Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE SELECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Evaluation of the predictive capability of coupled thermo-hydro-mechanical models for a heated bentonite/clay system (HE-E) in the Mont Terri Rock Laboratory

Process understanding and parameter identification using numerical methods based on experimental findings are a key aspect of the international cooperative project DECOVALEX. Comparing the predictions from numerical models against experimental results increases confidence in the site selection and site evaluation process for a radioactive waste repository in deep geological formations. In the present phase of the project, DECOVALEX-2015, eight research teams have developed and applied models for simulating an in-situ heater experiment HE-E in the Opalinus Clay in the Mont Terri Rock Laboratory in Switzerland. The modelling task was divided into two study stages, related to prediction and interpretation of the experiment. A blind prediction of the HE-E experiment was performed based on calibrated parameter values for both the Opalinus Clay, that were based on the modelling of another in-situ experiment (HE-D), and modelling of laboratory column experiments on MX80 granular bentonite and a sand/bentonite mixture .. After publication of the experimental data, additional coupling functions were analysed and considered in the different models. Moreover, parameter values were varied to interpret the measured temperature, relative humidity and pore pressure evolution. The analysis of the predictive and interpretative results reveals the current state of understanding and predictability of coupled THM behaviours associated with geologic nuclear waste disposal in clay formations.

54 ENVIRONMENTAL SCIENCES↗

Deep Borehole Disposal Safety Analysis.

This report presents a preliminary safety analysis for the deep borehole disposal (DBD) concept, using a safety case framework. A safety case is an integrated collection of qualitative and quantitative arguments, evidence, and analyses that substantiate the safety, and the level of confidence in the safety, of a geologic repository. This safety case framework for DBD follows the outline of the elements of a safety case, and identifies the types of information that will be required to satisfy these elements. At this very preliminary phase of development, the DBD safety case focuses on the generic feasibility of the DBD concept. It is based on potential system designs, waste forms, engineering, and geologic conditions; however, no specific site or regulatory framework exists. It will progress to a site-specific safety case as the DBD concept advances into a site-specific phase, progressing through consent-based site selection and site investigation and characterization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Approaches for Nuclear Waste Disposal in Geological Formations: Geological Challenges in Radioactive Waste Isolation—Fifth Worldwide Review

The overall objective of the Fifth Worldwide Review (WWR-5) is to document the current state-of-the-art of major developments in a number of nations throughout the World pursuing geological disposal programs, and to summarize challenging problems and experience that have been obtained in siting, preparing and reviewing cases for the operational and long-term safety of proposed and operating nuclear waste repositories. The scope of the Review is to address current specific technical issues and challenges in safety case development along with the interplay of technical feasibility, siting, engineering design issues, and operational and post-closure safety. In particular, the chapters included in the report present the following types of information: the current status of the deep geological repository programs for high level nuclear waste and low- and intermediate level nuclear waste in each country, concepts of siting and radioactive waste and spent nuclear fuel management in different countries (with the emphasis of nuclear waste disposal under different climatic conditions and different geological formations), progress in repository site selection and site characterization, technology development, buffer/backfill materials studies and testing, support activities, programs, and projects, international cooperation, and future plans, as well as regulatory issues and transboundary problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Definition study for photovoltaic residential prototype system

A site evaluation was performed to assess the relative merits of different regions of the country in terms of the suitability for experimental photovoltaic powered residences. Eight sites were selected based on evaluation criteria which included population, photovoltaic systems performance and the cost of electrical energy. A parametric sensitivity analysis was performed for four selected site locations. Analytical models were developed for four different power system implementation approaches. Using the model which represents a direct (or float) charge system implementation the performance sensitivity to the following parameter variations is reported: (1) solar roof slope angle; (2) ratio of the number of series cells in the solar array to the number of series cells in the lead-acid battery; and (3) battery size. For a Cleveland site location, a system with no on site energy storage and with a maximum power tracking inverter which feeds back excess power to the utility was shown to have 19 percent greater net system output than the second place system. The experiment test plan is described. The load control and data acquisition system and the data display panel for the residence are discussed.

Shepard, N. F.↗

Near surface observations

Learning objectives include: (1) developing an understanding of the implications of the term "near surface observations"; (2) associating the appearance of large ground features as seen in satellite imagery with their appearance as seen from the ground; (3) grasping criteria and procedures for selecting training sites on the ground for use in supervised classification; (4) running through an example of training site selection; (5) becoming familiar with several methods of accuracy assessment; (6) becoming aware of the approach and value of making supporting measurements of the spectral and physical properties of materials on the ground and from aircraft; (7) taking note of the different types of instruments used in making specific ground measurements; and (8) appreciating the rationale underlying laboratory and field studies on or near the Earth's surface for the purpose of developing new sensor systems.

Source record↗

Hummingbird Comet Nucleus Analysis Mission

Hummingbird is a highly focused scientific mission, proposed to NASA s Discovery Program, designed to address the highest priority questions in cometary science-that of the chemical composition of the cometary nucleus. After rendezvous with the comet, Hummingbird would first methodically image and map the comet, then collect and analyze dust, ice and gases from the cometary atmosphere to enrich characterization of the comet and support landing site selection. Then, like its namesake, Hummingbird would carefully descend to a pre-selected surface site obtaining a high-resolution image, gather a surface material sample, acquire surface temperature and then immediately return to orbit for detailed chemical and elemental analyses followed by a high resolution post-sampling image of the site. Hummingbird s analytical laboratory contains instrumentation for a comprehensive molecular and elemental analysis of the cometary nucleus as well as an innovative surface sample acquisition device.

Kojiro, Daniel↗

Drilling on the Moon and Mars: Developing the Science Approach for Subsurface Exploration with Human Crews

DOMEX (Drilling on the Moon and Mars in Human Exploration) is using analog missions to develop the approach for using human crews to perform science activities on the Moon and Mars involving exploration and sampling of the subsurface. Subsurface science is an important activity that may be uniquely enabled by human crews. DOMEX provides an opportunity to plan and execute planetary mission science activities without the expense and overhead of a planetary mission. Objectives: The objective of this first in a series of DOMEX missions were to 1) explore the regional area to understand the geologic context and determine stratigraphy and geologic history of various geologic units in the area. 2) Explore for and characterize sites for deploying a deep (10 m depth) drilling system in a subsequent field season. 3) Perform GPR on candidate drill sites. 4) Select sites that represent different geological units deposited in different epochs and collect soil cores using sterile procedures for mineralogical, organic and biological analysis. 5) Operate the MUM in 3 different sites representing different geological units and soil characteristics. 6) Collect rock and soil samples of sites visited and analyze them at the habitat. Results: At mission start the crew performed a regional survey to identify major geologic units that were correlated to recognized stratigraphy and regional geologic maps. Several candidate drill sites were identified. During the rest of the mission, successful GPR surveys were conducted in four locations. Soil cores were collected in 5 locations representing soils from 4 different geologic units, to depths up to 1m. Soil cores from two locations were analyzed with PCR in the laboratory. The remainder were reserved for subsequent analysis. XRD analysis was performed in the habitat and in the field on 39 samples, to assist with sample characterization, conservation, and archiving. MUM was deployed at 3 field locations and 1 test location (outside the habitat) where it operated autonomously for 2-4 hours at each site. Depths achieved ranged from 15 to 70 cm depending on the soil compressive strength and the presence and depth of subsurface indurated layers. Subsurface samples weighing 0.5 to 1 g were collected at the deepest depth encountered at each of the sites using the MUM automated sample collection system, and subsequently analyzed with XRD. Downhole inspection of holes produced by MUM with the Raman spectrometer was acquired on two of the holes and spectral features associated with selenite were identified in specific soil layers. Previously unreported fossilized remains of vertebrate fauna from the Jurassic era were discovered during our mission. Analysis of mineral biomarkers associated with this discovery are underway.

Stoker, C. R.↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Constraints, Approach and Present Status for Selecting the Mars Surveyor 2001 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough, defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.↗

Constraints and Approach for Selecting the Mars Surveyor '01 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.↗

Status Quo of Heliostat Field Deployment Processes

Deployment of the solar field of a concentrating solar power plant is one of many factors that are integral to the success of a project. Knowledge transfer from outside the industry is limited due to the unique nature of heliostats, which redirect sunlight to a receiver with high precision while maintaining a high level of reflectivity. Moreover, learning from project to project can be limited due to the site-specific nature of projects, as the market includes several developers, each with their own unique design. In this paper, we discuss the state of the art in heliostat field deployment. We cover all the key aspects of deployment from project assessment to a fully functioning system, which include site selection, layout development, supply chain, assembly, site preparation and construction, calibration, and operations and maintenance.

concentrating solar power↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗

Multiscale architecture for fast optical addressing and control of large-scale qubit arrays

This paper presents a technique for rapid site-selective control of the quantum state of particles in a large array using the combination of a fast deflector (e.g., an acousto-optic deflector) and a relatively slow spatial light modulator (SLM). The use of SLMs for site-selective quantum state manipulation has been limited due to slow transition times that prevent rapid, consecutive quantum gates. By partitioning the SLM into multiple segments and using a fast deflector to transition between them, it is possible to substantially reduce the average time increment between scanner transitions by increasing the number of gates that can be performed for a single SLM full-frame setting. We analyzed the performance of this device in two different configurations: In configuration 1, each SLM segment addresses the full qubit array; in configuration 2, each SLM segment addresses a subarray and an additional fast deflector positions that subarray with respect to the full qubit array. With these hybrid scanners, we calculated qubit addressing rates that are tens to hundreds of times faster than using an SLM alone.

Graham, T. M.↗

PG&E WaveConnect Program (Final Report)

The PG&E WaveConnect project was intended to demonstrate the technical and economic viability of wave power in the open ocean adjacent to PG&E's service territory. WaveConnect was conceived as a multi-stage development process leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial readiness. The second stage would have included development of infrastructure, undersea cabling, and deployment of wave energy conversion devices (WECs). In the third stage, the most promising WEC devices would have been deployed in larger quantities and connected to the grid. This report documents the findings of Stage One. Site Selection: After studying the wave energy potential, grid interconnection and other project infrastructure along the California coast, PG&E selected two sites: one near Eureka, called the Humboldt WaveConnect (HWC) project, and another near Vandenberg Air Force Base, called the Central Coast WaveConnect project (CCWC).

16 TIDAL AND WAVE POWER↗

Development of an Integrated Natural Barrier Database System for Site Evaluation of a Deep Geologic Repository in Korea - 13527

Korea Radioactive-waste Management Corporation (KRMC) established in 2009 has started a new project to collect information on long-term stability of deep geological environments on the Korean Peninsula. The information has been built up in the integrated natural barrier database system available on web (www.deepgeodisposal.kr). The database system also includes socially and economically important information, such as land use, mining area, natural conservation area, population density, and industrial complex, because some of this information is used as exclusionary criteria during the site selection process for a deep geological repository for safe and secure containment and isolation of spent nuclear fuel and other long-lived radioactive waste in Korea. Although the official site selection process has not been started yet in Korea, current integrated natural barrier database system and socio-economic database is believed that the database system will be effectively utilized to narrow down the number of sites where future investigation is most promising in the site selection process for a deep geological repository and to enhance public acceptance by providing readily-available relevant scientific information on deep geological environments in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of the Mars Pathfinder Landing Site

The Mars Pathfinder spacecraft will land on a depositional fan near the mouth of the catastrophic outflow channel, Ares Vallis (19.5 deg N, 32.8 deg W). This site offers the prospect of analyzing a variety of rock types from the ancient cratered highlands, intermediate-age ridged plains, and reworked channel deposits. Analyses of these rocks by Pathfinder instruments will enable first-order scientific questions to be addressed, such as differentiation of the crust, the development of weathering products, and the nature of the early environment, as well as their subsequent evolution on Mars. Constraints imposed by: (1) spacecraft and rover designs (which are robust), (2) entry, descent, and landing, (3) scientific potential at various sites, and (4) safety were important considerations in site selection. Engineering constraints require a 70 km by 200 km smooth, flat (low slopes) area located between 10 deg and 20 deg N that is below 0 km elevation, with average radar reflectivity, little dust, and moderate rock abundance. Three regions on Mars are between 10 deg and 20 deg N and below 0 km elevation: Chryse, Amazonis, and Isidis-Elysitun. Science considerations favor sites at the mouths of outflow channels (grab bag sites offer an assay of rock types on Mars), highland sites (early crustal differentiation and climate), and sites covered with dark (unoxidized) material. Sites are considered safe if they are clearly below 0 km elevation, appear acceptably free of hazards in high-resolution (less than 50 m/pixel) Viking orbiter images and have acceptable reflectivity and roughness at radar wavelengths, thermal inertia, rock abundance, red to violet ratio, and albedo. Recent 3.5-cm wavelength radar observations were used to verify elevation, reflectivity, and roughness within the landing ellipses. Three sites meet all of these criteria: Ares Vallis, Tritonis Lacus, and Isidis. Although Isidis appears to be safer than Tritonis and Ares, the greater scientific potential at Ares Vallis resulted in its selection. Comparisons of the Grand Coulee (channel) and the depositional Ephrata Fan of the Channeled Scabland in eastern Washington, with Ar-es Vallis and its depositional fan also suggest the Ares Vallis landing site is safe and scientifically interesting.

Golombek, M. P.↗

Candidate locations for SPS rectifying antennas

The feasibility of placing 120 Satellite Power System (SPS) rectifying antenna (rectenna) sites across the U.S. was studied. An initial attempt is made to put two land sites in each state using several land site selection criteria. When only 69 land sites are located, it is decided to put the remaining sites in the sea and sea site selection criteria are identified. An estimated projection of electrical demand distribution for the year 2000 is then used to determine the distribution of these sites along the Pacific, Atlantic, and Gulf Coasts. A methodology for distributing rectenna sites across the country and for fine-tuning exact locations is developed, and recommendations on rectenna design and operations are made.

Eberhardt, A. W.↗