Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synchrophasor Visual Integration and Event Evaluation for Utilities (SynchroVIEEU) with High Penetration of Renewables

The Hawaiian Electric Companies (Companies), operating independent grid systems on the islands of Oahu, Hawaii, Maui, Molokai and Lanai, have been contending with some of the highest levels of renewable generation from both utility-scale and distributed generation resources. Renewable penetration levels exceeding 50% of generation are some of the highest in the nation and are changing the system characteristics and requiring operational changes to grid management. The Companies have aggressively leveraged federal, multi-state and industry grant funding to demonstrate new technologies for monitoring, visualization, forecasting and analysis to inform transformation needs and to improve operational awareness, especially at the distribution level. As part of the American Recovery and Reinvestment Act (ARRA) supported efforts to facilitate integration of renewables, synchrophasor devices were deployed on the islands of Hawaii and Maui in 2010. The devices have potential to provide Hawaii Electric Light Company (HELCO) on Hawaii Island and Maui Electric Company (MECO) with additional information to support post-event analysis and to help quantify observed area-wide changes in voltage and frequency on the systems. Consistent with the U.S. Department of Energy’s (DOE) Office of Electricity Delivery and Energy Reliability (OE) FOA objectives, the goal of this project was to accelerate the integration of synchrophasor information into production grade data visualization and analysis platforms/models to inform timely, efficient and reliable operations of a modern grid in light of high penetrations of renewable resources. The project comprised a two-year development effort to investigate the integration and visualization of synchrophasor field data into production-ready transmission and distribution proactive modeling efforts and a common data analysis platform application currently being used by the Companies. Conceptually, the project was about getting the right data to the right people at the right time in an easily accessible and timely environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Securing Grid-interactive Efficient Buildings (GEB) through Cyber Defense and Resilient System (CYDRES)

The DOE CYDRES project is driven by the urgent need to address critical research gaps in the domain of cyber-physical security of smart buildings, including Grid-interactive Efficient Buildings (GEBs). CYDRES, a real-time advanced building resilient platform, aims to enhance the cyber-attack-immune capabilities of buildings through multi-layered prevention, detection, and adaptation mechanisms. CYDRES consists of five key modules: a multi-layer network analyzer, an Automatic Fault Detection, Diagnosis, and Prognosis (AFDDP) framework, an intelligent mode selector, a cyber-resilient control framework, and a situation awareness platform. The Network Analyzer employs a data-driven framework that includes a protocol state learning tool and a CRF (Conditional Random Field) command validator. In Hardware-In-the-Loop (HIL) testbeds, it achieved 100% detection accuracy with a false alarm rate of 3%, validating its efficacy in identifying selected cyber-attacks. The AFDDP framework leverages pattern matching, PCA (Principal Component Analysis)-based strategies, and a DBN (Dynamic Bayesian Network)-based fault diagnosis approach to pinpoint the causes of physical system abnormalities using Building Automation System (BAS) data. In HIL experiments, the AFDDP module attained a detection accuracy of over 95% with a false alarm rate below 7%. Additionally, the fault detector utilized machine learning (Random Forest) and deep learning (Multi-Layer Perceptron) methods with acoustic sensor data to achieve a 100% fault detection accuracy in Heating, Ventilation, and Air-Conditioning (HVAC) equipment. The Mode Selector offered real-time impact analysis, allowing immediate actions to protect BASs in the face of emerging threats. The cyber-resilient control framework included an adaptive Model Predictive Control (MPC) and a measurement compensator, reducing temperature violations by up to 94% and improving the total demand flexibility by up to 70% in HIL experiments. Such HIL experiments covered a cyber-attack case and a physical fault case, showcasing CYDRES’ efficiency in maintaining operational continuity during threats. The situation awareness platform in Grafana enhanced real-time threat detection and response visualization, augmenting the operational awareness for building operators. CYDRES demonstrated high technical effectiveness in various test scenarios, particularly in HIL environments. The project's phased development approach ensured efficient use of resources, highlighting its practical feasibility and readiness for commercialization. By enhancing the security and resilience of building operations, CYDRES represents a significant advance in mitigating risks associated with cyber-physical systems, thereby enhancing public confidence in the safety of modern building infrastructure. Future directions for the project include expanding testing protocols, refining AFDDP methodologies, exploring more comprehensive resilient control strategies, and testing in real commercial buildings.

42 ENGINEERING↗

Design and Construction of a High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory, together with Lawrence Berkeley National Laboratory, is building a new High Field Vertical Magnet Test Facility (HFVMTF) to be situated in the Magnet Test Facility at Fermilab. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences, and will serve as a superconducting cable test facility for both communities. The background magnetic field for test samples is 15 T and will be produced by a magnet provided by LBNL operating at 1.9 K in superfluid helium. The samples will be placed in the background magnetic field, cooled to between 4.5 K and a user-specified upper limit, and will be powered with a super-conducting transformer at up to 100 kA. Additionally, this facility will be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program. Presently, the various tasks of the project are at different stages of execution, from conceptual to ready-for-construction designs. Here, this paper describes the parameters and design status of the pit construction, cryostat, heat exchanger, lambda plate, power system, and quench protection and monitoring systems of the facility.

43 PARTICLE ACCELERATORS↗

Fibrous Fillers to Manufacture Ultra High Ash/Performance Paper

The paper industry is one of the largest users of energy and emitters of CO2 in the US manufacturing industry. In addition to that, it is facing tremendous financial pressure due to lower cost imports. The fine paper industry has shrunk from 15 million tons per year production to 10 million tons per year in the last 5 years. This has resulted in mill closures and job loses. The AF&PA and the DOE formed a program called Agenda 2020 to help in funding to develop breakthrough technologies to provide help in meeting these challenges. The objectives of this project were to optimize and scale-up Fibrous Fillers technology, ready for commercial deployment and to develop ultra high ash/high performance paper using Fibrous Fillers. The goal was to reduce energy consumption, carbon footprint, and cost of manufacturing paper and related industries. GRI International (GRI) has been able to demonstrate the techno - economic feasibility and economic advantages of using its various products in both handsheets as well as in commercial paper mills. GRI has also been able to develop sophisticated models that demonstrate the effect of combinations of GRI's fillers at multiple filler levels. GRI has also been able to develop, optimize, and successfully scale-up new products for use in commercial paper mills.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Summary of Plutonium-238 Production Alternatives Analysis (Final Report)

The Team implemented a two-phase evaluation process. During the first phase, a wide variety of past and new candidate facilities and processing methods were assessed against the criteria established by DOE for this assessment. Any system or system element selected for consideration as an alternative within the project to reestablish domestic production of Pu-238 must meet the following minimum criteria: Any required source material must be readily available in the United States, without requiring the development of reprocessing technologies or investments in systems to separate material from identified sources. It must be cost, schedule, and risk competitive with existing baseline technology. Any identified facilities required to support the concept must be available to the program for the entire project life cycle (notionally 35 years, unless the concept is so novel as to require a shorter duration). It must present a solution that can generate at least 1.5 Kg of Pu-238 oxide per year, for at least 35 years. It must present a low-risk, near-term solution to the National Aeronautics and Space Administration’s urgent mission need. DOE has implemented this requirement by eliminating from project consideration any alternative with key technologies at less than Technology Readiness Level 5. The Team evaluated the options meeting these criteria using a more detailed assessment of the reasonable facility variations and compared them to the preferred option, which consists of target irradiation at the Advanced Test Reactor (ATR) and the High Flux Isotope Reactor (HFIR), target fabrication and chemical separations processing at the ORNL Radiochemical Engineering Development Center, and neptunium 237 storage at the Materials and Fuels Complex at INL. This preferred option is consistent with the Records of Decision from the earlier National Environmental Policy Act (NEPA) documentation

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase I Conceptual Study)

The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.

03 NATURAL GAS↗

The JLab Eta Factory (JEF) experiment

The new experiment, JLab Eta Factory (JEF), in the experimental Hall D at Jefferson Lab will extend the physics potential of the GlueX detector beyond the main spectroscopy program and perform precision measurements of various ?(?)decays with emphasis on rare neutral modes. The physics program of the experiment spans from precision tests of low-energy QCD to search of gauge bosons in the mass range below 1 GeV coupling the SM sector to the dark sector. Photoproduction of highly boosted ?(?)mesons using a tagged photon beam, good detection of recoil proton and multi-photon final states will allow to suppress background and collect high-statistics data sample of ?mesons. All these provide many advantages over other ?(?)experiments. The JEF experiment requires to upgrade the inner part of the forward lead glass calorimeter of the GlueX detector with high-granularity, high-resolution lead tungstate PbWO4 scintillating crystals. The calorimeter insert is currently under construction at Jeffeson Lab. The detector will be ready to take data in 2024. An overview of the JEF project will be presented.

Somov, Alexander↗

Cool GTL - A New Biogas Conversion Process from GTI

GTI is currently developing the Cool GTL process, to convert biogas into jet fuel. Cool GTL can be used to convert any biogas stream or high CO2 content natural gas to high quality liquid fuels. In Cool GTL we convert high CO2 feeds to synthesis gas at a 2-2.4/1 H2/CO ratio using a novel CO2/steam reforming catalyst which has high stability. The 2.0-2.4/1 H2/CO synthesis gas ratio is always achieved, for a variety of levels of feed CO2 content, by adjusting the amount of water added according to the amount of CO2 in the feed. The reformer catalyst has been tested for 500 hours and shows no deactivation. The product from the reformer then goes directly to a low temperature bubbling fluid bed Fischer Tropsch reactor with an integrated finishing hydroisomerization reactor which makes hydrocarbon liquids from the synthesis gas, With this configuration no wax is produced. The fluid bed allows excellent temperature control. Cool GTL is under development but still requires longer integrated testing. Currently Cool GTL is being developed at GTI through DOE funding in the project “Cool GTL for the Production of Jet Fuel from Biogas”. In this DOE project, our goal is to make 100 gallons of high quality jet fuel. This project will also demonstrate Cool GTL catalyst and process stability through long term, 24 hour operation. Once the DOE project is complete, we believe the Cool GTL process will be ready for larger scale commercial deployment in multiple applications.

09 BIOMASS FUELS↗

Reducing Mass of Steel Auto Bodies using Thin Advanced High Strength Steel with Carbon-Fiber Reinforced Epoxy

Diversitak, a company based in Detroit, MI, has developed a proprietary, low specific gravity, carbon fiber-reinforced epoxy (CFRE) under U.S. patent number 9,963,58832. Preliminary testing on this new material conducted in collaboration with ArcelorMittal Steel Company proved out the CFRE concept. A thin layer of this CFRE was applied to a stamped sheet of steel with residual stamping oils from a mill, in a time corresponding to automotive processing (e.g., ~15 seconds), and processed following automotive e-coat procedures (phosphating + 175–200°C heating), to complete the curing. No problems with adherence or performance were noted. While the CFRE does add weight to a thin gauge steel panel, it weighs much less than what is displaced by using thicker conventional mild steel gauges. The application of the coating showed a significant increased dent resistance, oil canning resistance, and part stiffness.This current two-year project was designed to mature this new technology to near manufacturing readiness to reduce the weight of a vehicle and lower the cost of weight reduction. The process involves the use of thinner gauge steels than are currently used. The collaborative development team included two industrial manufacturers: Diversitak and ArcelorMittal Steel Company; LightMAT; and two National Laboratories: Oak Ridge National Laboratory (ORNL) and Idaho National Laboratory (INL). The team developed a new manufacturing process to reduce the weight of a vehicle and lower the cost of weight reduction, as well as a better understanding of how to apply the coating so that it will perform to a high standard in-service. The team also performed an in-depth study to determine the long-term durability of the materials manufactured using this technology and well-known automotive industry standard tests.The overall process involved stiffening the thinner gauge steel by applying the CFRE on only one side. To accomplish this goal, the optimal reinforcement fiber length and fiber concentration was first determined. This was followed by measuring the coefficient of thermal expansion (CTE) in all three directions, so it could be fed into manufacturing models and methods for rapidly and inexpensively applying the coating. This was followed by panel level evaluations of the coating and steel combination, and then by full part demonstration of the technology on door panels. The final step was corrosion testing of the parts.ArcelorMittal characterized the advanced high strength steel (AHSS) (e.g., metallurgy-heat treatment for required AHSS properties as a function of the sheet thickness, state of internal stress) and quantified CFRE adhesion to the steel as a function of sheet preparation (e.g., rolling and stamping).ORNL optimized the fiber length, fiber concentration, and coating thickness for best vehicle function and performance at the least cost. Along with the suppliers, ORNL developed a durable CFRE application process (e.g., gun material, design, robotic dispensing process) and identified the adhesion stability of the CFRE during process holding. An approach to ensure that application/curing timing conforms to conventional assembly line speed and plant cycle times was determined. ORNL also determined the CTE of the material in all three directions and performed material scanning electron microscopy (SEM) analyses.INL characterized the corrosion properties of the steel panels coated with CFRE. The panels were investigated for corrosion resistance and stability as replacement materials used in automotive body panels to reduce mass. The coupons tested at INL were supplied by Diversitak after an optimized CFRE formulation was achieved in the already coated form for corrosion testing.

99 GENERAL AND MISCELLANEOUS↗

Novel additive manufacturing for plasma facing materials ‐ creating a research pathway for minority students

This project addresses two critical and intertwined challenges in fusion energy, namely the shortage of a broadly trained scientific workforce and the lack of scalable manufacturing solutions for plasma-facing components (PFCs). Through a collaboration among Florida International University (FIU), Miami Dade College (MDC), and Purdue University, the project established structured, reproducible educational and research pathways that recruit and advance students from institutions historically outside the fusion energy enterprise, building the human capital that this field urgently needs. The project integrates the complementary research strengths of FIU and Purdue to investigate flash sintering as a transformative processing route for tungsten-based PFCs. Unlike conventional sintering approaches, flash sintering offers rapid densification at significantly reduced thermal budgets, making it a compelling candidate for fabricating complex tungsten geometries that must withstand extreme plasma-facing environments. Systematic experimental and modeling efforts will elucidate the fundamental mechanisms governing microstructure evolution, grain boundary chemistry, and thermomechanical response during flash sintering — knowledge that is presently lacking but essential for translating this technology into reliable manufacturing practice. The convergence of workforce development and cutting-edge manufacturing research positions this project to deliver measurable, durable impact: a pipeline of fusion-ready researchers cultivated through expanded institutional partnerships, and a validated materials processing framework that accelerates domestic readiness for next-generation fusion reactor construction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Making Progress toward Net Zero Sites in the Army Reserve through Analysis of Multiple Scenarios

The U.S. Army Reserve (USAR) prioritized achieving net zero as part of its Sustainability Program in 2013, and developed a pilot that investigated net zero energy, water, and waste at 10 sites. Pilot sites were selected based on mission requirements for energy and water resilience and the likelihood of achieving the technical and economic thresholds for net zero. USAR owns and operates hundreds of sites that typically consist of between 2 and 10 buildings. The pilot sites were intentionally dispersed across the U.S. and its territories to provide a range of geographic characteristics where the net zero potential could be analyzed and solutions could be developed. For the Army, changes to operations must support the mission and enhance readiness, which includes increasing efficiency and resiliency. To facilitate alignment of project prioritization with different goals and site-specific needs, a net zero roadmap outlined three scenarios for project implementation: (1) cost-effective measures, (2) net zero measures, and (3) recommended measures. Each scenario included the same measures for some sites, while others had three different outcomes. USAR has used these roadmaps to plan and execute projects and move toward net zero at multiple sites since 2014, with the primary focus on the cost-effective and recommended scenarios. As conditions and costs change, additional measures required to achieve net zero are considered. This paper describes the methodology deployed for analyzing net zero for the USAR and discusses the benefits of working toward net zero under three distinct scenarios.

Net Zero↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning and Startup of a New Category 2 Nuclear Facility for RH TRU Sludge Packaging - 18614

For many years the Department of Energy (DOE) has been executing a plan to eliminate all threats of Radiological release to the Columbia River from the Hanford site, in Richland, Washington. While the River Corridor Closure Project is nearing completion, one of the last remaining facilities along the Columbia River is the 100K reactor complex. Since the 1950's the 105KW fuel storage basin has contained varying levels of spent reactor fuel and products of the degradation of aging stored fuel. Having previously removed all of the distinguishable spent fuel components, CH2M HILL Plateau Remediation Company (CH2M) is now in the final stages of readiness review to commence removal of the residual sludge material that has accumulated in the basin throughout the years of operation. There is approximately 27 m3 of sludge in the 105KW basin currently. This sludge material exhibits a very high radiation dose rate with levels reaching 100 R/hr. It is also very difficult to mobilize and transfer due to its physical characteristics. CH2M engineers have developed a novel mechanical system for mobilization and transfer of the sludge to specially designed storage containers. Once transferred to these containers, the sludge will be moved away from the river and taken to T Plant, a decontamination and repair facility on site, for interim storage, while a project to treat and package the material for final disposition is established. The Sludge Removal Project (SRP) is a $309 M capital line item project that was established to achieve the goals of this mission. Part of the project is to develop and install the equipment needed to do the transfer, and part of the project is to construct a new Category 2 sludge packaging facility. Construction of the facility is now complete, all equipment is installed and the project is well into the commissioning phase. Over the final three months of 2017, the project progressed into the final stages of readiness to transition to operations. This will represent the first commissioning of a new Category 2 process and facility at Hanford in over 10 years. The SRP team has crossed over many hurdles in establishing a workable plan for the safety basis for installing, commissioning and transitioning to operations within the boundaries of an existing Facility Safety Analysis Report. The project team has also applied extensive use of a mockup facility in the development and execution of the path to readiness and commencement of operations. At the time of the conference, the project will have completed a DOE Operational Readiness Review and will be very near of just entering full operation. This paper will share the experiences of the project team through these final steps and lessons learned on making the project successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗