Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Preparations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Final Report: Preparation and Evaluation of N-Type CdSeTe and CdTe as an Absorber in Thin Film PV

The primary objective of this project was to demonstrate n-type CdTe and CdSeTe films prepared by in-situ doping methods using pre-doped source material. Our goal was to achieve electron density (>10 17 cm -3 ) and lifetime (>10 ns) in n-type CdTe and CdSeTe films. The focus was on indium as the dopant, as it is suitable for incorporation during melt growth of CdTe. It was thought that indium doped bulk crystals might exhibit self compensation and high resistivity, so post-growth annealing studies were planned to manipulate crystal stoichiometry, defects and electrical activity. Single crystals of CdTe:In and CdSe 0.4 Te 0.6 :In, with target In concentration 10 19 cm -3 , were grown by the vertical Bridgman crystal growth method at Washington State University (WSU). Incorporation of the intended In into the crystals was ~25%-30%, (2.5-3) ×10 18 cm -3 , according to glow discharge mass spectrometry (GDMS). Carrier concentration in CdTe:In crystals were very low until after a Cd anneal, at which point the concentration reached 8 ×10 17 cm -3 (~27% activation) according to Hall effect and time resolved photoluminescence (TRPL). CdSeTe:In, on the other hand, had ~100% carrier activation with no post-growth treatments, resulting in ~3×10 18 cm -3 carriers with a lifetime of 1.5 ns, near the radiative limit for this material.

14 SOLAR ENERGY↗

Support CEED-enabled ECP applications in their preparation for Aurora/Frontier

The goal of this milestone was to help CEED-enabled ECP applications (particularly ExaSMR, MARBL, ExaAM, ExaWind and E3SM) in their preparations for the Aurora and Frontier architectures. This work included collaboration with ECP vendors and porting and optimization of CEED’s benchmarks and miniapps to early access hardware. As part of this milestone, we also made the best bake-off problems and bake-off kernel implementation from Nek, MFEM, libParanumal and the external community available in the latest libCEED release, libCEED-0.7. During the milestone period we also organized, in virtual form, the fourth CEED Annual meeting (CEED4AM) which included representatives from ECP applications, vendors and software technology projects. The specific tasks addressed in this milestone were to: (1) Work with vendors to port and run CEED benchmarks on early access systems for Aurora and Frontier; (2) Make the best BP/BK implementations from Nek, MFEM, libParanumal and external community available in libCEED; (3) Organize the next CEED Annual meeting (CEED4AM); and (4) Optimize CEED applications and miniapps for Aurora and Frontier architectures. The artifacts delivered include the next libCEED release, libCEED-0.7, and a number of developments integrated within applications to improve their GPU performance and capabilities. See the CEED website, http://ceed.exascaleproject.org and the CEED GitHub organization, http://github.com/ceed for more details.

97 MATHEMATICS AND COMPUTING↗

Characterization of Tank 9H Salt Dissolution Batch 2A in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Remediation (SRR) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The first batch of salt to make up Batch 2 (Batch 2A) has been dissolved in Tank 9H and will later be transferred to Tank 10H. Savannah River National Laboratory (SRNL) received samples from the batch of dissolved salt for characterization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lithium Ion Cathode Materials Prepared Using Glycerol as Solvent and Reactant

Two different types of cathode materials were prepared using glycerol as a solvent and reactant. The LiMn1/3Ni1/3Co1/3O2 layered oxide cathode material was successfully synthesized with a shorter time of heat treatment of 8hr at 900°C. An appreciated capacity retention of 83.7% after 100 cycles with an initial discharge capacity of 177.1 mAh/g at 0.1C (discharge rate) has been achieved. Another cathode material with the formula of Li1.2 Mn0.51Ni0.145+xCo0.145-xO2 (x=0 (LR2), 0.0725 (LR1)), as a Li-rich cathode material, has been also successfully synthesized using glycerol. It was shown that LR1 discharge capacity was increased from 185 to 213 mAh/g after 20 cycles and ended up with 194.9 mAh/g after 60 cycles at 0.1C (discharge rate). This material shows an exceptional discharge capacity retention, lower toxic cobalt component, and lower production cost comparing with other Li-rich cathode materials. Detailed results of powder material synthesis, characterization, and battery testing will be presented to demonstrate that glycerol as a green solvent in the synthesis of battery materials.

25 ENERGY STORAGE↗

Preparing Equal Superpositions of n Computational-Basis States

This document presents, tutorial-style, a sequence of quantum circuits for preparing 3-qubit quantum states that are superpositions of 2, 3, . . . , 8 computational-basis states. Each circuit is accompanied by a timeline illustration of the evolution of the state from |000> to the target state.

97 MATHEMATICS AND COMPUTING↗

14 MeV Irradiation and Analysis of a 93% 239 Pu Target in Preparation for a F2019 FY22 Pu Campaign

In this work, we present the irradiation of a 93% 239 Pu with 14 MeV neutrons and subsequent analysis of the fission and activation products. The fully assembled target, a Pu metal bead encapsulated in Al, further encapsulated in welded stainless steel, was analyzed 22 times over more than 100 days using gamma emission analysis (GEA). Using the results from these analyses, R-values and fission yields for fission products were determined. To prepare for the FY22 Pu irradiation using the GODIVA critical assembly at NCERC, the irradiated Pu target was disassembled, dissolved, and separated using chemistry provided by LANL collaborators. This chemical separation was intended to remove the Pu from solution with little to no effect on the remaining elements. The chemistry was assessed to try to determine possible routes of fractionation of the sample and the fission products. The separation process used was successful for the bulk of the analyzed fission and activation products, as well as the added radiotracers. The final dissolved solution and separated fractions were analyzed by GEA looking at the remaining fission, activation and radiotracers and thermal ionization mass spectrometry analysis looking at the Pu isotopics.

14MeV↗

Preparation & shipping of ten neutron irradiated Eurofer97 steel variants to HFIR for SANS experiments

At ORNL, ten variants of Eurofer97 steel were irradiated in the high flux isotope reactor (HFIR) to ~2.94 – 3.24 dpa at 300 ± 30 °C, as part of the EUROfusion Lot-IV collaboration. The irradiations were performed in non-instrumented rabbit capsules in the flux trap region, which included SS-J3 type tensile samples and M4-CVN multi-notch bend bars. Their full set of microstructure and mechanical properties were previously reported in multiple previous publications. In this project, half-broken irradiated and nonirradiated SS-J3 tensile samples from ten alloys, code-named H, I, J, K, L, M, N, O, P and E, were prepared and shipped for facilitating small angle neutron scattering (SANS) experiments at the HFIR general purpose (GP)-SANS beam line. This report summarizes the completed tasks which included canister moves at the Irradiated Materials Examination and Testing (IMET) hot-cell facility to retrieve the samples from long-term storage, loading of the ten irradiated samples at IMET inside lead (Pb) piglets that were specifically provided by ORNL for SANS experiments and radiological shipment from IMET facility to the HFIR hot cells for performing SANS experiments. In addition to the irradiated samples, ten nonirradiated half-broken pieces from the Eurofer97 variants were also provided to HFIR for SANS.

36 MATERIALS SCIENCE↗

Completion of IER 305: Molybdenum Sleeve Experiments and Preparations for Performing IER 441: Epithermal Tantalum Experiments [Slides]

This presentation includes a look into Sandia critical experiments including the 7uPCX, BUCCX, and assembly design. This presentation touches on the completion of IER 305 with CED-3b, CED-4a, and CED-4b. Finally, there are preparations to perform IER 441 including new hardware, critical configurations, and next steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Tutorial Set to Prepare for Science with the Vera C. Rubin Observatory

In this poster the Rubin Observatory's Community Science team (CST) presents its current suite of tutorials, which are designed to help people make use of simulated data sets in preparation for the upcoming Legacy Survey of Space and Time (LSST). We will show examples of the tutorial contents, provide custom learning modules for different astronomical fields, and describe the online environment for data analysis (the Rubin Science Platform; RSP). We will also supply a checklist for how to obtain an RSP account and access the tutorials. All are welcome to drop by the poster or the Rubin booth in the exhibit hall with questions.

79 ASTRONOMY AND ASTROPHYSICS↗

FY24 accomplishments in preparation for startup of Activated Materials Laboratory (AML)

The Activated Materials Laboratory (AML) will be a new radiological facility at the Advanced Photon Source (APS) in Argonne National Laboratory (ANL), adjacent to the high-energy x-ray microscopy (HEXM) beamline in the long beamline building (LBB) constructed under the APS-upgrade (APS-U) project. The AML is a centralized facility to facilitate the safe conduct of experiments on activated materials at the APS. This report provides an overview of the status of the AML as a Nuclear Science User Facilities (NSUF) partner user facility in preparation for the general user access in 2025 upon the commissioning of the APS-U beamlines. The AML's scope, functionality and components are detailed. The NSUF partner beamlines’ commissioning status in the post-APS-U era is provided, along with the AML’s operational updates and operational plan.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗

Development of Transformative Preparation Methods to Push up High Q&G Performance of FRIB Spare HWR Cryomodule Cavities

The FRIB accelerator project construction, a top priority of US nuclear science, was completed in January 2022, and is now moving to user operation. The stable and reliable operation of the accelerating cryomodules is essential in achieving/fulfilling DOE and user expectations. So far, FRIB cryomodules meet all FRIB specifications for cavity performance. However, during the lifetime of machine operation, degradation of cryomodule performance is possible, as reported in similar operating facilities (CEBAF, SNS). If cryomodule degradation is observed at FRIB, the under-performing cryomodule will require replacement/maintenance. In effort to manage operational reliability, FRIB plans to construct a 0.53 half-wave cryomodule to serve as an active spare. In a parallel effort, FRIB will also work toward increasing operational Q and gradient of spare cryomodule cavities to gain an overall performance margin to support future operational reliability. The current FRIB cavity designs have a potential to operate at gradients higher than 8 MV/m, but are currently limited by field emission (FE) and/or high field Q slope (HFQS); known issue in buffered chemical polished (BCP) treated cavities. The proposal looks to develop transformative surface preparation treatments to improve the operational gradient of spare cryomodules higher than 10 MV/m while maintaining high Q. Thus, increasing operational margin by 30 - 50%. With the goal to improve operational reliability set, the proposal will investigate multiple objectives as possible paths forward to achieve an overall increase in cavity performance and gain a better understanding of SRF limiting mechanisms. The proposal will study the application of different chemical surface treatments to 0.53 half-wave cavities, with the addition of low temperature bakes (LTB), and measure their effects on accelerating performance. Proposed chemical treatments to be explored in this proposal include conventional EP acid mixtures, as well as innovated EP and BCP acid mixtures designed to simplify processing paths in migrating FE and HFQS. The proposed transformative treatment wet N-doping also has the potential to replicate recent advancements in SRF technology relating to nitrogen doping and high Q operation without the requirement for an ultra-high vacuum annealing furnace; currently being developed at FNAL and JLAB. In parallel, high Q performance relating to flux trapping will be investigated with the installation of a second layer of magnetic shielding in the vertical test Dewar. The research objectives presented in the proposal, and their corresponding effects on cavity performance, will provide essential knowledge and future guidance to the SRF community and provide possible paths for future SRF based projects and applications.

43 PARTICLE ACCELERATORS↗

Preparation for DM searches with high Q SRF cavities

This work focuses on the preparatory for two dark matter searches based on high Q SRF cavities. In the context of the SERAPH experiment I participated to experimental work of characterizing the cavity at mK temperature and subsequently analyzed the data collected. For the SHADE experiment, I worked on the preparation of the data analysis starting from the collection of simulated data and built a flexible framework to analyze them. The goal of this report is to present my contribution to these two experiments that are being investigated at Fermilab by the Physics Sensing group at SQMS.

47 OTHER INSTRUMENTATION↗

Preparation and Qualification of Preproduction SSR2 Jacketed Cavities for PIP-II

The qualification of 325 MHz Single Spoke Resonators type 2 (SSR2) jacketed cavities to meet technical requirements represents a significant milestone in the development of the SSR2 cryomodules for the PIP-II Project at Fermilab. This poster reports the procedures and lessons learned in processing and preparing these cavities for horizontal cold testing prior to integration into a cavity string assembly, with a focus on addressing the field emission issues observed during the cold testing. A comprehensive root cause analysis identified critical fabrication, processing, and handling factors impacting field emission onset. New techniques were successfully developed and implemented to achieve field emission-free SSR2 cavities, and efforts were made to correlate radiation levels measured at the test stand with expected levels in the LINAC tunnel. Additionally, the evolution of field emission through assembly steps was thoroughly investigated, leading to a reassessment of design choices and enhancing our understanding of their effects on cavity performance.

Grassellino, L. [Fermilab]↗

ORNL Report for the Preparation and Verification of a U-233 Spike Solution

In response to a Letter Request from the International Atomic Energy Agency to the United States Support Program, the NNSA’s Nuclear Reference Material Program (NRMP) tasked the Material Signatures and Isotopic Standards (MSIS) group at Oak Ridge National Laboratory to prepare 50 units of a U-233 CRM standard with a unit size of approximately 10 µg of U-233.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhanced Preparation for Intelligent Cybermanufacturing Systems (EPICS)

Opportunities exist for realizing transformative advances in productivity and reductions in energy footprint through ubiquitous sensing in manufacturing environments. Enhanced Preparation for Intelligent Cybermanufacturing Systems (EPICS) is a 21-month (4 academic semesters, plus one summer) experience for graduate students that focuses on scaling the knowledge, understanding and leadership skills in the cyber manufacturing area. Masters students (8/year, 32 total) complete 2-year projects on industrially-driven project topics, rotating to internships in summer semester to work on scoping and implementation at project partners. Students complete academic training in embedded systems, process modeling, data science, and cloud-based systems design. Their projects are targeted toward sensor retrofit, process monitoring, root cause analysis, and sensor fusion.

Advanced Manufacturing↗