Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Optimal CO 2 storage management considering safety constraints in multi-stakeholder multi-site GCS projects: A Markov game perspective

Geological carbon storage (GCS) projects could involve a diverse array of stakeholders or players from public, private, and regulatory sectors, each with different objectives and responsibilities. Given the complexity, scale, and long-term nature of GCS operations, determining whether individual stakeholders can independently optimize their interests — or whether collaborative coalition agreements are needed — remains a central question for effective GCS project planning and management. To access large, high-quality storage resources, future GCS deployment may increasingly occur in geologically connected sites, where shared geological features such as pressure space and reservoir pore capacity can lead to competitive behavior among stakeholders. In this work, we propose a paradigm based on Markov games to quantitatively investigate how different coalition structures affect the goals of stakeholders. We frame this multi-stakeholder multi-site problem as a multi-agent reinforcement learning problem with safety constraints. Our approach enables agents to learn optimal strategies while complying with safety regulations. We present an example where multiple operators are injecting CO 2 into their respective project areas in a geologically connected basin. To address the high computational cost of repeated simulations of high fidelity models, a previously developed surrogate model based on the Embed-to-Control (E2C) framework is employed. Our results demonstrate the effectiveness of the proposed framework in addressing optimal management of CO 2 storage when multiple stakeholders with different objectives and goals are involved.

58 GEOSCIENCES↗

Nuclear Direct Air Capture with Carbon Storage (NuDACCS) (Final Technical Report)

This final report, which is for DOE Award Number DE-FE0032160 (Direct Air Capture Combined with dedicated Long-Term Carbon Storage, Coupled to Existing Low-Carbon Energy), covers the Nuclear Direct Air Capture with Carbon Storage (NuDACCS) project period of performance from 03/31/2022 to 12/27/2024. Battelle Memorial Institute (Battelle) partnered with Aircapture LLC (Aircapture), Southern Company (Southern), Carbonvert, the University of Alabama, and Sargent & Lundy (S&L) to develop a front end engineering design (FEED) study for a direct air capture (DAC) system co-located with Southern Company's Joseph M. Farley Nuclear Plant (Plant Farley) in Columbia, Alabama. The DAC system was designed to capture at least 5,000 net tonnes of carbon dioxide (CO2) per year from ambient air in a form suitable for long duration carbon storage (e.g., geologic storage). To complement and support the FEED study, additional analyses were completed, including a Technology Maturation Plan (TMP); Workforce Readiness Plan; Project Cost Estimate; Business Case Analysis (BCA); Life Cycle Analysis (LCA); Environmental Health and Safety (EH&S) Assessment; and Environmental Justice (EJ) Analysis and Economic Revitalization and Job Creation Outcomes Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Strategy for Migration of Traditional to Hybrid Control Boards in a Nuclear Power Plant

This strategy document describes the NUREG-0711 based human factors engineering (HFE) phases and associated elements required to support design, verification and validation (V&V), and implementation of new digital control room elements in a legacy analog main control room (MCR). Information from previous planning and analysis work serves as the foundation for creating a human-machine interface (HMI) specification for distributed control systems (DCSs) to be implemented as part of nuclear power plant (NPP) modernization. This document reviews ways to take the HMSI specification and use it when migrating legacy displays or designing displays with new functionality. These displays undergo iterative usability testing during the design phase and then an integrated system validation (ISV) in the full-scope control room training simulator. Following successful demonstration of operator performance using the systems during the ISV, the new DCS is implemented at the plant, first in the training simulator and then in the MCR. This document concludes with a sample project plan, including a 15-month timeline from DCS design through implementation. Included is a discussion of how the U.S. Department of Energy’s Human System Simulation Laboratory (HSSL) can be used to support design and V&V activities. This report completes a Level 4 (M4) milestone under the U.S. Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Additive Manufacturing of Fuel Injectors

Additive manufacturing (AM), also known as 3D-printing, has been shifting from a novelty prototyping paradigm to a legitimate manufacturing tool capable of creating components for highly complex engineered products. An emerging AM technology for producing metal parts is the laser powder bed fusion (L-PBF) process; however, industry manufacturing specifications and component design practices for L-PBF have not yet been established. Solar Turbines Incorporated (Solar), an industrial gas turbine manufacturer, has been evaluating AM technology for development and production applications with the desire to enable accelerated product development cycle times, overall turbine efficiency improvements, and supply chain flexibility relative to conventional manufacturing processes (casting, brazing, welding). Accordingly, Solar teamed with EWI on a joint two-and-a-half-year project with the goal of developing a production L-PBF AM process capable of consistently producing high-nickel alloy material suitable for high temperature gas turbine engine fuel injector components. The project plan tasks were designed to understand the interaction of the process variables and their combined impact on the resultant AM material quality. The composition of the high-nickel alloy powders selected for this program met the conventional cast Hastelloy X compositional limits and were commercially available in different particle size distributions (PSD) from two suppliers. Solar produced all the test articles and both EWI and Solar shared responsibility for analyzing them. The effects of powder metal input stock, laser parameters, heat treatments, and post-finishing methods were evaluated. This process knowledge was then used to generate tensile, fatigue, and creep material properties data curves suitable for component design activities. The key process controls for ensuring consistent material properties were documented in AM powder and process specifications. The basic components of the project were: • Powder metal input stock: Powder characterization, dimensional accuracy, metallurgical characterization, and mechanical properties evaluation. • Process parameters: Laser parameter effects, post-printing heat-treatment development, mechanical properties evaluation, and post-finishing technique. • Material design curves: Room and elevated temperature tensiles, low cycle fatigue, and creep rupture properties curves generated. • AM specifications: Key metal powder characteristics, laser parameters, and heat-treatment controls identified.

36 MATERIALS SCIENCE↗

An environmental pressure index proposal for urban development planning based on the analytic network process

This paper introduces a new approach to prioritize urban planning projects according to their environmental pressure in an efficient and reliable way. It is based on the combination of three procedures: (i) the use of environmental pressure indicators, (ii) the aggregation of the indicators in an Environmental Pressure Index by means of the Analytic Network Process method (ANP) and (iii) the interpretation of the information obtained from the experts during the decision-making process. The method has been applied to a proposal for urban development of La Carlota airport in Caracas (Venezuela). There are three options which are currently under evaluation. They include a Health Club, a Residential Area and a Theme Park. After a selection process the experts chose the following environmental pressure indicators as ANP criteria for the project life cycle: used land area, population density, energy consumption, water consumption and waste generation. By using goal-oriented questionnaires designed by the authors, the experts determined the importance of the criteria, the relationships among criteria, and the relationships between the criteria and the urban development alternatives. The resulting data showed that water consumption is the most important environmental pressure factor, and the Theme Park project is by far the urban development alternative which exerts the least environmental pressure on the area. The participating experts coincided in appreciating the technique proposed in this paper is useful and, for ranking ordering these alternatives, an improvement from traditional techniques such as environmental impact studies, life-cycle analysis, etc.

54 ENVIRONMENTAL SCIENCES↗

Sagebrush Flat Wildlife Area 2008 Annual Report.

The Sagebrush Flat Wildlife Area is a 12,718 acre complex located in Douglas County, Washington. Four distinct management units make up the area: Bridgeport, Chester Butte, Dormaier and Sagebrush Flat. The four Units are located across a wide geographic area within Douglas County. The Units are situated roughly along a north/south line from Bridgeport in the north to the Douglas/Grant county line in the south, 60 miles away. The wildlife area was established to conserve and enhance shrubsteppe habitat for the benefit shrubsteppe obligate and dependent wildlife species. In particular, the Sagebrush Flat Wildlife Area is managed to promote the recovery of three state-listed species: Columbian sharp-tailed grouse (threatened), greater sage grouse (threatened) and the pygmy rabbit (endangered). The US Fish and Wildlife Service also list the pygmy rabbit as endangered. Wildlife area staff seeded 250 acres of old agricultural fields located on the Sagebrush Flat, Dormaier and Chester Butte units. This has been a three project to reestablish high quality shrubsteppe habitat on fields that had either been abandoned (Dormaier) or were dominated by non-native grasses. A mix of 17 native grasses and forbs, most of which were locally collected and grown, was used. First year maintenance included spot spraying Dalmatian toadflax on all sites and mowing annual weeds to reduce competition. Photo points were established and will be integral to long term monitoring and evaluation. Additional monitoring and evaluation will come from existing vegetation transects. This year weed control efforts included spot treatment of noxious weeds, particularly Dalmatian toadflax, in previously restored fields on the Bridgeport Unit (150 acres). Spot treatment also took place within fields scheduled for restoration (40 acres) and in areas where toadflax infestations are small and relatively easily contained. Where toadflax is so widespread that chemical treatment would be impractical, we use the bioagent Mecinus janthinus, available through Professor Gary Piper of Washington State University. This year we released 4,000 M. janthinus on the Bridgeport Unit at 6 separate locations. Since 2002 we have released approximately 14,400 of these insects, 80% of these on the Bridgeport Unit. Additional weed control activities included mowing and spot spraying more than 32 miles of roads, cutting and removal of annual weeds within fenced deer exclosures. We upgraded the solar powered irrigation system that supplies water to a stand of water birch trees planted in 2002. Wildlife area staff designed and built a new solar array and installed a higher capacity pump. The increased capacity will ensure that these trees receive adequate water through the hot summer months and allow us to create at least one additional stand. This project is an important part in our effort to expand the available winter habitat for sharp-tailed grouse on the Bridgeport Unit. Maintenance of fences, parking areas and roads continued during throughout the year. Two parking areas, at Chester Butte and Bridgeport, were graded and additional gravel added. Roads on the Bridgeport Unit were graded and repaired following spring runoff. Trespass and dumping issues have increased in recent years on the Bridgeport Unit. To address these problems we constructed four steel gates at access points on this unit. Each gate is tubular steel attached to 8-inch diameter steel posts, 10 feet long that are cemented into the ground. Two gates allow access to BPA substation facilities and power-line right-of ways so placement, construction and locking issues had to be coordinated with BPA's Real Estate staff in Spokane. Environmental Compliance Documentation issues were addressed again this year. This process has the potential to cause delays the completion of projects within the fiscal year. With this in mind and an eye toward the future, we requested that several projects planned for the coming years be surveyed this year. Beginning in August of 2007, area staff worked with BPA staff to identify work elements that had the potential to disturb cultural resources. Subsequently, in April of 2008, BPA staff archaeologists surveyed numerous sites and several miles of fence line. Final clearance to proceed was granted in August of 2008. This year we submitted and were awarded a grant from the state Recreation and Conservation Office. This grant will provide funding to restore native shrubsteppe habitat on 335 acres of old CRP fields located on the Bridgeport Unit. These fields were planted to non-native grasses in 1988 and currently have marginal habitat values for shrubsteppe obligate and dependent wildlife. Assuming that the state legislature allocates the funds, which, given the state's financial condition is not a sure thing, work on this project can begin late in the summer of 2009.

13 HYDRO ENERGY↗

Level-2 Milestone 3244: Deploy Dawn ID Machine for Initial Science Runs

This report documents the delivery, installation, integration, testing, and acceptance of the Dawn system, ASC L2 milestone 3244: Deploy Dawn ID Machine for Initial Science Runs, due September 30, 2009. The full text of the milestone is included in Attachment 1. The description of the milestone is: This milestone will be a result of work started three years ago with the planning for a multi-petaFLOPS UQ-focused platform (Sequoia) and will be satisfied when a smaller ID version of the final system is delivered, installed, integrated, tested, accepted, and deployed at LLNL for initial science runs in support of SSP mission. The deliverable for this milestone will be a LA petascale computing system (named Dawn) usable for code development and scaling necessary to ensure effective use of a final Sequoia platform (expected in 2011-2012), and for urgent SSP program needs. Allocation and scheduling of Dawn as an LA system will likely be performed informally, similar to what has been used for BlueGene/L. However, provision will be made to allow for dedicated access times for application scaling studies across the entire Dawn resource. The milestone was completed on April 1, 2009, when science runs began running on the Dawn system. The following sections describe the Dawn system architecture, current status, installation and integration time line, and testing and acceptance process. A project plan is included as Attachment 2. Attachment 3 is a letter certifying the handoff of the system to a nuclear weapons stockpile customer. Attachment 4 presents the results of science runs completed on the system.

99 GENERAL AND MISCELLANEOUS↗

Concentrating Solar Power and Water Issues in the U.S. Southwest

Concentrating solar power (CSP) systems utilize the sun's energy to create heat that is used to generate electrical power. CSP systems in the United States are installed primarily in the Southwest, with 92% of plants that are operational, under construction, or under development located in three western states--Arizona, California, and Nevada. This report provides an overview of CSP development in these states, or the 'Southwest' for the purposes of this discussion, with a particular focus on the water supply issues associated with CSP. The Western Governors' Association (WGA) commissioned staff from the Western States Water Council (WSWC) to collaborate with staff from the National Renewable Energy Laboratory (NREL) to prepare this report. The WGA has long supported the effective management of the West's water resources, as well as the development of a clean, diverse, reliable, and affordable energy supply consisting of traditional and renewable energy resources. This report is specifically intended to help inform these goals, especially as WGA continues to underwrite a Regional Transmission Expansion Planning project, undertaken by the WSWC and the Western Electricity Coordinating Council (WECC), to better understand energy development within the existing and future water resource constraints of the West. This report builds upon earlier research conducted by NREL, the University of Colorado-Boulder, and Stanford University that was supported through the Joint Institute for Strategic Energy Analysis (JISEA) and presents information gathered through extensive research and literature reviews, as well as interviews and outreach with state water administrators and energy regulators, WECC and other experts familiar with CSP development in the Southwest.

14 SOLAR ENERGY↗

Integrated work management system.

Sandia National Laboratories develops technologies to: (1) sustain, modernize, and protect our nuclear arsenal (2) Prevent the spread of weapons of mass destruction; (3) Provide new capabilities to our armed forces; (4) Protect our national infrastructure; (5) Ensure the stability of our nation's energy and water supplies; and (6) Defend our nation against terrorist threats. We identified the need for a single overarching Integrated Workplace Management System (IWMS) that would enable us to focus on customer missions and improve FMOC processes. Our team selected highly configurable commercial-off-the-shelf (COTS) software with out-of-the-box workflow processes that integrate strategic planning, project management, facility assessments, and space management, and can interface with existing systems, such as Oracle, PeopleSoft, Maximo, Bentley, and FileNet. We selected the Integrated Workplace Management System (IWMS) from Tririga, Inc. Facility Management System (FMS) Benefits are: (1) Create a single reliable source for facility data; (2) Improve transparency with oversight organizations; (3) Streamline FMOC business processes with a single, integrated facility-management tool; (4) Give customers simple tools and real-time information; (5) Reduce indirect costs; (6) Replace approximately 30 FMOC systems and 60 homegrown tools (such as Microsoft Access databases); and (7) Integrate with FIMS.

99 GENERAL AND MISCELLANEOUS↗

Assimilating Scanning Radar Data into Cloud-Scale Models

The aim of this project is to improve the initial conditions of large eddy simulations (LES) of deep convective storms by assimilating scanning radar reflectivity and radial velocity data as well as local environmental observations. Accomplishing this goal often results in more accurate numerical forecasts of clouds and precipitation than if the background initial meteorological conditions are solely relied upon for convection initiation and intensification, as is typical of most operational and research models. Conducted in a storm-scale LES framework, these more accurate numerical analyses can serve as tool to better understand and parameterize land-atmosphere coupling, boundary layer turbulence, and cloud processes, each used for model parameterization development of convection. Our work examined the sensitivity of the numerical representation of cloud-scale wind and microphysical structures to: i) the assimilation of radiosonde observations characterizing the near-storm inflow, ii) the assimilation of radar data of varying resolution for model simulations with grid spacings of 1-km and 0.25-km, and iii) to the assimilation of three-dimensional plan-projection-indicator (PPI) and range-height indicator (RHI) radar volumes. Few studies have explored deep convective storm analyses and forecasts produced by assimilation of radar observations to cloud-scale LES. Furthermore, to our knowledge, no storm-scale DA study has explored the value of assimilating high-resolution sector RHI volumes to determine if they can improve the retrieval of the vertical kinematic and microphysical storm structure aloft over the use of traditionally utilized PPI scans.

54 ENVIRONMENTAL SCIENCES↗

SCALE Enhancements for Detailed Cask Dose Rate Analysis - Paper 37

The Nuclear Fuels Storage and Transportation Planning Project and the Used Fuel Disposition Campaign, both under the US Department of Energy (DOE) Office of Nuclear Energy, require the ability to predict k{sub eff}, heat generation and temperature distributions, and external dose rates from any combination of commercial spent nuclear fuel assemblies loaded into any type of licensed cask. Work in the Reactor and Nuclear Systems Division at Oak Ridge National Laboratory has begun to develop the UNF-ST[and]DARDS system (Used Nuclear Fuel Storage, Transportation and Disposal Analysis Resource and Data System) that uses many of the nuclear analysis codes from the SCALE package, a comprehensive database of used nuclear fuel inventories from utilities, and a library of model template files to produce complete input files for the various types of UNF computational analyses. UNF-ST[and]DARDS uses the template files and input parameters that are applicable to a safety analysis to assemble and execute a complete input file, collect the output files and relevant information for subsequent calculations, and illustrate calculation results as a function of decay time and other relevant analysis parameters. This paper will focus on the shielding aspects and the ability to predict external dose rates from as-loaded casks. Realistic dose rate values based on actual canister fuel contents may be used in developing appropriate plans, procedures, and methods to keep personnel radiation exposures as low as reasonably achievable during cask repackaging and transportation operations, as well as in performing total system analyses and transportation risk evaluations. The MAVRIC shielding sequence of the SCALE package was created for the US Nuclear Regulatory Commission for analyzing dose rates outside of storage, transfer, or transportation casks loaded with spent nuclear fuel. MAVRIC contains automated variance reduction capabilities based on the CADIS and FW-CADIS methods that are effective for optimizing deep penetration Monte Carlo shielding problems for achieving low relative uncertainties in short computing times. MAVRIC uses the Denovo discrete ordinates code to compute importance maps and biased source terms for the Monaco fixed-source Monte Carlo code, which can use multi-group or continuous-energy cross section data. ORIGEN (Oak Ridge Isotope Generation and Depletion) is the SCALE computer code for calculating time-dependent isotopic concentrations during irradiation and decay for more than 2,200 nuclides that can be produced by nuclear fuel irradiation and activation. A series of SCALE enhancements was implemented to enable automatic decay heat and radiation source term generation and shielding safety analysis of as-loaded casks. The enhancements to SCALE made under this project will be a part of the SCALE 6.2 release expected in fall 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The Appalachian Basin Geoteam consists of geologists from the state geological surveys of Kentucky, Maryland, New York, Ohio, Pennsylvania, and West Virginia. Pennsylvania and West Virginia led the research related to enhanced recovery opportunities in oil and gas fields, while Kentucky led the work associated with enhanced gas recovery (EGR) opportunities in organic-rich shales. The Appalachian Basin Geoteam evaluated reservoirs amenable to CO2-EOR and EGR using a combination of data sources and technical approaches. The Geoteam characterized the subsurface geology of the area in stepwise fashion, starting with existing geologic maps and fields/pools data generated as part of previous MRCSP regional characterization research. With this data, the Geoteam correlated stratigraphy and generated cross sections to delineate the extent, depths and thicknesses of those formations that may serve as reservoirs for either miscible or immiscible enhanced recovery projects. In addition, the team prepared structure and isopach maps for prospective formations, as well as assessments of gross and net porosity of these units. Once prospective localities were identified, the Geoteam selected a short list of oil fields in each of the three states for assessment for case study preparation.

01 COAL, LIGNITE, AND PEAT↗

Streamlining analysis capabilities for SNF management - 15490

A comprehensive, integrated data and analysis tool-the Used Nuclear Fuel-Storage, Transportation and Disposal Analysis Resource and Data System (UNF-ST and DARDS) -is being developed for the US DOE Office of Nuclear Energy (DOE-NE) Nuclear Fuels Storage and Transportation Planning Project (NFST). The overarching goal of UNF-ST and DARDS is to provide a comprehensive controlled source of technical data integrated with key analysis capabilities to characterize inputs to the overall US waste management system from reactor power production through ultimate disposition. UNF-ST and DARDS seamlessly integrates a unified SNF system relational database and key analysis capabilities to simplify and automate the performance of accurate and efficient SNF related analyses to support numerous DOE waste management and fuel cycle activities. Hence, UNF-ST and DARDS enables decision making relative to design, safety, and licensing of SNF systems and facilities by providing the best information available. Automated analysis sequences have been deployed to characterize the discharge inventory and perform criticality, thermal, and dose analyses using time-dependent data. UNF-ST and DARDS provides cask-specific as-loaded safety analysis including criticality, thermal and dose evaluations, as well as results visualization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Core-Shell Oxidative Aromatization Catalysts for Single Step Liquefaction of Distributed Shale Gas (Final Technical Report)

The objective of this project was to design and demonstrate a core-shell structured multifunctional catalyst to convert the light (dry) components of shale gas into liquid aromatic compounds (primarily benzene and toluene) in a single step. Operated in a modular oxidative aromatization system (OAS) under a cyclic redox scheme, the novel catalyst and process can significantly improve the value and transportability of distributed shale gas. Since the project started, each quarter addressed a different set of tasks related to the completion of the milestone detailed in the project award. The yearly summaries of these tasks are summarized below: Q1-Q4: • Conducted project planning and literature search. • Investigated a number of SHC redox catalysts using thermogravimetric analysis and fixed-bed reactor experiments. • Initiated process modeling towards generating two process models for the methane DHA base case and OAS process. • Developed DHA catalysts capable of producing >500 g/kg-cat-hr aromatics at 80% or greater aromatics selectivity at 700°C. Q5-Q8: • Developed alternative approaches with sequential bed configurations to enhance the aromatic yields based on OCM+DHA • Improved the zeolite synthesis efficiency by using the microwave-assisted technique and investigated the synthesis conditions on the zeolite yield, crystalline structure and morphology • Constructed a set of Aspen Plus process models with significant energy savings for OAS as compared to the base case non-oxidative DHA. • Adapted conventional hydrothermal method to be applicable to the microwave synthesizer unit for more efficient catalyst synthesis. • Studied the structure of the OCM catalyst and the dispersion of the carbonate in the redox reactions and in methane flow with Raman Spectroscopy. Q9-Q12: • Scaled up the catalyst synthesis with the microwave synthesis method. Based on its performance, procedural characterizations and catalytic performance testing were further conducted for the new microwave synthesized catalysts with the newly-developed product analysis procedure. • Developed the reaction system setup for the C2-DHA or OCM+DHA reaction product and achieved a better product collection-analysis method for the aromatic products with an improved carbon balance. The product from the OCM reaction exhibited complicated effects on the DHA catalyst. • Conducted additional OCM catalyst characterization using Near Ambient Pressure X-ray Photoelectron Spectroscopy and in situ Raman characterization • Validated the significant energy savings for OAS as compared to the base case non-oxidative DHA. Successfully set up the simulation model for the OCM+DHA+SHC reaction system based on the updated experimental results from NCSU. Q13-End of project: • Synthesized new zeolite catalysts by the microwave method, conducted characterizations (XRD, SEM, and TEM) and catalytic behavior testing. • Explored the “wet” C 2 H 6 and C 2 H 4 DHA reactions with using steam co-feed. A subsequent reduction as the regeneration step can regenerate the DHA catalyst and recover 99% activity of the fresh performance. • Achieved a 15.3% single-pass aromatic yield from methane by rationally combining the OCM and DHA at different temperatures. • Conducted a 105-hour stability test with an improved regeneration procedure, with an average aromatic yield of 13.8%. • Developed new catalyst and achieved a record-high 23.2% yield.

03 NATURAL GAS↗

Analysis of travel logistics for transportation of used nuclear fuel in the continental United States - 15179

The US DOE Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that consider all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management strategy is the transportation of spent nuclear fuel to an away from reactor interim storage facility. Transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. chosen as hypothetical locations for a future interim storage facility were evaluated using Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of this evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses that include an interim storage facility, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing generic design alternatives for dry storage of used nuclear fuel at an interim storage facility - 15480

The Department of Energy (DOE) is beginning to lay the groundwork for implementing interim storage of used nuclear fuel (UNF) as recommended by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published on January 26, 2012. These plans include activities to 1) establish one or more Interim Storage Facilities (ISF) using consent-based siting, and 2) prepare for large-scale transport of UNF. The Administration released its Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy) on January 11, 2013. The Strategy includes a phased, adaptive, and consent-based approach to siting and implementing a comprehensive management and disposal system. The Strategy calls for an operational Pilot ISF by 2021, a Larger ISF by 2025, and a geological repository by 2048. The DOE Nuclear Fuels Storage and Transportation Planning Project (NFST) prepared a report in April 2013 titled, -A Project Concept for Nuclear Fuels Storage and Transportation.- This report developed the functions and requirements necessary for development of a Pilot and Larger ISF to meet the framework outlined in the Strategy as follows: - The UNF inventory is limited for the Pilot and Larger ISF as described in the Strategy. - It is assumed that bare fuel will be received in reusable transportation casks in significant quantities for the larger ISF and will not be solely limited to the receipt of fuel in dry storage canister (DSC) as is the Pilot ISF. This assumption was made because the method for accepting UNF from the utilities once the larger ISF begins operating has not yet been decided. - UNF storage alternative concepts identified in previous reports must be more fully developed to support alternative analysis. The purpose of this topic is to report on the development of the generic design alternatives that have been evaluated for the receipt and storage of the UNF at the initial Pilot ISF and Larger ISF. The generic design alternatives have been developed over the past few months by collaboration between the DOE and industry experts experienced in UNF facilities. The design alternatives will enable volunteer host communities to investigate generic design alternatives that could be fully developed for a site-specific location based on their unique design requirements. The design alternatives provide flexibility for additional capabilities to be developed and executed in a modular fashion such that expansion from a Pilot ISF to a Larger ISF could be achieved in an orderly manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An assessment of EIA system in India

Environmental impact assessment (EIA) was first introduced in India based on the Environmental Protection Act (EPA), 1986. But formally it came in to effect, when Ministry of Environment and Forest (MoEF) has passed a major legislative measure under EPA in January 1994 for Environmental Clearance (EC) known as EIA Notification, 1994. Subsequently, EIA processes have been strengthened by MoEF by a series of amendments. The current practice is adhering to EIA Notification, 2006 and its amendments. The pieces of evidence collected and analysis in the present assessment suggest that, despite a sound legislative, administrative and procedural set-up EIA has not yet evolved satisfactorily in India. An appraisal of the EIA system against systematic evaluation criteria, based on discussions with various stakeholders, EIA expert committee members, approval authorities, project proponents, NGOs and consulting professionals, reveals various drawbacks of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor quality EIA reports, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. While shortcomings are challenging, Government of India is showing a high degree of commitment. The EIA system in the country is undergoing progressive refinements by steadily removing the constraints. The paper identifies opportunities for taking advantage of the current circumstances for strengthening the EIA process. - Highlights: Black-Right-Pointing-Pointer An assessment has been carried out on Environmental Clearance under EIA Notification, 2006, MoEF, Government of India. Black-Right-Pointing-Pointer EIA system is appraised against systematic evaluation criteria proposed by Ahmad and Wood (2002), Wood (2003), Fuller (1999). Black-Right-Pointing-Pointer The analysis reveals reveals various drawbacks of the EIA system. Black-Right-Pointing-Pointer The paper identifies opportunities to enhance the effectiveness of the EIA system in India.

54 ENVIRONMENTAL SCIENCES↗

Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be improved.

54 ENVIRONMENTAL SCIENCES↗