Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Practitioner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

The paradox of strategic environmental assessment

Strategic Environmental Assessment (SEA) is a tool that can facilitate sustainable development and improve decision-making by introducing environmental concern early in planning processes. However, various international studies conclude that current planning practice is not taking full advantage of the tool, and we therefore define the paradox of SEA as the methodological ambiguity of non-strategic SEA. This article explores causality through at three-step case study on aggregates extraction planning in Denmark, which consists of a document analysis; a questionnaire survey and follow-up communication with key planners. Though the environmental reports on one hand largely lack strategic considerations, practitioners express an inherent will for strategy and reveal that their SEAs in fact have been an integrated part of the planning process. Institutional context is found to be the most significant barrier for a strategy and this suggests that non-strategic planning setups can prove more important than non-strategic planning in SEA practice. Planners may try to execute strategy within the confinements of SEA-restricted planning contexts; however, such efforts can be overlooked if evaluated by a narrow criterion for strategy formation. Consequently, the paradox may also spark from challenged documentation. These findings contribute to the common understanding of SEA quality; however, further research is needed on how to communicate and influence the strategic options which arguably remain inside non-strategic planning realities. - Highlights: • International studies conclude that SEAs are not strategic. = The paradox of SEA. • Even on the highest managerial level, some contexts do not leave room for strategy. • Non-strategic SEA can derive from challenged documentation. • Descriptive and emergent strategy formation can, in practice, be deemed non-strategic.

54 ENVIRONMENTAL SCIENCES↗

Theory versus practice in Strategic Environmental Assessment (SEA)

Could the theory of Strategic Environmental Assessment (SEA) be ahead of its time and decoupled from its practice? This paper evolved in search for this leading research question. Over the years the discourse on SEA experienced a gradual shift from the technocratic and rationalist thinking that supported its origin to more strategic approaches and integrated concepts, suggested since the mid 1990's. In this paper we share the results of our analysis of international thinking and practical experience with SEA. Results reveal that SEA practice changes very slowly when compared to advanced thinking supporting the noted shift. Current SEA practice shows to be still predominantly rooted in the logic of projects' environmental impact assessment (EIA). It is strongly bound to legal and regulatory requirements, and the motivation for its application persists being the delivery of environmental (or final) reports to meet legal obligations. Even though advanced SEA theoretical thinking claim its potential to help decisions to look forward, change mind-sets and the rationale of decision-making to meet sustainability challenges and enhance societal values, we note a weak relationship between the theoretical development of SEA and its practice. Why is this happening? Which factors explain this apparent inertia, resistance to change, in the SEA practice? Results appear to demonstrate the influence of assumptions, understandings, concepts, and beliefs in the use of SEA, which in turn suggest the political sensitivity of the instrument. - Highlights: • Theoretical thinking in SEA is ahead of its time. • SEA international practice reveals inertia to move out of project’ EIA comfort zone. • World current SEA practice show similar understandings of 30 years ago. • 100 world reports and survey of practitioners supported world review. • SEA great challenge is to change paradigms into new scientific complexity theories.

54 ENVIRONMENTAL SCIENCES↗

Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

54 ENVIRONMENTAL SCIENCES↗

Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools. - Highlights: • We assessed the effectiveness of Environmental Management Plans (EMPs) for major developments, focusing on delivery of mitigation and monitoring. • EIA and Environmental Management Systems (EMS) post-consent are weakly linked. • The use of EMPs varies significantly in practise, partly due to the range of terminology used. • Linkages are hampered by poor communication and follow-up • More detailed guidance on how EMPs can successfully link with EMS is required.

54 ENVIRONMENTAL SCIENCES↗

Consideration of climate change on environmental impact assessment in Spain

Most of the projects subject to environmental impact assessment (EIA) are closely related to climate change, as they contribute to or are affected by it. The growing certainty about climate change and its impacts makes its consideration an essential part of the EIA process, as well as in strategic environmental assessment (SEA). This paper examines how climate change (CC) has been taken into account in EIA in Spain through the analysis of 1713 environmental records of decision (RODs) of projects submitted for EIA. In 2013 Spain approved one of the most advanced laws in terms of CC consideration in environmental assessment, although it had not yet accumulated extensive practice on the issue. This contrasts with the situation of countries like Canada or the USA, which have a significant body of experience without specific legal requirements. Only 14% of the RODs analysed included references to CC, and in more than half of the cases it was a mere citation. Thermal power plants, which are subject to specific GHG regulations, show the highest consideration, while transport infrastructures, which are important contributors to CC, show a very low consideration. Almost all the references are related to their contribution to CC, while consideration of the effects of CC is minimal. The increasingly common incorporation of CC into SEA, should not imply its exclusion from EIA, because both processes have different aims and uses. Including the obligation to consider CC in the EIA regulations is highly desirable, but probably not enough without other measures, such as practical guidance, training and motivational programmes for practitioners and evaluators. But even these actions cannot ensure effective and adequate assessments of CC. Probably more resources should be spent on creating greater awareness in all the agents involved in EIA. - Highlights: • We analyse how the climate change is considered in EIA in Spain. • Few projects seriously assess climate change. • Transport infrastructure projects barely consider climate change. • Assessing climate change in SEA should not imply that it is excluded from EIA.

54 ENVIRONMENTAL SCIENCES↗

Cumulative effects in strategic environmental assessment: The influence of plan boundaries

Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

54 ENVIRONMENTAL SCIENCES↗

A knowledge brokerage approach for assessing the impacts of the setting up young farmers policy measure in Greece

This study explores Knowledge Brokerage (KB) aspects of an ex-post Impact Assessment (IA) for the Rural Development Programme (RDP) measure of setting up young farmers, under the Common Agricultural Policy (CAP), at the regional level in Northern Greece. The measure supports the entry of young farmers in agriculture by moving land from older to younger farmers. The aim of the study was to test a set of KB tools for improving the interaction between researchers and policy makers. Our analysis mainly focused on a suite of IA Support Modules to guide practitioners, and on a technical tool kit, a web-based contextualisation platform, to support the IA of the specific test case. Offering a structured approach towards IA, both the Support Modules and LIAISE-KIT allow framing the context, organisation, scheduling and method selection in the light of KB objectives. The evaluation of how IA Support Modules influence the Science Policy Interface (SPI), in the case of the ex-post assessment, demonstrated the high relevance of KB activities for facilitating the interaction between researchers and regional policy makers. The assessment bridges the gap between knowledge producers developing scientific output to be applied in a specific context, and knowledge users, who want clear messages regarding the policy challenges they face. Other conclusions include the need for specific guidelines and training for knowledge users, especially with regard to the use of tools. According to our findings, a consequent application of KB activities is a crucial pre-condition for successfully implementing IAs in future RDP measures.

54 ENVIRONMENTAL SCIENCES↗

Conceptualizing strategic environmental assessment: Principles, approaches and research directions

Increasing emphasis has been placed in recent years on transitioning strategic environmental assessment (SEA) away from its environmental impact assessment (EIA) roots. Scholars have argued the need to conceptualize SEA as a process designed to facilitate strategic thinking, thus enabling transitions toward sustainability. The practice of SEA, however, remains deeply rooted in the EIA tradition and scholars and practitioners often appear divided on the nature and purpose of SEA. This paper revisits the strategic principles of SEA and conceptualizes SEA as a multi-faceted and multi-dimensional assessment process. It is suggested that SEA can be conceptualized as series of approaches operating along a spectrum from less to more strategic – from impact assessment-based to strategy-based – with each approach to SEA differentiated by the specific objectives of SEA application and the extent to which strategic principles are reflected in its design and implementation. Advancing the effectiveness of SEA requires a continued research agenda focused on improving the traditional SEA approach, as a tool to assess the impacts of policies, plans and programs (PPPs). Realizing the full potential of SEA, however, requires a new research agenda — one focused on the development and testing of a deliberative governance approach to SEA that can facilitate strategic innovations in PPP formulation and drive transitions in short-term policy and initiatives based on longer-term thinking. - Highlights: • SEA facilitates strategic thinking, enabling transitions toward sustainability. • SEA is conceptualized as a spectrum of approaches, from IA-based to strategy-based. • Each approach variably emphasizes strategic principles in its design and practice. • There is no one conceptualization of SEA that is best, SEA is fit for PPP purpose. • Research is needed to advance SEA to facilitate strategic PPP transformations.

54 ENVIRONMENTAL SCIENCES↗

System dynamic simulation: A new method in social impact assessment (SIA)

Many complex social questions are difficult to address adequately with conventional methods and techniques, due to the complicated dynamics, and hard to quantify social processes. Despite these difficulties researchers and practitioners have attempted to use conventional methods not only in evaluative modes but also in predictive modes to inform decision making. The effectiveness of SIAs would be increased if they were used to support the project design processes. This requires deliberate use of lessons from retrospective assessments to inform predictive assessments. Social simulations may be a useful tool for developing a predictive SIA method. There have been limited attempts to develop computer simulations that allow social impacts to be explored and understood before implementing development projects. In light of this argument, this paper aims to introduce system dynamic (SD) simulation as a new predictive SIA method in large development projects. We propose the potential value of the SD approach to simulate social impacts of development projects. We use data from the SIA of Gareh-Bygone floodwater spreading project to illustrate the potential of SD simulation in SIA. It was concluded that in comparison to traditional SIA methods SD simulation can integrate quantitative and qualitative inputs from different sources and methods and provides a more effective and dynamic assessment of social impacts for development projects. We recommend future research to investigate the full potential of SD in SIA in comparing different situations and scenarios.

54 ENVIRONMENTAL SCIENCES↗

Health impact assessment in Latin American countries: Current practice and prospects

Background: With the objective to avoid and mitigate potential adverse health impacts of projects, programmes and policies, health impact assessment (HIA) offers an opportunity for disease prevention and health promotion. Although HIA has gained importance over the past two decades, it is unclear whether and to what extent HIA practice has been established and institutionalised in Latin America. To address this issue, the current practice and prospects of HIA in Latin America was assessed in the peer-reviewed literature and existing guidelines. Methodology: The peer-reviewed literature was systematically searched using five electronic databases until February 2016. Studies were included on a set of pre-defined criteria. The search was carried out in English, French, Portuguese and Spanish. Additionally, a search for HIA guidelines used in Latin American countries and territories was performed by means of a Google search and on websites of government departments and institutions that may promote HIA. Results: The search yielded 167 hits in the peer-reviewed literature of which 17 articles met inclusion criteria. Only four peer-reviewed articles described prospective HIAs and four featured a discussion of the HIA approach. The remaining nine articles presented health impact evaluations. Most studies were published only recently, after 2012 (88%). Seven HIA guideline documents were identified, two of which were country-specific (i.e. Brazil and Mexico) and the remaining five addressed HIA at the regional level. Conclusions: This study confirmed the paucity of literature pertaining to HIA implementation, as well as HIA guidelines in Latin America. Mexico, Brazil and Cuba have the longest track record in scientific literature and guidelines on HIA. In order to better understand current barriers and limitations to practice and institutionalisation of HIA in Latin American countries, a broad discussion among policy makers, academic institutions and HIA practitioners is warranted nationally and regionally. - Highlights: •We conducted a systematic review pertaining to HIA and a search for guidelines on HIA in use in Latin America. •We identified 17 peer-reviewed articles, four of which were prospective HIAs. •Seven HIA guideline documents were identified, with two country-specific pieces. •There is a paucity of HIA articles in the peer-reviewed literature and guidelines in Latin America, but the situation is improving.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Confronting barriers and recognizing opportunities: Developing effective community-based environmental monitoring programs to meet the needs of Aboriginal communities

Aboriginal communities can be negatively affected by resource development, but often they do not have a full opportunity to participate in project review and the resulting monitoring and mitigation activities. Cumulative impacts of resource development are also typically neglected in monitoring protocols that focus on a limited number of environmental values, rather than adopting a long-term, holistic view of development over time and space. Community-based environmental monitoring (CBEM) is emerging as a way to meaningfully include local Aboriginal citizens in the decision-making process as well as the assessment of the long-term impacts of the development of natural resources. We explored opportunities and barriers for developing CBEM programs that meet the needs of small and rural Aboriginal communities that are faced with the rapid and wide-spread development of natural resources. We conducted interviews with a local Aboriginal community, and natural resource management practitioners who could provide perspectives on the application of CBEM to resource management in north-central British Columbia, Canada. Results demonstrate that CBEM offers a locally adapted and culturally appropriate approach to facilitate the participation of Aboriginal communities in natural resource decision making and management. The interpretation of the specific role and purpose of CBEM differed among participants, depending on their objectives for and concerns about natural resource development. However, all parties were consistent in viewing CBEM as an effective method for engaging in dialogue, cooperation, and tracking environmental change. The development or improvement of CBEM programs should consider the efficacy of monitoring protocols, social cohesion and relationships, ability to inform decision-making, and effectiveness of CBEM for the members of the community. - Highlights: • We explored how to develop effective CBEM with a focus on Aboriginal communities. • We identified opportunities and barriers for developing CBEM programs. • CBEM can facilitate Aboriginal community participation in natural resource management.

54 ENVIRONMENTAL SCIENCES↗

Use of significance thresholds to integrate cumulative effects into project-level socio-economic impact assessment in Canada

A longstanding critique of project-level environmental assessment is that it is weak at addressing cumulative effects, and because of this many argue that cumulative effects are best managed at a regional scale. However, in the absence of regional management it is important that project-level assessment supports cumulative effects management as best as possible. In this paper we present case study socio-economic impact assessments of liquefied natural gas development on Aboriginal groups on Canada's west coast. The case studies use an analytical structure modified from typical Canadian practice including unambiguous and non-arbitrary significance thresholds grounded in stakeholder values to focus baselines, impact assessment, and significance determination on cumulative effects. This approach is found to be more capable of informing decision-makers on cumulative effects as well as more rigorous and transparent than typical assessments. Much of this approach is not conceptually new, but at least in western Canada such an approach is not typically used or meaningfully implemented by practitioners. As such, the case studies serve to illustrate how practice can bolster project-level assessment. - Highlights: •Typical project assessment is weak with respect to cumulative effects. •Modified analysis structure and thresholds enable a focus on cumulative effects. •Clear, value-based thresholds make analysis rigorous, transparent, and democratic.

03 NATURAL GAS↗

Digital archives, big data and image-based culturomics for social impact assessment: Opportunities and challenges

Social impact assessment (SIA) is well-established but uses conventional approaches that have become less effective in recent decades, particularly in relation to declining survey response rates and a lack of youth engagement. Images from digital archives and social media sources are poised to advance the research and practice of SIA by transcending text-based methods with insights into changing landscapes, and human engagement with them. This viewpoint describes progress, challenges and cautions toward the development of such tools (defined as culturomics), using hydroelectricity cases to illustrate potential approaches. These tools build on foundational work in a range of disciplines, including the humanities and computer science. We describe necessary advances in machine learning, image digitization, and data aggregation and visualization techniques, as well as ways to ensure that such tools are carefully tested, applied and interpreted. Challenges include the automation, acquisition and management of datasets, and using these tools appropriately and equitably. Critically, culturomics of any kind must not be used as a replacement for engagement with people, but as complementary to inclusive stakeholder engagement. - Highlights: •Image-based digital archives and social media present opportunities for new SIA tools. •Application-ready big data approaches are emerging across many fields. •SIA scholars, practitioners and stakeholders should engage with culturomics. •Challenges include automation, digitization, interpretation and justice. •Culturomics of any kind must not replace engagement with people.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Seven good practices for the environmental licensing of coastal interventions: Lessons from the Italian, Cuban, Spanish and Colombian regulatory frameworks and insights on coastal processes

Highlights: • Environmental licensing procedures (ELP) line up by projects instead of environments. • The ELP of four countries was compared according to the generic EIA stages. • The study relies upon the revision of EIA legislation and technical guidelines. • Seven EIA good practices were extracted from the ELP analysis of the four countries. • A changing approach is proposed for the EPL performance on coastal interventions. - Abstract: Environmental licensing is the regulatory procedure that enforces the environmental impact assessment (EIA) of human activities inside a given country. Despite worldwide acceptance of EIA as a valid tool, its application in coastal environments is still too diverse and limited regarding the specificity of the natural processes influencing the shore. This paper compares the Environmental Licensing Procedure (ELP) of four countries, focusing on the activities that could affect the coastal geomorphology. The acquisition and validation of information were done through interviews with EIA representatives in each country, who signalized the official documents of environmental licensing and coastal management to be considered in the documentary review. The results present those differences and similarities among ELP stages in each country, based on the principles of the International Association of Impact Assessment and the national documents analyzed. In sum, 59 interventions associated with human uses and activities in the coastal zone were compared according to the prescriptive character of the environmental licensing in Italy, Spain, Cuba and Colombia. The natural processes influencing coastal geomorphology were also analyzed within the technical criteria included in the official guidelines for the EIA, finding a generalized weakness in processes associated with geochemical courses on coastal environments. By way of discussion, seven good practices are illustrated, according to their pertinence to the impact assessment of the coastal zone: 1) The integration of screening and scoping; 2) Evaluation focusing on the environment rather than the intervention; 3) Binding the coastal zone delimitation; 4) Institutional articulation; 5) Accreditation of environmental consultancies; 6) Official guidelines by types of environment; 7) The integration of environmental geographic information. Finally, general conclusions to assist EIA practitioners operating in the four countries and recommendations to lead further research are provided, introducing a novel process-oriented approach for ELP.

54 ENVIRONMENTAL SCIENCES↗

A framework for monitoring-based commissioning: Identifying variables that act as barriers and enablers to the process

The practice of monitoring-based commissioning (MBCx) using energy management and information systems (EMIS) has been shown to enable and help sustain up to 20% energy savings in buildings. Despite research that has quantified the costs, benefits, and energy savings of MBCx, the process remains under-utilized. To understand why MBCx is not more frequently adopted and how to encourage its use, this research synthesizes qualitative data from over 40 organizations, currently engaging in MBCx. The outcome of this research is a framework containing variables that emerged from the qualitative data, marked as barriers or enablers, organized by phases of the MBCx process. The framework is comprised of 51 emergent variables that fall within 13 different categories. The variables that most frequently act as barriers are data configuration, measurement & verification (M&V), developing specifications for EMIS, and data architecture. Although some variables that act as barriers for one organization were identified as enablers for another. For example, payback/ROI was considered a barrier 7 times and an enabler 3 times. One organization had difficulty making the business case for the initial investment for MBCx due to lack of cost information, while another was able to justify large investments with documented savings of previously implemented measures identified through MBCx. The framework formally validates barriers found in previous research, and can be used by practitioners to better understand common experiences with MBCx. This research also highlights the need for a similar collective data set to validate common enablers to MBCx and also the need for empirical research to determine relationships between variables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Role of Sensitivity Analysis in the Building Performance Analysis: A Critical Review

A building system is highly nonlinear and commonly includes a variety of parameters ranging from the architectural design to the building mechanical and energy system. Serving as a powerful tool to understand the complicated building system, sensitivity analysis (SA) has been receiving increasing attention in the recent decade. This review paper focused on the application of SA in the building performance analysis (BPA). First, the existing review papers on the application of SA for BPA were briefly reviewed and summarized. Then, a large amount of recent SA case studies in BPA were reviewed. The critical information regarding the implementation of a SA, such as the sampling method, the SA method, etc., were extracted and summarized. Next, an extensive analysis was performed to evaluate the role of the SA in the BPA. This includes: 1) The typical selection of the input and output parameters for the SA were visualized; 2) The uncertainty level and sampling strategies for the input parameters were investigated; 3) The principles, benefits, and drawbacks of the SA methods were analyzed and summarized; and 4) The various tools used in the SA, including the simulation software, sampling tools, and SA tools were introduced to facilitate the practitioners. Lastly, several conclusions were summarized on the role of the SA in the BPA. Suggestions were also provided to offer practical solutions to the current challenges.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An open control sequence specification to scale building demand flexibility via analytics software

For over two decades, researchers and practitioners have showcased the ability of large commercial buildings to provide grid services by shedding or shifting load. Various utility demand response (DR) and virtual power plant (VPP) programs throughout the United States are presently utilizing these demand-side resources. However, growth of these programs have been limited, in part due to the high cost necessary to integrate the DR control strategies into the building automation system (BAS). Implementing these strategies involves adjusting control sequences, necessitating dozens of hours of customized programming per building, limiting their adoption to large organizations and progressive owners. Recent efforts by researchers and industry have demonstrated the capability of energy management and information systems (EMIS), originally designed for fault detection and diagnostics, to interface with existing BAS and perform supervisory control to optimize building operations. While these approaches are quickly being adopted by industry, demand flexibility (DF) control strategies remain limited in product offerings. One of the challenges is the lack of documented best-practice DF sequences, despite the rich literature on field implementations. This paper develops a new open-specification for a zone-based temperature adjustment shed strategy for commercial building HVAC systems, describing the specification’s implementation in two EMIS tools in both experimental and field settings. Both implementations successfully reduced electric load by at least 40% on average during the called event, while maintaining temperature limits. This study’s detailed process from specification to deployment shows the potential for scalability as well as highlights challenges related to integration with heterogeneous BAS products.

Granderson, Jessica↗

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗