Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RESOURCE CONSERVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radium/Barium Waste Project

The treatment, shipping, and disposal of a highly radioactive radium/barium waste stream have presented a complex set of challenges requiring several years of effort. The project illustrates the difficulty and high cost of managing even small quantities of highly radioactive Resource Conservation and Recovery Act (RCRA)-regulated waste. Pacific Northwest National Laboratory (PNNL) research activities produced a Type B quantity of radium chloride low-level mixed waste (LLMW) in a number of small vials in a facility hot cell. The resulting waste management project involved a mock-up RCRA stabilization treatment, a failed in-cell treatment, a second, alternative RCRA treatment approach, coordinated regulatory variances and authorizations, alternative transportation authorizations, additional disposal facility approvals, and a final radiological stabilization process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Mixed Waste Storage Unit (MWSU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application to the Nevada Division of Environmental Protection focuses on continued operation of the Mixed Waste Storage Unit at the Nevada National Security Site (NNSS), under the auspices of DOE’s National Nuclear Security Administration Nevada Field Office (NNSA/NFO). Low-level mixed waste (LLMW) accepted at the NNSS contains both radioactive and hazardous material components as defined by various laws and regulations. The Mixed Waste Storage Unit (MWSU) is located at the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC are used to store LLMW generated at or shipped to the NNSS prior to disposal at the Mixed Waste Disposal Unit (MWDU). The document describes the MWSU, its general design, its operation, the materials it stores, and relevant health and safety regulations with which NNSS complies. The currently permitted MWSU has been operated since December 2010. Each of the four designated storage areas is RCRA-compliant for the storage of hazardous waste. This application represents a renewal request by DOE for the permitted MWSU. For security reasons, some of the contents of the full application are not available for public viewing. This version of the application contains most but not all of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and classification of vegetation canopy structure and distribution within the Great Smoky Mountains National Park using LiDAR

Vegetation canopy structure is a critically important habit characteristic for many threatened and endangered birds and other animal species, and it is key information needed by forest and wildlife managers for monitoring and managing forest resources, conservation planning and fostering biodiversity. Advances in Light Detection and Ranging (LiDAR) technologies have enabled remote sensing-based studies of vegetation canopies by capturing three-dimensional structures, yielding information not available in two-dimensional images of the landscape pro- vided by traditional multi-spectral remote sensing platforms. However, the large volume data sets produced by airborne LiDAR instruments pose a significant computational challenge, requiring algorithms to identify and analyze patterns of interest buried within LiDAR point clouds in a computationally efficient manner, utilizing state-of-art computing infrastructure. We developed and applied a computationally efficient approach to analyze a large volume of LiDAR data and to characterize and map the vegetation canopy structures for 139,859 hectares (540 sq. miles) in the Great Smoky Mountains National Park. This study helps improve our understanding of the distribution of vegetation and animal habitats in this extremely diverse ecosystem.

Clustering↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel – 19002

ABSTRACT In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO2) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO2, the container remained in storage. Treatment and disposal of the NaK and KO2 container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands–on instruction associated with: • Hazards associated with handling and using sodium and NaK • Proper personal protection equipment, spill control techniques, and first aid • Common design approaches for buildings, systems, and equipment used to contain sodium and NaK • What to expect in the event of a water reaction and how to respond • How to properly prepare for a fire and contain/extinguish small metal fires • A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability.

99 GENERAL AND MISCELLANEOUS↗

HWMA RCRA Storage and Treatment Permit for the Material and Fuels Complex on the Idaho National Laboratory

Owners and operators of facilities that treat, store, and dispose of hazardous waste must obtain an operating permit required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The operating permit for the Materials and Fuels Complex is the Hazardous Waste Management Act (HWMA)/RCRA Storage and Treatment Permit. The permit defines the conditions and requirements that apply to the treatment and storage of hazardous waste managed at the treatment, storage and disposal facilities (TSDF). The regulations governing the permitting process are found at 40 CFR Pa 124 and 270.

99 GENERAL AND MISCELLANEOUS↗

Treatment of Problematic Reactive Metal Wastes Using GeoMelt ICV - WM2020 Conference Paper

Decommissioning of sodium-cooled reactors and fast reactor technologies has generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt® In-Container Vitrification (ICV)™ technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV™ melts that processed elemental sodium into stable non-reactive glass. INL is currently implementing GeoMelt® technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate sodium cooled reactor components into waste forms that comply with existing disposition pathways. Reactive metal wastes require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics to comply with land disposal restrictions. GeoMelt®, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions first demonstrated the effectiveness of the GeoMelt® ICV™ process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glass-formers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt® ICV™ at a higher waste loading relative to previously demonstrated work performed in 2016; the higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. Additionally, follow-on demonstration testing in 2018 and 2019 focused on more complex shapes and other reactive-metals (mocked up Experimental Breeder Reactor II [EBR-II] subassembly, sodium filled heat exchanger, and a can containing sodium potassium alloy) which were all performed at engineering-scale. Since 2018, a 10-metric ton full-scale GeoMelt unit (GeoMelt® Richland) was designed, installed, and commissioned at Perma-Fix Northwest in Richland, Washington for the treatment of reactive metal wastes. As of September 2019, over 900 55-gallon drums containing a total of around 3,500 lb of sodium with low levels of radioactivity have been treated at GeoMelt ® Richland, with resulting glass monoliths disposed at the Nevada National Security Site (NNSS). A full-scale radiological demonstration melt on an actual EBR-II subassembly has also been performed using the full-scale melter in 2019. The GeoMelt® technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt® technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt® can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results generated as a part of the 2018-2019 demonstration program are presented in the paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Going Beyond Code: A Guide for Creating Effective Green Building Programs for Energy Efficient and Sustainable Communities

This guide is designed to help state and local governments design and implement successful "beyond code" programs for new commercial and residential buildings. The goal is to help states and localities establish voluntary or mandatory programs that go well beyond traditional minimum code requirements for new buildings. The guide addresses keys to successful adoption and implementation and discusses the primary areas that are typically included in beyond code or green building programs, including energy-efficiency materials and resource conservation, water efficiency, indoor environmental quality, and site development and land use. Detailed descriptions and analysis of actual programs are discussed, including lessons learned and best practices. States and localities can use the information on local programs, model codes and standards, and the model energy-efficiency criteria for residential and commercial buildings to find the best approach for their jurisdiction to develop and implement an effective beyond code program.

Code adoption and implementation, sustainability, ↗

A Circularity Assessment for Silicon Solar Panels Based on Dynamic Material Flow Analysis

Solar photovoltaics (PV) are the fastest growing renewable energy technology for clean, inexpensive, and sustainable electricity generation. Along with numerous technical roadmaps to improve system cost, performance and reliability, the PV industry should also plan to handle large volumes of silicon panel waste, which is initially estimated to be ~13 million metric tons (MT) by 2050 in the U.S. alone. Understanding the magnitude of material needs and how material flows throughout the PV panel life cycle could respond to design, operational and different end-of-life (EOL) circular pathways will help transition into a circular, resource-conserving economy. Herein, we introduce a dynamic material flow analysis (DMFA) framework based on electricity generation to quantify time-series stocks and flows of bulk PV materials (e.g., solar glass and aluminum frames) throughout the life cycles of utility-scale silicon PV systems in the U.S. in the period 2000-2100. We apply the model to a range of scenarios to understand how material demands depend on selected PV-related parameters, different material circularity strategies, and recent module design trends (e.g., bifacial, frameless). We found that float glass and aluminum in PV installations would likely reach 100 million MT and 12 million MT by 2100, respectively, in the baseline scenario. The most influential parameters for PV installation and subsequent waste reduction are found to be module lifetime, module efficiency, annual degradation, and material reduction. Module recycling and component remanufacturing were found to be the most effective material circularity strategies for waste minimization. Panel reuse has negligible savings on waste under current module efficiencies compared to replacements with newer generations with higher efficiency. Ongoing trends to produce larger power frameless modules could save 10 million MT of glass and ~9 million MT of aluminum. Our results enable advanced planning for future materials needs and provide insight into potential opportunities to minimize waste.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Circularity Assessment for Silicon Solar Panels Based on Dynamic Material Flow Analysis: Preprint

Solar photovoltaics (PV) are the fastest growing renewable energy technology for clean, inexpensive, and sustainable electricity generation. Along with numerous technical roadmaps to improve system cost, performance and reliability, the PV industry should also plan to handle large volumes of silicon panel waste, which is initially estimated to be ~13 million metric tons (MT) by 2050 in the U.S. alone. Understanding the magnitude of material needs and how material flows throughout the PV panel life cycle could respond to design, operational and different end-of-life (EOL) circular pathways will help transition into a circular, resource-conserving economy. Herein, we introduce a dynamic material flow analysis (DMFA) framework based on electricity generation to quantify time-series stocks and flows of bulk PV materials (e.g., solar glass and aluminum frames) throughout the life cycles of utility-scale silicon PV systems in the U.S. in the period 2000-2100. We apply the model to a range of scenarios to understand how material demands depend on selected PV-related parameters, different material circularity strategies, and recent module design trends (e.g., bifacial, frameless). We found that float glass and aluminum in PV installations would likely reach 100 million MT and 12 million MT by 2100, respectively, in the baseline scenario. The most influential parameters for PV installation and subsequent waste reduction are found to be module lifetime, module efficiency, annual degradation, and material reduction. Module recycling and component remanufacturing were found to be the most effective material circularity strategies for waste minimization. Panel reuse has negligible savings on waste under current module efficiencies compared to replacements with newer generations with higher efficiency. Ongoing trends to produce larger power frameless modules could save 10 million MT of glass and ~9 million MT of aluminum. Our results enable advanced planning for future materials needs and provide insight into potential opportunities to minimize waste.

circular economy↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Example of a Risk-Based Disposal Approval: Solidification of Hanford Site Transuranic Waste

The Hanford Site requested, and the U.S. Environmental Protection Agency (EPA) Region 10 approved, a Toxic Substances Control Act of 1976 (TSCA) risk-based disposal approval (RBDA) for solidifying approximately four cubic meters of waste from a specific area of one of the K East Basin: the North Loadout Pit (NLOP). The NLOP waste is a highly radioactive sludge that contained polychlorinated biphenyls (PCBs) regulated under TSCA. The prescribed disposal method for liquid PCB waste under TSCA regulations is either thermal treatment or decontamination. Due to the radioactive nature of the waste, however, neither thermal treatment nor decontamination was a viable option. As a result, the proposed treatment consisted of solidifying the material to comply with waste acceptance criteria at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, or possibly the Environmental Restoration Disposal Facility at the Hanford Site, depending on the resulting transuranic (TRU) content of the stabilized waste. The RBDA evaluated environmental risks associated with potential airborne PCBs. In addition, the RBDA made use of waste management controls already in place at the treatment unit. The treatment unit, the T Plant Complex, is a Resource Conservation and Recovery Act of 1976 (RCRA)-permitted facility used for storing and treating radioactive waste. The EPA found that the proposed activities did not pose an unreasonable risk to human health or the environment. Treatment took place from October 26, 2005 to June 9, 2006, and 332 208-liter (55-gallon) containers of solidified waste were produced. All treated drums assayed to date are TRU and will be disposed at WIPP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Isolation of Waste Disposal Areas at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) is the location of several large waste disposal areas that received waste from more than 50 years of operation, production, and research activities at ORNL and the U.S. Atomic Energy Commission's Southern Regional Burial Ground for wastes from more than 50 other facilities. The major burial grounds in the valley are Solid Waste Storage Areas (SWSAs) 4, 5, and 6, where wastes were buried in more than 850 unlined trenches and more than 1500 unlined auger holes. The area includes 3 seepage pits and 3 gravel-filled trenches used by ORNL for the disposal of liquid low level wastes. The burial grounds contained several hundred thousand cubic yards of waste, and the combined inventory of the burial grounds and liquid disposal sites was well over 1 million curies. The Record of Decision for Interim Actions for the Melton Valley Watershed at ORNL selected hydraulic isolation of major waste sources as the primary mechanism for remediation of the watershed. Isolation was to be accomplished mainly through the construction of multi-layer caps over the burial grounds, seepage pits, and trenches. Groundwater diversion and collection systems were installed along the up-gradient and down-gradient edges, respectively, of selected caps to enhance the performance of the isolation system. The waste areas were covered with both Resource Conservation and Recovery Act (RCRA)-type and isolation multi-layer caps. A total of 13 multi-layer caps covering 58.7 hectares (ha) (plan view) were constructed in Melton Valley between 2003 and 2006. The project encountered considerable challenges, not the least of which was its scale, involving simultaneous construction activities at widely scattered sites across the 430-ha watershed. Detailed planning and coordination enabled year-round fieldwork, an essential requirement necessary to retain a skilled, experienced workforce and meet the contract milestone for completion. Other factors key to the success of the project involved the use of an on-site borrow area and construction of a dedicated haul road for transfer of materials from the borrow area to the capping sites. In summary: Remedy effectiveness data obtained during 2007 for the Melton Valley ROD actions collectively indicate that the remedy is generally operating and functioning as planned. Contaminant releases of the principal contaminants of concern in Melton Valley have decreased significantly during and since remediation of the contaminant source areas. Hydrologic isolation systems at the burial grounds functioned as intended as demonstrated by attainment of groundwater level goals in most areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Options To Cleanup Site-wide Vadose Zone Contamination At The Hanford Site, WA, State

The U.S. Department of Energy (DOE) Hanford Site in south central Washington State lies along the Columbia River and is one of DOE's largest legacy waste management sites. Enormous radionuclide and chemical inventories exist below-ground. These include Resource Conservation and Recovery Act (RCRA) storage facilities where hazardous and radioactive contaminants were discharged and leaked to the soil surface and to the deep vadose zone and groundwater. The vadose zone is also contaminated from facilities regulated by the RCRA and Comprehensive Environmental Response Compensation and Liability Act (CERCLA) Act. Hanford now contains as much as 28,300 cubic meters of soil contaminated with radionuclides from liquid wastes released near processing facilities. The Hanford Federal Facility Agreement and Consent Order, Tri-Party Agreement (TPA) has set the completion of the cleanup of these sites by 2024. There are numerous technical and regulatory challenges to cleanup of the vadose zone at the Hanford site. This paper attempts to identify the categories of deep vadose zone problem and identifies a few possible regulatory options to clean up the site under the mix of state and federal regulatory authorities. There are four major categories of vadose contamination areas at the Hanford Site. The first is laterally extensive with intermediate depth (ground surface to about 45 meters depth) mostly related to high volume effluent discharge into cribs, ponds and ditches of designated CERCLA facilities. The second is dominated by laterally less extensive mostly related to leaks from RCRA tank farms. The later contamination is often commingled at depth with wastes from adjacent CERCLA facilities. The third category is from the high volume CERCLA facilities extending from the surface to more than 60 meters below ground. Contamination from the later category crosses the entire thickness of the vadose zone and reached groundwater. The fourth category is the lower volume waste sites. There are multiple management options to clean up the above four categories of vadose zones sites. The following are some of the options considered for detailed evaluation: - Maintain separate decision processes for each RCRA and CERCLA units/waste sites with a more accommodating schedule. - Create new vadose zone operable units with limited geographical boundaries regardless of site category/origin and make an integrated decision. - Expand the existing CERCLA groundwater operable units to include the deep vadose zone - Use a combination of the above. Each option has pros and cons and regulatory limitations. Detailed evaluation of these options is required to support a cost effective expedited cleanup. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cleanup of the Idaho National Laboratory Status Report

This paper describes the status of the cleanup of the U.S. Department of Energy's Idaho National Laboratory site (INL). On May 1, 2005 CH2M.WG Idaho, LLC (CWI) began its 7-year, $2.4 billion cleanup of the INL. When the work is completed, 3,406,871 liters (900,000 gallons) of sodium-bearing waste will have been treated; 15 high-level waste tanks will have been grouted and Resource Conservation and Recovery Act (RCRA)- closed; more than 200 facilities will have been demolished or disposed of, including three reactors, several spent fuel basins, and hot cells; thousands of containers of buried transuranic waste will have been retrieved; more than 8,000 cubic meters (10,464 cubic yards) of contact-handled transuranic waste and more than 500 cubic meters (654 cubic yards) of remote-handled transuranic waste will have been characterized, packaged, and shipped offsite; almost 200 release sites and voluntary consent order tank systems will have been remediated; and 3,178 units of spent fuel will have been moved from wet to dry storage. In 2007, CWI began the construction of the Integrated Waste Treatment Unit that will treat the sodium-bearing waste for eventual disposal; removed and disposed the 112-ton Engineering Test Reactor vessel; demolished all significant radiological facilities at Test Area North; continued the exhumation of buried transuranic wastes from the Subsurface Disposal Area at the Radioactive Waste Management Complex; shipped the first of hundreds of containers of remote-handled transuranic waste to the Waste Isolation Pilot Plant; disposed of thousands of cubic meters of low-level and low-level mixed radioactive wastes both onsite and offsite while meeting all regulatory cleanup objectives. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatability Test Plan for Deep Vadose Zone Remediation at the Hanford Site's Central Plateau

A treatability test plan has been prepared to address options for remediating portions of the deep vadose zone beneath the U.S. Department of Energy's (DOE's) Hanford Site. The vadose zone is the region of the subsurface that extends from the ground surface to the water table. The overriding objective of the treatability test plan is to recommend specific remediation technologies and laboratory and field tests to support the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and Resource Conservation and Recovery Act of 1976 remedial decision-making process in the Central Plateau of the Hanford Site. Most of the technologies considered involve removing water from the vadose zone or immobilizing the contaminants to reduce the risk of contaminating groundwater. A multi-element approach to initial treatability testing is recommended, with the goal of providing the information needed to evaluate candidate technologies. The proposed tests focus on mitigating two contaminants - uranium and technetium. Specific technologies are recommended for testing at areas that may affect groundwater in the future, but a strategy to test other technologies is also presented. (authors)

54 ENVIRONMENTAL SCIENCES↗