Endurance test of helium circulator for HTR-PM - 18531
High-temperature Gas-cooled Reactor Pebble-bed Module (HTR-PM) will be built as the world's first pebble-bed type modular HTGR commercial demonstration plant according to Chinese National science and technology program. HTR-PM will be expected to begin generating electricity in the end of 2017 in Shidao bay of China. Helium circulator is one of critical component of HTR-PM, which circulates reactor coolant through the reactor core and steam generators. The helium circulator was designed to be a vertical layout and its rotor was supported by active magnet bearings (AMBs). The whole circulator including motor and cooler was sealed in a pressure vessel. Since it is a large mechanical and electrical equipment and the design is totally advanced integrated with many new technologies, experiment study of helium circulator would be significant for safe and reliable operation of HTR-PM plant in the future. For the lack of engineering experience of this equipment, it was necessary to manufacture a prototype for tests. Meanwhile, Engineering Test Facility- Helium Circulator. ETF-HC was built in Institute of Nuclear and New Energy Technology (INET) for the tests. The prototype is completely same as the real machine for the plant. After prototype fabrication, nitrogen test was firstly conducted in the factory by the manufacturer, designer and users. After successful factory test, the prototype was delivered to INET to be tested in ETF-HC. Although nitrogen simulation test had been completed successfully, helium endurance test has been continually carried out in ETF-HC for one and half years because of several sealing problems caused by helium. After solving all kinds of problem in the field, helium circulator run continuously 50 hours under rated condition. Furthermore, 50 service cycles test was conducted in ETF-HC. More than 500 operation hours was accumulated during endurance test. Throughout the final performance test, a conclusion can be made that the helium circulator performance met the design requirements and its feasibility, availability and reliability was verified. (authors)