Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

96 Park Way Vicinity Property Remediation Challenges at the FUSRAP Maywood Superfund Site, Maywood, New Jersey - 19216

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), 'the Project,' was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (US DOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980's and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of SLOWPOKE-2 HEU Irradiated Fuel Transportation from Canada to USA - 19123(2)

The SLOWPOKE-2 (Safe Low-Power Kritical Experiment) was designed by AECL (Atomic Energy of Canada Limited) in the late 1960's. The core consists of HEU (highly enriched uranium) fuel with an enrichment of 93%. The fuel cage typically has approximately 300 fuel pins assembled in a triangular pitch between the two plates. The fuel pins are made from uranium-aluminum alloy cladded with aluminum. The SLOWPOKE-2 reactor is rated at a nominal 20 kW. with varying neutron flux, maximum being 1 E12 n/cm{sup 2}/s. The mass of the fuel cage is 5.06 kg. The life of the core can be extended by adding layers of beryllium reflector. The transportation flask for the irradiated fuel is a Type B(U)F. The shipment classification is UN3328 Class 7. To date, 4 SLOWPOKE-2 reactors have been decommissioned. The fuel from all these reactors was transported to the U.S. The CNSC (Canadian Nuclear Safety Commission) joint Canada-United States guide for approval of Type B(U) and fissile material transportation packages (RD-364) satisfies the requirements stipulated in International Atomic energy Agency (IAEA) TS-R-1 1996 edition (revised) and is acceptable to the DOT (Department of Transportation) and NRC (Nuclear Regulatory Commission) for complying with U.S. code of federal regulations 10 CFR Part 71. The export license is issued by the CNSC. The transportation licence is issued by CNSC after approval from TC (Transport Canada) and also by DOT after approval from NRC. The final home of the HEU SLOWPOKE-2 irradiated fuel is in Savannah River Site of DOE (Department of Energy). The transportation licence requires that the Type B(U)F flask is structurally sound in case of a crash. The US DOT provides a CAC (Competent Authority Certificate) which describes the irradiated fuel specifications that can be transported in the designated flask. The U.S. DOT also requires a leak test certification in accordance with ANSI N14.5-2014 to verify a leakage rate not to exceed 1 E-7 std-cm{sup 3}/s. As most SLOWPOKE-2 facilities are not located on the existing approved routes for nuclear fuel transportation, a route survey needs to be performed and submitted to the NRC. The route survey report is assessed by the NRC and issues a route approval for the transportation of the fissile material. This technical paper will discuss the detailed processes required to obtain approvals in order to transport the HEU SLOWPOKE-2 irradiated fuel from Canada to U.S. based upon recent experiences of decommissioning SLOWPOKE-2 reactors in Canada. It will provide details on the requirements of various regulators in Canada and the U.S. that govern and regulate this shipment including transportation, safety and security. It will also present lessons learned from previous experiences that can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.

54 ENVIRONMENTAL SCIENCES↗

ARM-Related Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) Operational Requirements and Approval

This procedure addresses the requirements and process for obtaining approval for Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) operations at DOE Office of Science (SC) Atmospheric Radiation Measurement user facility observatories (ARM sites), ARM-supported training flights, atmospheric instrument development flights, and campaigns at non-ARM sites. ARM sites include both ARM observatories and ARM mobile facility deployments. The protection of people, property, and the environment during UAS and TBS operations is the foundation of executing a successful mission using UAS or TBS. This procedure is designed to facilitate safe mission execution. It does not address obtaining approval for ARM-supported research, which is approved through the ARM Field Campaign (AFC) or Engineering Evaluation (EE) processes. Approval of UAS and TBS operations is a prerequisite for final approval of an AFC or EE by the Infrastructure Management Board (IMB) and may be conducted in parallel with preparation and submittal of the AFC or EE proposal to the IMB. This procedure addresses UAS and TBS requirements; mission planning; documentation; maintenance; risk assessment; airworthiness determination; operation approval; training and qualification requirements and responsibilities for UAS remote pilots; TBS operators; visual observers; maintenance technicians; and A&P mechanics. It also addresses the responsibilities of ARM site managers, the Office of Science Aviation Safety Manager, principal investigators, requesting organizations, and Range Safety Officers. This procedure is derived from DOE O 440.2C, Aviation Management and Safety, and Federal Aviation Administration (FAA) Regulations (FARs), 14 CFR 107, and 14 CFR 101. It contains two sections: Section 3.0 addresses UAS operations; Section 4.0 addresses TBS operations.

unmanned aerial systems, tethered balloon systems,↗

Interim measure conceptual design for remediation at the former CCC/USDA grain storage facility at Centralia, Kansas : pilot test and remedy implementation.

This document presents an Interim Measure Work Plan/Design for the short-term, field-scale pilot testing and subsequent implementation of a non-emergency Interim Measure (IM) at the site of the former grain storage facility operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Centralia, Kansas. The IM is recommended to mitigate both (1) localized carbon tetrachloride contamination in the vadose zone soils beneath the former facility and (2) present (and potentially future) carbon tetrachloride contamination identified in the shallow groundwater beneath and in the immediate vicinity of the former CCC/USDA facility. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory have demonstrated that groundwater at the Centralia site is contaminated with carbon tetrachloride at levels that exceed the Kansas Tier 2 Risk-Based Screening Level (RBSL) and the U.S. Environmental Protection Agency's maximum contaminant level of 5.0 {micro}g/L for this compound. Groundwater sampling and analyses conducted by Argonne under a monitoring program approved by the Kansas Department of Health and Environment (KDHE) indicated that the carbon tetrachloride levels at several locations in the groundwater plume have increased since twice yearly monitoring of the site began in September 2005. The identified groundwater contamination currently poses no unacceptable health risks, in view of the absence of potential human receptors in the vicinity of the former CCC/USDA facility. Carbon tetrachloride contamination has also been identified at Centralia in subsurface soils at concentrations on the order of the Kansas Tier 2 RBSL of 200 {micro}g/kg in soil for the soil-to-groundwater protection pathway. Soils contaminated at this level might pose some risk as a potential source of carbon tetrachloride contamination to groundwater. To mitigate the existing contaminant levels and decrease the potential future concentrations of carbon tetrachloride in groundwater and soil, the CCC/USDA recommends initial short-term, field-scale pilot testing of a remedial approach that employs in situ chemical reduction (ISCR), in the form of a commercially available material marketed by Adventus Americas, Inc., Freeport, Illinois (http://www.adventusgroup.com). If the pilot test is successful, it will be followed by a request for KDHE authorization of full implementation of the ISCR approach. In the recommended ISCR approach, the Adventus EHC{reg_sign} material--a proprietary mixture of food-grade organic carbon and zero-valent iron--is introduced into the subsurface, where the components are released slowly into the formation. The compounds create highly reducing conditions in the saturated zone and the overlying vadose zone. These conditions foster chemical and biological reductive dechlorination of carbon tetrachloride. The anticipated effective lifetime of the EHC compounds following injection is 1-5 yr. Although ISCR is a relatively innovative remedial approach, the EHC technology has been demonstrated to be effective in the treatment of carbon tetrachloride contamination in groundwater and has been employed at a carbon tetrachloride contamination site elsewhere in Kansas (Cargill Flour Mill and Elevator, Wellington, Kansas; KDHE Project Code C209670158), with the approval of the KDHE. At Centralia, the CCC/USDA recommends use of the ISCR approach initially in a short-term pilot test addressing the elevated carbon tetrachloride levels identified in one of three persistently highly contaminated areas ('hot-spot areas') in the groundwater plume. In this test, a three-dimensional grid pattern of direct-push injection points will be used to distribute the EHC material (in slurry or aqueous form) throughout the volume of the contaminated aquifer and (in selected locations) the vadose zone in the selected hot-spot area. Injection of the EHC material will be conducted by a licensed contractor, under the supervision of Adventus and Argonne technical personnel. The contractor will be identified upon acceptance by the KDHE of the conceptual design presented here. In the pilot test, Argonne will install and periodically sample a network of temporary and permanent monitoring points to document (1) the contaminant distribution in the saturated and vadose zones prior to injection, (2) the distribution of the EHC material in these zones immediately following injection, and (3) subsequent changes in contaminant concentrations that occur over time in response to the imposed treatment. Argonne's investigations have shown that the lithologic properties of the unit hosting the contaminated aquifer at Centralia vary both vertically and laterally, resulting in a heterogeneous distribution of permeabilities and relatively restricted groundwater movement across much of the site.

54 ENVIRONMENTAL SCIENCES↗

Groundwater Monitoring Optimization of Post Closure Waste Sites at SRS - 13184

Groundwater monitoring at the Savannah River Site (SRS) is required at dozens of waste sites and includes sampling at over 1,000 monitoring wells. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost that represents an increasing proportion of the environmental management budget as surface waste units are closed. Therefore, a comprehensive evaluation of the monitoring program for eighteen regulated waste units was conducted to identify areas where monitoring could be optimized. The units evaluated varied considerably in the scope of monitoring; ranging from two wells to hundreds of wells. In order to systematically evaluate such disparate monitoring networks, SRS developed a decision-logic analysis using flow sheets to address potential areas of optimization. Five areas were identified for evaluation, including: (1) Comparison of current monitoring to regulatory requirements, (2) Spatial distribution, (3) Temporal sampling, (4) Analyte requirements, and (5) Reporting frequency and content. Optimization recommendations were made for fifteen of the eighteen groundwater units. The spatial evaluation resulted in recommendations to suspend sampling in 79 wells and add sampling at 16 wells. The temporal evaluation resulted in recommendations to reduce the number of well visits per year by 504. Analyte reductions were recommended at three groundwater units, with increases at three other units. Reporting frequency reductions were recommended for five units. Approximately $700,000 (direct dollars) of potential annualized cost savings were identified for these groundwater units, provided all recommendations are approved. The largest area of savings was associated with reducing the reporting frequency. The optimization approach has been presented to the EPA and South Carolina Department of Environmental Control (SCHDEC), with unit-specific recommendations approved for all five units presented. This approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-505: Inter-Comparison of Clinical Plans Created On Truebeam with Trilogy and Clinac

Purpose The purpose of this study is to investigate the dosimetric differences in clinical treatment plans when machine parameters are switched from Varian Truebeam to older Varian models and vice-versa. This is used to determine the clinically-safe limits to directly transfer patients from Truebeam to Trilogy or Clinac. Methods Thirty-two patients with cancer of different treatment sites such as lung, head-and-neck, prostate and breast were studied. The clinically approved IMRT, VMAT or 3D conformal treatment plans were delivered either on Truebeam or Clinac/Trilogy. Keeping the monitor units, fraction size and other machine parameters the same, the plans were recomputed on a different Varian linear accelerator (e.g., Truebeam plans were recomputed on Trilogy and vice-versa). The plans comparison was done using the target D98 and normal organ D2, D10, D20, D30, D50 and D70 dose metrics. Results The perfraction dose-difference in the PTV-D98 for all 32 patients varied from 0.01 to −0.06 Gy with median being −0.04 Gy. For a 2Gy/fraction treatment course, this would be maximum PTV-D98 dose-difference of 6 cGy/fraction or 30 cGy/5fractions. For organs-at-risks the maximum per-fraction dosedifference in D2, D5, D10, D20, D30, D50 and D70 between Truebeam and Trilogy/Clinac plans varied from 0.06 to −0.07 Gy with median being with — 0.02 Gy. The 3D-CRT plans had relatively lower dose-difference in comparison to IMRT and VMAT plans. The dose computed on Truebeam was systematically lower than the dose computed on Trilogy/ Clinac. Conclusions for conventional fractionation schedules, assuming the maximum uncertainty of <2%, it is clinically safe to switch the treatment machine for 5 fractions. For hypo-fractionated treatments with higher dose per-fraction, plans may need to be revisited before switching the linear accelerator from Truebeam to Clinac/Trilogy or vice-versa.

60 APPLIED LIFE SCIENCES↗

LLNL NESHAPs 2010 Annual Report

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (INL) where radionuclides are handled and stored. Using measured and calculated emission and building-specific and common parameters, LLNL applied the EPA approved computer code to calculate the dose to the maximally exposed individual for the Livermore site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

UAS Traffic Management Beyond Visual Line of Sight (UTM BVLOS)

NASA is working with Industry and FAA to enable beyond visual line of sight (BVLOS) unmanned aerial systems (UAS) operations wherever it is needed. Prior to NASA involvement, the UAS Traffic Management (UTM) concept and architecture did not exist. Then, a system architecture to support UTM in the nation's airspace was pioneered by NASA and adopted externally. Now, NASA will be a dedicated partner with the ongoing Key Site Operational Evaluation in Texas. NASA is needed to help define how services can be approved and applied to enable BVLOS operations in the nation's airspace.

UTM↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Protection Department LLNL NESHAPs 2007 Annual Report

This annual report is prepared pursuant to the National Emission Standards for Hazardous Air Pollutants (NESHAPs; Title 40 Code of Federal Regulations [CFR] Part 61, Subpart H). Subpart H governs radionuclide emissions to air from U.S. Department of Energy (DOE) facilities. NESHAPs limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 {micro}Sv) to any member of the public. The EDEs for the Lawrence Livermore National Laboratory (LLNL) site-wide maximally exposed members of the public from operations in 2007 are summarized here. Livermore site: 0.0031 mrem (0.031 {micro}Sv) (42% from point source emissions, 58% from diffuse source emissions). The point source emissions include gaseous tritium modeled as tritiated water vapor as directed by the U.S. Environmental Protection Agency (EPA) Region IX; the resulting dose is used for compliance purposes. Site 300: 0.0035 mrem (0.035 {micro}Sv) (90% from point source emissions, 10% from diffuse source emissions). The EDEs were calculated using the U.S. EPA-approved CAP88-PC air dispersion/dose-assessment model, except for doses for two diffuse sources that were estimated using measured radionuclide concentrations and dose calculations. Specific inputs to CAP88-PC for the modeled sources included site-specific meteorological data and source emissions data, the latter variously based on continuous stack effluent monitoring data, stack flow or other release-rate information, ambient air monitoring data, and facility knowledge.

54 ENVIRONMENTAL SCIENCES↗

Polyester functional graphenic materials as a mechanically enhanced scaffold for tissue regeneration

Traditional metal implants such as titanium, cobalt, and chromium have found wide utility in medicine; however, these come with a risk of toxicity. To overcome metal-related toxicity and enable degradability, polyesters including polycaprolactone (PCL), polylactic acid (PLA), and polyglycolic acid (PGA) show promise for the replacement of various biomedical applications of metals due to their accepted biocompatibility and FDA approval. However, polyesters are less stiff than their metallic counterparts, limiting their application to non-load bearing injury sites, such as fixation hardware for fingers. To improve mechanical properties, graphene oxide (GO)-polyester composites are a promising class of biodegradable scaffolds. Initial reports of these composites are encouraging, but mechanical properties still fall short. Traditional composites rely on non-covalent association between GO and the polyesters, which often leads to failure at the interface and weakens the overall strength of the material. Herein, we present a strategy for attachment of these FDA-approved polyesters onto a derivative of GO using a robust covalent bond. By covalently functionalizing the graphenic backbone with polyesters and without metal catalysts, we create functional graphenic materials (FGMs) to not only simultaneously retain biodegradability and compatibility, but also mechanically strengthen PCL, PLA, and PGA; we observed an average increase in the Young's modulus of over 140% compared to the graphenic backbone. These polyester-functionalized FGMs are a promising platform technology for tissue implants.

60 APPLIED LIFE SCIENCES↗

Conversion of Site-Specific Meteorological Data for use in CAP-88 PC

CAP-88 PC is a commonly used radiological atmospheric dispersion model. This US EPA-approved model is used to demonstrate compliance with atmospheric emission regulations for radionuclides. While the model includes a large library of meteorological data for use across the United States, there are applications when users may wish to use onsite meteorological data as an input to the CAP-88 PC model. Here, in this work, we present a work-around process for preparing and converting onsite data for use in CAP-88 PC. However, the use of local data should provide a more realistic estimate of doses to members of the public in the immediate vicinity of a facility, although the regulatory agency having jurisdiction may not accept the use of local data for compliance. Additionally, the historical meteorological records from 20+ years ago (at a site many kilometers away) might not be representative of current local weather patterns, highlighting another benefit of using local meteorological data.

54 ENVIRONMENTAL SCIENCES↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structure of HIV-1 Reverse Transcriptase with the Inhibitor -thujaplicinol Bound at the RNase H Active Site

Novel inhibitors are needed to counteract the rapid emergence of drug-resistant HIV variants. HIV-1 reverse transcriptase (RT) has both DNA polymerase and RNase H (RNH) enzymatic activities, but approved drugs that inhibit RT target the polymerase. Inhibitors that act against new targets, such as RNH, should be effective against all of the current drug-resistant variants. Here, we present 2.80 {angstrom} and 2.04 {angstrom} resolution crystal structures of an RNH inhibitor, {beta}-thujaplicinol, bound at the RNH active site of both HIV-1 RT and an isolated RNH domain. {beta}-thujaplicinol chelates two divalent metal ions at the RNH active site. We provide biochemical evidence that {beta}-thujaplicinol is a slow-binding RNH inhibitor with noncompetitive kinetics and suggest that it forms a tropylium ion that interacts favorably with RT and the RNA:DNA substrate.

59 BASIC BIOLOGICAL SCIENCES↗