conditions and effects and material properties of arrays and their components are discussed.

Rauschenbach, H. S.↗

Use of Glass Reinforced Concrete (GRC) as a substrate for photovoltaic modules

A substrate for flat plate photovoltaic solar panel arrays using a glass fiber reinforced concrete (GRC) material was developed. The installed cost of this GRC panel is 30% less than the cost goal of the Near Term Low-Cost Flat Plate Photovoltaic Solar Array Program. The 4 ft by 8 ft panel is fabricated from readily available inexpensive materials, weighs a nominal 190 lbs., has exceptionally good strength and durability properties (rigid and resists weathering), is amenable to mass production and is easily installed on simple mountings. Solar cells are encapsulated in ethylene/vinyl acetate with Tedlar backing and Korad cover film. The laminates are attached to the GRC substrate with acrylic transfer tape and edge sealed with silicone RTV adhesive.

Eirls, J. L.↗

Bad River Band of Lake Superior Chippewa Indians Solar Project

The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.

14 SOLAR ENERGY↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Graton Rancheria Solar G.R.E.E.N. Project (Final Report)

Final Technical Report Graton Rancheria Solar GREEN Project to install approximately 1.7 megawatts (MW) of rooftop solar to provide electricity to four Tribally owned buildings on Tribal trust land located in Sonoma County. The project is the first solar photovoltaic (PV) installation by the Tribe on Tribal lands and complement previously installed clean energy projects including multiple electric vehicle chargers located at the Tribe’s economic enterprise.

14 SOLAR ENERGY↗

Hybrid power plants: An effective way of decreasing loss-of-load expectation

Diversifying variable renewable resources by combining wind, solar photovoltaic, and battery assets in a hybrid power plant can increase renewable energy usage efficiency and improve system flexibility, particularly in distributed energy systems. However, the resilience impact of these systems, particularly outage mitigation, can be difficult to quantify due to uncertainty in resource, energy demand, and outage occurrence. Here, this study outlines a framework to quantify the incremental benefit of hybrid power plant assets for reducing loss-of-load expectation during random outage events. Hybrid power plant performance during outages (considering varying duration and severity) is simulated using a Monte Carlo methodology to reflect uncertainty associated with renewable resource, load demand, and outage timing. Results demonstrate the additional incremental value from increasingly hybrid designs, in which relative capacities of wind, solar photovoltaic, and storage assets contribute to lower loss-of-load expectation than the constituent technologies would alone. The value of added wind or solar capacity increases as the plant composition approaches an equal split. The value of added battery capacity depends on the outage duration and severity, but the first 50 MWh of added storage capacity is the most valuable for reducing the loss-of-load expectation for all plant designs.

14 SOLAR ENERGY↗

Solar-Powered Cooler and Heater for an Automobile Interior

The apparatus would include a solar photovoltaic panel mounted on the roof and a panellike assembly mounted in a window opening. The window-mounted assembly would include a stack of thermoelectric devices sandwiched between two heat sinks. A fan would circulate interior air over one heat sink. Another fan would circulate exterior air over the other heat sink. The fans and the thermoelectric devices would be powered by the solar photovoltaic panel. By means of a double-pole, double-throw switch, the panel voltage fed to the thermoelectric stack would be set to the desired polarity: For cooling operation, the chosen polarity would be one in which the thermoelectric devices transport heat from the inside heat sink to the outside one; for heating operation, the opposite polarity would be chosen. Because thermoelectric devices are more efficient in heating than in cooling, this apparatus would be more effective as a heater than as a cooler. However, if the apparatus were to include means to circulate air between the outside and the inside without opening the windows, then its effectiveness as a cooler in a hot, sunny location would be increased.

Howard, Richard T.↗