Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

ARAM-CI Rev. 1

ARAM-CI provides the basic RAM framework process for conducting a security risk analysis (risk assessment and risk management) for different critical infrastructures. The user works through a step-by-step process which includes screening, facility characterization, identification of potential targets, detemine consequences, identify and characterize threat, conduct a vulnerability assessment, and detemining a relative risk. The ARAM-CI tool also allows the user address risk reduction measrues by developing upgrade packages and considering possible impacts.

Jaeger, Calvin↗

Space flight risk data collection and analysis project: Risk and reliability database

The focus of the NASA 'Space Flight Risk Data Collection and Analysis' project was to acquire and evaluate space flight data with the express purpose of establishing a database containing measurements of specific risk assessment - reliability - availability - maintainability - supportability (RRAMS) parameters. The developed comprehensive RRAMS database will support the performance of future NASA and aerospace industry risk and reliability studies. One of the primary goals has been to acquire unprocessed information relating to the reliability and availability of launch vehicles and the subsystems and components thereof from the 45th Space Wing (formerly Eastern Space and Missile Command -ESMC) at Patrick Air Force Base. After evaluating and analyzing this information, it was encoded in terms of parameters pertinent to ascertaining reliability and availability statistics, and then assembled into an appropriate database structure.

Source record↗

Human Systems Risk Network - A Ranking Analysis of Risks

INTRODUCTION The Human Systems Risk Board (HSRB) is responsible for understanding, managing, and mitigating the risks associated with spaceflight. For a particular mission, the HSRB assigns each human system risk a rating on a 5x5 grid assessing its likelihood and consequence, which is ultimately used to compare and rank the risks. The HSRB approaches risk management by primarily establishing the context of each human system risk individually with the understanding that mitigating one risk might affect the likelihood, consequence, and mitigation approaches of another. To support this effort the HSRB, subject matter experts, and risk custodian teams created directed acyclic graphs (DAG), often called a causal graph, for the twenty-nine risks. In this presentation, we propose a new ranking algorithm for the risks which includes the downstream influence of each risk according to the information in the DAGs and provide an application of graph theoretic tools. METHODS In 2014, Mindock and Klaus proposed a taxonomy for human system risk influences which we have adopted to categorize the nodes in each DAG. Analyzing the nodes that correspond to the risks in this taxonomy allows us to analyze and understand how each risk influences the others. We construct an auxiliary network, which we call the Primary Risk Network (PRN), where the nodes are the twenty-nine space flight risks and, a directed edge connects Risk A to Risk B if Risk A has some influence on the likelihood or consequence of Risk B as described in the DAGS. We perform a variety of graph theoretic ranking methods on the nodes (or risks) in the PRN, including Katz centrality. RESULTS We rank the nodes in the PRN using the Katz centrality score. The ten risks with the highest score are pictured in Figure 1, colored (light to dark) according to their score. We analyze other centrality measures like betweenness centrality, eigenvector centrality, and the Estrada index, and provide the meaning of the corresponding rankings in terms of the risks. Future work includes analyzing the other categories in the taxonomy defined by Mindock and Klaus [1]. For example, we are interested in analyzing the nodes that are labeled as countermeasures or capabilities and perform similar analysis to measure their effect on certain medical conditions.

dag↗

Determination of a Generic Human Error Probability Distribution, Part 1: A Dynamic Formulation of SPAR-H

In almost all major nuclear power plants (NPP) events include a significant human error component. As an example, in Fukushima Daiichi (2011) nuclear meltdown, the human actions related to the high-pressure injection cooling strongly affected accident evolution. Furthermore, in the Three Mile Island accident (1979) (which was initiated by a stuck open valve and thus was triggered a loss of coolant accident) the unit operators made decisions based upon false assumptions that contributed negatively to the accident. Given these premises, the ability to accurately model human interactions with plant evolution and, in particular, dynamically calculate human error probability (HEP) plays a major role in a probabilistic risk analysis (PRA). Human reliability analysis (HRA) identifies and models the causes of human errors, and quantifies HEP by applying different methodologies. HRA methods identify errors and reflect on the understanding of error-prone people and systems. There are a number of HRA methods available that assist in identifying the vulnerabilities in the system and provide guidance in determining the HEP. HEP is the probability of a human failure event (HFE), and quantification of HEPs under various situations is utilized in PRA of large complex systems. One of the more prominent HRA methods is the Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method that was developed to estimate HEPs for the use in the Standardized Plant Analysis Risk (SPAR) PRA models employed in U.S. NPPs. SPAR-H is implemented in U.S. NPPs by regulators at the U.S. Nuclear Regulatory Commission (NRC) to determine the HEP based on expert estimation through the use of calculation worksheets. In SPAR-H, the nominal HEPs (NHEPs) are multiplied by performance shaping factors (PSF) multiplier values to obtain the overall error probability. PSFs encompass the human components, individual characteristics, their environment, and aspects of the task. With PSFs, the goal is to capture all factors that can affect human performance. In SPAR-H there are eight PSFs used, each having respective levels corresponding to multipliers: Available Time, Stress/Stressors, Complexity, Experience/Training, Procedures, Ergonomics/Human Machine Interface, Fitness for Duty, and Work Processes. The PSF multipliers indicate enhanced, nominal, or degraded human performance. The SPAR-H method estimates the HEP through multiplying a NHEP with PSFs. Hence, SPAR-H is a traditional HRA method that assesses human performance at a fixed, or static, point in time. In a dynamic HRA framework, human performance is assessed on a continuous time basis. SPAR-H can be used within a dynamic PRA framework through the use of simulation and stochastic models. The goal of dynamic HRA is to build a more realistic model of the human-system interaction to enhance calculation of reliability, risk and safety analysis. The progression of events in dynamic SPAR-H considers that some PSFs may experience gradual change, while other change can be sudden due to individualistic differences or rapid plant status changes. The PSF changes are caused by contextual changes in the scenario. For example, as more time passes, the realization that a task should be completed sooner may cause the operator more stress. In another example, a sudden relay of information about sickness of a family member may alter the operator's general stress level and fitness for duty. Each PSF has a different dynamic nature; PSFs like stress and complexity change more quickly over the course of a task than experience and training. While the experience of an operator changes over the course of attaining the objective, the amount that this added experience changes the HEP is very minimal. In contrast, the stress, complexity, and procedures PSFs may change quite a bit over the course of task completion.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Beneficial Use of Harvested Ponded Fly Ash and Landfilled FGD Materials for High-Volume Surface Mine Reclamation

The overall motivation of this project was to demonstrate at laboratory, bench-scale, and full-scale demonstration levels that (a) coal ash surface impoundments can go through closure by removal as per USEPA and state regulations so that the material can be used as is (other than draining free water using CCRs piles) in high-volume beneficial applications, (b) FGD material from closed out FGD facilities can be excavated and recompacted for coal mine reclamation, and (c) harvested CCRs can be beneficially utilized (providing a net environmental gain) in large-volumes for reclamation at abandoned coal mine sites across the US, especially in the Eastern and Midwest coal mining regions. The objectives of this project were to: 1) promote the safe and cost-effective closure by removal of coal ash impoundments, 2) harvest landfilled FGD, and 3) promote the high-volume beneficial use of these harvested CCRs in the reclamation of abandoned surface coal mine sites across the eastern and midwestern coal mining regions of the United States. The major tasks carried out for this project are summarized below: 1) Conesville Full-Scale Demonstration Project: About 2 million tons of harvested CCR materials from the closure by removal of an inactive fly ash pond and an adjacent old FGD landfill were used for the full-scale demonstration project to fully reclaim a nearby partially completed abandoned surface coal mine. Site monitoring for the project duration was carried out and results are discussed. 2) Laboratory Testing: Geotechnical and environmental testing of harvested ponded fly ash and landfilled FGD material at the former Conesville power plant were carried out. Completing the laboratory testing allowed for QA/QC for the full-scale site construction and informed the formulation of the risk analysis. 3) Risk Analysis: We developed a reliable computational model for fate and transport. We used these models and the rich set of monitored data for the Conesville site to analyze risks to human health and ecological risks associated with high-volume surface mine reclamation using harvested CCRs. 4) GIS Siting Study: A Geographic Information System (GIS) study was carried out for three states in the Eastern coal mining region and two states in the Midwest coal region. This effort provided site specific GIS information for five states and allowed us to establish protocols that other states can follow in implementing their own state specific GIS study.

01 COAL, LIGNITE, AND PEAT↗

The Challenger disaster was caused by an Apollo decision

NASA’s view of risk changed between early Apollo and the Space Shuttle. Risk was a known serious problem at the beginning of Apollo and the risk estimates were disturbingly high. To avoid public concern, risk analysis was discontinued. Risk analysis was avoided in Shuttle, leading to an unnecessarily risky design. The immediate cause of the Challenger tragedy was the mistaken decision to launch in cold weather. The fundamental cause was the high risk of the Shuttle design. Before Challenger, management thought and testified that the probability of an accident was 1 in 100,000. After Challenger, Probabilistic Risk Analysis (PRA) found a roughly 1 in 100 chance of a Shuttle failure. The recent Orion design uses the safer Apollo approach, with a hardened capsule, launch abort escape, and the crew placed above the rocket tanks and engines. During Apollo it was estimated that, “assuming all elements from propulsion to rendezvous and life support were done as well or better than ever before, that 30 astronauts would be lost before 3 were returned safely to the Earth.” The chance of astronaut survival was only 10%. After the Apollo 1 tragedy, the awareness of risk led to an intense focus on achieving safety. “The only possible explanation for the astonishing success – no losses in space and on time – was that every participant at every level in every area far exceeded the norm of human capabilities.” During Apollo, a NASA PRA found that the chance of success was “less than 5 percent.” The NASA Administrator felt that “the numbers could do irreparable harm,” and discontinued numerical risk assessment.

Harry W Jones↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

[MaRS Project]

The Space Exploration Division of the Safety and Mission Assurances Directorate is responsible for reducing the risk to Human Space Flight Programs by providing system safety, reliability, and risk analysis. The Risk & Reliability Analysis branch plays a part in this by utilizing Probabilistic Risk Assessment (PRA) and Reliability and Maintainability (R&M) tools to identify possible types of failure and effective solutions. A continuous effort of this branch is MaRS, or Mass and Reliability System, a tool that was the focus of this internship. Future long duration space missions will have to find a balance between the mass and reliability of their spare parts. They will be unable take spares of everything and will have to determine what is most likely to require maintenance and spares. Currently there is no database that combines mass and reliability data of low level space-grade components. MaRS aims to be the first database to do this. The data in MaRS will be based on the hardware flown on the International Space Stations (ISS). The components on the ISS have a long history and are well documented, making them the perfect source. Currently, MaRS is a functioning excel workbook database; the backend is complete and only requires optimization. MaRS has been populated with all the assemblies and their components that are used on the ISS; the failures of these components are updated regularly. This project was a continuation on the efforts of previous intern groups. Once complete, R&M engineers working on future space flight missions will be able to quickly access failure and mass data on assemblies and components, allowing them to make important decisions and tradeoffs.

Aruljothi, Arunvenkatesh↗

Analysis of Alternatives for Risk Assessment Methodologies and Tools

The purpose of this document is to provide a basic overview and understanding of risk assessment methodologies and tools from the literature and to assess the suitability of these methodologies and tools for cyber risk assessment. Sandia National Laboratories (SNL) performed this review in support of risk modeling activities performed for the Stakeholder Engagement and Cyber Infrastructure Resilience (SECIR) division of the Department of Homeland Security (DHS) Office of Cybersecurity and Communications (CS&C). The set of methodologies and tools covered in this document is not intended to be exhaustive; instead, it focuses on those that are commonly used in the risk assessment community. The classification of methodologies and tools was performed by a group of analysts with experience in risk analysis and cybersecurity, and the resulting analysis of alternatives has been tailored to address the needs of a cyber risk assessment.

97 MATHEMATICS AND COMPUTING↗

SMART: A Propositional Logic-Based Trade Analysis and Risk Assessment Tool for a Complex Mission

This paper introduces a new trade analysis software called the Space Mission Architecture and Risk Analysis Tool (SMART). This tool supports a high-level system trade study on a complex mission, such as a potential Mars Sample Return (MSR) mission, in an intuitive and quantitative manner. In a complex mission, a common approach to increase the probability of success is to have redundancy and prepare backups. Quantitatively evaluating the utility of adding redundancy to a system is important but not straightforward, particularly when the failure of parallel subsystems are correlated.

Ono, Masahiro↗

Radiation With or Without 6 Months of Androgen Suppression Therapy in Intermediate- and High-Risk Clinically Localized Prostate Cancer: A Postrandomization Analysis by Risk Group

Purpose: Six months of androgen suppression therapy (AST) plus radiation (RT) prolongs survival vs. RT alone in men with unfavorable risk localized prostate cancer (PCa), but it is unknown if this benefit applies to all risk subgroups and, in particular, the intermediate-risk group. Methods and Materials: Among 206 men with stages T1b to T2b PCa and either a prostate-specific antigen level of >10 or a Gleason score of {>=}7 or MRI evidence of T3 disease randomized to receive 70 Gy of RT with or without 6 months of AST, Cox multivariable analysis was used to assess the impact of AST on overall survival in intermediate- and high-risk localized PCa, adjusting for age, Adult Comorbidity Evaluation 27 comorbidity score, interaction between comorbidity and treatment, and known prognostic factors. Survival estimates were compared using a two-sided log-rank test. Results: After an 8.2-year median follow-up, 74 men died. Compared to treatment with AST plus RT, treatment with RT alone was associated with an increased risk of death in intermediate-risk (adjusted hazard ratio, 3.0 [95% confidence interval, 1.3-7.2]; p = 0.01) and high-risk PCa (adjusted hazard ratio, 3.3 [95% confidence interval, 0.94-11.3]; p = 0.06). The survival benefit of adding AST was restricted to men with no or mild comorbidity in both the intermediate-risk (90.9% vs. 85.8% survival, respectively, at 7 years for AST plus RT vs. RT alone; p = 0.009) and high-risk (88.9% vs. 51.2% survival, respectively, at 7 years for AST plus RT vs. RT alone; p = 0.007) subgroups. Conclusions: In men with localized PCa who have no or mild comorbidity, adding 6 months of AST to RT was associated with improved survival for those with both intermediate-risk and high-risk disease, but in men with moderate to severe comorbidity, no benefit was observed in either risk group.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-T-246: Evaluation of Healthcare Failure Mode And Effect Analysis For Risk Assessment

Purpose: To evaluate the differences between the Veteran Affairs Healthcare Failure Modes and Effect Analysis (HFMEA) and the AAPM Task Group 100 Failure and Effect Analysis (FMEA) risk assessment techniques in the setting of a stereotactic radiosurgery (SRS) procedure were compared respectively. Understanding the differences in the techniques methodologies and outcomes will provide further insight into the applicability and utility of risk assessments exercises in radiation therapy. Methods: HFMEA risk assessment analysis was performed on a stereotactic radiosurgery procedure. A previous study from our institution completed a FMEA of our SRS procedure and the process map generated from this work was used for the HFMEA. The process of performing the HFMEA scoring was analyzed, and the results from both analyses were compared. Results: The key differences between the two risk assessments are the scoring criteria for failure modes and identifying critical failure modes for potential hazards. The general consensus among the team performing the analyses was that scoring for the HFMEA was simpler and more intuitive then the FMEA. The FMEA identified 25 critical failure modes while the HFMEA identified 39. Seven of the FMEA critical failure modes were not identified by the HFMEA and 21 of the HFMEA critical failure modes were not identified by the FMEA. HFMEA as described by the Veteran Affairs provides guidelines on which failure modes to address first. Conclusion: HFMEA is a more efficient model for identifying gross risks in a process than FMEA. Clinics with minimal staff, time and resources can benefit from this type of risk assessment to eliminate or mitigate high risk hazards with nominal effort. FMEA can provide more in depth details but at the cost of elevated effort.

60 APPLIED LIFE SCIENCES↗

MRCI Subtask 2.4/2.5: Regional/Subregional Analysis and Risk Assessment Final Technical Summary Report

The objective of the Midwest Regional Carbon Initiative (MRCI) project is to implement a collaborative Regional Initiative (RI) to accelerate the deployment of carbon capture, and storage (CCS) in the Midwest-Northeastern quadrant of the United States. This report is a Technical Summary report describing work performed on Tasks 2.4 (Conducting Regional/Subregional Analysis) and 2.5 (Assessing and Managing Risk) during the MRCI project. In Task 2.4, detailed numerical reservoir simulation models were developed for selected carbon storage (CS) systems identified under Task 2.1 (Battelle, 2021a) in the MRCI study area. The objective of Task 2.4 is to demonstrate a dynamic modeling methodology for evaluating the suitability of the (selected) CS systems in the MRCI region for hosting a commercial-scale storage project. In this study, CO2 injectivity was evaluated for different CS systems with an annual injection rate of 1 million metric tonnes (MMT) of CO2 considered as the minimum requirement for a commercial scale project. The objective of Task 2.5 is to assess key risks associated with storing CO2 in the different CS systems across the MRCI region and to demonstrate a method(s) for assessing these risks that may be used by developers of future CO2 storage projects in the region. The risk analysis was limited to evaluating two types of leakage risks (i.e., wellbore leakage, flow across unfractured caprock) at three modeled sites considered in Task 2.4.

MRCI,Report,Summary,Technical Challenges,dynamic m↗

Space Program Advocacy Can Distort Project Management and Damage Systems Engineering

Over-optimistic project advocacy often causes exaggerated performance claims and underestimated costs and schedules. This can distort project management and damage systems engineering. NASA projects such as the space shuttle and Hubble are extreme examples. NASA's spectacular success in the Apollo moon landings seems to have produced overconfidence and carelessness, but also to have gained tolerance for unrealistic claims and forgiveness when they were proven wrong. Apollo risk analysis predicted many astronaut fatalities. This was believed but was potentially damaging to the Apollo program, so risk analysis was discontinued. The moon landings beat bad odds because Apollo obsessively reduced risk. Its success seemed to confirm that risk analysis was unreasonably pessimistic and that risk could be overcome by good engineering. This understanding caused risk to be increased during space shuttle engineering and led to an unnecessarily dangerous approach. The shuttle design placed a fragile spacecraft next to the fuel tanks and failed to provide crew escape or launch abort. These design decisions directly caused the Challenger and Columbia tragedies. After Challenger, risk analysis was re-established. The current rocket and capsule design does consider risk and the result strongly resembles Apollo. Apollo advocacy led NASA to abandon risk analysis and this was ultimate cause of the Shuttle tragedies. Excessive advocacy that distorts risk, cost, and schedule could be prevented in an ideal organization that used systems engineering to make rational and fair decisions. However, most real organizations accommodate human and group needs using informal methods often described as "the system." Humans have biases, use innate decision making heuristics, instinctively rely on "gut feel," and establish deviant groups through groupthink. Expecting organizations to become totally rational is impractical, but specific problems such as neglecting risk and underestimating cost and schedule can be directly challenged with some hope of success.

Jones, Harry W.↗

Key Attributes of the SAPHIRE Risk and Reliability Analysis Software for Risk-Informed Probabilistic Applications

The Idaho National Laboratory is a primary developer of probabilistic risk and reliability analysis (PRRA) tools, dating back over 35 years. Evolving from mainframe-based software, the current state-of-the-practice has lead to the creation of the SAPHIRE software. Currently, agencies such as the Nuclear Regulatory Commission, the National Aeronautics and Aerospace Agency, the Department of Energy, and the Department of Defense use version 7 of the SAPHIRE software for many of their risk-informed activities. In order to better understand and appreciate the power of software as part of risk-informed applications, we need to recall that our current analysis methods and solution methods have built upon pioneering work done 30 to 40 years ago. We contrast this work with the current capabilities in the SAPHIRE analysis package. As part of this discussion, we provide information for both the typical features and special analysis capabilities which are available. We also present the application and results typically found with state-of-the-practice PRRA models. By providing both a high-level and detailed look at the SAPHIRE software, we give a snapshot in time for the current use of software tools in a risk-informed decision arena.

99 GENERAL AND MISCELLANEOUS↗

WE-H-BRC-03: Failure Mode and Effects Analysis in the First Clinical Implementation of a Novel Stereotactic Breast Radiotherapy Device: GammaPod™

Purpose: GammaPod™, the first stereotactic radiotherapy device for early stage breast cancer treatment, has been recently installed and commissioned at our institution. A multidisciplinary working group applied the failure mode and effects analysis (FMEA) approach to perform a risk analysis. Methods: FMEA was applied to the GammaPod™ treatment process by: 1) generating process maps for each stage of treatment; 2) identifying potential failure modes and outlining their causes and effects; 3) scoring the potential failure modes using the risk priority number (RPN) system based on the product of severity, frequency of occurrence, and detectability (ranging 1–10). An RPN of higher than 150 was set as the threshold for minimal concern of risk. For these high-risk failure modes, potential quality assurance procedures and risk control techniques have been proposed. A new set of severity, occurrence, and detectability values were re-assessed in presence of the suggested mitigation strategies. Results: In the single-day image-and-treat workflow, 19, 22, and 27 sub-processes were identified for the stages of simulation, treatment planning, and delivery processes, respectively. During the simulation stage, 38 potential failure modes were found and scored, in terms of RPN, in the range of 9-392. 34 potential failure modes were analyzed in treatment planning with a score range of 16-200. For the treatment delivery stage, 47 potential failure modes were found with an RPN score range of 16-392. The most critical failure modes consisted of breast-cup pressure loss and incorrect target localization due to patient upper-body alignment inaccuracies. The final RPN score of these failure modes based on recommended actions were assessed to be below 150. Conclusion: FMEA risk analysis technique was applied to the treatment process of GammaPod™, a new stereotactic radiotherapy technology. Application of systematic risk analysis methods is projected to lead to improved quality of GammaPod™ treatments. Ying Niu and Cedric Yu are affiliated with Xcision Medical Systems.

60 APPLIED LIFE SCIENCES↗