Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Development And Initial Testing Of Off-Gas Recycle Liquid From The WTP Low Activity Waste Vitrification Process - 14333

The Waste Treatment and Immobilization Plant (WTP) process flow was designed to pre-treat feed from the Hanford tank farms, separate it into a High Level Waste (HLW) and Low Activity Waste (LAW) fraction and vitrify each fraction in separate facilities. Vitrification of the waste generates an aqueous condensate stream from the off-gas processes. This stream originates from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrospray Precipitator (WESP). Currently, the baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed into the LAW melter again. If the Pretreatment facility is not available, the baseline disposition pathway is not viable. Additionally, some components in the stream are volatile at melter temperatures, thereby accumulating to high concentrations in the scrubbed stream. It would be highly beneficial to divert this stream to an alternate disposition path to alleviate the close-coupled operation of the LAW vitrification and Pretreatment facilities, and to improve long-term throughput and efficiency of the WTP system. In order to determine an alternate disposition path for the LAW SBS/WESP Recycle stream, a range of options are being studied. A simulant of the LAW Off-Gas Condensate was developed, based on the projected composition of this stream, and comparison with pilot-scale testing. The primary radionuclide that vaporizes and accumulates in the stream is Tc-99, but small amounts of several other radionuclides are also projected to be present in this stream. The processes being investigated for managing this stream includes evaporation and radionuclide removal via precipitation and adsorption. During evaporation, it is of interest to investigate the formation of insoluble solids to avoid scaling and plugging of equipment. Key parameters for radionuclide removal include identifying effective precipitation or ion adsorption chemicals, solid-liquid separation methods, and achievable decontamination factors. Results of the radionuclide removal testing indicate that the radionuclides, including Tc-99, can be removed with inorganic sorbents and precipitating agents. Evaporation test results indicate that the simulant can be evaporated to fairly high concentration prior to formation of appreciable solids, but corrosion has not yet been examined.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PREPARATION AND TESTING OF CORROSIONAND SPALLATION-RESISTANT COATINGS

This Energy & Environmental Research Center (EERC) project is designed to determine if plating APMT®, a specific highly oxidation-resistant oxide dispersion-strengthened FeCrAl alloy made by Kanthal, onto nickel-based superalloy turbine parts is a viable method for substantially improving the lifetimes and maximum use temperatures of the parts. The method for joining the APMT plate to the superalloys is called evaporative metal bonding and involves placing a thin foil of zinc (Zn) between the plate and the superalloy, clamping them together, and heating in an atmosphere-controlled furnace. Upon heating, the Zn melts and dissolves the oxide skins of the alloys at the bond line, allowing the two alloys to diffuse into each other. The Zn then diffuses through the alloys and evaporates from their surfaces. Laboratory testing to determine the diffusion rate of Zn through the alloys has been completed. However, an analytical solution does not exist to model the diffusion of zinc through the alloys. For this reason, a finite difference algorithm using MATLAB was developed. It makes use of the hopscotch algorithm. The model allows the user to specify the dimensions of the metal parts, the Zn concentration at the bondline, the mesh size, time step, and Zn diffusivity. The experimentally measured values of diffusivity for Zn in APMT and Rene 80/CM 247LC are approximately 2.7 × 10-12 and 4 × 10-14 m2/s, respectively. While the qualitative behavior of the model appears correct, a comparison of the diffusion predictions with the experimental results from earlier in the project indicates that the expected Zn concentration is significantly higher than that measured experimentally. The difference depends on the assumed initial concentration, which is difficult to quantify exactly under experimental conditions for t = 0. In addition to the diffusion work, the coefficients of thermal expansions were determined for each of the alloys as a function of temperature. This information has been entered into a finite element model using ANSYS so that appropriate force-applying structures can be designed for use in joining structures composed of APMT and the nickel alloys. Finite element modeling has been performed to finalize the fabrication geometry for the corrosion-testing phase. The addition of another bolt increases stress uniformity away from the region where the clamping is applied. It appears that a bolt spacing of approximately 25 mm in each jig is appropriate. This will allow the fabrication of 50-mm-wide sections of joints for the corrosion-testing task. Gasifier sampling activities continue to determine what types of trace contaminants may occur in cleaned syngas that could lead to corrosion or deposition in turbines firing coal syngas. The EERC has several pilot-scale gasifiers that are continually used in a variety of test configurations as determined by the needs of the projects that are funding the tests. We are sampling both noncombusted and combusted syngas produced during some of the pilot-scale gasifier tests. This year sampling was performed of both syngas and combusted syngas while the entrained-flow gasifier (EFG) was firing subbituminous coal from the Antelope Mine in Wyoming. Results of scanning electron microscope analyses of the syngas before combustion showed no submicron particles, only flakes of iron oxide that had likely formed on steel surfaces inside the combustor. As shown in the 2013 annual report, soot was also collected from the syngas when the much-lower-temperature fluid-bed gasifier (FBG) was fired, indicating that the much higher temperature of the EFG prevented soot formation. However, particles collected from the combusted syngas consist almost entirely of submicron soot, and little to no vaporized metals made it past the warm-gas filters and scrubbers in the high-temperature EFG system which could then deposit in a turbine system burning a higher hydrogen syngas. These results are consistent with the analyses of the particulates collected from combusted syngas when the lowertemperature FBG system is used.

Electric↗

FGD Wastewater Treatment Testing Using a Saltworks Flex EDR Selective Technology

A 61-day, on-site pilot of Saltworks Technologies Inc.’s Flex EDR Selective (electrodialysis reversal system) technology was completed at the Water Research Center (located at Georgia Power’s Plant Bowen near Cartersville, Georgia) in collaboration with the Electric Power Research Institute, Southern Company, and U. S. Department of Energy. A unique characteristic of the Flex EDR technology is its ability to selectively remove chloride from a wastewater. In this project, flue gas desulfurization (FGD) wastewater was tested. Because FGD operators often establish limits on chloride concentration levels based on FGD material of construction to initiate purge/blowdown cycles, the Flex EDR technology has the potential to enable higher scrubber water recycling. The piloted treatment technology demonstrated over a 90% recovery in a system that required a less complex pretreatment often associated with other water treatment approaches. Instead, chloride removal allows for an internal process recycle, which significantly decreases wastewater volume. The resulting products are a low chloride and cleaner water that can be either reused or potentially discharged and a concentrated calcium-chloride-rich brine that is suitable for further volume reduction or direct wastewater encapsulation.

01 COAL, LIGNITE, AND PEAT↗

In-situ resource utilization-derived water purification and hydrogen and oxygen production

This disclosure provides an integrated system and method for producing purified water, hydrogen, and oxygen from contaminated water. The contaminated water may be derived from regolith-based resources on the moon, Mars, near-Earth asteroids, or other destination in outer space. The integrated system and method utilize a cold trap to receive the contaminated water in a vapor phase and selectively freeze out water from one or more volatiles. A heat source increases temperature in the cold trap to vaporize the frozen contaminated water to produce a gas stream of water vapor and volatiles. A chemical scrubber may remove one or more volatiles. The integrated system and method utilize ionomer membrane technology to separate the water vapor from remaining volatiles. The water vapor is delivered for crew use or delivered to an electrolyzer to produce hydrogen and oxygen.

Finger, Barry Wynns↗

Big Bend sees big environmental push

The 1800 MW Big Bend Power Station is a coal-fired facility in Tampa Bay, Florida, USA owned by Tampa Electric. It has four pulverized coal- fired steam units equipped with FGD scrubbers and electrostatic precipitators. Currently the addition of selective catalytic reduction (SCR) systems is under consideration. The Unit 4 SCR retrofit was completed in June 2007; the remaining three systems are scheduled for completion by 2010. Boiler draft systems will be modified to a balance draft design to accommodate the increased pressure drop of the new systems. 3-D computer models were developed to determine constructability due to the tight clearance at the site. 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Development of silica/vanadia/titania catalysts for removal of elemental mercury from coal-combustion flue gas

SiO{sub 2}/V{sub 2}O{sub 5}/TiO{sub 2} catalysts were synthesized for removing elemental mercury (Hg{sup 0}) from simulated coal-combustion flue gas. Experiments were carried out in fixed-bed reactors using both pellet and powder catalysts. In contrast to the SiO{sub 2}-TiO{sub 2} composites developed in previous studies, the V{sub 2}O{sub 5} based catalysts do not need ultraviolet light activation and have higher Hg{sup 0} oxidation efficiencies. For Hg{sup 0} removal by SiO{sub 2}-V{sub 2}O{sub 5} catalysts, the optimal V{sub 2}O{sub 5} loading was found between 5 and 8%, which may correspond to a maximum coverage of polymeric vanadates on the catalyst surface. Hg{sup 0} oxidation follows an Eley-Rideal mechanism where HCl, NO, and NO{sub 2} are first adsorbed on the V{sub 2}O{sub 5} active sites and then react with gas-phase Hg{sup 0}. HCl, NO, and NO{sub 2} promote Hg oxidation, while SO{sub 2} has an insignificant effect and water vapor inhibits Hg{sup 0} oxidation. The SiO{sub 2}-TiO{sub 2}-V{sub 2}O{sub 5} catalysts exhibit greater Hg{sup 0} oxidation efficiencies than SiO{sub 2}-V{sub 2}O{sub 5}, may be because the V-O-Ti bonds are more active than the V-O-Si bonds. This superior oxidation capability is advantageous to power plants equipped with wet-scrubbers where oxidized Hg can be easily captured. The findings in this work revealed the importance of optimizing the composition and microstructures of SCR (selective catalytic reduction) catalysts for Hg{sup 0} oxidation in coal-combustion flue gas. 33 refs., 5 figs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Predictable SCR co-benefits for mercury control

A test program, performed in cooperation with Dominion Power and the Babcock and Wilcox Co., was executed at Dominion Power's Mount Storm power plant in Grant County, W. Va. The program was focused on both the selective catalytic reduction (SCR) catalyst capability to oxide mercury as well as the scrubber's capability to capture and retain the oxidized mercury. This article focuses on the SCR catalyst performance aspects. The Mount Storm site consists of three units totaling approximately 1,660 MW. All units are equipped with SCR systems for NOx control. A full-scale test to evaluate the effect of the SCR was performed on Unit 2, a 550 MWT-fired boiler firing a medium sulfur bituminous coal. This test program demonstrated that the presence of an SCR catalyst can significantly affect the mercury speciation profile. Observation showed that in the absence of an SCR catalyst, the extent of oxidation of element a mercury at the inlet of the flue gas desulfurization system was about 64%. The presence of a Cornertech SCR catalyst improved this oxidation to levels greater than 95% almost all of which was captured by the downstream wet FGD system. Cornertech's proprietary SCR Hg oxidation model was used to accurately predict the field results. 1 ref., 2 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

'Bugs' used to treat FGD wastewater

Tough regulation of heavy metals may justify a bioreactor approach in addition to chemical treatment of FGD wastewater. Two of Duke Energy' coal-fired plants, Belews Creek and Allen (in North Carolina) have installed new biological reactor systems to increase selenium removal to levels not achievable by existing scrubber waste water systems. The ABMet system removes nitrate and selenium in a single step. Progress Energy has installed the system at Roxboro and Mayo Stations, also in North Carolina. 1 fig., 2 photos.

01 COAL, LIGNITE, AND PEAT↗

Controlling mercury emissions from coal-fired power plants

Increasingly stringent US federal and state limits on mercury emissions form coal-fired power plants demand optimal mercury control technologies. This article summarises the successful removal of mercury emissions achieved with activated carbon injection and boiler bromide addition, technologies nearing commercial readiness, as well as several novel control concepts currently under development. It also discusses some of the issues standing in the way of confident performance and cost predictions. In testing conducted on western coal-fired units with fabric filters or TOXECON to date, ACI has generally achieved mercury removal rates > 90%. At units with ESPs, similar performance requires brominated ACI. Alternatively, units firing western coals can use boiler bromide addition to increase flue gas mercury oxidation and downstream capture in a wet scrubber, or to enhance mercury removal by ACI. At eastern bituminous fired units with ESPs, ACI is not as effective, largely due to SO{sub 3} resulting from the high sulfur content of the coal or the use of SO{sub 3} flue gas conditioning to improve ESP performance. 7 refs., 3 figs.

01 COAL, LIGNITE, AND PEAT↗

Vitrification assistance program: international co-operation on vitrification technology

With 10 vitrification lines in operation (3 on WVP in Sellafield, 1 on AVM in Marcoule and 6 on AVH in La Hague), Sellafield Ltd and Areva NC benefit from the most in-depth experience worldwide in the vitrification of highly active liquors within a framework of commercial operations. Based on the two-step process design, using a calciner and an induction-heated hot melter, which was initially deployed in Marcoule in 1978, core vitrification equipment has been continuously improved by the independent development programmes of the two companies. In March 2005, Sellafield Ltd and Areva NC signed the Vitrification Assistance Program (hereafter referred to as VAP); a co-operative project lasting 4 years during which Areva NC is to share some areas of their experience and expertise with Sellafield Ltd. Now at the halfway point of this project, this paper summarises the work performed by the VAP team to date, highlighting the early benefits and lessons learned. The following points will be developed: - Equipment delivery and preparation for implementation on WVP - Training organization and dissemination to WVP teams - Lessons learned from the early changes implemented in operations (Calciner, Melter, Dust Scrubber and Primary off gas system), and initial feedback from the first campaign using a VAP equipped line. In conclusion: The vitrification process and technology implemented at Sellafield and at La Hague, based on the two-step process, have proved to be efficient in treating high active liquor of various types. Ten lines based on this principle have been successfully operated for more than 15 years in France and in the UK. The process has also been demonstrated to be sufficiently versatile to benefit from continuous improvement and development programmes. VAP, as a complete package to support vitrification technology and knowledge transfer from AREVA NC to Sellafield Ltd, has provided the framework for fruitful technical exchanges and discussions between the two companies. From equipment delivery to knowledge embedding within the WVP teams, both companies have worked hard together to respect the tight schedule of the contract, despite growing external constraints. This has been closely managed in order to achieve the best results for the VAP without jeopardizing the continuing production operations on both the Sellafield and La Hague sites. For future campaigns, WVP1 will be equipped with an automatic heating control system similar to the one used at La Hague (i.e. based on 4 kHz). This will facilitate the work of the WVP operators and finalise the conversion of WVP melter control systems from manual to automatic, meaning that the melters on all 3 lines will be automatically controlled. Further implementation of VAP equipment is also planned on the other lines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF)

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) began stabilizing high level waste (HLW) in a glass matrix in 1996. Over the past few years, there have been several process and equipment improvements at the DWPF to increase the rate at which the high level waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process to upsets, thereby minimizing downtime and increasing production. Improvements due to optimization of waste throughput with increased HLW loading of the glass resulted in an 8 % waste throughput increase over the standard 28 % waste loading based upon operational efficiencies. Improvements in canister production include the pour spout heated bellows liner (7 %), glass surge (siphon) protection software (2 %), melter feed pump software logic change to prevent spurious interlocks of the feed pump with subsequent dilution of feed stock (2 %) and optimization of the steam atomized scrubber (SAS) operation to minimize downtime (3 %) for a total increase in canister production of 14 %. A number of process recovery efforts have allowed continued operation. These include the off gas system pluggage and restoration, slurry mix evaporator (SME) tank repair and replacement, remote cleaning of melter top head center nozzle, remote melter internal inspection, SAS pump J-Tube recovery, inadvertent pour scenario resolutions, dome heater transformer bus bar cooling water leak repair and new Infra-red camera for determination of glass height in the canister are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

K-1435 Wastewater Treatment System for the Toxic Substances Control Act Incinerator Wastewater at the East Tennessee Technology Park, Oak Ridge, TN

This paper will discuss the design and performance of a wastewater treatment system installed to support the operation of a hazardous waste incinerator. The Oak Ridge Toxic Substances Control Act Incinerator (TSCAI), located at the East Tennessee Technology Park (ETTP), is designed and permitted to treat Resource Conservation and Recovery Act (RCRA) wastes including characteristic and listed wastes and polychlorinated biphenyl (PCB)-contaminated mixed waste. The incinerator process generates acidic gases and particulates which consist of salts, metals, and radionuclides. These off-gases from the incinerator are treated with a wet off-gas scrubber system. The recirculated water is continuously purged (blow down), resulting in a wastewater to be treated. Additional water sources are also collected on the site for treatment, including storm water that infiltrates into diked areas and fire water from the incinerator's suppression system. To meet regulatory requirements for discharge, a wastewater treatment system (WWTS) was designed, constructed, and operated to treat these water sources. The WWTS was designed to provide for periodic fluctuation of contaminant concentrations due to various feed streams to the incinerator. Blow down consists of total suspended solids (TSS) and total dissolved solids (TDS), encompassing metals, radionuclide contamination and trace organics. The system design flow rate range is 7.95 to 17 cubic meters per hour (m3/hr) (35 to 75 gallons per minute; gpm). The system is designed with redundancy to minimize time off-line and to reduce impacts to the TSCAI operations. A novel treatment system uses several unit operations, including chemical feed systems, two-stage chemical reaction treatment, micro-filtration, sludge storage and dewatering, neutralization, granular activated carbon, effluent neutralization, and a complete programmable logic controller (PLC) and human-machine interface (HMI) control system. To meet the space requirements and to provide portability of the WWTS to other applications, the system was installed in three, over-the-road semi trailers, and interconnected with piping and power. Trailers were oriented on a small site footprint to facilitate ease of installation. A remote sump pump skid was provided to convey water from two holding sumps adjacent to the treatment process. An accumulation tank and pump were also provided to receive miscellaneous wastewaters for treatment if they meet the waste acceptance criteria. The paper will include details of the technology used in the design, the requirements for compliance, and the initial performance demonstration and jar testing results. The WWTS successfully allowed for highly efficient, high-volume treatment with compliant discharge to off-site surface water. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of In-Can Melting Process Applied to Vitrification of High Activity Waste Solutions (HAWS): Glass characterizations and process tests results - 12442

The CEA has selected vitrification for specific High-Activity nuclear Waste Solutions (HAWS) containing large quantities of salts. This choice has led the CEA Marcoule to develop a compact 'in-can' batch melting process in which the melting pot is disposable and serves as the primary canister for the solidified glass. This process is particularly suitable for the treatment of small waste quantities (less than 10 m{sup 3} per year) and low flow rates (5 to 10 L/h) which do not justify the use of a Cold Crucible Induction Melter. The unit capacity is approximately one hundred kilograms of glass a week operating alternately between feeding during the day and surveillance at night. In order to be fully representative of the glove box to be implemented, a new nonradioactive pilot-scale unit in which the core process (furnace and dust scrubber) is completely enclosed with glove box simulation was built at CEA Marcoule in 2008. The equipment includes all the systems and components necessary to perform full-scale tests: feed system, furnace and complete off-gas treatment system. The nominal tests were performed in 2009 and 2010 to verify that no problems arose in vitrifying solutions under the specified conditions. Two different liquid feeds representatives of the current HAWS stored and future solutions were used. The transient runs were carried out in this facility in 2010. Their objectives were to validate the glass product with different operating conditions and to determine optimum parameters for transient phases such as decreased volatility during standby phases. Finally, all the material obtained under nominal conditions or different operating conditions (e.g. initial glass frit quantity, standby temperature or restart procedure of feeding after night surveillance) have been characterized and described. The impact of transient phases on the process is then discussed in terms of volatility, thermal balance, etc., and compared with nominal tests results. Off-gas treatment system (OGTS) assessments determined preliminary decontamination factors for the OGTS components and allowed comparison between the two types of solutions and for different operating parameters. Since 2005 CEA Marcoule has been developing an 'in-can melting' vitrification process for specific High Activity Nuclear Waste Solutions. The tests carried out to date have validated the feasibility of this process and confirmed the direct vitrification option in which the liquid and solid feed streams are supplied directly to a disposable melting pot. CEA Marcoule began process qualification testing in 2009 in a new facility using equipment representative of the devices that will be installed in a glove box. The nominal mode tests performed in 2009 and 2010 were used to determine nominal operating conditions for the process: - a nominal process temperature of 1100 deg. C; - a maximum glass production rate of 5 kg/h; - a liquid feed solution flow rate of 5 L/h or less if the glass production rate exceeds the preceding maximum value; - a liquid recycle rate of 0.5 L/h for a nominal solution feed rate 5 L/h. They also produced glass samples generally meeting our expectations, and allowed us to measure the characteristic properties (viscosity, density, thermal conductivity, chemical durability). The first test of transient operation in 2010 yielded glass consistent with expectations and showed that reducing the temperature had no significant effect on the volatility of the constituent elements. However, a significant impact on the release of elements at the beginning of the test was observed with a larger initial quantity of glass frit on startup. The process qualification program will now continue with tests of degraded operating modes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

De-nitration Process in Glass Melter Off-Gas Treatment System - 17092

Vitrification technology has been generally applied to stabilize High-Level Radioactive Wastes (HLW) generated from spent fuel reprocessing for safe interim storage and final geological disposal. High temperature operation of the glass melter system generates substantial amounts of NOx with various hazardous radioactive elements, due to HLW containing a lot of nitrate. Hence the off-gas treatment system (OGTS) is one of the essential systems for the removal of hazardous radioactive elements including NOx, to ensure the stable and safe operation of the glass melter system. In general, the wet scrubbing process (e.g. Sub-merged Bed Scrubber: SBS) is installed in the upstream of the OGTS for HLW vitrification in order to remove volatile ruthenium, cesium and other radioactive mists and dusts. NOx together with ruthenium, iodine and submicron particles are removed in the wet absorber equipment to below the regulated limit by law. In the Rokkasho Vitrification Laboratory (RVL) constructed recently for inactive full scale mock-up tests, we have adopted the de-nitration process using reduction catalyst in addition to together with the wet scrubbing process considering the future scenarios that are compliant to the even stricter Air Pollution Control Law. By introducing this new system, we have successfully demonstrated a good de-nitration performance in the full scale mock-up test of the glass melter system. On the other hand, by using the wet scrubbing process, nitric acid would be generated by the absorption of NOx on this recovery process and should be reworked or disposed of as secondary liquid wastes. This is one of the deciding factors for enlarging the facility and increasing construction cost. That is the reason why IHI has developed the OGTS omitting the wet scrubbing process. In this paper, we have summarized the results on the de-nitration process of the OGTS in RVL and the progress of the optimizing denitration process for future reprocessing system applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Effect of Ettringite on Cementitious Waste Form Development for Low- Activity Waste - 17170

The current Cast Stone formulation, with 8% ordinary Portland cement (OPC), 45% fly ash (FA), and 47% blast furnace slag (BFS), proposed for cementitious waste forms (CWFs) at the Hanford site has been shown to be inadequate for secondary liquid wastes sent to the Effluent Treatment Facility (ETF). This is due to the high sulfate concentrations and non-alkaline conditions present in the ETF waste stream that lead to the late formation of ettringite, [Ca{sub 6}Al{sub 2}(SO{sub 4}){sub 3}(OH){sub 12}.26(H{sub 2}O)], which can consequently cause undesirable swelling and cracks in the CWF that facilitate {sup 99}Tc release. To overcome this challenge, hydrated lime (HL), Ca(OH){sub 2}, can be used instead of FA to provide the Ca necessary to sequester sulfate early in the cast stone curing process through early formation of ettringite. Early ettringite formation minimizes the risk of localized disruptive action or harmful stress that lead to undesirable swelling and cracking of the CWF. Furthermore, early formation reduces the permeability of the CWF, further reducing the risk of {sup 99}Tc release and increasing structural stability. Two liquid waste simulants, 1) WTP off-gas condensate (WTP) and 2) Effluent Management Facility (EMF) process condensate combined with low activity waste (LAW) caustic scrubber (labeled EMF/CS), were prepared and tested for ettringite formation effects on HL-containing CWF development and {sup 99}Tc leachability. After curing for 28 days, X-ray diffraction analysis revealed that ettringite was formed in the early stages of curing for the CWFs prepared using both simulants. However, because of the higher sulfate concentration in the EMF/CS simulant and limited Ca and Al sources, some sulfate did not form ettringite during the early stages of curing, resulting in significant monolith swelling and cracking during subsequent leaching tests. Despite observable cracking in monoliths prepared with the EMF/CS simulant, low {sup 99}Tc release from HL-based waste forms was measured in later leaching periods tested by the EPA Method 1315 in both simulants. Ettringite-{sup 99}Tc co-precipitation batch experiments support a possible chemical sequestration mechanism that is hypothesized to contribute to the observed low {sup 99}Tc leach rates, which are likely the result of an additional chemical reaction that sequesters {sup 99}Tc rather than simply physical factors such as reduced porosity and permeability (or tortuosity). Overall these findings quantitatively support the use of HL to overcome the deleterious effects of sulfate-rich conditions on CWFs through early formation of ettringite and provide evidence for {sup 99}Tc release rates that fall within low risk levels reported by the United States Department of Energy (US DOE). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Testing of Off-Gas Recycle Condensate Liquid from the WTP Low Activity Waste Vitrification Process - 16432

The Waste Treatment and Immobilization Plant (WTP) under construction at the Hanford site is designed to treat and immobilize the inventory of High-Level Waste stored in the 177 underground storage tanks. The WTP process flow was designed to pre-treat this waste, separating it into High Level Waste (HLW) and Low Activity Waste (LAW) fractions for vitrification. Vitrification of the waste generates a condensate stream from the off-gas processes originating from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP). The baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed through the LAW melter again. If the Pretreatment facility is unavailable, this baseline disposition pathway is not viable. Additionally, chloride, fluoride, and sulfate are partially volatile in the melter, accumulating to high concentrations while recycling and impacting the glass waste loading and facility throughput. The primary radionuclide that volatizes and accumulates is {sup 99}Tc. The long half-life and environmental mobility of {sup 99}Tc complicates disposal options for this secondary aqueous waste stream. This task is investigating {sup 99}Tc removal to examine the potential for diverting this stream to an alternate disposition path and avoiding impacting the glass waste loading. Separation methods for {sup 99}Tc have focused on using inorganic precipitation agents that can remove it by reducing it from soluble pertechnetate ion, with a +7 oxidation state, to insoluble technetium dioxide in the +4 oxidation state. Stannous chloride (SnCl{sub 2}) has been found highly effective at causing the reduction and precipitating {sup 99}Tc for removal, but it also precipitates other components. The primary competitor that precipitates is chromium, which consumes the redox activity of the Sn(II), causing addition of more of the SnCl{sub 2}. Research has examined the optimum quantity of SnCl{sub 2}, mixing time, and the impact of other redox-active species. It is also important to know the stability of the precipitated {sup 99}Tc in process conditions, since it is expected it will eventually be re-oxidized by oxygen and dissolve. This work is expected to determine if a {sup 99}Tc removal step could be used to decontaminate the bulk of this stream, and make it suitable for other disposal paths so that the chloride, fluoride, and sulfate can be diverted away from the glass melter. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RECENT PROCESS AND EQUIPMENT IMPROVEMENTS TO INCREASE HIGH LEVEL WASTE THROUGHPUT AT THE DEFENSE WASTE PROCESSING FACILITY

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) began stabilizing high level waste (HLW) in a glass matrix in 1996. Over the past few years, there have been several process and equipment improvements at the DWPF to increase the rate at which the high level waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process to upsets, thereby minimizing downtime and increasing production. Improvements due to optimization of waste throughput with increased HLW loading of the glass resulted in a 6% waste throughput increase based upon operational efficiencies. Improvements in canister production include the pour spout heated bellows liner (5%), glass surge (siphon) protection software (2%), melter feed pump software logic change to prevent spurious interlocks of the feed pump with subsequent dilution of feed stock (2%) and optimization of the steam atomized scrubber (SAS) operation to minimize downtime (3%) for a total increase in canister production of 12%. A number of process recovery efforts have allowed continued operation. These include the off gas system pluggage and restoration, slurry mix evaporator (SME) tank repair and replacement, remote cleaning of melter top head center nozzle, remote melter internal inspection, SAS pump J-Tube recovery, inadvertent pour scenario resolutions, dome heater transformer bus bar cooling water leak repair and new Infra-red camera for determination of glass height in the canister are discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Results of Voloxidation Processing of Kilogram Quantities of Used Nuclear Fuel

Advanced nuclear fuel processing methodologies are being studied as part of the Advanced Fuel Cycle Initiative (AFCI) program at ORNL. To support this initiative, processes and equipment were deployed at ORNL to perform all steps in the recycle process on actual used nuclear fuels, ranging from used fuel receipt to production of products and waste forms at the kilogram-scale (with capacity to process 20 kg of used fuel per year in up to four campaigns). In the first campaign, approximately 4 kg of used fuel was processed. As previously reported, the head-end processing was completed using saw-segmented Dresden fuel in lab-scale equipment in multiple batches. The second processing campaign used a new single pin shear and a new bench-scale voloxidizer to perform the dry head-end treatment prior to fuel dissolution. Approximately ~5 kg of used fuel (heavy metal basis) was processed in the second campaign. Two different fuels were oxidized in three separate batches to provide a range of processing conditions. The material used for each batch and general processing conditions are summarized in Table 1. Progress of the oxidation reaction was monitored continuously by two primary measurements; the concentration of oxygen in the effluent stream which was depressed as the oxygen was consumed, and the concentration of krypton-85 in the effluent stream as measured by a gamma counter on the off-gas pipeline. Table 1. Voloxidation test conditions for second campaign. Batch Fuel Source Burnup (GWd/MT)Batch size (kg*)/(kg**)Segment Length (in) Oxidation GasOperation Temperature ( C) 1Surry-2361.223/1.7041.0Air500 2North Anna63 702.071/2.8850.88Air600 3North Anna63 702.012/2.8030.88Oxygen600 * Heavy metal basis. ** Total fuel (oxide + cladding) basis. Fission product gases evolved from the fuel during the oxidation process were trapped for subsequent chemical and radiochemical analysis. The series of traps included a bed of molecular sieves to recover tritium (as HTO), silver-substituted zeolite to capture iodine (e.g. as AgI), a caustic scrubber to collect carbon dioxide (including 14CO2), a hydrogen-substituted mordenite to capture krypton (e.g. 85Kr) by cryogenic temperature swing adsorption, and a silver-substituted mordenite to capture xenon by cryogenic temperature swing absorption. The quantities of these volatile gases collected were compared to ORIGEN calculations to estimate the effectiveness of the voloxidation process to separate the volatiles from the used fuel. This paper will describe the voloxidation system and present preliminary results from the second processing campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗